Aqueduct trough body post-cast strip concrete formwork mounting structure Download PDFInfo
- Publication number
- CN210712751U CN210712751U CN201921506300.1U CN201921506300U CN210712751U CN 210712751 U CN210712751 U CN 210712751U CN 201921506300 U CN201921506300 U CN 201921506300U CN 210712751 U CN210712751 U CN 210712751U
- Authority
- CN
- China
- Prior art keywords
- formwork
- aqueduct
- template
- post
- die
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型涉及一种渡槽施工工程的模板技术,尤指一种渡槽槽身后浇带混凝土模板安装结构,包括模板结构与辅助支架;模板结构包括底模、内模、外侧模、面板与拉杆梁,由U形状的模板上部与框形状的模板下部组成,外侧模与底模上下连接并设置为模板的两边外侧面,内模设置为模板的内侧面;外侧模与内模之间通过面板拼接为立体结构;外侧模与底模各设置有两处,拉杆梁搭设在两外侧模之上以通过两外侧模支撑拉杆梁;内模包括内模侧面、内模底面与内模顶面;辅助支架安装在模板上部的外侧模或内模处,包括活动背架、支架与顶托,本实用新型通过后浇带模板结构与辅助支架利于后浇带模板安装,减轻了渡槽槽身及后浇带高空作业的施工难度,提高了安全防护性能。
The utility model relates to a formwork technology for aqueduct construction engineering, in particular to a concrete formwork installation structure for a post-cast strip of aqueduct trough, comprising a formwork structure and an auxiliary support; the formwork structure comprises a bottom formwork, an inner formwork, an outer formwork, a panel and a tie rod beam, and is composed of a U-shaped formwork upper part and a frame-shaped formwork lower part, the outer formwork and the bottom formwork are connected up and down and are arranged as the two outer side surfaces of the formwork, and the inner formwork is arranged as the inner side surface of the formwork; the outer formwork and the inner formwork are spliced into a three-dimensional structure through a panel; the outer formwork and the bottom formwork are respectively arranged at two places, and the tie rod beam is erected on the two outer formworks to support the tie rod beam through the two outer formworks; the inner formwork comprises an inner formwork side surface, an inner formwork bottom surface and an inner formwork top surface; the auxiliary support is installed at the outer formwork or the inner formwork on the upper part of the formwork, and comprises a movable back frame, a support and a top support. The utility model facilitates the installation of the post-cast strip formwork through the post-cast strip formwork structure and the auxiliary support, reduces the construction difficulty of high-altitude operations of the aqueduct trough body and the post-cast strip, and improves the safety protection performance.
Description
技术领域technical field
本实用新型涉及一种渡槽施工工程的模板技术,尤指一种渡槽槽身后浇带混凝土模板安装结构。The utility model relates to a formwork technology for an aqueduct construction project, in particular to a concrete formwork installation structure poured behind the aqueduct.
背景技术Background technique
我国水资源配置工程是从水库引水,向沿线城乡生活、工业和指定地区农业供水,解决部分地区干旱缺水问题的一项大型水资源配置工程;工程建筑物包括有渡槽、明渠等,渡槽是指输送渠道水流跨越河渠、溪谷、洼地和道路的架空水槽,普遍用于灌溉输水,也用于排洪、排沙等,大型渡槽还可以通航;渡槽主要用砌石、混凝土及钢筋混凝土等材料建成,渡槽由进出口段、槽身、支承结构和基础等部分组成,其中渡槽槽身主要起输水作用,对于梁式、拱上结构为排架式的拱式渡槽,槽身还起纵向梁的作用;由于渡槽一般由多段跨分段组成,渡槽长度较长,经过的区域较多,一般为25-35m一跨,且各跨之间需要设置后浇带,均为高空作业,其安全工作非常重要,而后浇带施工过程是一个施工工序较复杂、难度偏大的工艺过程,因此在施工过程中需要设计适宜的渡槽槽身后浇带的模板结构与模板安装方法,从较高难度的步骤中进行改进以尽可能降低施工难度,有利于水资源配置工程的长期规划发展。China's water resource allocation project is a large-scale water resource allocation project that diverts water from reservoirs to supply water to urban and rural life, industry and designated areas for agriculture along the line, and solves the problem of drought and water shortage in some areas; engineering buildings include aqueducts, open channels, etc. Refers to the overhead water tank where the water flow of the conveying channel spans rivers, valleys, depressions and roads. It is generally used for irrigation and water delivery, and is also used for flood discharge and sand discharge. Large-scale aqueducts can also be navigable; aqueducts are mainly made of masonry, concrete and reinforced concrete. The aqueduct is composed of the inlet and outlet sections, the aqueduct body, the supporting structure and the foundation, among which the aqueduct body mainly plays the role of water conveyance. It acts as a longitudinal beam; since the aqueduct is generally composed of multiple spans, the aqueduct is long in length and passes through many areas, generally a span of 25-35m, and a post-casting belt needs to be set between the spans, all of which are high-altitude operations , its safety work is very important, and the construction process of the post-casting belt is a process with more complicated construction procedures and greater difficulty. Therefore, it is necessary to design an appropriate formwork structure and formwork installation method for the back-casting belt behind the aqueduct during the construction process. Improvements are made in difficult steps to reduce the construction difficulty as much as possible, which is beneficial to the long-term planning and development of water resources allocation projects.
发明内容SUMMARY OF THE INVENTION
为解决上述问题,本实用新型旨在公开一种渡槽施工工程的模板技术,尤指一种渡槽槽身后浇带混凝土模板安装结构。In order to solve the above problems, the utility model aims to disclose a formwork technology for aqueduct construction engineering, especially a concrete formwork installation structure behind the aqueduct.
为实现上述目的,本实用新型采用的技术方案是:一种渡槽槽身后浇带混凝土模板安装结构,其特征在于,所述的模板安装结构包括模板结构与辅助支架;所述模板结构包括底模、内模、外侧模、面板与拉杆梁,组装成型为匹配渡槽槽身的类U型模板,类U型模板由U形状的模板上部与框形状的模板下部组成,所述外侧模与底模上下连接并设置为模板的两边外侧面,内模设置为模板的内侧面;外侧模与内模之间通过面板拼接为立体结构;其中所述外侧模与底模各设置有两处,分别对称安装在模板两侧位置;所述拉杆梁搭设在两外侧模之上以通过两外侧模支撑拉杆梁;所述内模包括内模侧面、内模底面与内模顶面,沿面板内侧安装;所述辅助支架安装在模板上部的外侧模或内模处,包括活动背架、支架、支杆、对拉杆与顶托。In order to achieve the above purpose, the technical scheme adopted by the present invention is: an installation structure of a concrete formwork cast behind an aqueduct, characterized in that the formwork installation structure comprises a formwork structure and an auxiliary support; the formwork structure comprises a bottom formwork , The inner mold, the outer mold, the panel and the tie rod beam are assembled and formed into a U-shaped template matching the aqueduct body. The U-shaped template is composed of the upper part of the U-shaped template and the lower part of the frame-shaped template. The outer mold and bottom mold The upper and lower sides are connected and set as the outer sides of the two sides of the template, and the inner mold is set as the inner side of the template; the outer mold and the inner mold are spliced into a three-dimensional structure through the panel; wherein the outer mold and the bottom mold are each provided with two places, which are symmetrical respectively. It is installed on both sides of the template; the tie rod beam is erected on the two outer molds to support the tie rod beam through the two outer molds; the inner mold includes the inner mold side surface, the inner mold bottom surface and the inner mold top surface, and is installed along the inner side of the panel; The auxiliary support is installed at the outer mold or the inner mold on the upper part of the formwork, and includes a movable back frame, a support, a support rod, a pair of tie rods and a top support.
优选地,所述外侧模包括第一层外侧模、第二层外侧模与第三层外侧模,第一、二层外侧模为立式板块结构,依次垂直安装在面板的外侧面,且第一、二层外侧模层叠组装固定,第三层外侧模衔接在第一层外侧模顶部并倾斜朝上。Preferably, the outer molds include a first layer of outer molds, a second layer of outer molds, and a third layer of outer molds. The first and second layers of outer molds are vertical plate structures, which are vertically installed on the outer side of the panel, and the first and second layers of outer molds are vertical plate structures. The first and second layers of outer molds are stacked and assembled and fixed, and the third layer of outer molds is connected to the top of the first layer of outer molds and tilted upward.
优选地,所述内模的内模侧面包括内模上侧面与内模下侧面,分别设置在模板上部、模板下部的面板内侧面处;内模底面设置在模板上部的面板内侧面处,并与内模上侧面从下端拼接,内模顶面设置在模板下部的面板内侧面处,并与内模下侧面从上端拼接。Preferably, the side surface of the inner mold of the inner mold includes an upper side surface of the inner mold and a lower side surface of the inner mold, which are respectively arranged on the inner side of the panel on the upper part of the template and the lower part of the template; the bottom surface of the inner mold is arranged on the inner side of the panel on the upper part of the template, and It is spliced with the upper side of the inner mold from the lower end, and the top surface of the inner mold is arranged at the inner side of the panel at the lower part of the template, and is spliced with the lower side of the inner mold from the upper end.
优选地,所述内模的内模顶面为木模板结构,内模侧面与内模顶面为钢模板结构。Preferably, the top surface of the inner mold of the inner mold is a wooden formwork structure, and the side surface of the inner mold and the top surface of the inner mold are a steel formwork structure.
优选地,所述底模为衔接外侧模底端的单层或双层钢模板结构。Preferably, the bottom mold is a single-layer or double-layer steel formwork structure connecting the bottom end of the outer mold.
优选地,所述第一层外侧模为钢模板,设置为两块,左右对称连接在面板两侧,第二层外侧模为2块钢模板,分别设置在两第一层外侧模的外侧,第三层外侧模为2块钢模板,分别连接在两第一层外侧模的顶部,并倾斜朝上与第一层外侧模相交角度呈钝角。Preferably, the outer molds of the first layer are steel templates, which are arranged in two pieces, which are symmetrically connected on both sides of the panel. The outer molds of the third layer are two steel templates, which are respectively connected to the tops of the outer molds of the first layer, and are inclined upward to form an obtuse angle to intersect with the outer molds of the first layer.
优选地,所述的模板结构还包括加强固定钢筋,同时贯穿内模与外侧模后通过螺栓锁紧。Preferably, the formwork structure further includes reinforcing and fixing steel bars, which are fastened by bolts after passing through the inner mold and the outer mold at the same time.
优选地,所述辅助支架的活动背架安装在外侧模上,支架安装在模板上部,支架两端与支杆连接,支杆底端通过顶托支承式安装在模板上部的内模底面上,对拉杆安装在立杆与内模上侧面之间。Preferably, the movable back frame of the auxiliary support is installed on the outer mold, the support is installed on the upper part of the formwork, the two ends of the support are connected with the support rod, and the bottom end of the support rod is installed on the bottom surface of the inner mold on the upper part of the formwork through a jacking support type, The tie rod is installed between the vertical rod and the upper side of the inner mold.
优选地,所述的拉杆梁为拉杆横梁,横架在外侧模上方。Preferably, the tie rod beam is a tie rod beam, and the transverse frame is above the outer mold.
本实用新型的有益效果体现在:本实用新型通过提供渡槽槽身后浇带模板结构,并设置辅助支架从而利于后浇带模板安装,通过后浇带模板与辅助支架的组合减轻了渡槽槽身及后浇带高空作业的施工难度,提高了安全防护性能,防止安全事故的发生;本实用新型通过在渡槽槽身之间设置后浇带模板使得后期浇筑更加便利,而通过设置的辅助支架可根据需求进行调节位移则便于模板安装,提高后浇带模板的组装效率,且后浇带模板组成部分为后浇带整体浇筑提供了稳定牢固的施工基础,从而本实用新型在人力、时间及施工成本上均有较大幅度地降低,同时更提高施工效率,并安全可靠。The beneficial effects of the utility model are reflected in: the utility model provides a formwork structure behind the aqueduct tank, and sets auxiliary brackets to facilitate the installation of the formwork for the post-casting belt, and the combination of the back-casting belt formwork and the auxiliary support reduces the cost of the aqueduct tank body and the auxiliary support. The construction difficulty of post-casting belt high-altitude operation improves the safety protection performance and prevents the occurrence of safety accidents; the utility model makes post-casting more convenient by arranging the post-casting belt formwork between the aqueduct bodies, and the auxiliary support can be set according to the Adjusting the displacement on demand facilitates the installation of the formwork, improves the assembly efficiency of the post-casting belt formwork, and the components of the post-casting belt formwork provide a stable and firm construction foundation for the overall pouring of the post-casting belt, so that the utility model saves labor, time and construction costs. The above are greatly reduced, and at the same time, the construction efficiency is improved, and it is safe and reliable.
附图说明Description of drawings
图1是本实用新型的后浇带结构图。Fig. 1 is the structure diagram of the post-casting belt of the present invention.
图2是本实用新型的后浇带安装模板结构图。FIG. 2 is a structural diagram of a post-casting belt installation template of the present invention.
附图标注说明:1-底模,2-内模,3-外侧模,4-面板,5-拉杆梁,6-模板上部,7-模板下部,11-内模上侧面,12-内模下侧面,13-内模顶面,14-内模底面,31-第一层外侧模,32-第二层外侧模,33-第三层外侧模,91-活动背架,92-支架,93-支杆,94-对拉杆,95-顶托。Description of the drawings: 1-bottom mold, 2-inner mold, 3-outer mold, 4-panel, 5-tie beam, 6- upper part of template, 7- lower part of template, 11- upper side of inner mold, 12- inner mold Lower side, 13- top surface of inner mold, 14- bottom surface of inner mold, 31- outer mold of the first layer, 32- outer mold of the second layer, 33- outer mold of the third layer, 91- movable back frame, 92- bracket, 93-Strut, 94-Tie rod, 95-Jump.
具体实施方式Detailed ways
下面结合附图详细说明本实用新型的具体实施方式:The specific embodiments of the present utility model will be described in detail below in conjunction with the accompanying drawings:
一种渡槽槽身后浇带混凝土模板安装结构,所述的模板安装结构包括模板结构与辅助支架;所述模板结构包括底模、内模、外侧模、面板与拉杆梁,组装成型为匹配渡槽槽身的类U型模板,类U型模板由U形状的模板上部与框形状的模板下部组成,所述外侧模与底模上下连接并设置为模板的两边外侧面,内模设置为模板的内侧面;外侧模与内模之间通过面板拼接为立体结构,面板上预留开设有安装对拉杆的对拉孔;A concrete formwork installation structure poured behind an aqueduct tank, the formwork installation structure includes a formwork structure and an auxiliary support; the formwork structure includes a bottom mold, an inner mold, an outer mold, a panel and a tie rod beam, which are assembled and formed to match the aqueduct tank. The U-shaped formwork of the body is composed of the upper part of the U-shaped formwork and the lower part of the frame-shaped formwork. Side; the outer mold and the inner mold are spliced into a three-dimensional structure through a panel, and a pair of pull holes for installing the pull rods are reserved on the face plate;
其中所述外侧模与底模各设置有两处,分别对称安装在模板两侧位置;所述拉杆梁搭设在两外侧模之上以通过两外侧模支撑拉杆梁,所述外侧模包括第一层外侧模、第二层外侧模与第三层外侧模,第一、二层外侧模为立式板块结构,依次垂直安装在面板的外侧面,且第一、二层外侧模层叠组装固定,第三层外侧模衔接在第一层外侧模顶部并倾斜朝上;本实施例对外侧模尺寸进行举例,所述第一层外侧模为1300×3400钢模板,设置为两块,左右对称连接在面板两侧,第二层外侧模为2块1300×3070mm钢模板,分别设置在两第一层外侧模的外侧,第三层外侧模为2块1300×400mm钢模板,分别连接在两第一层外侧模的顶部,并倾斜朝上与第一层外侧模相交角度呈钝角;所述的拉杆梁为拉杆横梁,横架在外侧模上方;The outer mold and the bottom mold are respectively provided with two places, which are respectively installed symmetrically on both sides of the template; the tie rod beam is erected on the two outer molds to support the tie rod beam through the two outer molds, and the outer mold includes a first Layer outer mold, second layer outer mold and third layer outer mold, the first and second layer outer molds are vertical plate structures, which are vertically installed on the outer side of the panel in turn, and the first and second layer outer molds are stacked and assembled and fixed. The outer mold of the third layer is connected to the top of the outer mold of the first layer and is inclined upward; the size of the outer mold is exemplified in this embodiment. The outer mold of the first layer is a 1300×3400 steel template, which is set in two pieces and connected symmetrically on the left and right sides. On both sides of the panel, the second layer of outer molds are 2 pieces of 1300×3070mm steel templates, which are respectively set on the outside of the two first layers of outer molds, and the third layer of outer molds are 2 pieces of 1300×400mm steel templates, which are connected to the two outer molds respectively. The top of the outer mold of the first layer is inclined upward and the intersection angle with the outer mold of the first layer is an obtuse angle; the tie rod beam is a tie rod beam, and the transverse frame is above the outer mold;
所述内模包括内模侧面、内模底面与内模顶面,沿面板内侧安装;所述内模的内模侧面包括内模上侧面与内模下侧面,分别设置在模板上部、模板下部的面板内侧面处;内模底面设置在模板上部的面板内侧面处,并与内模上侧面从下端拼接,内模顶面设置在模板下部的面板内侧面处,并与内模下侧面从上端拼接,所述内模的内模顶面为木模板结构,内模侧面与内模顶面为钢模板结构;The inner mold includes an inner mold side surface, an inner mold bottom surface and an inner mold top surface, and is installed along the inner side of the panel; the inner mold side surface of the inner mold includes an inner mold upper side surface and an inner mold lower side surface, which are respectively arranged on the upper part of the template and the lower part of the template At the inner side of the panel; the bottom surface of the inner mold is set at the inner side of the upper panel of the template, and is spliced with the upper side of the inner mold from the lower end, and the top surface of the inner mold is set at the inner side of the panel at the lower part of the template, and is connected with the lower side of the inner mold from the lower end. The upper end is spliced, and the top surface of the inner mold of the inner mold is a wooden formwork structure, and the side surface of the inner mold and the top surface of the inner mold are a steel formwork structure;
所述底模为衔接外侧模底端的单层或双层钢模板结构,其中双层钢模板结构设置有两块叠置钢板,分别与第一层外侧模、第二层外侧模的厚度对应,而单层钢模板结构与第一层外侧模、第二层外侧模的组合厚度对应;本实施例中各钢模板上设置有横肋与纵肋,横肋采用8#槽钢,纵肋采用t=8mm×80mm扁钢,面板预留有对拉孔D35mm/D40mm,边框采用t=12mm×80mm扁钢,对拉杆采用D25mm精轧螺纹钢;所述的模板结构还包括加强固定钢筋,同时贯穿内模与外侧模后通过螺栓锁紧;The bottom mold is a single-layer or double-layer steel formwork structure connecting the bottom end of the outer mold, wherein the double-layer steel formwork structure is provided with two superimposed steel plates, corresponding to the thicknesses of the first layer of outer molds and the second layer of outer molds, respectively, The single-layer steel formwork structure corresponds to the combined thickness of the first layer of outer molds and the second layer of outer molds; in this embodiment, each steel formwork is provided with transverse ribs and longitudinal ribs, the transverse ribs are made of 8# channel steel, and the longitudinal ribs are made of t=8mm×80mm flat steel, the panel is reserved with a pair of pulling holes D35mm/D40mm, the frame is made of t=12mm×80mm flat steel, and the tie rod is made of D25mm fine-rolled rebar; the formwork structure also includes reinforcing and fixing steel bars, and at the same time After passing through the inner mold and the outer mold, it is locked by bolts;
所述辅助支架安装在模板上部的外侧模或内模处,包括活动背架、支架、支杆、对拉杆与顶托,所述辅助支架的活动背架安装在外侧模上,支架安装在模板上部,支架两端与支杆连接,支杆底端通过顶托支承式安装在模板上部的内模底面上,对拉杆安装在立杆与内模上侧面之间,活动背架成型为立式支架,由横支撑板、斜支撑板与立面板组成,其中立面板竖直安装在外侧模旁侧,横支撑板设置有纵向间隔平行的若干板块,分别从一边垂直安装在立面板上,另一边连接在外侧模上,斜支撑板连接在相邻的两横支撑板之间;支架安装在模板上部的中部位置,两端连接支杆,支杆顶部与拉杆梁连接,底部通过顶托与内模底面连接,对拉杆包括横向对拉杆与斜向对拉杆,横向对拉杆与斜向对拉杆均搭接在立杆与内模上侧面之间,且斜向对拉杆设置在两横向对拉杆之间,对拉杆可采用D25mm精轧螺纹钢制备;The auxiliary support is installed at the outer mold or the inner mold at the upper part of the formwork, and includes a movable back frame, a bracket, a support rod, a pair of tie rods and a top support. The movable back frame of the auxiliary support is installed on the outer mold, and the bracket is installed on the formwork. In the upper part, the two ends of the bracket are connected with the support rod. The bottom end of the support rod is installed on the bottom surface of the inner mold on the upper part of the template through the top support type, and the tie rod is installed between the vertical rod and the upper side of the inner mold. The movable back frame is formed into a vertical type The bracket is composed of a horizontal support plate, an oblique support plate and a vertical plate, wherein the vertical plate is installed vertically on the side of the outer mold, and the horizontal support plate is provided with several parallel plates at longitudinal intervals, which are respectively vertically installed on the vertical plate from one side, and the other is installed vertically on the vertical plate. One side is connected to the outer mold, and the inclined support plate is connected between the two adjacent horizontal support plates; the bracket is installed in the middle of the upper part of the template, and the two ends are connected to the support rod. The bottom surface of the inner mold is connected, and the tie rods include a horizontal tie rod and an oblique tie rod. In between, the tie rod can be prepared with D25mm finishing rebar;
本实施例中的各模板之间采用法兰连接,部分模尺寸可列举如下:内模下侧面可采用4块650×750mm钢模板,内模上侧面可采用4块650×750×150mm钢模板,内模顶面可采用5400×1100mm木模板,面板t=4mm,边缘的边框可采用t=6mm×50mm扁钢/L50×5mm角钢,钢模板的纵肋采用t=6mm×50mm扁钢,面板预留对拉孔D35mm;对于内模上侧面,其下方位置与内模底面连接处设有下倒角,可采用2块1300×1000mm钢模板,对于内模下侧面与内模顶面,由于模板下部成型为框形状,因此模板下部开设有方形通槽,内模下侧面设置在通槽侧面处,内模顶面设置在通槽顶面处;In this embodiment, flanges are used for connection between the templates, and the dimensions of some of the molds can be listed as follows: 4 pieces of 650×750mm steel templates can be used for the lower side of the inner mold, and 4 pieces of 650×750×150mm steel templates can be used for the upper side of the inner mold. , the top surface of the inner mold can use 5400×1100mm wooden formwork, the panel t=4mm, the edge frame can use t=6mm×50mm flat steel/L50×5mm angle steel, the longitudinal rib of the steel formwork can use t=6mm×50mm flat steel, The panel reserves a pair of holes of D35mm; for the upper side of the inner mold, there is a lower chamfer at the connection between the lower position and the bottom surface of the inner mold, and two 1300×1000mm steel templates can be used. For the lower side of the inner mold and the top surface of the inner mold, Since the lower part of the template is formed into a frame shape, the lower part of the template is provided with a square through groove, the lower side of the inner mold is set at the side of the through groove, and the top surface of the inner mold is set at the top surface of the through groove;
本实施例提供的一种渡槽槽身后浇带混凝土模板安装结构,安装在后浇带处,在渡槽工程中,每两跨渡槽槽身相邻设置,两渡槽槽身的相邻面为内墙,渡槽槽身朝外为外墙,后浇带设置在两跨渡槽槽身之间作为施工缝;具体模板安装的施工步骤为:This embodiment provides a concrete formwork installation structure with a back-casting belt behind an aqueduct, which is installed at the back-casting belt. In the aqueduct project, every two spans of the aqueduct are adjacent to each other, and the adjacent surfaces of the two aqueducts are inner walls. , the aqueduct body faces outward as the outer wall, and the post-casting belt is set between the two-span aqueduct bodies as construction joints; the construction steps for the specific formwork installation are:
1)固定安装后浇带底模,然后通过第一层外侧模、第二层外侧模、第三层外侧模组装形成后浇带的外侧模,通过桁架进行连接加固;1) The bottom mold of the post-casting belt is fixed and installed, and then the outer mold of the post-casting belt is formed by assembling the first layer of outer mold, the second layer of outer mold, and the third layer of outer mold, and connected and strengthened by truss;
2)安装外侧模时,首先使外侧模滑移或吊装到位,与底模的相对位置对准,用顶压杆调整外侧模的垂直度;2) When installing the outer mold, first slide or hoist the outer mold into place, align with the relative position of the bottom mold, and adjust the verticality of the outer mold with the push rod;
3)外侧模安装完成后,用连接机构(如螺栓、卡子等)加以固定牢固,并安装对拉杆;调整了其它紧固件后检查整体模板的长、宽、高尺寸及不平整度等,并做好记录;不符合要求的,应及时调整;外侧模安装应做到位置准确,连接紧密,外侧模与底模接缝密贴且不漏浆;3) After the installation of the outer formwork is completed, use the connecting mechanism (such as bolts, clips, etc.) to fix it firmly, and install the tie rod; after adjusting other fasteners, check the length, width, height and unevenness of the overall formwork, etc., And make a record; if it does not meet the requirements, it should be adjusted in time; the installation of the outer mold should be in an accurate position, the connection should be tight, and the joint between the outer mold and the bottom mold should be closely attached without leakage;
4)内模通过辅助支架进行移动式分节段拼装,内模节段拼装时,接缝内贴双面胶条;保证模板接缝严密、不漏浆,内模安装完后,检查各部位尺寸是否满足要求4) The inner mold is assembled by mobile sections through auxiliary brackets. When the inner mold is assembled in sections, double-sided adhesive tapes are attached to the joints; ensure that the joints of the template are tight and do not leak slurry. After the inner mold is installed, check all parts. Does the size meet the requirements?
5)支立式安装面板,安装顺序为先从底模处安装,再从侧模处安装;5) For the vertical installation panel, the installation sequence is to install from the bottom mold first, and then install it from the side mold;
6)安装后浇带模板整体结构后进行混凝土浇筑,并按照渡槽槽身横断面结构一次浇筑完成,后浇带模板预设止水槽,后浇带模板支立时必须保证垂直度<5mm;面板平整度<3mm,以确保后浇带混凝土外观质量符合规范要求,后浇带专用模板必须支设牢固,严密,防止漏浆,并有良好的保水作用。6) After the overall structure of the post-casting formwork is installed, the concrete is poured, and the pouring is completed at one time according to the cross-sectional structure of the aqueduct body. The post-casting formwork is preset with a water stop, and the verticality of the post-casting formwork must be guaranteed <5mm when it is erected; the panel is flat To ensure that the concrete appearance quality of the post-casting belt meets the requirements of the specification, the special formwork for the post-casting belt must be firmly and tightly supported to prevent slurry leakage and have a good water retention effect.
以上所述,仅是本实用新型的较佳实施例,并非对本实用新型的技术范围作任何限制,本行业的技术人员,在本技术方案的启迪下,可以做出一些变形与修改,凡是依据本实用新型的技术实质对以上的实施例所作的任何修改、等同变化与修饰,均仍属于本实用新型技术方案的范围内。The above are only preferred embodiments of the present utility model, and do not limit the technical scope of the present utility model. Those skilled in the art can make some deformations and modifications under the inspiration of this technical solution. Any modifications, equivalent changes and modifications made by the technical essence of the present invention to the above embodiments still fall within the scope of the technical solutions of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921506300.1U CN210712751U (en) | 2019-09-11 | 2019-09-11 | Aqueduct trough body post-cast strip concrete formwork mounting structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921506300.1U CN210712751U (en) | 2019-09-11 | 2019-09-11 | Aqueduct trough body post-cast strip concrete formwork mounting structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210712751U true CN210712751U (en) | 2020-06-09 |
Family
ID=70961093
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921506300.1U Expired - Fee Related CN210712751U (en) | 2019-09-11 | 2019-09-11 | Aqueduct trough body post-cast strip concrete formwork mounting structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210712751U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110468790A (en) * | 2019-09-11 | 2019-11-19 | 广东省水利水电第三工程局有限公司 | A kind of aqueduct body post-pouring zone construction process |
| CN113152248A (en) * | 2021-01-06 | 2021-07-23 | 中铁大桥局集团有限公司 | High pier support structure and aqueduct construction method |
| CN113174854A (en) * | 2021-04-20 | 2021-07-27 | 浙江交工金筑交通建设有限公司 | Construction method of large-span wide-body reserved post-cast-in-place box girder formwork system |
| CN114792023A (en) * | 2022-05-23 | 2022-07-26 | 广东省水利水电第三工程局有限公司 | Cast-in-place aqueduct supporting frame structure based on BIM technology and design process |
-
2019
- 2019-09-11 CN CN201921506300.1U patent/CN210712751U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110468790A (en) * | 2019-09-11 | 2019-11-19 | 广东省水利水电第三工程局有限公司 | A kind of aqueduct body post-pouring zone construction process |
| CN110468790B (en) * | 2019-09-11 | 2024-02-13 | 广东省水利水电第三工程局有限公司 | Construction process of post-pouring belt of aqueduct body |
| CN113152248A (en) * | 2021-01-06 | 2021-07-23 | 中铁大桥局集团有限公司 | High pier support structure and aqueduct construction method |
| CN113174854A (en) * | 2021-04-20 | 2021-07-27 | 浙江交工金筑交通建设有限公司 | Construction method of large-span wide-body reserved post-cast-in-place box girder formwork system |
| CN114792023A (en) * | 2022-05-23 | 2022-07-26 | 广东省水利水电第三工程局有限公司 | Cast-in-place aqueduct supporting frame structure based on BIM technology and design process |
| CN114792023B (en) * | 2022-05-23 | 2023-10-20 | 广东省水利水电第三工程局有限公司 | Cast-in-situ aqueduct support frame structure based on BIM technology and design process |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
| CN106988525A (en) | A kind of skyscraper aluminum alloy mould plate construction method | |
| CN205839568U (en) | A kind of cast-in-situ box girder model sheetinstallat structure | |
| CN114482375A (en) | Integral joint type reinforced concrete laminated slab and construction method | |
| CN105568854A (en) | Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder | |
| CN212534738U (en) | Truss Floor Slab | |
| CN111549812A (en) | Cast-in-place prefabricated formwork-free thermal insulation integrated house | |
| CN211682694U (en) | A prefabricated formwork system for a laminated slab beam factory assembly line | |
| CN211691450U (en) | A kind of anti-leakage grout device for prefabricated side pre-embedded steel bars of laminated slab beams | |
| CN210737617U (en) | Special-shaped water stop steel plate system for special part of prefabricated basement | |
| CN116290483A (en) | A prefabricated steel frame composite shear wall structure | |
| CN111733893A (en) | Post-cast strip plugging structure and construction method thereof | |
| CN114457953B (en) | A prefabricated thermal insulation structure integrated under-fill wall and its manufacturing method | |
| CN204940652U (en) | Large-span prestressed site prefabrication arch bar | |
| CN110835970A (en) | Profiled steel sheet structure and construction method | |
| CN108239968B (en) | A non-pull cast-in-place aqueduct formwork device and construction method thereof | |
| CN207959244U (en) | Prefabricated assembling type reinforced frame raft foundation alter-pouring strips mould plate | |
| CN213062545U (en) | Assembly type disassembly-free composite template | |
| CN117166540B (en) | Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process | |
| CN204059973U (en) | Tool-type body of wall one side formwork support type steel truss | |
| CN209082555U (en) | A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form open | |
| CN110820791A (en) | Water-stopping system and construction method for concrete foundation construction | |
| CN206070570U (en) | A kind of building structure | |
| CN108978494A (en) | A kind of steel pipe concrete cable-carried bowstring arch bridge construction method of base-supporting | |
| CN211691514U (en) | A prefabricated top leveling device for laminated slab beams |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200609 |
|