CN215060038U - Support arrangement for petroleum pipeline installation - Google Patents

Support arrangement for petroleum pipeline installation Download PDF

Info

Publication number
CN215060038U
CN215060038U CN202120387854.5U CN202120387854U CN215060038U CN 215060038 U CN215060038 U CN 215060038U CN 202120387854 U CN202120387854 U CN 202120387854U CN 215060038 U CN215060038 U CN 215060038U
Authority
CN
China
Prior art keywords
plate
arc
fixedly connected
shaped
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120387854.5U
Other languages
Chinese (zh)
Inventor
王建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jiasheng Petroleum Technology Co ltd
Original Assignee
Jiangsu Jiasheng Petroleum Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jiasheng Petroleum Technology Co ltd filed Critical Jiangsu Jiasheng Petroleum Technology Co ltd
Priority to CN202120387854.5U priority Critical patent/CN215060038U/en
Application granted granted Critical
Publication of CN215060038U publication Critical patent/CN215060038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a supporting device for petroleum pipeline installation, which comprises an installation bottom plate, an arc-shaped plate base and a sliding plate, the two sides of the upper part of the mounting bottom plate are respectively and fixedly connected with the bottom of the arc-shaped plate base, the upper part of the arc-shaped plate base is fixedly connected with the bottom of the sliding plate through a vertical rod, the upper part of the sliding plate is fixedly connected with a self-locking slideway, an arc-shaped supporting plate is fixedly connected between the surfaces of one side opposite to the sliding plate, the two side surfaces of the arc-shaped supporting plate are respectively in threaded connection with a pushing threaded rod, the top end of the pushing threaded rod penetrates through the arc-shaped supporting plate and is movably connected with the abutting plate I, the upper part of the self-locking slideway is slidably connected with the bottom end of the moving plate, the top end of the moving plate is fixedly connected with the bottom end of the bearing plate, the top end of the bearing plate is fixedly connected with a threaded sleeve in an inclined mode, and the internal threads of the threaded sleeve are connected with a reinforcing threaded rod.

