CN218508989U - Attached type lifting scaffold walkway plate capable of being quickly installed and dismantled - Google Patents

Attached type lifting scaffold walkway plate capable of being quickly installed and dismantled Download PDF

Info

Publication number
CN218508989U
CN218508989U CN202222665250.XU CN202222665250U CN218508989U CN 218508989 U CN218508989 U CN 218508989U CN 202222665250 U CN202222665250 U CN 202222665250U CN 218508989 U CN218508989 U CN 218508989U
Authority
CN
China
Prior art keywords
guidance tape
walkway plate
horizontal
style
lifting scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222665250.XU
Other languages
Chinese (zh)
Inventor
何亮
王莉莉
徐骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202222665250.XU priority Critical patent/CN218508989U/en
Application granted granted Critical
Publication of CN218508989U publication Critical patent/CN218508989U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses an inserted lift scaffold who tears open fast walks guidance tape, it includes the horizontal member that two parallel intervals set up, the inboard logical length of every horizontal member is provided with C style of calligraphy notch, guidance tape installation breach has been seted up at its upper portion edge of a wing middle part, its both ends outside can be dismantled perpendicularly respectively and be connected with the pole setting, the corresponding setting of C style of calligraphy notch of two horizontal members installs a plurality of length in proper order and is less than walking guidance tape installation breach length and width slightly less than walking guidance tape unit of two horizontal member web intervals along length direction between two C style of calligraphy notches. To the defect that exists among the above-mentioned background art, the utility model provides an attached lift scaffold who tears open fast walks guidance tape can be after the support body adheres to the building main part, again the guidance tape is torn open fast, uses convenient, safe, reliable.

Description

Attached type lifting scaffold walkway plate capable of being quickly installed and detached
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to an attached lifting scaffold who can ann tear open fast walks guidance tape.
Background
The attached scaffold is generally used in the construction of high-rise buildings, because the attached scaffold has unique advantages. Along with the continuous deepening of reform development, the building trade of china is also in the development of leaping forward suddenly, and the inserted scaffold is accepted rapidly and a large amount of uses by domestic market because of the advanced practicality of self, and inserted lift scaffold can become the low place operation with the high place operation, becomes unsettled operation support body inside operation, has apparent low carbon nature, high-tech content and characteristics such as more economy, safer, more convenient.
However, traditional attached lifting scaffold has many accessories, and is mostly connected with high-strength bolts, and is slow in field assembly, so that manpower and material resources are seriously wasted, and an electric wrench is easy to generate noise pollution.
Therefore, it is an urgent technical problem to be solved to develop an attached type lifting scaffold walkway plate capable of being quickly installed and dismantled.
SUMMERY OF THE UTILITY MODEL
To the defect that exists among the above-mentioned background art, the utility model provides a can fast ann's attached form lift scaffold board of walking of tearing open can be after the support body adheres to the building main part, again fast ann tears the board of walking open, uses convenient, safe, reliable.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model relates to an attached lifting scaffold who tears open fast walks guidance tape, it includes the horizontal member that two parallel intervals set up, the inboard logical length of every horizontal member is provided with C style of calligraphy notch, guidance tape installation breach has been seted up at its upper portion edge of a wing middle part, the perpendicular pole setting that is connected with can be dismantled respectively in its both ends outside, the corresponding setting of C style of calligraphy notch of two horizontal members and install a plurality of length along length direction in proper order between two C style of calligraphy notches and be less than guidance tape installation breach length and width slightly less than the guidance tape unit of walking of two horizontal member web intervals.
Further, the horizontal bar is made of channel steel.
Furthermore, bolt holes are respectively formed in the positions, 10cm away from the end portion, of the two sides of the horizontal rod piece, a plurality of bolt holes are formed in the rod body of the vertical rod at intervals of 10cm, and the horizontal rod piece penetrates through the bolt holes of the horizontal rod piece through connecting bolts to be connected and fixed with one bolt hole of the vertical rod.
Furthermore, the front side and the rear side of the walkway plate unit are respectively provided with a groove with a size larger than that of the connecting bolt.
Further, the walkway plate unit is a light high-strength alloy piece or a hard plastic piece.
Compared with the prior art, the traditional attached scaffold has no horizontal rod, the iron or steel walkway plates are used as the horizontal rod, the walkway plates can be lifted and installed only after being organized on the ground, the weight is large, the installation is inconvenient, and the safety risk exists; and an inserted lift scaffold who can ann tear open fast walks guidance tape, novel structure, it is reasonable, through setting up two horizontal member that have C style of calligraphy notch, and behind the support body adheres to the building main part, utilize to walk guidance tape installation breach and respectively walk the ann of guidance tape unit and tear open, convenient to use is swift, high efficiency, and simultaneously, walk the guidance tape unit and can adopt light high strength alloy or duroplasts etc. to make, when ann tears open, save tower crane handling weight greatly, the whole dead weight of climbing the frame of also greatly reduced promotes factor of safety.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the middle horizontal rod of the present invention;
fig. 3 is a schematic structural view of the connection between the middle horizontal rod and the vertical rod of the present invention;
fig. 4 is a schematic structural view of the middle walkway plate unit of the present invention;
in the figure: 1. a horizontal bar member; 1.1, C-shaped notches; 1.2, installing a gap on the walkway plate; 2. erecting a rod; 3. a connecting bolt; 4. a walkway plate unit; 4.1, grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Unless defined otherwise, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this disclosure belongs. The terms "upper", "lower", "left", "right", "front", "rear", "inner", "outer" and the like used in the specification and claims of the present disclosure are used only to indicate relative positional relationships, and when the absolute position of a described object is changed, the relative positional relationships are changed accordingly. The parts of the present invention not described in detail are the known techniques of those skilled in the art.
As shown in fig. 1-4, the utility model relates to an inserted lift scaffold pavement that can ann tear open fast, it includes the horizontal rod 1 of two parallel interval settings, horizontal rod 1 can be made by the channel-section steel or other materials are made, inboard expert is long to be provided with C style of calligraphy notch 1.1, be the flange board from top to bottom respectively, the middle part is the web, 1 upper portion flange middle part of every horizontal rod has seted up pavement board installation breach 1.2, pavement board installation breach 1.2's length slightly is greater than 500mm usually, its both ends outside can be dismantled respectively perpendicularly and be connected with pole setting 2, the C style of calligraphy notch 1.1 corresponding setting of two horizontal rods 1 and install a plurality of lengths between two C style of calligraphy notches 1.1.1 along length direction in proper order and be less than pavement board installation breach 1.2 length and width slightly less than the pavement board unit 4 of two horizontal rod 1 web intervals, the length of pavement board unit 4 is 500mm usually, call for with pavement board installation breach 1.2 mutually, and be convenient for the installation.
In this embodiment, when the horizontal rod member 1 is connected to the vertical rod 2, the horizontal rod member 1 may be respectively provided with bolt holes at positions 10cm away from the end portions at both sides, the rod body of the vertical rod 2 may be provided with a plurality of bolt holes at intervals of 10cm, and the horizontal rod member 1 is connected and fixed to one of the bolt holes of the vertical rod 2 by passing through the bolt hole thereof by the high-strength connecting bolt 3.
In this embodiment, the walkway plate unit 4 may be a light high-strength alloy member or a hard plastic member, or may be made of other light high-strength materials, and is not limited to iron or steel, so that the self weight of the frame body can be greatly reduced, and the walkway plate can be conveniently lifted, dismounted and mounted.
In this embodiment, the front side and the rear side of the walkway plate unit 4 are respectively provided with a groove 4.1 with a size slightly larger than the connecting bolt 3, so that when the connecting stud 3 is installed on the horizontal rod member 1, the horizontal rod member can freely move in the C-shaped notch 1.1 of the horizontal rod member 1.
When the device is applied, firstly, the vertical rod 2 is connected with the horizontal rod 1 by using a high-strength connecting bolt 3, after the connection is firm, the manufactured walkway plate unit 4 with the groove 4.1 is placed through a walkway plate installation notch 1.2 reserved in the middle of the horizontal rod 1, the walkway plate unit 4 is knocked to the connecting position of the horizontal rod 1 and the vertical rod 2 by using a small wooden hammer, and after the walkway plate unit 4 reaches a designated position, other walkway plate units 4 are knocked and installed in sequence by using the small wooden hammer to enter the C-shaped notches 1.1 of the two horizontal rods 1; when the pavement slab is dismounted, the pavement slab unit 4 at the installation gap 1.2 of the pavement slab is firstly dismounted and knocked from bottom to top, then other pavement slab units are pried by a crowbar, and are pried to the installation gap 1.2 of the pavement slab in sequence, and then the pavement slab is taken out by the same method.

Claims (5)

1. The utility model provides an attached lifting scaffold who tears open fast walks guidance tape, a serial communication port, it includes horizontal member (1) that two parallel intervals set up, every horizontal member (1) inboard leads to long and is provided with C style of calligraphy notch (1.1), guidance tape installation breach (1.2) have been seted up at its upper portion flange middle part, its both ends outside is perpendicular detachably connected with pole setting (2) respectively, C style of calligraphy notch (1.1) of two horizontal members (1) are corresponding to be set up and install between two C style of calligraphy notches (1.1) in proper order along length direction that a plurality of length are less than guidance tape installation breach (1.2) length and width slightly are less than guidance tape unit (4) of walking of two horizontal members (1) web interval.
2. A quickly attachable and detachable attachable lifting scaffold walkway plate according to claim 1, wherein the horizontal bars (1) are made of channel steel.
3. The attached type lifting scaffold walkway plate capable of being quickly installed and dismantled according to claim 1 or 2, wherein bolt holes are respectively formed in two sides of the horizontal rod member (1) at a distance of 10cm from the end portion, a plurality of bolt holes are formed in the rod body of the vertical rod (2) at a distance of 10cm, and the horizontal rod member (1) is fixedly connected with one bolt hole of the vertical rod (2) through a connecting bolt (3) penetrating through the bolt hole.
4. The attached lifting scaffold walkway plate capable of being quickly installed and dismantled of claim 3, wherein the front and rear sides of the walkway plate unit (4) are respectively provided with a groove (4.1) having a size larger than the connecting bolt (3).
5. An attachable lifting scaffold walkway plate for quick assembly and disassembly according to claim 4, wherein the walkway plate unit (4) is a light high strength alloy member or a hard plastic member.
CN202222665250.XU 2022-10-10 2022-10-10 Attached type lifting scaffold walkway plate capable of being quickly installed and dismantled Active CN218508989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222665250.XU CN218508989U (en) 2022-10-10 2022-10-10 Attached type lifting scaffold walkway plate capable of being quickly installed and dismantled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222665250.XU CN218508989U (en) 2022-10-10 2022-10-10 Attached type lifting scaffold walkway plate capable of being quickly installed and dismantled

Publications (1)

Publication Number Publication Date
CN218508989U true CN218508989U (en) 2023-02-21

Family

ID=85215288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222665250.XU Active CN218508989U (en) 2022-10-10 2022-10-10 Attached type lifting scaffold walkway plate capable of being quickly installed and dismantled

Country Status (1)

Country Link
CN (1) CN218508989U (en)

Similar Documents

Publication Publication Date Title
CN218508989U (en) Attached type lifting scaffold walkway plate capable of being quickly installed and dismantled
CN210264003U (en) Edge-facing protection device for assembled beam
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN214739791U (en) Truss type cantilever beam combined structure for climbing frame
CN214169883U (en) Construction elevator adheres to frame
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN214575532U (en) Lifting type steel platform arranged at corridor lighting well position
CN211341732U (en) Compound aluminum mould board subassembly in narrow space
CN210105728U (en) Steel structure door post
CN208456101U (en) A kind of housing construction scaffold
CN206800983U (en) A kind of building scaffold safety tread
CN212562404U (en) Overhanging scaffold
CN201274392Y (en) Operating platform on portable adjustable bar
CN111217274A (en) A hang in midair hoist that is used for assembled buckling restrained steel plate wall quick, high-efficient assembly
CN214144633U (en) Upside-down hanging attached lifting scaffold
CN212773412U (en) Aluminum alloy upright rod
CN212642096U (en) Aluminum alloy walkway plate
CN205024908U (en) Constructional device that whole combination of steel bar truss floor board, hoist and mount are taken one's place
CN221053295U (en) Convenient construction stair
CN215160255U (en) Vertical prefabricated component hoist and mount fixing tool of assembled
CN218786776U (en) Supporting operation platform of overhanging type steel mould that can have enough to meet need
CN211447722U (en) Connection structure of walkway plate, connection plate and vertical rod
CN219429514U (en) Climbing frame dismantling support
CN211572567U (en) Integrated form steel construction platform formwork system
CN212897528U (en) Pavement board main body and pavement board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant