CN218479528U - Combined formwork system for steel structure building concrete wallboard - Google Patents

Combined formwork system for steel structure building concrete wallboard Download PDF

Info

Publication number
CN218479528U
CN218479528U CN202222382492.8U CN202222382492U CN218479528U CN 218479528 U CN218479528 U CN 218479528U CN 202222382492 U CN202222382492 U CN 202222382492U CN 218479528 U CN218479528 U CN 218479528U
Authority
CN
China
Prior art keywords
wallboard
steel
formwork system
building concrete
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222382492.8U
Other languages
Chinese (zh)
Inventor
章泽锋
余春锋
汪永鸿
阮柯倩
沈晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG BAOSHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG BAOSHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG BAOSHENG CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG BAOSHENG CONSTRUCTION GROUP CO Ltd
Priority to CN202222382492.8U priority Critical patent/CN218479528U/en
Application granted granted Critical
Publication of CN218479528U publication Critical patent/CN218479528U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a construction technical field specifically is a steel construction building concrete wallboard's combination formwork system, including wallboard, the stupefied subassembly of steel backing and the supporting component who is used for concreting, the stupefied subassembly of steel backing is used for consolidating the wallboard, the supporting component is used for locking and consolidating the stupefied subassembly of steel backing, forms the combination formwork system. This combination formwork system of steel construction building concrete wallboard adopts the compound wall mould effective control concrete quality defect, improves reinforced concrete shear force wall shaping quality, reduces on-the-spot coping work, according to the standard operation procedure of army, improves major structure actual measurement and repair work, satisfies the requirement of owner to the engineering quality, promotes the satisfaction of construction side to the engineering quality.