Description

Support arrangement for petroleum pipeline installation
Technical Field
The utility model relates to a petroleum pipeline technical field, concretely relates to support arrangement of petroleum pipeline installation.
Background
The pipeline support is a mechanical assembly for aerial laying of pipelines on the ground, and is divided into a fixed support, a sliding support, a guide support, a rolling support and the like, and the pipeline support is used in any place where pipelines are laid and is also called as a pipeline support, a pipe part and the like; at present, the petroleum pipeline supporting bracket has a complex structure, is inconvenient to install quickly, and is inconvenient to install, disassemble and maintain pipelines, so that a supporting device for installing the petroleum pipeline is needed.
SUMMERY OF THE UTILITY MODEL
To the problem that above-mentioned prior art exists, the utility model provides a strutting arrangement of petroleum pipeline installation to solve the above-mentioned technical problem who mentions.
In order to achieve the above object, the utility model discloses a following technical scheme realizes: a supporting device for petroleum pipeline installation comprises an installation bottom plate, an arc-shaped plate base and a sliding plate, wherein two sides of the upper portion of the installation bottom plate are fixedly connected with the bottom of the arc-shaped plate base respectively, the upper portion of the arc-shaped plate base is fixedly connected with the bottom of the sliding plate through a vertical rod, the upper portion of the sliding plate is fixedly connected with a self-locking slide way, an arc-shaped supporting plate is fixedly connected between the opposite side surfaces of the sliding plate, two side surfaces of the arc-shaped supporting plate are respectively in threaded connection with a pushing threaded rod, the top end of the pushing threaded rod penetrates through the arc-shaped supporting plate and is movably connected with a first abutting plate, the upper portion of the self-locking slide way is slidably connected with the bottom end of a moving plate, the top end of the moving plate is fixedly connected with the bottom end of a bearing plate, the top end of the bearing plate is obliquely and fixedly connected with a threaded sleeve, the internal threads of the threaded sleeve are connected with a reinforcing threaded rod, and the bottom end of the reinforcing threaded rod is movably connected with a second abutting plate, a reinforced inclined plate is hinged between the moving plate and the bearing plate.
Furthermore, the two first abutting plates and the two second abutting plates are arranged concentrically.
Furthermore, the surface of one side, opposite to the abutting plate I and the abutting plate II, of the abutting plate I is provided with a fixedly connected wear-resistant bulge.
Furthermore, the upper part of the arc-shaped plate base is fixedly connected with the bottom of the sliding plate through three vertical rods.
Furthermore, the surfaces of the two sides of the mounting bottom plate are respectively in threaded connection with a positioning rod.
To sum up, the utility model provides a petroleum pipeline installation's strutting arrangement has mounting plate and arc base installation bearing effect, provides the gravity supporting role in the petroleum pipeline transportation, through butt plate one with butt plate two concentric circles setting, can carry out the centre gripping installation to petroleum pipeline, provide firm fixed action, through the position control effect of auto-lock slide and propulsion threaded rod, can use the location installation of the petroleum pipeline of different bores.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
in the figure: the device comprises a mounting bottom plate 1, a positioning rod 11, an arc-shaped plate base 2, a vertical rod 21, a sliding plate 3, a self-locking slideway 31, a moving plate 32, a bearing plate 33, a threaded sleeve 34, a reinforcing threaded rod 35, a second abutting plate 36, a reinforcing inclined plate 37, an arc-shaped support plate 4, a pushing threaded rod 41, a first abutting plate 42 and a wear-resistant bulge 43.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
As shown in FIG. 1, the utility model relates to a supporting device for petroleum pipeline installation, which comprises an installation bottom plate 1, an arc-shaped plate base 2 and a sliding plate 3, wherein both sides of the upper part of the installation bottom plate 1 are respectively fixedly connected with the bottom of the arc-shaped plate base 2, the upper part of the arc-shaped plate base 2 is fixedly connected with the bottom of the sliding plate 3 through a vertical rod 21, the upper part of the sliding plate 3 is fixedly connected with a self-locking slideway 31, an arc-shaped support plate 4 is fixedly connected between the opposite side surfaces of the sliding plate 31, the two side surfaces of the arc-shaped support plate 4 are respectively in threaded connection with a push threaded rod 41, the top end of the push threaded rod 41 passes through the arc-shaped support plate 4 and is movably connected with a butt plate 42, the upper part of the self-locking slideway 31 is in sliding connection with the bottom end of a movable plate 32, the top end of the movable plate 32 is fixedly connected with the bottom end of a bearing plate 33, the top end of the bearing plate 33 is fixedly connected with a threaded sleeve 34, and the internal thread of the threaded sleeve 34 is connected with a reinforcing threaded rod 35, the bottom end of the reinforcing threaded rod 35 is movably connected with a second abutting plate 36, a reinforcing inclined plate 37 is hinged between the moving plate 32 and the bearing plate 33, and the fixing function between the moving plate 32 and the bearing plate 33 is improved through the installation of the reinforcing inclined plate 37.
Further, the two first abutting plates 42 and the two second abutting plates 36 are concentrically arranged.
Furthermore, the surface of one side, opposite to the second abutting plate 36, of the first abutting plate 42 is provided with a wear-resistant protrusion 43 in fixed connection, and due to the arrangement of the wear-resistant protrusion 43, when the petroleum pipeline is clamped and fixed, the pipeline is protected from wear.
Further, the upper part of the arc-shaped plate base 2 is fixedly connected with the bottom of the sliding plate 3 through three vertical rods 21.
Further, the surfaces of the two sides of the mounting base plate 1 are respectively connected with a positioning rod 11 through screw threads.
The use mode is as follows: support sliding plate 3 through arc base 2 bearing, 3 upper portions of sliding plate are provided with auto-lock slide 31, sliding action through auto-lock slide 31 adjusts movable plate 32 and accepts board 33, realize the interval between two butt joint boards 36 and adjust, with the bore of the different pipeline of adaptation, set up arc backup pad 4 between through two sliding plates 3, support the fixed action with two butt joint boards 42, adjust through advancing threaded rod 41 screw thread, with realize interval adjustment between butt joint board 42, with the realization is suitable for different bore piping erection location, through the propulsion of two butt joint boards 42 and two butt joint boards 36, with the centre gripping fixed action of completion to the petroleum pipeline.
To sum up, the utility model provides a support arrangement for petroleum pipeline installation has mounting plate and arc base installation bearing effect, provides the gravity supporting role in the petroleum pipeline transportation, through butt plate one with the butt plate two with the centre of a circle setting, can carry out the centre gripping installation to petroleum pipeline, provides firm fixed action, through the position control effect of auto-lock slide and propulsion threaded rod, can use the location installation of the petroleum pipeline of different bores.

Claims (5)

1. The supporting device for petroleum pipeline installation is characterized by comprising an installation bottom plate (1), an arc-shaped plate base (2) and a sliding plate (3), wherein two sides of the upper part of the installation bottom plate (1) are respectively and fixedly connected with the bottom of the arc-shaped plate base (2), the upper part of the arc-shaped plate base (2) is fixedly connected with the bottom of the sliding plate (3) through a vertical rod (21), the upper part of the sliding plate (3) is fixedly connected with a self-locking slideway (31), an arc-shaped supporting plate (4) is fixedly connected between the opposite side surfaces of the sliding plate (31), the two side surfaces of the arc-shaped supporting plate (4) are respectively in threaded connection with a propelling threaded rod (41), the top end of the propelling threaded rod (41) penetrates through the arc-shaped supporting plate (4) and is movably connected with a first abutting plate (42), and the upper part of the self-locking slideway (31) is slidably connected with the bottom end of the moving plate (32), the bottom of board (33) is accepted to the top fixed connection of movable plate (32), accept top slope fixed connection thread bush (34) of board (33), the internal thread connection reinforcement threaded rod (35) of thread bush (34), the bottom swing joint of reinforcement threaded rod (35) supports board two (36), movable plate (32) and accept to articulate between board (33) and have and consolidate hang plate (37).
2. A petroleum pipeline installation support device as claimed in claim 1, wherein two of said first abutment plates (42) are concentric with two of said second abutment plates (36).
3. A supporting device for mounting petroleum pipelines as claimed in claim 1, wherein the side surface of the first abutting plate (42) opposite to the second abutting plate (36) is provided with a fixed connection wear-resistant protrusion (43).
4. A supporting device for oil pipe installation according to claim 1, characterized in that the upper part of the arc-shaped plate base (2) is fixedly connected with the bottom of the sliding plate (3) through three vertical rods (21).
5. A petroleum pipeline installation supporting device as claimed in claim 1, wherein the two side surfaces of the installation bottom plate (1) are respectively connected with a positioning rod (11) in a threaded manner.
CN202120387854.5U 2021-02-20 2021-02-20 Support arrangement for petroleum pipeline installation Active CN215060038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120387854.5U CN215060038U (en) 2021-02-20 2021-02-20 Support arrangement for petroleum pipeline installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120387854.5U CN215060038U (en) 2021-02-20 2021-02-20 Support arrangement for petroleum pipeline installation

Publications (1)

Publication Number Publication Date
CN215060038U true CN215060038U (en) 2021-12-07

Family

ID=79257083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120387854.5U Active CN215060038U (en) 2021-02-20 2021-02-20 Support arrangement for petroleum pipeline installation

Country Status (1)

Country Link
CN (1) CN215060038U (en)

Similar Documents

Publication Publication Date Title
CN201109014Y (en) Conduit butt-joint rapid alignment device
CN202846128U (en) Flange docking auxiliary device
CN209683756U (en) A kind of Municipal Engineering Construction pipeline handling device
CN203334191U (en) Steel truss girder jointing rod piece clearance adjusting device
CN208457334U (en) A kind of concrete prefabricated pipe push pipe coaster
CN110440052B (en) Movable smooth jacking mechanism for pipe jacking construction
CN107931944A (en) A kind of steel construction large-diameter pipeline butt welding erecting device and construction method
CN215060038U (en) Support arrangement for petroleum pipeline installation
CN208703275U (en) A kind of push pipe power device
CN219465297U (en) Hydraulic engineering pipeline is auxiliary fixtures for accurate butt joint
CN115218040B (en) Adjustable sliding rail support and hanger
CN105065005B (en) Curve tube coupling clamps propulsion plant
CN212338397U (en) Supporting device for natural gas pipeline
CN113187952B (en) Nodular cast iron steel pipe laying device for water conservancy construction
CN208475607U (en) Adjustable climate control water rack mounting structure
CN108817720A (en) The fast junction apparatus and its construction method of round tube
CN212004603U (en) Quick connector for stainless steel pipe fitting
CN211145569U (en) Mounting bracket of building component
CN202769052U (en) Pipeline movable cradle
CN217653378U (en) Pipeline construction equipment that municipal works were used
CN207814657U (en) A kind of pipeline hold-down support bearing 500t axial forces
CN215057358U (en) Rectangle push pipe stopping structure
CN215522246U (en) Support arrangement for water conservancy pipeline hookup location
CN218468395U (en) Pipeline laying device for road construction for municipal construction
CN215555699U (en) Pipeline transport positioner is used in municipal administration pipeline construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant