CN218540683U - A precast pile implantation device for stake board road bed - Google Patents
A precast pile implantation device for stake board road bed Download PDFInfo
- Publication number
- CN218540683U CN218540683U CN202222951013.XU CN202222951013U CN218540683U CN 218540683 U CN218540683 U CN 218540683U CN 202222951013 U CN202222951013 U CN 202222951013U CN 218540683 U CN218540683 U CN 218540683U
- Authority
- CN
- China
- Prior art keywords
- pile
- braced frame
- precast pile
- motor
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model provides a precast pile implanting device for a pile plate roadbed, which comprises a supporting frame, wherein a drilling piece for drilling and implanting a precast pile on the ground is arranged at the left end of the upper surface of a lower transverse plate of the supporting frame, a moving piece for driving the supporting frame to move is arranged on the lower surface of the supporting frame, a transfer piece for hoisting the precast pile into a hole is arranged in the supporting frame, a limiting vertical piece for limiting the precast pile is arranged in the lower transverse plate in the supporting frame, and an implanting hole is formed in the middle of the lower transverse plate of the supporting frame; the utility model discloses can realize that the precast pile implants the operation be used for the pile slab road bed.
Description
Technical Field
The utility model relates to a pile foundation construction technical field, especially a device is implanted to precast pile for stake slab road bed.
Background
The pipe following while drilling method is a middle digging pile sinking method. During construction, the long spiral drill rod connected with the drill bit with the hole expanding function penetrates through the precast tubular pile, and the bottom end of the precast tubular pile is excavated to form a hole. When drilling is needed, the power head rotates forwards, a hole expanding wing plate of the hole expanding drill bit is opened, the drill bit rotates to excavate soil at a distance below the bottom end of the precast tubular pile, drilling residues are conveyed by the blade of the screw drilling rod to be discharged through the tubular pile hole, and the precast tubular pile sinks along with the drill bit by means of self weight during drilling. If the precast tubular pile is not smooth when being blocked in the pile sinking process, a vibration exciter can be started to vibrate and press the precast tubular pile to break through (the vibration exciter is arranged at the upper end of the power head by the conventional clamping vibration power head, so that the stroke of the vibration exciter on a guide rail is limited). After the pile is connected by the drill and the pile is connected to the calibrated depth, the power head reversely rotates to withdraw the reaming wing plate for removing the slag, concrete is poured at the pile bottom, the vibration exciter is started to press the prefabricated pipe pile to be seated in the hole bottom, the drill rod is drawn out, and the drilling machine moves. And then, performing high-pressure grouting treatment on the outer side of the precast tubular pile by grouting equipment to form a pile.
In the existing precast pile planting technology, a crawler crane is mainly adopted to lift a pile and then sink the pile by means of the self weight of a pile body or to plant the pile by means of external force applied by a static pressure machine or hammering and the like in the pile planting process, for example, a static drilling root-planting pile construction method (CN 105649073A) and a non-prestressed centrifugal high-strength concrete pile planting pile construction method (CN 105421445A) are pile sinking by means of the self weight of the pile body; a construction device and a construction method (CN 104947652B) of a stiff composite pile (CN 202298602U) and a long spiral drilling cement mortar wall protection type implanted pipe pile depend on a static pressure machine or a hammering pile to apply external force to sink the pile.
No matter in the concrete precast pile construction, a certain soil squeezing effect exists no matter hammering and static pressure are adopted, a pile body is damaged to a certain extent, in recent years, some construction methods that non-soil squeezing (half soil squeezing) is firstly drilled (pre-stirred) and then the precast pile is implanted exist, and when the pile is sunk depending on the dead weight of the pile body, the situation that the pile is not sunk in place can occur under the condition that the geological conditions and the construction conditions are complex.
When the traditional static pressure machine is used for pile planting, the following problems exist:
when the tonnage of the static pressure machine is too large, the volume of the static pressure machine body is too large, the occupied area is large, the static pressure machine body is difficult to construct in a flow mode with equipment for drilling construction, a large distance needs to be kept between the static pressure machine body and a drilling machine, and the construction efficiency is low; when the tonnage of the static pressure machine is too small, the pile pressing force is too small, and the expected effect cannot be achieved. In addition, the diameter of the drilled hole is larger than the diameter of the pile body, so that the verticality control difficulty of the pile in the pile planting process is high.
Disclosure of Invention
In view of this, the utility model aims at providing a can realize precast pile implantation operation's precast pile implantation device for stake board road bed.
The utility model discloses a following method realizes: the utility model provides a precast pile implantation device for stake board road bed, includes braced frame, braced frame's lower diaphragm upper surface left end is provided with and is used for subaerial drilling part of going on drilling implantation precast pile, the braced frame lower surface is provided with and is used for driving the moving member that braced frame removed, be provided with the transfer member that is used for hoisting in the precast pile puts into the hole in the braced frame, be provided with the spacing vertical part that is used for spacing precast pile in the lower diaphragm in the braced frame, the implantation hole has been seted up at braced frame's lower diaphragm middle part.
Further, drilling spare includes the portal frame, first bar recess has all been seted up at both ends around the diaphragm upper surface under the braced frame, be provided with first motor in the first bar recess, the output of first motor is connected with first screw rod, two montant turnbuckles of portal frame are established on the first screw rod, the spacing groove has been seted up to two montant medial surfaces of portal frame, spacing inslot upper surface inlays and is equipped with synchronous machine, synchronous machine's output is connected with the second screw rod, and the turnbuckle is equipped with the backup pad between the second screw rod at front and back both ends, backup pad upper surface middle part is provided with the second motor, the output of second motor is provided with the anger, the anger passes through the bearing the backup pad extends to the backup pad below.
Further, the moving member includes the action wheel and follows the driving wheel, both ends all are provided with around braced frame lower surface right side from the driving wheel, both ends all are provided with around braced frame lower surface left side the action wheel is connected through a pivot between the action wheel at front and back both ends, braced frame's lower diaphragm lower surface is seted up flutedly, the front end inlays and is equipped with the third motor in the recess, be provided with first gear on the output shaft of third motor, be provided with the second gear in the pivot, first gear with the setting is connected through the toothed belt to the second gear.
Further, the transport piece includes the fourth motor, second bar groove has been seted up to the lower surface of braced frame's last diaphragm, the left end inlays in the second bar groove and is equipped with the fourth motor, the output of fourth motor is connected with the third screw rod, the swivel nut is equipped with the sliding seat on the third screw rod, the sliding seat lower surface has the fixed plate through bolted connection, the fixed plate lower surface is provided with and is used for hoisting the electric hoist that transports the precast pile.
Furthermore, the limiting vertical part comprises a telescopic cylinder, the periphery of the inner side face of the implantation hole is embedded with the telescopic cylinder, and the tail end of a telescopic rod of the telescopic cylinder is provided with a limiting block.
The beneficial effects of the utility model reside in that: the utility model adds the drilling piece, the transferring piece and the implanting hole into the device, and can realize the drilling operation on the ground through the drilling piece, and then realize the implanting operation of the precast pile through the action of the transferring piece and the implanting hole; the limiting vertical part is added into the device, so that the precast pile can be limited when being implanted, the verticality of the pile sinking can be ensured, and the pile implanting efficiency can be greatly improved; the utility model discloses simple structure, the simple operation can effectually use manpower sparingly material resources, improves work efficiency.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view of the present invention.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1 and 2, the present invention provides an embodiment: the utility model provides a precast pile implantation device for stake board road bed, includes braced frame 1, braced frame 1's lower diaphragm upper surface left end is provided with and is used for subaerial drilling part 2 of going on drilling implantation precast pile, braced frame 1 lower surface is provided with and is used for driving moving member 3 that braced frame 1 removed, be provided with in braced frame 1 and be used for hoisting the transfer 4 that the precast pile put into the hole, be provided with spacing vertical part 5 that is used for spacing precast pile in the diaphragm down in braced frame 1, implant hole 6 has been seted up at braced frame 1's lower diaphragm middle part. Make and drill hole subaerial through drilling 2, then hoist the precast pile through transporting 4, implant in the subaerial hole with the precast pile through the effect of implanting hole 6, through spacing vertical part 5's effect, can realize carrying out perpendicular spacing to the precast pile when the precast pile is implanted.
Please continue to refer to fig. 1 and fig. 2, in an embodiment of the present invention, the drilling member 2 includes a portal frame 21, first bar-shaped grooves (not shown) are disposed at front and rear ends of an upper surface of a lower transverse plate of the supporting frame 1, a first motor (not shown) is disposed in the first bar-shaped grooves, an output end of the first motor is connected to a first screw 22, two vertical rod screws of the portal frame 21 are sleeved on the first screw 22, two vertical rod inner sides of the portal frame 21 are provided with a limiting groove 23, a synchronous motor 24 is embedded in the limiting groove 23, an output end of the synchronous motor 24 is connected to a second screw 25, a supporting plate 26 is disposed between the second screws 25 at the front and rear ends, a second motor 27 is disposed in a middle portion of an upper surface of the supporting plate 26, an output end of the second motor 27 is provided with an auger 28, and the auger 28 passes through the supporting plate 26 via a bearing and extends to a lower portion of the supporting plate 26. The first screw 22 can be driven to rotate through the first motor, the portal frame 21 is moved left and right, the second screw 25 is driven to rotate through the synchronous motor 24, the auger 26 can be lifted up and down, the auger 28 can be driven to rotate by opening the second motor 27, punching on the ground can be achieved, and the precast pile can be conveniently implanted.
Please continue to refer to fig. 1 and fig. 2, in an embodiment of the present invention, the moving member 3 includes a driving wheel 31 and a driven wheel 32, both ends all are provided with around the right side of the lower surface of the supporting frame 1 from the driving wheel 32, both ends all are provided with around the left side of the lower surface of the supporting frame 1 from the driving wheel 31, the driving wheels 31 at both ends are connected through a rotating shaft 33, a groove 33 is formed on the lower surface of the lower transverse plate of the supporting frame 1, a third motor 34 is embedded in the groove 33 at the front end, a first gear 35 is provided on the output shaft of the third motor 34, a second gear 36 is provided on the rotating shaft 33, and the first gear 35 and the second gear 36 are connected through a toothed belt 37. So that the third motor 34 can drive the first gear 35 to rotate, and the second gear 36 is driven to rotate through the action of the toothed belt 37, so as to realize the rotation of the rotating shaft 33, and further realize the movement of the driving wheel 31 and the driven wheel 32.
Please continue to refer to fig. 1 and fig. 2, in an embodiment of the present invention, the transferring member 4 includes a fourth motor 41, a second bar-shaped groove 42 has been seted up on the lower surface of the upper transverse plate of the supporting frame 1, the left end is embedded in the second bar-shaped groove 42 in the fourth motor 41, the output end of the fourth motor 41 is connected with a third screw 43, a screw sleeve is equipped with a sliding seat 44 on the third screw 43, the lower surface of the sliding seat 44 is connected with a fixing plate 45 through a bolt, the lower surface of the fixing plate 45 is provided with an electric hoist 46 for hoisting and transferring the precast pile. So that the fourth motor 41 can drive the third screw 43 to rotate, the left and right movement of the electric hoist 46 is realized, and then the precast pile is hoisted by the electric hoist 46.
As shown in fig. 1 and fig. 2, in an embodiment of the present invention, the limiting vertical member 5 includes a telescopic cylinder 51, the telescopic cylinder 51 is embedded around the inner side surface of the implanting hole 6, and a limiting block 52 is disposed at the end of a telescopic rod of the telescopic cylinder 51. So that the limiting block 52 can be driven to move inwards through the telescopic cylinder 51, the limiting of the precast pile is realized through the limiting block 52, and the precast pile can be vertically inserted into the implantation hole 6.
The utility model discloses well motor, telescopic cylinder, auger, electric hoist and synchronous machine are prior art, and the skilled person in the art has clearly been known, does not describe here in detail.
The above is only the preferred embodiment of the present invention, and all the equivalent changes and modifications made according to the claims of the present invention should be covered by the present invention.
Claims (5)
1. The utility model provides a precast pile implantation device for stake board road bed which characterized in that: including braced frame, braced frame's lower diaphragm upper surface left end is provided with and is used for subaerial drilling the drilling spare of implanting the precast pile, the braced frame lower surface is provided with and is used for driving the moving member that braced frame removed, be provided with the transportation piece that is used for hoisting the precast pile and puts into the hole in the braced frame, be provided with the spacing vertical part that is used for spacing precast pile in the diaphragm down in the braced frame, the hole of implanting has been seted up at braced frame's lower diaphragm middle part.
2. A precast pile implant device for a pile-slab roadbed according to claim 1, wherein: drilling spare includes the portal frame, first bar groove has all been seted up at both ends around the diaphragm upper surface under the braced frame, be provided with first motor in the first bar groove, the output of first motor is connected with first screw rod, two montant turnbuckles of portal frame are established on the first screw rod, the spacing groove has been seted up to two montant medial surfaces of portal frame, spacing inslot upper surface inlays and is equipped with synchronous machine, synchronous machine's output is connected with the second screw rod, and the turnbuckle is equipped with the backup pad between the second screw rod at front and back both ends, backup pad upper surface middle part is provided with the second motor, the output of second motor is provided with the anger, the anger passes through the bearing the backup pad extends to the backup pad below.
3. A precast pile implanting apparatus for a pile-slab roadbed according to claim 1, wherein: the moving member includes the action wheel and follows the driving wheel, both ends all are provided with around braced frame lower surface right side from the driving wheel, both ends all are provided with around braced frame lower surface left side the action wheel is connected through a pivot between the action wheel at front and back both ends, braced frame's lower diaphragm lower surface is seted up flutedly, the front end inlays and is equipped with the third motor in the recess, be provided with first gear on the output shaft of third motor, be provided with the second gear in the pivot, first gear with the setting is connected through the profile of tooth area to the second gear.
4. A precast pile implant device for a pile-slab roadbed according to claim 1, wherein: the transportation piece includes the fourth motor, the second bar recess has been seted up to the lower surface of braced frame's last diaphragm, the left end inlays in the second bar recess and is equipped with the fourth motor, the output of fourth motor is connected with the third screw rod, the swivel nut is equipped with the sliding seat on the third screw rod, the sliding seat lower surface has the fixed plate through bolted connection, the fixed plate lower surface is provided with and is used for hoisting the electric hoist that transports the precast pile.
5. A precast pile implanting apparatus for a pile-slab roadbed according to claim 1, wherein: the limiting vertical part comprises a telescopic cylinder, the periphery of the inner side face of the implantation hole is embedded with the telescopic cylinder, and the tail end of a telescopic rod of the telescopic cylinder is provided with a limiting block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222951013.XU CN218540683U (en) | 2022-11-03 | 2022-11-03 | A precast pile implantation device for stake board road bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222951013.XU CN218540683U (en) | 2022-11-03 | 2022-11-03 | A precast pile implantation device for stake board road bed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218540683U true CN218540683U (en) | 2023-02-28 |
Family
ID=85260545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222951013.XU Active CN218540683U (en) | 2022-11-03 | 2022-11-03 | A precast pile implantation device for stake board road bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218540683U (en) |
-
2022
- 2022-11-03 CN CN202222951013.XU patent/CN218540683U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100476082C (en) | Post-grouting construction method for long helical bore grouting pile and grouting device thereof | |
CN105714834B (en) | A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake | |
CN206903582U (en) | It may move double-arm rock bolting jumbo | |
CN104314078A (en) | Concrete pile construction equipment and construction method thereof | |
CN111594041A (en) | Rapid hole forming construction method for large-diameter deep hole pile foundation under karst geology | |
CN110344414A (en) | A kind of pilot hole plant stake piling all-in-one machine | |
CN210530738U (en) | Pile system is planted in drilling in groups | |
CN108397128A (en) | A kind of bridge construction perforating device and its drilling method | |
CN100523389C (en) | Ballastless track steel reinforced concrete pile-net construction method | |
CN108468334B (en) | Gravel stratum dry-excavation clay dado pore-forming bored concrete pile construction device | |
CN113969581A (en) | Construction method for rock-entering pile planting | |
CN218540683U (en) | A precast pile implantation device for stake board road bed | |
CN105113976A (en) | Wire-brush-bit rotary drilling jig and method for solving bit burying, falling and jamming | |
CN217999477U (en) | Excavation equipment for construction foundation pit of rear-arranged reinforcement cast-in-place pile | |
CN209339143U (en) | A kind of concrete pipe pile construction equipment | |
CN208088287U (en) | Half casing guncreting pile construction equipment | |
CN216973402U (en) | Static pressure pile structure with complex terrain | |
CN215441884U (en) | Drilling and hammering integrated machine | |
JP2995430B2 (en) | Drilling equipment for steel pipe pile with excavator for steel pipe pile and construction method of steel pipe pile | |
CN108316288A (en) | Half casing guncreting pile construction equipment and construction method | |
CN109339044A (en) | A kind of concrete pipe pile construction equipment | |
CN108457279A (en) | A kind of foundation pit enclosure structure cast-in-situ bored pile collapse hole in-situ treatment method | |
CN115110515A (en) | Foundation reinforcing method for super-hard upper shell layer and deep and soft lower soil layer | |
CN206941610U (en) | Clothoid type steel pipe support pile and support anchor rod | |
CN2172311Y (en) | Earther taking apparatus for planting pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |