CN218503258U - Leak protection dress is towards riveting damping device - Google Patents

Leak protection dress is towards riveting damping device Download PDF

Info

Publication number
CN218503258U
CN218503258U CN202221862748.9U CN202221862748U CN218503258U CN 218503258 U CN218503258 U CN 218503258U CN 202221862748 U CN202221862748 U CN 202221862748U CN 218503258 U CN218503258 U CN 218503258U
Authority
CN
China
Prior art keywords
hinge
installation
detection rod
riveting
upper cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221862748.9U
Other languages
Chinese (zh)
Inventor
蔡森钢
蒋小波
邱国梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Youjia Metal Products Co ltd
Original Assignee
Jiaxing Youjia Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Youjia Metal Products Co ltd filed Critical Jiaxing Youjia Metal Products Co ltd
Priority to CN202221862748.9U priority Critical patent/CN218503258U/en
Application granted granted Critical
Publication of CN218503258U publication Critical patent/CN218503258U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model discloses a damping device is riveted towards leak protection dress, including the pre-installation subassembly, the pre-installation subassembly including pre-installation upper cover and pre-installation body, the one end of pre-installation upper cover, pre-installation body articulated, the upper surface of pre-installation body sets up hinge fixing station, and the fixed hinge and the slip hinge of waiting to process are placed in this hinge fixing station, and the pre-installation upper cover folds with the pre-installation body and presss from both sides the fixed hinge and the slip hinge of tightly waiting to process, be equipped with the riveting ditch in the hinge fixing station, the hinged end of fixed hinge and the hinged end of slip hinge are located in this riveting ditch, and are the packing ring position between the riveting end of fixed hinge and slip hinge, the below of pre-installation body be equipped with the detection lever, the one end of detection lever upwards stretches out in packing ring position department, and the other end extends to the below of pre-installation body. The utility model discloses can realize discovering the problem of plastic gasket neglected loading when dashing to rivet automatically, ensure the production quality of product, improve yields and production efficiency.

Description

Leak protection dress is towards riveting damping device
Technical Field
The utility model belongs to the technical field of the frock clamp of stamping processing usefulness and specifically relates to a damping device is riveted towards leak protection dress.
Background
I have a product, for the hinge product of taking damping, by fixed hinge and slip hinge riveting, at the riveted in-process, the riveting end of fixed hinge and the riveting end of slip hinge are relative to each other its, need install tiny plastic packing ring between two riveting ends, then after penetrating by the rivet, the clamping is riveted to little bench punching equipment. In the existing processing process, the procedure of stacking the gaskets on the hinge is basically operated manually, and the situation that the gaskets are not assembled always exists because the plastic gaskets are too thin. And because the plastic gasket is too small, the condition of neglected installation of the gasket cannot be found at the first time, and the neglected installation condition of the gasket cannot be found only when the product is delivered to a customer for product inspection after the product is subjected to punching and riveting. This results in a high defective rate of the product, which affects the quality of the product and results in a low production efficiency.
Disclosure of Invention
In order to solve the above problem, the utility model provides a leak protection dress dashes rivets damping device.
The technical scheme of the utility model is that a damping device is riveted towards leak protection dress, including the pre-installation subassembly, the pre-installation subassembly including pre-installation upper cover and pre-installation body, the one end of pre-installation upper cover, pre-installation body articulated, the upper surface of pre-installation body sets up hinge fixing station, and the fixed hinge and the slip hinge of waiting to process are placed in this hinge fixing station, and the pre-installation upper cover folds with the pre-installation body and presss from both sides tight fixed hinge and the slip hinge of waiting to process, be equipped with the riveting ditch in the hinge fixing station, the hinged end of fixed hinge and the hinged end of slip hinge locate in this riveting ditch, and be the packing ring position between the riveting end of fixed hinge and slip hinge, the below of pre-installation body be equipped with the detection pole, the one end of detection pole upwards stretches out in packing ring position department, and the other end extends to the below of pre-installation body.
Preferably, a detection rod cavity is arranged below the preassembly body, a rotating shaft is arranged in the middle of the detection rod and fixed with the preassembly body, the detection rod can rotate around the rotating shaft, the right end of the detection rod is hooked upwards and extends into a gasket position of the riveting groove, the left end of the detection rod is positioned in the detection rod cavity below the preassembly body, and a spring is arranged between the left end of the detection rod and the inner wall of the detection rod cavity; when a plastic gasket is placed at the gasket position in the riveting groove and the pre-installed upper cover and the pre-installed body are in a closed state, the right end of the detection rod is pressed downwards by the plastic gasket to rotate, and the left end of the detection rod overcomes the elasticity of the spring and is collected into the detection rod cavity; when the plastic gasket is not placed at the gasket position in the riveting ditch, the preassembled upper cover is closed with the preassembled body, and the left end of the detection rod outwards extends out of the detection rod cavity under the action of the spring.
Preferably, the front side of the preassembly body is provided with a locking magnet, the front side of the preassembly upper cover is provided with a magnet adsorption position, and when the preassembly upper cover and the preassembly body are closed, the magnet adsorption position corresponds to the position of the locking magnet.
Preferably, when the preassembled cover and the preassembled body are folded, a gap of 2.4 +/-0.2 mm is left between the locking magnet and the preassembled cover.
Preferably, hinge fixed station around both sides be equipped with locating piece and lower locating piece for both sides are spacing around fixed hinge and the slip hinge, still are equipped with the locating pin on the hinge fixed station, insert in the spout of slip hinge, are used for spacingly.
Preferably, still including preventing slow-witted dog, should prevent slow-witted dog and the cooperation of pre-installation subassembly, wholly be L form, form the dog that holds a semi-enclosed structure of pre-installation subassembly, the inward flange of the left part of preventing slow-witted dog is laminated with the left end outward flange of pre-installation subassembly closure state mutually, and the front side inward flange of preventing slow-witted dog is the straight form, laminates with the lower limb of pre-installation body mutually.
Preferably, the preassembly at least comprises two groups of detection rods, including an upper detection rod and a lower detection rod, and the height of the fool-proof block is not less than the distance from the rear side edge of the preassembly body to the upper detection rod.
The utility model has the advantages that: the utility model discloses can realize discovering the problem of plastic gasket neglected loading when dashing to rivet automatically, ensure the production quality of product, improve yields and production efficiency. The utility model discloses whether detectable, discernment small-size part are installed and are target in place whether, accomplish whole work operation under the prerequisite that does not influence assembly efficiency, can effectively solve the hourglass equipment pain point in tiny part puzzlement workshop always in the production process, have stronger spreading value.
Drawings
Fig. 1 is a front view of a preassembly of the present invention.
Fig. 2 is a top view of the pre-assembly of the present invention.
Fig. 3 is a front view of the pre-assembly of the present invention with the hinge and plastic washer installed.
Fig. 4 is a top view of the pre-assembly of the present invention with the hinge and plastic washer installed.
Fig. 5 is a bottom view of the pre-assembly of the present invention with the dual washers properly installed and closed.
Fig. 6 is a front view of the pre-assembly of the present invention with the dual washers properly installed and closed.
Fig. 7 is a front view of the pre-assembly of the present invention, which can be smoothly placed into the fool-proof block.
Fig. 8 is a top view of the pre-assembly of the present invention being able to smoothly place the pre-assembly into the fool-proof stop.
Fig. 9 is a front view of the pre-assembly of the present invention with the hinge installed and without the gasket and closed.
Fig. 10 is a front view of the pre-assembly of the present invention, which cannot be smoothly placed into the fool-proof stop.
Fig. 11 is a top view of the pre-assembly of the present invention that cannot be successfully placed into the fool-proof stop.
Fig. 12 is a front view of the present invention mounted on a small table punch.
Fig. 13 is a plan view of the present invention mounted on the small table punch during operation.
Description of reference numerals:
1: pre-assembling an upper cover; 2: a spring; 3: riveting a groove; 4: pre-assembling the body; 5: a rotating shaft; 6: a detection lever; 6-1: an upper detection rod; 6-2: a lower detection rod; 7: a gasket position; 8: locking the magnet; 9: a magnet adsorption position; 10: fixing the hinge; 11: a plastic gasket; 12: a sliding hinge; 13: a lower positioning block; 14: a chute; 15: positioning pins; 16: an upper positioning block; 17: a fool-proof stop block; 18: a detection rod cavity; 19: riveting a lower die; 20: a base; 21: a slide plate; 22: a damping male die; 23: damping auxiliary male die; 24: riveting a male die; 25: and (4) riveting.
Detailed Description
The present invention will be further explained with reference to the drawings and the embodiments.
As shown in fig. 1-13, the utility model discloses a pre-installation component, pre-installation component including pre-installation upper cover 1 and pre-installation body 4, pre-installation upper cover 1, pre-installation body 4's one end articulated, pre-installation body 4's upper surface sets up hinge fixing station, and the fixed hinge 10 and the slip hinge 12 of waiting to process are placed in this hinge fixing station, and pre-installation upper cover 1 folds with pre-installation body 4 and presss from both sides tight fixed hinge 10 and the slip hinge 12 of waiting to process, be equipped with riveting ditch 3 in the hinge fixing station, the hinged end of fixed hinge 10 and the hinged end of slip hinge 12 are located in this riveting ditch 3, and be packing ring position 7 between the riveting end of fixed hinge 10 and the riveting end of slip hinge 12, pre-installation body 4's below be equipped with detection lever 6, detection lever 6's one end upwards stretches out in packing ring position 7 department, and the other end extends to pre-installation body 4's below.
In the embodiment, a detection rod cavity 18 is arranged below the pre-assembly body 4, a rotating shaft 5 is arranged in the middle of the detection rod 6, the rotating shaft 5 is fixed with the pre-assembly body 4, the detection rod 6 can rotate around the rotating shaft 5, the right end of the detection rod 6 is hooked upwards and extends into a gasket position 7 of the riveting groove 3, the left end of the detection rod 6 is positioned in the detection rod cavity 18 below the pre-assembly body 4, and a spring 2 is arranged between the left end of the detection rod 6 and the inner wall of the detection rod cavity 18; when a plastic gasket 11 is placed at a gasket position 7 in the riveting groove 3 and the pre-installed upper cover 1 and the pre-installed body 4 are in a folded state, the right end of the detection rod 6 is pressed down by the plastic gasket 11 to rotate, and the left end of the detection rod 6 overcomes the elasticity of the spring 2 and is retracted into the detection rod cavity 18; when the plastic washer 11 is not placed at the washer position 7 in the riveting groove 3 and the pre-assembled upper cover 1 and the pre-assembled body 4 are in a folded state, the left end of the detection rod 6 extends out of the detection rod cavity 18 under the action of the spring 2. The detection rod 6 in a lever form can be used for detecting whether the plastic gasket 11 is neglected to be installed or not.
In this embodiment, the front side of pre-installation body 4 be equipped with locking magnet 8, the front side of pre-installation upper cover 1 is equipped with the strength of magnetic attraction position 9, when pre-installation upper cover 1 and pre-installation body 4 folded, the strength of this strength of magnetic attraction position 9 and locking magnet 8 corresponded.
In this embodiment, when the pre-installed cap 1 and the pre-installed body 4 are folded, a gap of 2.4 ± 0.2mm is left between the locking magnet 8 and the pre-installed cap 1.
In this embodiment, the hinge fixing station is provided with an upper positioning block 16 and a lower positioning block 13 at the front side and the rear side for limiting the front side and the rear side of the fixed hinge 10 and the sliding hinge 12, and the hinge fixing station is further provided with a positioning pin 15 inserted into a sliding groove 14 of the sliding hinge 12 for limiting.
In this embodiment, still including preventing slow-witted dog 17, should prevent slow-witted dog 17 and pre-installation subassembly cooperation, wholly be the L form, form the dog that holds a half surrounding structure of pre-installation subassembly, prevent that the inward flange of the left part of slow-witted dog 17 and the left end outward flange that the pre-installation subassembly folded the state and laminate mutually, prevent that the front side inward flange of slow-witted dog 17 is the straight form, laminates mutually with the lower limb of pre-installation body 4.
In this embodiment, the pre-assembly comprises at least two sets of the detecting rods 6, including an upper detecting rod 6-1 and a lower detecting rod 6-2, and the height of the fool-proof block 17 is not less than the distance from the rear side edge of the pre-assembly body 4 to the upper detecting rod 6-1. When ensuring that the pre-assembly inserts the fool-proof stop block 17, can all carry out effective detection to two measuring sticks.
The working process and the implementation principle are as follows: the principle explanation is given by taking a group of preassembled components used in the existing production process as an example, and does not represent the uniqueness of specific parameters. The specific parameters can be set according to actual requirements in actual production.
1. Pre-assembling: as shown in fig. 1-2, the pre-assembly has a self-weight of 620G, which creates a gravity G ≈ 6.2N. The spring 2 is made of 65Mn materials, the shear modulus G =79000Mpa, the diameter D =0.4mm of the steel wire, the middle diameter D =4.5mm of the spring 2, the number of effective turns n =7 turns of the spring 2, and the deformation amount f =18-10=8mm.
Elasticity F = F × G × d ^ 4/(8 × N × D ^ 3) =8 × 79000 × 0.4^ 4/(8 × 7 × 4.5^ 3) =3.17N
G is greater than F, the detection rod 6 in the state shown in the figure can not be popped out from the detection rod cavity 18, the flat arrangement of the A surface of the clamp in the assembly process can be ensured, and necessary conditions are provided for the subsequent part arrangement process.
2. Pre-clamping: as shown in fig. 3 to 4, "fixed hinge 10, sliding hinge 12, 2 plastic washers 11, and rivet 25" are installed in this order. The pre-assembled upper cover 1 rotates in the direction of an arrow, and clamping is quickly completed by using the locking magnet 8. A strong magnet with the theoretical suction force of 24N is selected to lock the pre-assembly, the pre-assembly upper cover is easily broken by impact force in the folding process, and the clamp is difficult to open due to the overlarge suction force. The distance between the reserved locking magnet 8 and the preassembled upper cover is 12.4 +/-0.2 mm, the phenomenon that the preassembled upper cover 1 directly impacts the locking magnet 8 can be avoided, the suction force is reduced to 10N after locking, and the effects of quick clamping and opening can be achieved.
After clamping is completed, the clamp is placed on the side for standby, and the surface B is horizontally placed on the workbench.
3. Automatic neglected loading identification: and after the clamp is laterally placed, the B datum is horizontally placed on the workbench. There are four states: a, correctly installing double gaskets; b, the upper gasket is not installed; c, the lower gasket is not installed; d, neither of the double gaskets is installed.
and a state, as shown in fig. 5-8, the elasticity 3.2N of the detection rod 6 is applied to the preassembled upper cover 1 through the plastic washer 11, and if the distance from the left end of the detection rod 6 to the rotating shaft 5 is two times of the distance from the right end of the detection rod 6 to the rotating shaft 5, the preassembled upper cover 1 is subjected to 6.4N of thrust force due to the 2-time force arm relationship, and the thrust force is smaller than the suction force 10N of the locking magnet 8, so that the overall clamp can be ensured to be always maintained in a locked state in the moving process. Meanwhile, the detection rod 6 can not push the plastic washer 11 to be flush with the A reference surface, and can be smoothly placed into the fool-proof stop block 17.
When the remaining three states b, c and d are present, as shown in fig. 9-11, the detecting rod 6 is not blocked by the plastic washer 11, and the right end of the detecting rod 6 moves upwards while the left end protrudes out of the a datum. The upper detection rod 6-1 and the lower detection rod 6-2 only need one protruding A datum and cannot be placed into the foolproof stop block 17. The phenomenon of neglected loading of the plastic ring is found immediately. Only products which are correctly installed and have no neglected loading can be put into a die to realize the final riveting and damping procedures.
Fig. 12 and 13 are a front view and a top view of the present invention mounted on a small table punch. The foolproof stop block 17 is fixed on a sliding plate 21 of a small bench punch, a roller pin is arranged between the sliding plate 21 and a base 20, a hinge and a gasket are well stacked when a pre-assembly is assembled, the hinge and the gasket are conveyed into the rear side of a rivet 25 and placed in the foolproof stop block 17, the sliding plate 21 is pushed to slide to the rear end to abut against the rear stop block, the rivet 25 is respectively aligned with a riveting male die 24 and a riveting lower die 19, finally the upper die moves downwards, and the riveting male die 24, a damping auxiliary male die 23, a damping male die 22 are matched with the riveting lower die 19 to realize punching and riveting.
In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "inner", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
In the present application, unless otherwise explicitly stated or limited, the term "connected" or the like is to be understood broadly, and may be, for example, a fixed connection, a detachable connection, or an integral part; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (7)

1. The utility model provides a leak protection dress is towards riveting damping device, its characterized in that includes the pre-installation subassembly, the pre-installation subassembly including pre-installation upper cover (1) and pre-installation body (4), the one end of pre-installation upper cover (1), pre-installation body (4) articulated, the upper surface of pre-installation body (4) sets up hinge fixing station, and fixed hinge (10) and slip hinge (12) of waiting to process place in this hinge fixing station, pre-installation upper cover (1) and pre-installation body (4) are folded and are pressed from both sides tight fixed hinge (10) and slip hinge (12) of waiting to process, be equipped with riveting ditch (3) in the hinge fixing station, the hinged end of fixed hinge (10) and the hinged end of slip hinge (12) are located in this riveting ditch (3), and be pre-installation position packing ring (7) between the riveted end of fixed hinge (10) and the riveting end of slip hinge (12), the below of pre-installation body (4) be equipped with detection lever (6), the one end of detection lever (6) upwards stretches out in pre-installation position packing ring (7) department, the other end extends to the below of body (4).
2. The leak-proof rivet punching damping device according to claim 1, characterized in that a detection rod cavity (18) is arranged below the pre-assembly body (4), a rotating shaft (5) is arranged in the middle of the detection rod (6), the rotating shaft (5) is fixed with the pre-assembly body (4), the detection rod (6) can rotate around the rotating shaft (5), the right end of the detection rod (6) is hooked upwards and extends into a gasket position (7) of the riveting groove (3), the left end of the detection rod (6) is positioned in the detection rod cavity (18) below the pre-assembly body (4), and a spring (2) is arranged between the left end of the detection rod (6) and the inner wall of the detection rod cavity (18); when a plastic gasket (11) is placed at a gasket position (7) in the riveting groove (3) and the pre-installed upper cover (1) and the pre-installed body (4) are in a folded state, the right end of the detection rod (6) is pressed down by the plastic gasket (11) to rotate, and the left end of the detection rod (6) overcomes the elasticity of the spring (2) and is retracted into the detection rod cavity (18); when the plastic gasket (11) is not placed at the gasket position (7) in the riveting groove (3) and the pre-installed upper cover (1) and the pre-installed body (4) are in a folded state, the left end of the detection rod (6) extends out of the detection rod cavity (18) under the action of the spring (2).
3. The leak-proof rivet punching damping device according to claim 1, characterized in that the front side of the pre-installed body (4) is provided with a locking magnet (8), the front side of the pre-installed upper cover (1) is provided with a magnet adsorption position (9), and when the pre-installed upper cover (1) and the pre-installed body (4) are folded, the magnet adsorption position (9) corresponds to the locking magnet (8).
4. A leak-proof rivet punching damping device according to claim 3, characterized in that when the pre-assembled cover (1) and the pre-assembled body (4) are folded, a gap of 2.4 ± 0.2mm is left between the locking magnet (8) and the pre-assembled cover (1).
5. The leak-proof loading punch riveting damping device is characterized in that an upper positioning block (16) and a lower positioning block (13) are arranged on the front side and the rear side of the hinge fixing station and used for limiting the front side and the rear side of the fixed hinge (10) and the sliding hinge (12), and a positioning pin (15) is further arranged on the hinge fixing station and inserted into a sliding groove (14) of the sliding hinge (12) for limiting.
6. The leak-proof rivet punching damping device according to claim 1, further comprising a fool-proof stop (17), wherein the fool-proof stop (17) is engaged with the pre-assembly, and is generally L-shaped to form a stop for accommodating a semi-surrounding structure of the pre-assembly, an inner edge of a left portion of the fool-proof stop (17) is engaged with an outer edge of a left end of the pre-assembly in a closed state, and an inner edge of a front side of the fool-proof stop (17) is flat and engaged with a lower edge of the pre-assembly body (4).
7. A leak-proof punch-rivet damping device according to claim 1, characterized in that the pre-assembly comprises at least two sets of test bars (6) including an upper test bar (6-1) and a lower test bar (6-2), and the height of the fool-proof stop (17) is not less than the distance from the rear edge of the pre-assembly body (4) to the upper test bar (6-1).
CN202221862748.9U 2022-07-16 2022-07-16 Leak protection dress is towards riveting damping device Active CN218503258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221862748.9U CN218503258U (en) 2022-07-16 2022-07-16 Leak protection dress is towards riveting damping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221862748.9U CN218503258U (en) 2022-07-16 2022-07-16 Leak protection dress is towards riveting damping device

Publications (1)

Publication Number Publication Date
CN218503258U true CN218503258U (en) 2023-02-21

Family

ID=85207333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221862748.9U Active CN218503258U (en) 2022-07-16 2022-07-16 Leak protection dress is towards riveting damping device

Country Status (1)

Country Link
CN (1) CN218503258U (en)

Similar Documents

Publication Publication Date Title
CN206335591U (en) Special-shaped structure piece gripper equipment
CN218503258U (en) Leak protection dress is towards riveting damping device
CN105568352B (en) One kind plating folder
CN108942160A (en) Snap-fitted device
US20020014102A1 (en) Rivet setting machine
CN105290777B (en) Valve assembly all-in-one machine
CN107335984B (en) Self-centering double-locking enclasping turnover mechanism
CN204747942U (en) Automatic equipment
CN207432230U (en) Hub fixture
CN111644843B (en) Hook assembly fixture and hook assembly equipment
CN217252548U (en) All-in-one is foldd in vice riveting
CN107252871B (en) Disc assembly machine of double-pitch area annex piece
CN211469078U (en) Turnover case locking device
CN212648300U (en) Electricity core trades anchor clamps equipment
CN213161661U (en) Be used for 9 robot devices for rubber coating
CN103851062B (en) Guide location fastener
CN209455954U (en) The angular limiting device in two-position
CN209821322U (en) Automatic structure of bounceing of display screen detection tool clamp plate
CN218677291U (en) Harmless battery mechanism of disassembling
CN208310470U (en) A kind of mounting bracket and the vehicle with it
CN220702513U (en) Clamping mechanism and clamping device
CN217585569U (en) Positioning detection die for hydraulic lock clamping plate
CN211539182U (en) Closed polyhedral sheet metal part bending forming cutter
CN219768128U (en) Tool die assembly mechanism for fishmouth hook