Description

Combined formwork system for steel structure building concrete wallboard
Technical Field
The utility model relates to a construction technical field specifically is a steel construction building concrete wallboard's combination formwork system.
Background
With the continuous popularization of high-rise buildings, the amount of the reinforced concrete wall panels generated by the frame shear structure, the core tube structure, the stiffness structure and the like occupying the vertical members is larger and larger, and how to improve the quality and the production efficiency and reduce the production cost is necessary to be considered by technical personnel at the construction line under the condition of ensuring the safety of the structure. The conventional wallboard formwork system mainly comprises two types, wherein one type is 15 thick plywood plus square wood secondary ribs (40 × 70, 50 × 70 or 60 × 80) + phi 48 steel pipe primary ribs; one is 15-thick plywood + phi 48 steel pipe secondary edge + phi 48 steel pipe main edge, the secondary edge distance ranges from 160 to 260mm according to the thickness of the reinforced concrete wallboard, and the main edge distance ranges from 400 to 550mm. Of course, different regions may be distinguished according to local conditions.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a combination formwork system of steel construction building concrete wallboard has solved because of the multiplexing number of times greatly reduced of partial material, is difficult to reuse to reduce production efficiency to a certain extent, and improved manufacturing cost's problem.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a steel construction building concrete wallboard's combination formwork system, is including wallboard, the stupefied subassembly of steel back and the supporting component that is used for concreting, the stupefied subassembly of steel back is used for consolidating the wallboard, the supporting component is used for locking and consolidating the stupefied subassembly of steel back, forms the combination formwork system. The steel back arris has the advantages that: the wall plate has the advantages that the rigidity is high, flatness and deformation are avoided, the flatness of the wall plate can be guaranteed, the longer the wall plate is, the better the superiority of the wall plate can be, the size and the angle can be easily controlled within an allowable deviation range through setting, the use efficiency is high, the service life is long, and fasteners are avoided.
Preferably, the stupefied subassembly of steel backing includes cube pipe, and is a plurality of the cube pipe is interval form evenly distributed in the outside of wallboard, the outside of cube pipe is equipped with the horizontal square pipe that links to each other with cube pipe just horizontal square pipe carries out fixed mounting through the locating part. The advantage of square pipe: the one-step forming is repeatedly applied, the contact surface with the plate surface is large, the rigidity is better than that of a steel pipe, and the distance can be enlarged by 30mm compared with that of a square pipe; the surface cleaning is more convenient than square wood, and the surface cleaning is not warped or mildewed, and the homogeneity performance is stable. The steel back arris has the advantages that: the wall plate has the advantages that the rigidity is high, flatness and deformation are avoided, the flatness of the wall plate can be guaranteed, the longer the wall plate is, the better the superiority of the wall plate can be, the size and the angle can be easily controlled within an allowable deviation range through setting, the use efficiency is high, the service life is long, and fasteners are avoided.
Preferably, the limiting part comprises an inserting rod and a limiting plate, the inserting rod is embedded in the vertical pipe, the output end of the inserting rod extends to the outside of the horizontal pipe and is connected with the limiting plate.
Preferably, the limiting plate is positioned and installed at the output end part of the inserted rod through a fixing part and carries out limiting support on the transverse square tube.
Preferably, the supporting component comprises a plurality of main rods, and is adjacent to a plurality of groups of connecting rod components which can slide up and down along the main rods and are used for supporting the transverse pipes are arranged between the main rods.
Preferably, the top and the bottom of mobile jib are equipped with respectively and slide and two slide respectively along the both ends of mobile jib and adjust that slide, the connecting rod subassembly comprises two connecting rods that are parallel distribution and the tip of horizontal side pipe extends to between two connecting rods.
Preferably, the outside of sliding piece is equipped with and is used for carrying out spacing sliding piece spacing bolt to sliding of sliding piece, be equipped with a plurality of sliders that slide along connecting rod assembly on the connecting rod assembly just the slider is used for supporting and spacing horizontal side's pipe, the outside of slider is equipped with and is used for carrying out spacing slider spacing bolt to sliding of slider. Through the setting to the sliding part, make things convenient for personnel to adjust the adaptability between mobile jib and the floor in the supporting component according to different floor height, later through sliding part spacing bolt fixed can to can improve supporting component's stability and security, also make things convenient for personnel to be under construction above a certain extent.
Preferably, the wall panels are made of plastic.
The application of the plastic wallboard is improved: in the early stage of use, due to the lack of experience in using plastic templates, in summer, the temperature difference is large, and after being spliced in a high-temperature period of morning or afternoon, the spliced seam is 1 to 2mm due to the characteristics of the plastic when the temperature is low, and the seam gradually becomes small until the spliced seam is tightly sealed when the temperature is high.
Therefore, when the temperature is lower, a proper expansion space of 0.5 mm-1mm is required for separating the joint, and when the temperature is higher, the joint needs to be tightly jointed.
Actually measuring actual measurement after the first layer of concrete is poured and demolded, and generating two large deviation items, wherein due to the fact that plastic deformation of a plastic mold is large, the positions of secondary ridges are separated from two sides of the positions of the screws, the positions of the screws bulge outwards, and the distances are as much as 3mm to 6 mm; and forming an arc ridge between the vertical secondary ridge and the middle of two secondary ridges of the concrete wallboard, and measuring a flatness difference value of 2mm to 6mm by using a clearance gauge.
During deviation analysis, the tightness of the screw and the distance between secondary ridges are two main reasons, so that workers are required to control the bolt tightening torque to be 40 to 45N.M when tightening the screw, the secondary ridges are arranged on two sides of the screw, and the clear distance between the rest secondary ridges is controlled to be 140mm to 160mm.
The complete integral construction scheme is as follows:
the construction process comprises the following steps: paying off → checking and accepting of reinforcing steel bar binding of wall board → positioning → opening, splicing board → vertical secondary ridge → combination of steel back ridge → reinforcement → correction → pouring mold viewing → dismantling after maintenance → arrangement.
Opening a hole: according to the template construction scheme trompil, the plate is according to horizontal setting (transversely be favorable to improving the roughness of bottom), for making the plate no matter direction, face, so the trompil all adopts symmetrical arrangement, controls 460mm, and the margin distance 225mm, upper and lower 460mm, margin distance 225mm. And (5) putting plastic pipes and wall thickness stays into the splicing plates. The jointed boards are vertical 40mm 60mm square wood, and the nail pitch is controlled to be about 250 mm.
Vertical secondary corrugation: after the screw rod is placed in the secondary ridge, a back ridge is placed at the middle upper part, the gap between the back ridge and the template ranges from 60mm to 80mm, and the back ridge can be easily discharged into the secondary ridge. The corner adopts 40mm 60mm square timber "L" shape concatenation, fixes with the nail, guarantees among the reinforcement process vertical direction concatenation not to walk the shape, not the opening.
Steel backing and corrugation combination: and (4) combining the steel backing edges after the steel backing edges are completely placed, sleeving the double-beam main rod into the screw, placing the screw into the internal corner, and inserting the pin. The end sockets are special locks, and small wall stacks of 50mm to 200mm optimized by some drawings are combined by special-shaped rods (Z-shaped or L-shaped customized parts).
Reinforcing: after all the components are combined, firstly reinforcing the long wallboard to fix the position of the long wallboard, basically enabling the flatness and the verticality to be matched with the axis, then fixing the position of the internal corner, and using the internal corner to fix the position and square the internal corner when controlling the axis and the verticality; the external corner part adopts 60mm 4.75mm angle steel and the special shaping lockset for the external corner of the small steel plate, a split bolt is penetrated to split and fasten the external corner by 45 degrees, the seal head is reinforced by adopting a hook inward locking mode, and the corner part of the seal head is completely closed and compacted in the longitudinal and transverse directions.
And (3) correction: and (3) correcting after all reinforcement is finished, firstly correcting the main wall board, checking the verticality every 2m, ensuring that the verticality is within the range of 0-2mm, then checking the section size of the wall pile and the short limb, checking the verticality after the size is accurate, basically meeting the requirement of template acceptance by the verticality and the flatness in the other direction after the verticality adjustment in one direction is finished, and then checking whether the screwing degree of each screw is consistent.
Pouring and observing a mold: the special condition is basically not existed during pouring, and bolt looseness caused by excessive vibration is avoided during observation of wallboard vibration.
Maintenance and dismantling: when the square wood is dismantled, the square wood is dismantled by two persons, and the plastic mold is removed and then lightly placed on the ground.
And (3) finishing: and cleaning and oiling concrete bonded on the steel back edge assembly, and lightly scratching away the concrete crackles on the side surface of the plastic mould.
This combination formwork system of steel construction building concrete wallboard adopts the composite wall mould effective control concrete quality defect, improves reinforced concrete shear force wall shaping quality, reduces on-the-spot coping work, according to the standard operation procedure of working as one's office, improves the actual measurement of major structure and repair work, satisfies the requirement of owner to the engineering quality, promotes the satisfaction of builder to the engineering quality.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic side view of the present invention shown in fig. 1.
In the figure: 1. a wallboard; 2. a steel back corrugation assembly; 3. a support assembly; 4. a vertical tube; 5. a transverse square tube; 6. a stopper; 7. inserting a rod; 8. a limiting plate; 9. a main rod; 10. a connecting rod assembly; 11. a sliding member; 12. a connecting rod; 13. a sliding member limit bolt; 14. a slider; 15. and a sliding block limiting bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a combined formwork system of a steel structure building concrete wallboard comprises a wallboard 1 for pouring concrete, the wallboard 1 is made of plastics, the steel back arris assembly 2 comprises a plurality of upright pipes 4, the upright pipes 4 are uniformly distributed outside the wallboard 1 at intervals, a transverse pipe 5 connected with the upright pipes 4 is arranged outside the upright pipes 4, the transverse pipe 5 is fixedly installed through a limiting part 6, the limiting part 6 comprises an inserting rod 7 and a limiting plate 8, the inserting rod 7 is embedded in the upright pipes 4, the output end of the inserting rod 7 extends to the outside of the transverse pipe 5 and is connected with the limiting plate 8, the limiting plate 8 is positioned and installed at the output end part of the inserting rod 7 through a fixing part and carries out limiting support on the transverse pipe 5, the steel back arris assembly 2 is used for reinforcing the wallboard 1, the supporting assembly 3 is used for locking and reinforcing the steel back arris assembly 2 to form a combined supporting formwork system, the supporting assembly 3 comprises a plurality of main rods 9, be equipped with the multiunit between adjacent mobile jib 9 and can carry out the connecting rod subassembly 10 and the connecting rod subassembly 10 that slides about going on along mobile jib 9 and adjust and be used for supporting horizontal side pipe 5, the top and the bottom of mobile jib 9 are equipped with slide 11 respectively and two slide 11 adjust along the both ends of mobile jib 9 respectively, connecting rod subassembly 10 comprises two connecting rods 12 that are parallel distribution and the tip of horizontal side pipe 5 extends to between two connecting rods 12, slide 11's outside is equipped with and is used for carrying out spacing slide spacing bolt 13 to sliding of slide 11, it is used for supporting and spacing to horizontal side pipe 5 to be equipped with a plurality of sliders 14 and the slider 14 that slide along connecting rod subassembly 10 on connecting rod subassembly 10, the outside of slider 14 is equipped with and is used for carrying out spacing slider spacing bolt 15 to sliding of slider 14.
In the description of the present application, the terms "connect", "install", "fix", "set", etc. are used in a broad sense, for example, the term "connect" may be a fixed connection or an indirect connection through intermediate components without affecting the relationship and technical effects of the components, or may be an integral connection or a partial connection, and as in this case, for a person skilled in the art, the specific meaning of the above terms in the present invention or the present invention can be understood according to specific situations.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a combination formwork system of steel construction building concrete wallboard, includes wallboard (1) that are used for concreting, stupefied subassembly of steel backing (2) and supporting component (3), its characterized in that: the steel back edge component (2) is used for reinforcing a wallboard (1), the supporting component (3) is used for locking and reinforcing the steel back edge component (2) to form a combined formwork supporting system, the steel back edge component (2) comprises a vertical pipe (4), the vertical pipes (4) are uniformly distributed outside the wallboard (1) at intervals, a transverse square pipe (5) connected with the vertical pipe (4) is arranged outside the vertical pipe (4), and the transverse square pipe (5) is fixedly installed through a limiting piece (6); supporting component (3) include a plurality of mobile jib (9), and are adjacent be equipped with between mobile jib (9) multiunit can slide connecting rod subassembly (10) of adjusting from top to bottom along mobile jib (9) just connecting rod subassembly (10) are used for supporting horizontal side pipe (5).
2. The combined formwork system for the steel structure building concrete wall panel according to claim 1, wherein: the limiting part (6) comprises an inserting rod (7) and a limiting plate (8), the inserting rod (7) is embedded in the vertical pipe (4) and the output end of the inserting rod (7) extends to the outside of the transverse square pipe (5) and is connected with the limiting plate (8).
3. The combined formwork system for the steel structure building concrete wall panel according to claim 2, wherein: the limiting plate (8) is positioned and installed at the output end part of the inserted rod (7) through a fixing piece and carries out limiting support on the transverse square pipe (5).
4. The combined formwork system of the steel structure building concrete wallboard according to claim 1, characterized in that: the top and the bottom of mobile jib (9) are equipped with respectively sliding (11) and two sliding (11) adjust along the both ends of mobile jib (9) respectively sliding, connecting rod subassembly (10) are by two connecting rod (12) that are parallel distribution constitute and the tip of horizontal side pipe (5) extend to between two connecting rod (12).
5. The combined formwork system of the steel structure building concrete wallboard according to claim 4, characterized in that: the outside of sliding piece (11) is equipped with and is used for carrying out spacing sliding piece spacing bolt (13) to sliding of sliding piece (11), be equipped with a plurality of slider (14) that slide along connecting rod subassembly (10) on connecting rod subassembly (10) just slider (14) are used for supporting horizontal pipe (5) and spacing, the outside of slider (14) is equipped with and is used for carrying out spacing slider spacing bolt (15) to sliding of slider (14).
6. The combined formwork system for the steel structure building concrete wall panel according to claim 1, wherein: the wall panel (1) is made of plastic.
CN202222382492.8U 2022-09-06 2022-09-06 Combined formwork system for steel structure building concrete wallboard Active CN218479528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222382492.8U CN218479528U (en) 2022-09-06 2022-09-06 Combined formwork system for steel structure building concrete wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222382492.8U CN218479528U (en) 2022-09-06 2022-09-06 Combined formwork system for steel structure building concrete wallboard

Publications (1)

Publication Number Publication Date
CN218479528U true CN218479528U (en) 2023-02-14

Family

ID=85168191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222382492.8U Active CN218479528U (en) 2022-09-06 2022-09-06 Combined formwork system for steel structure building concrete wallboard

Country Status (1)

Country Link
CN (1) CN218479528U (en)

Similar Documents

Publication Publication Date Title
CN102912900A (en) Prefabricated assembled superposed plate type concrete shear wall and construction method thereof
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN114046041B (en) Template reinforcing structure of bare concrete wall post-pouring strip and construction method thereof
CN210712751U (en) Aqueduct trough body post-cast strip concrete formwork mounting structure
CN111335181A (en) Mounting support frame and mounting method for cast-in-place concrete structure template of steel-concrete composite beam flange plate
CN109853944A (en) Building frame structure square column circumference button formwork and its construction method
CN110616840A (en) Concrete laminated slab bottom plate based on steel truss and cement plate and preparation method
CN202925721U (en) Prefabricated superimposed sheet-type concrete shear wall structure
CN110616839A (en) Preparation method of concrete laminated slab bottom plate based on light steel keels and cement boards
CN112227404B (en) Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall
CN218479528U (en) Combined formwork system for steel structure building concrete wallboard
CN218437691U (en) Light-duty assembled superstructure system for reinforced concrete frame
CN111188409A (en) Anti-seismic section steel structure assembled building plate and assembling method thereof
CN115262412A (en) Construction method of assembled steel mixed bridge
CN111535578A (en) Mounting process of template of cast-in-place structure
CN216446503U (en) Reinforcing structure with template buffer cushion block
CN217760020U (en) Three-step formwork supporting device on stairs
CN211850810U (en) Cast-in-place position aluminium mould elevation adjusting device of assembled superimposed shear wall
CN213198076U (en) Concrete anchor pier aluminum template and system of anchor cable frame structure
CN116357075B (en) Construction method of multi-curved-surface stair railing of clean water modeling stair based on wood template
CN220580306U (en) Splicing seam structure of concrete laminated slab
CN219887348U (en) Integrated steel bar mould-free cast-in-place concrete mould shell parapet
RU220519U1 (en) MASONRY SUPPORT PROFILE
CN220828037U (en) Truss floor carrier plate supporting structure
CN218406456U (en) Concrete wall structure based on cavity concrete stop device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant