CN215217615U - On-spot sighting rod is used in building engineering management - Google Patents

On-spot sighting rod is used in building engineering management Download PDF

Info

Publication number
CN215217615U
CN215217615U CN202121360827.5U CN202121360827U CN215217615U CN 215217615 U CN215217615 U CN 215217615U CN 202121360827 U CN202121360827 U CN 202121360827U CN 215217615 U CN215217615 U CN 215217615U
Authority
CN
China
Prior art keywords
construction
sighting rod
mounting
personnel
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121360827.5U
Other languages
Chinese (zh)
Inventor
胡超莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121360827.5U priority Critical patent/CN215217615U/en
Application granted granted Critical
Publication of CN215217615U publication Critical patent/CN215217615U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building engineering management is with on-spot sighting rod relates to building engineering management is with on-spot sighting rod equipment technical field, specifically is an on-spot sighting rod for building engineering management, including a construction section of thick bamboo, the inside swing joint of a construction section of thick bamboo has the construction connection base that can reciprocate. This a field sighting rod is used in building engineering management, make personnel can utilize the sole to step on and press the mounting panel when using, use this to exert the pressure point for the installation and insert ground with the installation head, later take out first sighting rod from the inside of a construction section of thick bamboo, it is fixed to wait to take out construction connection base behind the suitable position, later take out the second sighting rod from the top of first sighting rod again, in order to increase the overall length of this sighting rod, when the personnel do not get into some regions when needing to be warned, can open construction battery lamp, utilize it to warn personnel and keep away from the isolation region. The marker post is convenient for carrying and installing of personnel, can warn the personnel and prevent the personnel from entering certain specific areas by mistake.

Description

On-spot sighting rod is used in building engineering management
Technical Field
The utility model relates to a building engineering management specifically is a building engineering management is with on-the-spot sighting rod equipment technical field.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. In the building engineering management, a marker post is a construction tool which is commonly used in a construction site.
And the disclosed on-spot sighting rod for building engineering management of chinese patent CN 211552856U, this sighting rod passes through the movable plate and avoids the staff to skid when using power for the staff is more convenient when gripping, and after the use, accomodates the movable plate to accomodating inslot portion, rethread gag lever post fix can, avoid the movable plate to influence the normal use of sighting rod main part, protect the conical block through the protection casing, avoid the conical block to collide the foreign object when removing. Although this patent has the effect of protecting the cone blocks and preventing people from slipping during installation, it has the following disadvantages:
at present, the existing site marker post for building engineering management mostly has no good force application point so that personnel can insert the bottom of the site marker post into the ground, and the site marker post has single function and poor practicability.
Therefore, it is urgently needed to design a multifunctional field post for building engineering management, which is convenient for personnel to install when in use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering management is with on-spot sighting rod has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides an on-spot sighting rod is used in building engineering management, includes a construction section of thick bamboo, the inside swing joint of a construction section of thick bamboo has the construction connection base that can reciprocate, the first sighting rod of top fixedly connected with of base is connected in the construction, the equal fixedly connected with construction warning board all around of base upper surface is connected in the construction, the screw thread mounting hole has been seted up at the top of construction warning board, the inside threaded connection of screw thread mounting hole has the screw thread installation pipe, the top fixedly connected with warning light head plate of screw thread installation pipe, one side of warning light head plate is provided with the construction battery lamp, the rotation screw hole has been seted up at the top of first sighting rod, the inside threaded connection who rotates the screw hole has the second sighting rod that can reciprocate, the positive bottom fixedly connected with mounting panel of a construction section of thick bamboo.
Optionally, the construction barrel and the left and right sides of the construction connection base are both provided with installation fixing holes, and installation fixing bolts for fixing the construction connection base penetrate through the installation fixing holes.
Optionally, the inside of construction battery lamp plate is provided with the battery, the positive swing joint of a construction section of thick bamboo has the handle connecting block, the board is held to one side fixedly connected with hand of handle connecting block.
Optionally, the number of the handle connecting blocks is two, and two handle mounting holes are formed in the surfaces of the handle connecting blocks and the construction cylinder.
Optionally, a handle mounting bolt for fixing the handle connecting block penetrates through the inside of the handle mounting hole.
Optionally, the four corners of the lower surface of the construction cylinder are fixedly connected with mounting heads, and anti-treading anti-skidding lines are arranged on the surface of the mounting plate.
(III) advantageous effects
The utility model provides a building engineering management is with on-spot sighting rod possesses following beneficial effect:
this a building engineering management is with on-spot sighting rod, through a construction section of thick bamboo, the mounting panel, construction connection base, the setting of construction battery lamp and second sighting rod, make personnel can place this sighting rod subaerial when using, later personnel can utilize the sole to step on and press the mounting panel, use this to insert ground for installation pressure point, later take out first sighting rod from the inside of a construction section of thick bamboo, it is fixed to connect the base after waiting to take out suitable position, later take out the top of second sighting rod from first sighting rod again, with the whole length that increases this sighting rod, when needs warning personnel do not get into some regions, can open construction battery lamp, utilize it to warn personnel and keep away from the isolation region, only need close construction battery lamp after finishing using, put back first sighting rod and second sighting rod in a construction section of thick bamboo, and pull out the installation head can. Therefore, the marker post is convenient for carrying and installing of personnel, and can warn the personnel and prevent the personnel from entering certain specific areas by mistake.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure of FIG. 1;
FIG. 3 is a schematic structural view of the construction warning board of the present invention;
fig. 4 is a schematic structural view of the construction cylinder of the present invention.
In the figure: 1. a construction cylinder; 2. constructing a connecting base; 3. a first marker post; 4. constructing a warning board; 5. a threaded mounting hole; 6. installing a pipe in a threaded manner; 7. a warning lamp head plate; 8. constructing a storage battery lamp; 9. a second marker post; 10. mounting a plate; 11. a handle connecting block; 12. a hand-held board; 13. a handle mounting hole; 14. a handle mounting bolt; 15. and (5) mounting the head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a field mark post for building engineering management comprises a construction cylinder 1, wherein the inside of the construction cylinder 1 is movably connected with a construction connection base 2 which can move up and down;
in order to facilitate the use of the first marker post by a worker, the construction connection base 2 is arranged, so that the worker can pull up the first marker post 3 after fixing the marker post on the ground, the first marker post 3 drives the construction connection base 2 to move upwards together when moving upwards, the construction connection base 2 is fixed by using a mounting and fixing bolt after moving to a proper height, and the first marker post 3 is fixed at a proper position;
the installation fixed orifices has all been seted up with the left and right sides that the base 2 was connected in the construction to a construction section of thick bamboo 1, the inside of installation fixed orifices runs through there is the installation fixing bolt who is used for fixed construction to connect base 2, the first sighting rod 3 of top fixedly connected with of base 2 is connected in the construction, the equal fixedly connected with construction warning board 4 all around of base 2 upper surface is connected in the construction, threaded mounting hole 5 has been seted up at the top of construction warning board 4, the inside threaded connection of threaded mounting hole 5 has threaded mounting pipe 6, the top fixedly connected with warning light head plate 7 of threaded mounting pipe 6, one side of warning light head plate 7 is provided with construction battery lamp 8, the inside of construction battery lamp plate 8 is provided with the battery, the positive swing joint of a construction section of thick bamboo 1 has handle connecting block 11, the quantity of handle connecting block 11 is two, handle mounting hole 13 has all been seted up on two handle connecting block 11 and the surface of a construction section of thick bamboo 1. The inside of handle mounting hole 13 runs through there is the handle construction bolt 14 that is used for fixed handle connecting block 11, board 12 is taken by one side fixedly connected with hand of handle connecting block 11, the rotation screw hole has been seted up at the top of first mark board 3, the inside threaded connection who rotates the screw hole has the second sighting rod 9 that can reciprocate, the positive bottom fixedly connected with mounting panel 10 of a construction section of thick bamboo 1, the equal fixedly connected with installation head 15 in four corners department of a construction section of thick bamboo 1 lower surface, the surface of mounting panel 10 is provided with anti-skidding line of stepping on.
The utility model discloses in, the device's working procedure as follows:
personnel can place this sighting rod subaerial when using, later personnel can utilize the sole to step on and press mounting panel 10, use this to insert ground with installation head 15 for installation point of exerting pressure, later take out first sighting rod 3 from the inside of construction section of thick bamboo 1, it is fixed to wait to take out construction connection base 2 behind the suitable position, later take out second sighting rod 9 from the top of first sighting rod 3 again, in order to increase the whole length of this sighting rod, when needs warning personnel do not get into some regions, can open construction battery lamp 8, utilize it to warn personnel and keep away from the isolation region, only need close construction battery lamp 8 after finishing using, put back construction section of thick bamboo 1 with first sighting rod 3 and second sighting rod 9, and it can to extract installation head 15.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building engineering management is with on-spot sighting rod, includes a construction section of thick bamboo (1), its characterized in that: the interior of the construction cylinder (1) is movably connected with a construction connection base (2) which can move up and down, the top of the construction connecting base (2) is fixedly connected with a first marker post (3), construction warning plates (4) are fixedly connected around the upper surface of the construction connection base (2), the top of the construction warning board (4) is provided with a threaded mounting hole (5), the inner thread of the threaded mounting hole (5) is connected with a threaded mounting pipe (6), the top of the threaded mounting pipe (6) is fixedly connected with a warning lamp head plate (7), a construction storage battery lamp (8) is arranged on one side of the warning lamp head plate (7), a rotary threaded hole is formed in the top of the first marker post (3), a second marker post (9) capable of moving up and down is connected with the inner thread of the rotary threaded hole, the bottom of the front surface of the construction cylinder (1) is fixedly connected with a mounting plate (10).
2. The construction work management field pole of claim 1, wherein: the construction barrel (1) and the construction connection base (2) are provided with mounting and fixing holes at the left side and the right side, and mounting and fixing bolts for fixing the construction connection base (2) penetrate through the mounting and fixing holes.
3. The construction work management field pole of claim 1, wherein: the inside of construction battery lamp (8) is provided with the battery, the front swing joint of a construction section of thick bamboo (1) has handle connecting block (11), board (12) are held to one side fixedly connected with of handle connecting block (11).
4. The site pole for construction engineering management according to claim 3, wherein: the number of the handle connecting blocks (11) is two, and the handle connecting blocks (11) and the surface of the construction cylinder (1) are provided with handle mounting holes (13).
5. The construction work management field pole of claim 4, wherein: and a handle mounting bolt (14) for fixing the handle connecting block (11) penetrates through the inside of the handle mounting hole (13).
6. The construction work management field pole of claim 1, wherein: all fixedly connected with installation head (15) in the four corners department of construction section of thick bamboo (1) lower surface, the surface of mounting panel (10) is provided with anti-skidding line of stepping on.
CN202121360827.5U 2021-06-18 2021-06-18 On-spot sighting rod is used in building engineering management Active CN215217615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121360827.5U CN215217615U (en) 2021-06-18 2021-06-18 On-spot sighting rod is used in building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121360827.5U CN215217615U (en) 2021-06-18 2021-06-18 On-spot sighting rod is used in building engineering management

Publications (1)

Publication Number Publication Date
CN215217615U true CN215217615U (en) 2021-12-17

Family

ID=79433503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121360827.5U Active CN215217615U (en) 2021-06-18 2021-06-18 On-spot sighting rod is used in building engineering management

Country Status (1)

Country Link
CN (1) CN215217615U (en)

Similar Documents

Publication Publication Date Title
CN204886003U (en) Unmanned aerial vehicle with high voltage transmission lines earth connection high altitude is torn open and is hung function
CN215217615U (en) On-spot sighting rod is used in building engineering management
CN206318599U (en) A kind of power supply for construction stair shaft mouthful protective door device
CN211257889U (en) High-rise building construction safety protection net
CN211398151U (en) Anchoring embedded part fixing device of suspender hanger based on aluminum mould
CN214557012U (en) Civil engineering job site reinforcing bar processingequipment
CN202055763U (en) Building roof precise boring device
CN210713757U (en) Scaffold for building
CN211444835U (en) Tower body tile holding mounting and dismounting device of tower crane
CN204430347U (en) One is used for high-altitude jewel hole can ranging localization lift electric hammer Electric drill support instrument
CN213518612U (en) Alarm for construction management of building engineering
CN207080169U (en) A kind of wall attaching parts for bridge construction safety climbing ladder
CN216616846U (en) Creeping formwork structure for super high-rise building engineering construction
CN205990780U (en) One kind is safe, easy-to-dismount to face frontier defense protection unit
CN216109857U (en) Quick pin-connected panel faces frontier defense guardrail
CN215926734U (en) A preformed hole template for building civil engineering
CN201274392Y (en) Operating platform on portable adjustable bar
CN220882189U (en) Arc pad dismounting tool
CN210561756U (en) Protector is used in bridge construction
CN215056072U (en) Combined guardrail for building safety
CN219080921U (en) Assembled temporary support for overhauling thermal power plant
CN203245833U (en) Multi-functional quick drilling tool rack
CN215948860U (en) Climbing frame protection device
CN219931846U (en) Building protection device for building engineering management
CN216056082U (en) Special cable erection device for building electromechanical installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant