Pipeline laying device for road construction for municipal construction Download PDFInfo
- Publication number
- CN218468395U CN218468395U CN202222752989.4U CN202222752989U CN218468395U CN 218468395 U CN218468395 U CN 218468395U CN 202222752989 U CN202222752989 U CN 202222752989U CN 218468395 U CN218468395 U CN 218468395U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- pipeline
- laying device
- road construction
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a pipeline laying device is used in road construction for municipal construction, including adjusting part, elevating system and bearing subassembly, the adjusting part includes the guide rail, sets up in the inside threaded rod of guide rail track and sets up in the crank of threaded rod one end, elevating system is including setting up respectively in the jack of guide rail bottom and setting up in the stabilizer blade of jack bottom, the bearing subassembly including set up in guide rail track inside and with the threaded block of threaded rod adaptation with set up in the supporting part of threaded block lateral wall, the utility model discloses, through the height of jack control guide rail, the control pipeline aligns, rotates the crank for the threaded block removes, and then drives the supporting part and remove, and then docks in the preceding pipeline with the pipeline, and the bearing subassembly is used for lifting the pipeline, can weld. Therefore, the pipeline control device is simple in operation, time-saving and labor-saving, improves stability during welding, improves welding quality and improves working efficiency.
Description
Technical Field
The utility model relates to a municipal construction technical field specifically is a pipeline laying device is used in road construction for municipal construction.
Background
Municipal drainage pipeline construction engineering is one of important construction engineering of urban municipal engineering, and the quality of municipal drainage pipeline construction has a great influence on the quality of life of urban residents.
The existing pipeline laying process needs to lift a large number of pipelines at the specified groove position through a crane, then the pipelines in the grooves are lifted and welded through manpower or machines, the quality is difficult to obtain effective guarantee during manual welding, when heavy pipelines are encountered, the operation is time-consuming and labor-consuming, and the working efficiency is low.
SUMMERY OF THE UTILITY MODEL
This section is for the purpose of summarizing some aspects of embodiments of the invention and to briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and in the abstract of the specification and the title of the application to avoid obscuring the purpose of this section, the abstract of the specification and the title of the application, and such simplifications or omissions are not intended to limit the scope of the invention.
The present invention has been made in view of the above and/or the problems that exist in the use of the existing screw following support transmission structure.
Therefore, the utility model aims at providing a pipe laying device is used in road construction for municipal construction, easy operation during the control pipeline, labour saving and time saving improves the stability when welding, improves welding quality, improves work efficiency.
In order to solve the technical problem, according to the utility model discloses an aspect, the utility model provides a following technical scheme:
the utility model provides a pipeline laying device is used in road construction for municipal construction, it includes:
the adjusting assembly comprises a guide rail, a threaded rod arranged in the guide rail track and a crank arranged at one end of the threaded rod;
the lifting mechanism comprises a jack and a support leg, the jack is arranged at the bottom of the guide rail, and the support leg is arranged at the bottom of the jack;
the bearing subassembly, the bearing subassembly including set up in the guide rail track inside and with the screw thread piece of threaded rod adaptation with set up in the supporting part of screw thread piece lateral wall.
As a municipal construction is with a preferred scheme of pipe laying device for road construction, wherein, the bottom of guide rail is provided with the backup pad, the backup pad bottom is provided with the movable sleeve, the inside of movable sleeve is provided with the activity post.
As an optimal selection scheme of pipeline laying device for road construction for municipal construction, wherein, the inside of movable sleeve is provided with the elastic component, the top of activity post and the lateral wall fixed connection of elastic component.
As an optimal selection scheme of pipeline laying device for road construction for municipal construction, wherein, the outer wall of shaking hands of crank is provided with the flexible cover, and the surface of this flexible cover is provided with anti-skidding line.
As an optimal scheme of pipeline laying device for road construction for municipal construction, wherein, the lateral wall of screw thread piece is provided with the fixed plate relatively, be provided with the pivot between the fixed plate, the lateral wall of supporting part is provided with the cover and rotates the hole in the pivot.
As an optimal scheme of pipeline laying device for road construction for municipal construction, wherein, the lateral wall of screw thread piece is provided with the extension board, the top of extension board is provided with the spring that supports in the supporting part bottom, the top of supporting part is provided with the skid resistant course.
Compared with the prior art, the utility model discloses the beneficial effect who has is: this kind of pipeline laying device for road construction for municipal construction, through the height of jack control guide rail, the control duct aligns, rotates the crank, rotates through the threaded rod for the screw thread piece removes, and then drives the supporting part and removes, and then with the pipeline in the butt joint of previous pipeline, the bearing subassembly is used for lifting the pipeline, can weld. Therefore, the pipeline control device is simple in operation, time-saving and labor-saving, improves stability during welding, improves welding quality and improves working efficiency.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the present invention will be described in detail with reference to the accompanying drawings and detailed embodiments, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor. Wherein:
FIG. 1 is a schematic view of the overall structure of a pipe laying apparatus for road construction for municipal construction according to the present invention;
FIG. 2 is an exploded view of the pipe-laying apparatus for road construction for municipal construction according to the present invention;
fig. 3 is the utility model relates to a pipeline laying device's thread piece part schematic structure diagram for road construction for municipal construction.
100. An adjustment assembly; 110. a guide rail; 120. a threaded rod; 130. a crank; 200. a lifting mechanism; 210. a jack; 220. a support leg; 230. a support plate; 240. a movable sleeve; 241. a movable post; 300. a holding assembly; 310. a thread block; 311. a fixing plate; 312. a rotating shaft; 313. an extension plate; 314. a spring; 320. A support portion; 321. rotating the hole; 322. and an anti-slip layer.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings.
Next, the present invention will be described in detail with reference to the schematic drawings, and in the detailed description of the embodiments of the present invention, for convenience of explanation, the sectional view showing the device structure will not be enlarged partially according to the general scale, and the schematic drawings are only examples, and should not limit the scope of the present invention. In addition, the three-dimensional dimensions of length, width and depth should be included in the actual fabrication.
In order to make the objects, technical solutions and advantages of the present invention clearer, embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
The utility model provides a pipeline laying device is used in road construction for municipal construction, easy operation during the control pipeline, labour saving and time saving improves the stability when welding, improves welding quality, improves work efficiency.
Fig. 1 to 3 are schematic structural views illustrating an embodiment of a pipe-laying device for road construction for municipal construction according to the present invention, and referring to fig. 1 to 3, a main body of the pipe-laying device for road construction for municipal construction according to the present embodiment includes an adjusting assembly 100, a lifting mechanism 200, and a supporting assembly 300.
The adjusting assembly 100 is used for adjusting the horizontal position of the bearing assembly 300, and further horizontally moving the pipeline, specifically, the adjusting assembly 100 includes a guide rail 110, a threaded rod 120 disposed inside a track of the guide rail 110, and a crank 130 disposed at one end of the threaded rod 120, in this embodiment, a support plate 230 is disposed at the bottom of the guide rail 110, a movable sleeve 240 is disposed at the bottom of the support plate 230, a movable post 241 is disposed inside the movable sleeve 240, an elastic member is disposed inside the movable sleeve 240, the top of the movable post 241 is fixedly connected with a side wall of the elastic member, a flexible sleeve is disposed on an outer wall of a handle of the crank 130, anti-slip threads are disposed on a surface of the flexible sleeve, fixing plates 311 are disposed on opposite side walls of the threaded block 310, a rotating shaft 312 is disposed between the fixing plates 311, a rotating hole 321 fitted on the rotating shaft 312 is disposed on a side wall of the support portion 320, an extending plate 313 is disposed on a side wall of the extending plate, a spring 314 supported at the bottom of the support portion 320 is disposed on the top of the support portion 313, and an anti-slip layer 322 is disposed on the top of the support portion 320;
the lifting mechanism 200 is used for controlling the guide rail 110 to lift, so as to adjust the supporting assembly 300 to lift and lower the pipeline, and to facilitate the pipeline alignment, specifically, the lifting mechanism 200 includes a jack 210 disposed at the bottom of the guide rail 110 and a supporting foot 220 disposed at the bottom of the jack 210;
the supporting component 300 is used for lifting the pipeline, keeps the pipeline stable, and rotates through the threaded rod 120 for the screw block 310 moves, and then drives the supporting part 320 to move, and is specific, the supporting component 300 includes the screw block 310 that sets up in the guide rail 110 track inside and with the adaptation of threaded rod 120 and sets up in the supporting part 320 of screw block 310 lateral wall.
With reference to fig. 1-3, the pipeline laying device for road construction for municipal construction of this embodiment has the following specific use process, controls the height of the guide rail 110 through the jack 210, controls the alignment of the pipeline, rotates the crank 130, and rotates through the threaded rod 120, so that the threaded block 310 moves, and further drives the supporting portion 320 to move, and further butt-joints the pipeline with the previous pipeline, and the supporting component 300 is used for lifting the pipeline, i.e. welding can be performed. Therefore, the pipeline control device is simple in operation, time-saving and labor-saving, improves stability during welding, improves welding quality and improves working efficiency.
While the invention has been described above with reference to an embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the various features of the disclosed embodiments of the present invention can be used in any combination with each other, and the non-exhaustive description of these combinations in this specification is merely for the sake of brevity and resource conservation. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.
Claims (6)
1. The utility model provides a pipeline laying device is used in road construction for municipal construction which characterized in that includes:
the adjusting assembly (100) comprises a guide rail (110), a threaded rod (120) arranged in the track of the guide rail (110) and a crank (130) arranged at one end of the threaded rod (120);
the lifting mechanism (200) comprises a jack (210) and a supporting leg (220), wherein the jack (210) and the supporting leg (220) are respectively arranged at the bottom of the guide rail (110);
the supporting component (300) comprises a thread block (310) which is arranged inside the track of the guide rail (110) and matched with the threaded rod (120), and a supporting part (320) which is arranged on the side wall of the thread block (310).
2. The pipe laying device for road construction for municipal construction according to claim 1, wherein a support plate (230) is provided at the bottom of the guide rail (110), a movable sleeve (240) is provided at the bottom of the support plate (230), and a movable column (241) is provided inside the movable sleeve (240).
3. The pipe-laying apparatus for road construction for municipal construction according to claim 2, wherein the movable sleeve (240) is internally provided with an elastic member, and the top of the movable post (241) is fixedly connected to the side wall of the elastic member.
4. The pipe laying device for road construction for municipal construction according to claim 3, wherein the outer wall of the handle (130) is provided with a flexible sleeve, and the surface of the flexible sleeve is provided with anti-slip lines.
5. The pipe-laying device for road construction for municipal construction according to claim 4, wherein the side walls of the screw blocks (310) are oppositely provided with fixing plates (311), a rotating shaft (312) is provided between the fixing plates (311), and the side walls of the support parts (320) are provided with rotating holes (321) which are sleeved on the rotating shaft (312).
6. The pipe laying device for road construction for municipal construction according to claim 5, wherein the side wall of the screw block (310) is provided with an extension plate (313), the top of the extension plate (313) is provided with a spring (314) supported at the bottom of the support (320), and the top of the support (320) is provided with an anti-slip layer (322).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222752989.4U CN218468395U (en) | 2022-10-19 | 2022-10-19 | Pipeline laying device for road construction for municipal construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222752989.4U CN218468395U (en) | 2022-10-19 | 2022-10-19 | Pipeline laying device for road construction for municipal construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218468395U true CN218468395U (en) | 2023-02-10 |
Family
ID=85146584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222752989.4U Active CN218468395U (en) | 2022-10-19 | 2022-10-19 | Pipeline laying device for road construction for municipal construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218468395U (en) |
-
2022
- 2022-10-19 CN CN202222752989.4U patent/CN218468395U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108838304B (en) | Cutting construction method of anchor cable cutting machine | |
CN209754427U (en) | Three-dimensional adjusting pipeline bracket for aligning pipeline | |
CN210687447U (en) | Municipal administration is fixed bolster for heating power pipeline | |
CN210795674U (en) | Lifting platform for shaft construction | |
CN218468395U (en) | Pipeline laying device for road construction for municipal construction | |
CN208184278U (en) | A kind of novel building template support | |
CN219862430U (en) | Pushing support structure for bridge construction | |
CN203621853U (en) | Tool for replacement of upper stepped base plate device of finishing mill | |
CN208996446U (en) | A kind of column mould strengthening frame structure | |
CN206645725U (en) | A kind of adjustable bridge crane of span | |
CN213065400U (en) | Magnet separator rack device | |
CN213005851U (en) | Hidden handle structure | |
CN113957772A (en) | A bed course removes instrument of strickleing off for road paving | |
CN211681829U (en) | Crane part installation auxiliary device convenient to accurate butt joint | |
CN211145569U (en) | Mounting bracket of building component | |
CN208342810U (en) | A kind of steel support bracket | |
CN202544394U (en) | Early-dismounting template system | |
CN112854746A (en) | Inverted hanging type supporting system for steel truss floor support plate and construction method | |
CN217629456U (en) | Construction formwork support system for railway engineering multi-span continuous beam support cast-in-place method | |
CN212745315U (en) | Adjustable support is fixed with pipeline to oil | |
CN219472919U (en) | Pipeline laying supporting device for municipal engineering construction | |
CN215555699U (en) | Pipeline transport positioner is used in municipal administration pipeline construction | |
CN218780849U (en) | Culvert pipe moving device for municipal pipeline laying | |
CN209339544U (en) | A kind of construction wall plastering levelling device | |
CN215060038U (en) | Support arrangement for petroleum pipeline installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |