CN208586759U - A kind of suspended ceiling embedded part - Google Patents

A kind of suspended ceiling embedded part Download PDF

Info

Publication number
CN208586759U
CN208586759U CN201820752265.0U CN201820752265U CN208586759U CN 208586759 U CN208586759 U CN 208586759U CN 201820752265 U CN201820752265 U CN 201820752265U CN 208586759 U CN208586759 U CN 208586759U
Authority
CN
China
Prior art keywords
plate
locating piece
template
ring flat
locking member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820752265.0U
Other languages
Chinese (zh)
Inventor
甘宗华
魏国民
汪少波
孙典和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Erjian Construction Group Co., Ltd.
Original Assignee
SUZHOU ZHONGZHENG CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU ZHONGZHENG CONSTRUCTION ENGINEERING Co Ltd filed Critical SUZHOU ZHONGZHENG CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201820752265.0U priority Critical patent/CN208586759U/en
Application granted granted Critical
Publication of CN208586759U publication Critical patent/CN208586759U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of suspended ceiling embedded parts, including metal internal thread built-in fitting, plastics locating piece, locking member and template, a mounting hole is formed on plastics locating piece, plastics locating piece is set in template and the two is connected by locking member, and metal internal thread built-in fitting is set in mounting hole.The utility model is fixed in cast-in-place concrete in advance compared to the prior art, by suspended ceiling embedded part, and metal internal thread built-in fitting is then reserved in cast-in-place concrete after form removable, is had the characteristics that structure is simple, secured, easy for construction, is easily installed sunpender.

Description

A kind of suspended ceiling embedded part
Technical field
The utility model relates to a kind of suspended ceiling embedded parts.
Background technique
Indoors when top plate ceiling construction, conventionally employed setscrew fixed derrick, this needs are used on concrete roof Impact drill drills out a hole identical with setscrew modulus, then throws setscrew into, then tighten nut, is amplified using pull rod Expansion between head and screw shell is amplified, and is fixed on screw on structural concrete.
The construction quality problem that conventionally employed setscrew fixed derrick is caused, such as be easy floor is punched, will be electromechanical Preheating embedding line breaks, constructional difficulties, dust pollution air environment, noise are larger etc..
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of suspended ceiling embedded part.
In order to achieve the above object, the technical solution of the utility model is as follows:
The utility model provides a kind of suspended ceiling embedded part, including metal internal thread built-in fitting, plastics locating piece, locking member and mould Plate forms a mounting hole on plastics locating piece, and plastics locating piece is set in template and the two is connected by locking member, in metal Silk built-in fitting is set in mounting hole.
The utility model is fixed in cast-in-place concrete in advance compared to the prior art, by suspended ceiling embedded part, is torn open to template Except rear metal internal thread built-in fitting is then reserved in cast-in-place concrete, has the characteristics that structure is simple, secured, easy for construction, be convenient for Sunpender is installed.
As a preferred option, the pre-buried set that above-mentioned metal internal thread built-in fitting includes bottom plate and is set on bottom plate Cylinder, embedded sleeve barrel is interior to be equipped with connection internal screw thread, and the outer diameter of bottom plate is greater than the outer diameter of embedded sleeve barrel.
Using above-mentioned preferred embodiment, the outer diameter of bottom plate is greater than the outer diameter of embedded sleeve barrel, can be effectively by furred ceiling Built-in fitting is fixed in cast-in-place concrete.
As a preferred option, above-mentioned plastics locating piece includes upper installation ring flat-plate, lower installation ring flat-plate and cylinder positioning sleeve, Upper installation ring flat-plate, lower installation ring flat-plate are respectively arranged at the upper axial end of cylinder positioning sleeve, lower end, and lower installation ring flat-plate is set to template On, locking member is successively arranged in installation ring flat-plate, lower installation ring flat-plate and template and is connected to plastics locating piece and dies plate tap Together.
Using above-mentioned preferred embodiment, locking member is by upper installation ring flat-plate, lower installation ring flat-plate by plastics locating piece and template It is fastened together, it is simple and strong in structure.
As a preferred option, above-mentioned plastics locating piece includes locking member and symmetrically arranged two positions semi-rings structure, Two fixed elongated slots are symmetrically arranged in template, on the same line, positions semi-ring structure includes upper to the length direction of two fixed elongated slots Mounting plate, lower installation board and positions semi-ring set, upper mounting plate, lower installation board be respectively arranged at positions semi-ring set upper axial end, Lower end, locking member are successively arranged in the fixation elongated slot of upper mounting plate, lower installation board and template that plastics locating piece and template is tight It is connected and is connected together.
Using above-mentioned preferred embodiment, two positions semi-ring structures can be adjusted according to the outer diameter size of metal internal thread built-in fitting Position, it is more convenient.
As a preferred option, multiple wedge blocks are additionally provided with, wedge block is set in the mounting hole of plastics locating piece and two Pass through dovetail raised line and dovetail groove matching connection between person.
Using above-mentioned preferred embodiment, increases wedge block, be applicable to the metal internal thread built-in fitting of inverted pyramidal structures.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is the structure top view of the utility model.
Wherein, 1. metal internal thread built-in fitting, 2. plastics locating pieces, 3. locking members, 4. templates.
Specific embodiment
The preferred embodiment that according to the present invention will be described in detail below with reference to the accompanying drawings.
In order to reach the purpose of this utility model, as shown in Figure 1, being mentioned in one of embodiment of the utility model For a kind of suspended ceiling embedded part, including metal internal thread built-in fitting 1, plastics locating piece 2, locking member 3 and template 4, on plastics locating piece 2 A mounting hole is formed, plastics locating piece 2 is set in template 4 and the two is connected by locking member 3, and metal internal thread built-in fitting 1 is set It is placed in mounting hole.
Present embodiment is fixed in cast-in-place concrete in advance compared to the prior art, by suspended ceiling embedded part, is torn open to template 4 Except rear metal internal thread built-in fitting 1 is then reserved in cast-in-place concrete, has the characteristics that structure is simple, secured, easy for construction, be convenient for Sunpender is installed.
In order to further optimize the implementation result of the utility model, in the another embodiment of the utility model, On the basis of foregoing teachings, above-mentioned metal internal thread built-in fitting 1 includes bottom plate and the embedded sleeve barrel being set on bottom plate, Connection internal screw thread is equipped in embedded sleeve barrel, the outer diameter of bottom plate is greater than the outer diameter of embedded sleeve barrel.
Using above-mentioned preferred embodiment, the outer diameter of bottom plate is greater than the outer diameter of embedded sleeve barrel, can be effectively by furred ceiling Built-in fitting is fixed in cast-in-place concrete.
In order to further optimize the implementation result of the utility model, in the another embodiment of the utility model, On the basis of foregoing teachings, above-mentioned plastics locating piece 2 includes upper installation ring flat-plate, lower installation ring flat-plate and cylinder positioning sleeve, on Installation ring flat-plate, lower installation ring flat-plate are respectively arranged at the upper axial end of cylinder positioning sleeve, lower end, and lower installation ring flat-plate is set to template On, locking member is successively arranged in installation ring flat-plate, lower installation ring flat-plate and template and is connected to plastics locating piece and dies plate tap Together.
Using above-mentioned preferred embodiment, locking member is by upper installation ring flat-plate, lower installation ring flat-plate by plastics locating piece and template It is fastened together, it is simple and strong in structure.
In order to further optimize the implementation result of the utility model, in the another embodiment of the utility model, On the basis of foregoing teachings, above-mentioned plastics locating piece includes locking member and symmetrically arranged two positions semi-rings structure, template On be symmetrically arranged with two fixed elongated slots, on the same line, positions semi-ring structure includes upper installation to the length direction of two fixed elongated slots Plate, lower installation board and positions semi-ring set, upper mounting plate, lower installation board are respectively arranged at the upper axial end of positions semi-ring set, lower end, Locking member, which is successively arranged in the fixation elongated slot of upper mounting plate, lower installation board and template, connects plastics locating piece with dies plate tap Together.
Using above-mentioned preferred embodiment, two positions semi-ring structures can be adjusted according to the outer diameter size of metal internal thread built-in fitting Position, it is more convenient.
In order to further optimize the implementation result of the utility model, in the another embodiment of the utility model, On the basis of foregoing teachings, be additionally provided with multiple wedge blocks, wedge block be set in the mounting hole of plastics locating piece and the two it Between by dovetail raised line and dovetail groove matching connection.
Using above-mentioned preferred embodiment, increases wedge block, be applicable to the metal internal thread built-in fitting of inverted pyramidal structures.
In order to further optimize the implementation result of the utility model, in the another embodiment of the utility model, On the basis of foregoing teachings, it is additionally provided with regulating mechanism, regulating mechanism is respectively arranged at the inside of positions semi-ring set, regulating mechanism Including upper spring circle, lower spring ring and positioning strip, upper spring circle, lower spring ring are connected to the upper end of positioning strip vertical direction And lower end, the distance between two positioning strips are by small gradually big setting by its lower end to upper end in vertical direction when original state.
Using above-mentioned preferred embodiment, regulating mechanism avoids metal internal thread built-in fitting and plastics locating piece from generating abrasion, prolongs Long life.
Above-described is only preferred embodiments of the present invention, it is noted that for the ordinary skill of this field For personnel, without departing from the concept of the present invention, various modifications and improvements can be made, these all belong to In the protection scope of the utility model.

Claims (5)

1. a kind of suspended ceiling embedded part, which is characterized in that including metal internal thread built-in fitting, plastics locating piece, locking member and template, modeling A mounting hole is formed on material locating piece, plastics locating piece is set in template and the two is connected by locking member, and metal internal thread is pre- Embedded part is set in mounting hole.
2. suspended ceiling embedded part according to claim 1, which is characterized in that metal internal thread built-in fitting includes bottom plate, Yi Jishe The embedded sleeve barrel being placed on bottom plate, embedded sleeve barrel is interior to be equipped with connection internal screw thread, and the outer diameter of bottom plate is greater than the outer of embedded sleeve barrel Diameter size.
3. suspended ceiling embedded part according to claim 1, which is characterized in that plastics locating piece includes upper installation ring flat-plate, lower peace Dress ring flat-plate and cylinder positioning sleeve, upper installation ring flat-plate, lower installation ring flat-plate are respectively arranged at the upper axial end of cylinder positioning sleeve, lower end, Lower installation ring flat-plate is set in template, and locking member, which is successively arranged in installation ring flat-plate, lower installation ring flat-plate and template, determines plastics Position part and dies plate tap link together.
4. suspended ceiling embedded part according to claim 1, which is characterized in that plastics locating piece includes locking member and is symmetrical arranged Two positions semi-ring structures, two fixed elongated slots are symmetrically arranged in template, the length direction of two fixed elongated slots is on the same line, fixed Position semi-loop includes upper mounting plate, lower installation board and positions semi-ring set, and upper mounting plate, lower installation board are respectively arranged at positioning half The upper axial end of ring set, lower end, locking member are successively arranged in plastics in the fixation elongated slot of upper mounting plate, lower installation board and template Locating piece and dies plate tap link together.
5. suspended ceiling embedded part according to claim 1, which is characterized in that be additionally provided with multiple wedge blocks, wedge block is set to It is connected in the mounting hole of plastics locating piece and therebetween by dovetail raised line and dovetail groove matching.
CN201820752265.0U 2018-05-19 2018-05-19 A kind of suspended ceiling embedded part Active CN208586759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820752265.0U CN208586759U (en) 2018-05-19 2018-05-19 A kind of suspended ceiling embedded part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820752265.0U CN208586759U (en) 2018-05-19 2018-05-19 A kind of suspended ceiling embedded part

Publications (1)

Publication Number Publication Date
CN208586759U true CN208586759U (en) 2019-03-08

Family

ID=65533851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820752265.0U Active CN208586759U (en) 2018-05-19 2018-05-19 A kind of suspended ceiling embedded part

Country Status (1)

Country Link
CN (1) CN208586759U (en)

Similar Documents

Publication Publication Date Title
US7093400B1 (en) Concrete insert for poured concrete floors
CN208586759U (en) A kind of suspended ceiling embedded part
CN207348464U (en) One kind is readily disassembled building template fixture
CN203846613U (en) Multifunctional ceiling embedded part
CN207681558U (en) A kind of hole making drill for opening sink hole
CN204019455U (en) A kind of pin removal
CN208441468U (en) A kind of bolt embedment device
CN205777516U (en) A kind of mould for job site hole to be provided
CN109025278A (en) A kind of fixed device of the pre-buried orifice of aluminum alloy mould plate and its application method
CN210013499U (en) Face limit entrance to a cave can dismantle protection railing fixing device
CN210221061U (en) Settlement observation point mounting structure
CN210307654U (en) Quick nail nipping device for construction site
CN210165154U (en) Quick installation device of colliery tunnel laser direction indicator
CN218541154U (en) Energy-saving ceiling keel connecting structure
CN206653498U (en) Mounting and positioning device for precast concrete mould connection
CN208557375U (en) A kind of multi-functional cable clamping plate dismantling device
KR200342749Y1 (en) Device For Connecting Concrete Form
CN106541495A (en) Shield-bored tunnels built-in fitting fixes spring and fixing meanss
CN219387203U (en) Aluminum template connection structure
CN216132418U (en) Fast-to-install joint meter
CN214090382U (en) Connection structure of light gauge steel
CN204012418U (en) A kind of cable testing bridge mounting auxiliary
CN107631450A (en) The attachment structure of idle call part
CN217682658U (en) Adhesive self-bottom-expanding anchor bolt
CN210276072U (en) Construction site worker positioning device based on BIM

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215000 No. 16 Jinda Road, Weiting Town, Suzhou Industrial Park, Suzhou City, Jiangsu Province

Patentee after: Suzhou Erjian Construction Group Co., Ltd.

Address before: 215000 No. 16 Jinda Road, Weiting Town, Suzhou Industrial Park, Suzhou City, Jiangsu Province

Patentee before: Suzhou Zhongzheng Construction Engineering Co., Ltd.

CP01 Change in the name or title of a patent holder