CN218491113U - Construction pipe laying pay-off - Google Patents

Construction pipe laying pay-off Download PDF

Info

Publication number
CN218491113U
CN218491113U CN202222383937.4U CN202222383937U CN218491113U CN 218491113 U CN218491113 U CN 218491113U CN 202222383937 U CN202222383937 U CN 202222383937U CN 218491113 U CN218491113 U CN 218491113U
Authority
CN
China
Prior art keywords
box
unwrapping wire
roller
construction
sets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222383937.4U
Other languages
Chinese (zh)
Inventor
左承龙
王桂华
苑亚维
安虹好
李玉君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Investment Engineering Construction Co ltd
Original Assignee
Hebei Construction Investment Engineering Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Investment Engineering Construction Co ltd filed Critical Hebei Construction Investment Engineering Construction Co ltd
Priority to CN202222383937.4U priority Critical patent/CN218491113U/en
Application granted granted Critical
Publication of CN218491113U publication Critical patent/CN218491113U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a construction pipe laying pay-off, including box, unwrapping wire roller, construction line, guide bar and threaded rod, the box top is equipped with the unwrapping wire roller, the construction line twines in the unwrapping wire roller, the box top is located the equal fixedly connected with backup pad in both ends about the unwrapping wire roller, the backup pad outer end all is equipped with the inserted bar, the sliding tray has all been seted up at both ends around the box, the box right-hand member is equipped with the threaded rod, the box bottom is equipped with two sets of gyro wheels, both ends all are equipped with two sets of sliding seats around the box, the telescopic link bottom all is equipped with the universal wheel, the utility model discloses a cooperation between box, inserted bar, bolt, unwrapping wire roller and the construction line can be fast more stable the work of burying the pipe unwrapping wire, can extract the inserted bar through rotating the bolt for the unwrapping wire roller can be nimble install the dismantlement, the personnel of being convenient for change different construction line according to the demand and carry out the unwrapping wire work.

Description

Construction pipe laying pay-off
Technical Field
The utility model relates to a construction pipe laying pay-off belongs to engineering construction technical field.
Background
Along with the development of the national rapid speed, the civil engineering is developed for the urban construction in various places, the pipe laying and the paying off are quite important links in various engineering constructions, electric power can be provided for various construction equipment, however, most of the existing paying off work is carried out manually by personnel, the whole wire bundle is heavier, the labor amount is increased by manual paying off, the paying off is not uniform and stable, the personnel are often required to bend down to arrange the bent wires in the wire grooves, time and labor are wasted, the replacement of the wires is troublesome, and the working efficiency is greatly influenced.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model overcomes current defect, provides a construction pipe laying pay-off, can effectively solve the problem in the background art.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model provides a construction pipe laying pay-off, includes box, unwrapping wire roller, construction line, guide bar and threaded rod, the box top is equipped with the unwrapping wire roller, the construction line twines in the unwrapping wire roller, the box top is located the equal fixedly connected with backup pad in both ends about the unwrapping wire roller, the backup pad outer end all is equipped with the inserted bar, the sliding tray has all been seted up at both ends around the box, the box right-hand member is equipped with the threaded rod, the box bottom is equipped with two sets of gyro wheels, both ends all are equipped with two sets of sliding seats around the box, the sliding seat bottom all is equipped with the guide bar, the guide bar bottom all is equipped with the positioning disk, the guide bar bottom all is equipped with the telescopic link, the telescopic link bottom all is equipped with the universal wheel.
Furthermore, through holes are formed in the two groups of supporting plates and the box body of the pay-off roller, the insertion rod penetrates through the pay-off roller from one group of supporting plates to the other group of supporting plates, and bolts are arranged at the two ends of the insertion rod through threads.
Furthermore, the top end of the telescopic rod is located inside the guide rod, a spring is arranged at the top end inside the guide rod, the bottom end of the spring is fixedly connected with the top end of the telescopic rod, and the top end of the guide rod is connected to the bottom end of the sliding seat through a rotating shaft.
Furthermore, the threaded rod left end all connects in the inside left end of box through the bearing, the cover is equipped with two sets of thread bush and the screw thread sets up on the threaded rod on the contrary, and is two sets of both ends all pass sliding tray and sliding seat fixed connection around the thread bush.
Furthermore, the front portion of the top end of the box body is provided with a wire releasing hole, the wire releasing hole is located in the middle of the sliding groove, and the front end of the construction wire penetrates through the wire releasing hole.
Furthermore, two groups of grooves are formed in the bottom of the box body, the rollers are respectively located in the two groups of grooves, a connecting rod is arranged inside the box body, the left end and the right end of the connecting rod are fixedly connected with the rollers, and a main gear is fixedly connected to the connecting rod.
Further, a servo motor is arranged inside the box body, the output end of the servo motor is fixedly connected with a rotating roller, the rotating roller is connected into the box body through a bearing, an auxiliary gear is fixedly connected onto the rotating roller, and the auxiliary gear is in contact with the main gear.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a cooperation between box, peg graft pole, bolt, unwrapping wire roller and the construction line, the work of carrying out the pipe laying unwrapping wire that can be more stable fast, can extract the peg graft pole through rotating the bolt for the unwrapping wire roller can be nimble install the dismantlement, the personnel of being convenient for change different construction lines according to the demand and carry out the unwrapping wire work, make the construction line can be located the intermediate position of wire casing through the setting of two sets of guide bars, overall structure is simple and stable, and reasonable in design is reliable, and it is very convenient to use;
2. the utility model discloses a box, guide bar, telescopic link, threaded rod, universal wheel and gyro wheel between the cooperation, make the utility model discloses can be stable under the state at the uniform velocity automatic carry out unwrapping wire work, no longer need personnel manual carry out unwrapping wire work, make the line of emitting can keep at the wire casing intermediate position through the cooperation between sliding tray and the spacing hole, can make through the cooperation between guide bar and the telescopic link the utility model discloses can the different wire casing of adaptation degree of depth and width carry out unwrapping wire work, the effectual work load that reduces personnel, very big improvement the work efficiency of unwrapping wire work.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall front cross-sectional structure of the present invention;
FIG. 3 is a schematic view of the top-view cross-sectional structure of the box body of the present invention;
fig. 4 is a schematic view of the sectional structure of the box body in the bottom view.
Reference numbers in the figures: 1. a box body; 2. a pay-off roller; 3. constructing a wire; 4. a guide bar; 5. a threaded rod; 6. a wire releasing hole; 7. a sliding seat; 8. a sliding groove; 9. a bolt; 10. a plug rod; 11. a support plate; 12. a guide plate; 13. a telescopic rod; 14. a universal wheel; 15. a roller; 16. a spring; 17. a threaded sleeve; 18. rotating the roller; 19. a pinion gear; 20. a servo motor; 21. a connecting rod; 22. a main gear.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
As shown in fig. 1-4, a construction pipe laying pay-off device, including box 1, unwrapping wire roller 2, construction line 3, guide bar 4 and threaded rod 5, 1 top of box is equipped with unwrapping wire roller 2, construction line 3 twines in unwrapping wire roller 2, 1 top of box is located unwrapping wire roller 2 and controls the equal fixedly connected with backup pad 11 in both ends, 11 outer ends in backup pad all are equipped with peg graft pole 10, sliding tray 8 has all been seted up at both ends around 1 box, 1 right-hand member of box is equipped with threaded rod 5, 1 bottom of box is equipped with two sets of gyro wheels 15, both ends all are equipped with two sets of sliding seat 7 around 1 box, 7 bottoms in sliding seat all are equipped with guide bar 4, 4 bottoms in guide bar all are equipped with positioning disk 12, 4 bottoms in guide bar all are equipped with telescopic link 13, 13 bottoms in telescopic link all are equipped with universal wheel 14.
As shown in fig. 2, through holes are formed in the two sets of supporting plates 11 and the box body of the pay-off roller 2, the inserting rod 10 penetrates the pay-off roller 2 through one set of supporting plate 11 to the other set of supporting plate 11, and bolts 9 are arranged at two ends of the inserting rod 10 through threads.
As shown in fig. 2, the top end of the telescopic rod 13 is located inside the guide rod 4, the top end inside the guide rod 4 is provided with a spring 16, the bottom end of the spring 16 is fixedly connected with the top end of the telescopic rod 13, and the top end of the guide rod 4 is connected to the bottom end of the sliding seat 7 through a rotating shaft.
As shown in fig. 3, the left end of the threaded rod 5 is connected to the left end inside the box body 1 through a bearing, two sets of threaded sleeves 17 are sleeved on the threaded rod 5, threads of the threaded sleeves are arranged oppositely, and the front end and the rear end of each set of threaded sleeves 17 penetrate through the sliding grooves 8 and are fixedly connected with the sliding seats 7.
As shown in figure 1, a wire releasing hole 6 is arranged at the front part of the top end of the box body 1, the wire releasing hole 6 is positioned in the middle of a sliding groove 8, and the front end of a construction wire 3 penetrates through the wire releasing hole 6.
As shown in fig. 4, two sets of grooves are formed at the bottom of the box body 1, the rollers 15 are respectively located in the two sets of grooves, a connecting rod 21 is arranged inside the box body 1, both the left and right ends of the connecting rod 21 are fixedly connected with the rollers 15, and a main gear 22 is fixedly connected to the connecting rod 21.
As shown in fig. 4, a roller 18 is fixedly connected to an output end of the servo motor 20, the roller 18 is connected to the inside of the case 1 through a bearing, a pinion 19 is fixedly connected to the roller 18, and the pinion 19 is in contact with a main gear 22.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
The utility model discloses the theory of operation: when the construction pipe laying and paying off work is carried out, firstly, a required construction wire 3 is wound on a paying-off roller 2, then the paying-off roller 2 is placed between two groups of supporting plates 11, then an inserting rod 10 is inserted into through holes in the supporting plates 11 and the paying-off roller 2 from the outer side of one end of the supporting plate 11, then two groups of bolts 9 are respectively rotatably connected with the left end and the right end of the inserting rod 10 to carry out limiting support on the paying-off roller 2, then the construction wire 3 passes through a paying-off hole 6, then two groups of guide rods 4 are placed in a wire groove, then two groups of threaded sleeves 17 are respectively driven to move by rotating a threaded rod 5, so that the guide rods 4 at the left end and the right end are respectively contacted with the inner wall of the wire groove, at the moment, a telescopic rod 13 downwards enables a universal wheel 14 to be contacted with the bottom end of the wire groove through the arrangement of a spring 16, then the front end of the construction wire 3 is pressed in the wire groove by an external heavy object, then open servo motor 20 and begin work, the roller 18 that changes this moment rotates and drives pinion 19 and rotate, and pinion 19 drives master gear 22 and connecting rod 21 and rotates, and connecting rod 21 drives two sets of gyro wheels 15 and rotates, and box 1 can remove along the wire casing this moment, can carry out stable unwrapping wire work along the wire casing through the setting of two sets of guide bars 4, very big reduction the work load of personnel's unwrapping wire, do above the utility model discloses the embodiment of preferred, the utility model discloses technical personnel in the field can also change and modify above-mentioned embodiment, consequently, the utility model discloses do not confine to foretell embodiment, all be in the field of technical personnel do any obvious improvement, replacement or the variant on the basis of the utility model discloses a protection scope.

Claims (7)

1. The utility model provides a construction pipe laying pay-off, includes box (1), unwrapping wire roller (2), construction line (3), guide bar (4) and threaded rod (5), its characterized in that: the utility model discloses a construction method, including box (1), construction line (3), wire unwinding roller (2), box (1) top are equipped with unwrapping wire roller (2), the equal fixedly connected with backup pad (11) in both ends about box (1) top is located unwrapping wire roller (2), backup pad (11) outer end all is equipped with peg graft pole (10), sliding tray (8) have all been seted up at both ends around box (1), box (1) right-hand member is equipped with threaded rod (5), box (1) bottom is equipped with two sets of gyro wheels (15), both ends all are equipped with two sets of sliding seat (7) around box (1), sliding seat (7) bottom all is equipped with guide bar (4), guide bar (4) bottom all is equipped with deflector (12), guide bar (4) bottom all is equipped with telescopic link (13), telescopic link (13) bottom all is equipped with universal wheel (14).
2. A construction pipe laying line apparatus according to claim 1, wherein: the through holes are formed in the two groups of supporting plates (11) and the box body position of the pay-off roller (2), the inserting rod (10) penetrates through the pay-off roller (2) to the other group of supporting plates (11) through one group of supporting plates (11), and bolts (9) are arranged at the two ends of the inserting rod (10) through threads.
3. A construction pipe laying line apparatus as claimed in claim 1, wherein: the telescopic link (13) top all is located inside guide bar (4), the inside top of guide bar (4) is equipped with spring (16), spring (16) bottom all with telescopic link (13) top fixed connection, guide bar (4) top all is connected in sliding seat (7) bottom through the pivot.
4. A construction pipe laying line apparatus according to claim 1, wherein: threaded rod (5) left end all connects in the inside left end of box (1) through the bearing, threaded rod (5) are gone up the cover and are equipped with two sets of thread bush (17) and the opposite setting of screw thread, and are two sets of both ends all pass sliding tray (8) and sliding seat (7) fixed connection around thread bush (17).
5. A construction pipe laying line apparatus as claimed in claim 1, wherein: box (1) top front portion is equipped with unwrapping wire hole (6), unwrapping wire hole (6) are located sliding tray (8) intermediate position, unwrapping wire hole (6) are passed to construction wire (3) front end.
6. A construction pipe laying line apparatus as claimed in claim 1, wherein: two sets of recesses have been seted up to box (1) bottom, gyro wheel (15) are located two sets of recesses respectively, box (1) inside is equipped with connecting rod (21), both ends all with gyro wheel (15) fixed connection about connecting rod (21), fixedly connected with master gear (22) on connecting rod (21).
7. A construction pipe laying line apparatus according to claim 6, wherein: the improved box is characterized in that a servo motor (20) is arranged inside the box body (1), the output end of the servo motor (20) is fixedly connected with a rotating roller (18), the rotating roller (18) is connected into the box body (1) through a bearing, an auxiliary gear (19) is fixedly connected onto the rotating roller (18), and the auxiliary gear (19) is in contact with a main gear (22).
CN202222383937.4U 2022-09-08 2022-09-08 Construction pipe laying pay-off Active CN218491113U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222383937.4U CN218491113U (en) 2022-09-08 2022-09-08 Construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222383937.4U CN218491113U (en) 2022-09-08 2022-09-08 Construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN218491113U true CN218491113U (en) 2023-02-17

Family

ID=85189896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222383937.4U Active CN218491113U (en) 2022-09-08 2022-09-08 Construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN218491113U (en)

Similar Documents

Publication Publication Date Title
CN110061451B (en) Cable pay-off is used in electric power construction
CN104795765B (en) Cable lays and lays frame
CN205687285U (en) A kind of cable drawing machine
CN111600244A (en) Assembled cable pit cable laying device
CN207774448U (en) A kind of electromechanics construction cable paying-off implement
CN218491113U (en) Construction pipe laying pay-off
CN214879131U (en) Submerged arc welding wire winding equipment
CN213387131U (en) Pay-off is used in electric power construction
CN211619666U (en) Cable take-up and pay-off device for electric power construction
CN110581459B (en) Threading construction auxiliary device for building electrical engineering and application method thereof
CN116812664A (en) Paying-off device with tension adjusting function for cable and use method of paying-off device
CN105417271A (en) Electric transmission line iron tower pile pay-off device and construction method thereof
CN113979189B (en) Automatic intelligent cable paying out machine with temporary machining function
CN206564435U (en) For the running gear for driving movable type cable crane span structure cable carding apparatus to move
CN209805262U (en) Protection device for laying power cable
CN213906124U (en) Laying device for paying-off of power cable
CN210884606U (en) Pay-off device for electric power engineering installation
CN214087063U (en) Portable cable unwrapping wire ware is used in field
CN211366566U (en) Cable unreels guiding mechanism for rolling
CN221051167U (en) Cable pay-off rack
CN214673967U (en) Auxiliary device for building electrical threading
CN111776875A (en) Cable drum lays pay-off
CN220264677U (en) Wear-resistant and drag-resistant pay-off rack for processing shielded cable
CN206767264U (en) A kind of cable draws auxiliary actinobacillus device
CN221070403U (en) Cable reel with device is tailor to cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant