CN218449177U - Interim rack of wire - Google Patents

Interim rack of wire Download PDF

Info

Publication number
CN218449177U
CN218449177U CN202222450857.6U CN202222450857U CN218449177U CN 218449177 U CN218449177 U CN 218449177U CN 202222450857 U CN202222450857 U CN 202222450857U CN 218449177 U CN218449177 U CN 218449177U
Authority
CN
China
Prior art keywords
supporting body
wire
tower
supporter
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222450857.6U
Other languages
Chinese (zh)
Inventor
雷广涛
陈向羽
钱勇山
尹清元
杨成
卢洪毅
于国鑫
赵新
王衍聪
冯哲
张楠
石根华
卢意新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jilin Electric Power Co Ltd Shulan Power Supply Co
Jilin Power Supply Co Of State Grid Jilinsheng Electric Power Supply Co
Original Assignee
State Grid Jilin Electric Power Co Ltd Shulan Power Supply Co
Jilin Power Supply Co Of State Grid Jilinsheng Electric Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jilin Electric Power Co Ltd Shulan Power Supply Co, Jilin Power Supply Co Of State Grid Jilinsheng Electric Power Supply Co filed Critical State Grid Jilin Electric Power Co Ltd Shulan Power Supply Co
Priority to CN202222450857.6U priority Critical patent/CN218449177U/en
Application granted granted Critical
Publication of CN218449177U publication Critical patent/CN218449177U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to a wire rack temporarily, its characteristics are: the supporting seat is arranged above a cross arm of a tower, sleeved on the top end of the tower and fixedly connected, the wire fixing frame is arranged above the supporting seat and fixedly connected, and a wire is placed in the wire fixing frame so as to be temporarily fixed. The working process is as follows: before dismantling the cross arm, earlier with the utility model discloses a supporting seat of the interim rack of wire is fixed on the shaft tower top, places the wire that will dismantle between the anticreep pole, treats that new cross arm installation finishes the back, installs every wire on post insulator one by one again, and the back is finished to whole wire ligatures, takes off the interim rack of wire again, and work finishes.

Description

Interim rack of wire
Technical Field
The utility model relates to a power supply line overhauls uses instrument technical field, is a interim rack of wire.
Background
The installation and replacement of the cross arm of the tower are an important part of the work of the distribution line. In the operation of replacing the cross arm of the line tower, the wire needs to be detached from the post insulator. The prior art has 2 treatment modes for wires detached from post insulators, the first mode needs to be manually pulled and dropped after being fastened by ropes, and the first mode has the following defects: 1. when the wire falls, the possibility of damaging or smashing objects below the wire can be caused; 2. the wire may be subjected to tension to cause the sag of the line close to the tower to be uneven, thereby causing hidden danger to the operation of the line in the future; 3. lifting and pulling heavy wires also brings certain operation risks to operation personnel at the top end of the tower. The second method is to fix the detached conductor on the tower by using binding wires, and the method has the following disadvantages: 1. the wires may fall off due to the influence of factors such as insecure binding, overlarge action of operators, wind blowing and the like, and the operators and objects below the operators are damaged; 2. when the three wires are installed again, repeated binding is needed, and tower operators need to work repeatedly, so that time and labor are wasted.
Disclosure of Invention
The utility model discloses the technical problem that will solve is: the temporary wire placing frame is firm, convenient, safe, high in practicability, simple and convenient to operate, capable of saving manpower and improving efficiency, can adapt to temporary fixation of various wires when a tower cross arm is replaced, better meets the working requirement of cross arm replacement, and ensures working safety and timeliness.
The utility model provides a technical problem's scheme is: the utility model provides a interim rack of wire, characterized by: the supporting seat is arranged above a cross arm of a tower, sleeved on the top end of the tower and fixedly connected, the wire fixing frame is arranged above the supporting seat and fixedly connected, and a wire is placed in the wire fixing frame so as to be temporarily fixed.
The supporting seat comprises a first supporting body, a second supporting body and connecting pieces, the first supporting body and the second supporting body are oppositely arranged on the top end of the tower in a concave mode, the connecting pieces are located at two ends of the first supporting body and the second supporting body respectively and penetrate through the first supporting body and the second supporting body simultaneously, and therefore the first supporting body and the second supporting body are fixed on the top end of the tower to form the supporting seat.
The first supporter of supporting seat with the second supporter structure is the same, the symmetry sets up, and its structure is: it includes staple bolt and connecting portion, the staple bolt is the arc body, equally divide at the both ends of the staple bolt of the arc body and do not set up and link firmly as an organic whole connecting portion set up the through-hole that is used for wearing the dress connecting piece at connecting portion, and the staple bolt of first supporter and second supporter is concave to be set up on the shaft tower top relatively, and the dress is worn simultaneously in the through-hole that the connecting portion of first supporter and second supporter set up to fix first supporter and second supporter on the shaft tower top to the connecting piece.
And reinforcing rib plates are respectively arranged on two sides between the hoop of the first support body or the second support body of the support seat and the connecting part.
The connecting piece of the supporting seat is a bolt and a nut.
The wire fixing frame is at least two anti-falling rods, the anti-falling rods are stand columns, the anti-falling rods are arranged on the side faces or the top faces of the first supporting body or/and the second supporting body, the lower portions of the anti-falling rods are fixedly connected with the side faces or the top faces of the first supporting body or/and the second supporting body, the upper portions of the anti-falling rods are located above the first supporting body or/and the second supporting body, and a certain distance is reserved between every two adjacent anti-falling rods and used for containing wires.
The utility model discloses a working process is: before dismantling the cross arm, earlier with the utility model discloses a supporting seat of the interim rack of wire is fixed on the shaft tower top, places the wire that will dismantle between the anticreep pole, treats that new cross arm installation finishes the back, installs every wire on post insulator one by one again, and the back is finished to whole wire ligatures, takes off the interim rack of wire again, and work finishes.
The utility model has the advantages that: it can adapt to the temporary fixation of various wires when changing the shaft tower cross arm, the better work needs that satisfy the cross arm and change, ensure the security and the ageing of work, the wire whereabouts of having avoided prior art to pull the mode whereabouts existence with the manual work behind the rope toggle of wire need of following the post insulator that pulls off, probably receive the pulling force messenger and close on the pole tower circuit operation and not all cause the hidden danger in the future, bring the defect of operation risk for the operation personnel in shaft tower top, overcome and fixed the wire that has been pulled off with the ligature line and lead to droing and cause the damage to operation personnel and below object on the shaft tower, install three wires again and need relapse the ligature, shaft tower operation personnel need repetitive work, both time-consuming and hard shortcoming. The purposes of firm, convenient, safe and efficient operation of replacing the cross arm of the tower are achieved. Has the advantages of strong practicability, simple and convenient operation, labor saving and efficiency improvement.
Drawings
Fig. 1 is a schematic front view of a temporary wire placement frame of the present invention;
FIG. 2 is a top view of FIG. 1;
fig. 3 is a schematic cross-sectional view of the temporary wire placement frame of the present invention;
fig. 4 is a schematic view of the working state of the temporary wire placing rack of the present invention;
fig. 5 is a left side view of fig. 4.
In the figure: 1. the anti-disengaging device comprises a bolt, a nut 2, an anti-disengaging rod 3, a connecting part 4, a reinforcing rib plate 5, a hoop 6, a second supporting body 7, a first supporting body 8, a lead 9, a cross arm 10 and a tower 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 5, in embodiment 1, the temporary wire holding frame in this embodiment includes a supporting seat and a wire fixing frame, the supporting seat is disposed above a cross arm 10 of a tower 11, sleeved on the top end of the tower 11, and fixedly connected thereto, the wire fixing frame is disposed above the supporting seat, and fixedly connected thereto, and a wire 9 is disposed in the wire fixing frame, so as to temporarily fix the wire 9.
The supporting seat comprises a first supporting body 8, a second supporting body 7 and connecting pieces, wherein the first supporting body 8 and the second supporting body 7 are arranged on the top end of a tower 11 in a concave phase, and the connecting pieces are respectively arranged at two ends of the first supporting body 8 and the second supporting body 7 and penetrate through the first supporting body 8 and the second supporting body 7 simultaneously, so that the first supporting body 8 and the second supporting body 7 are fixed on the top end of the tower 11 to form the supporting seat.
The first supporter 8 of supporting seat with the same, the symmetry setting of second supporter 7 structure, its structure is: it includes staple bolt 6 and connecting portion 4, staple bolt 6 is the arc body, and it is as an organic whole do not set up admittedly equally at the both ends of the staple bolt 6 of the arc body connecting portion 4 sets up the through-hole that is used for wearing the dress connecting piece at connecting portion 4, and 6 concave relative settings of staple bolt of first supporter 8 and second supporter 7 are on 11 tops of shaft tower, and the dress is worn simultaneously in the through-hole that the connecting portion 4 of first supporter 8 and second supporter 7 set up to fix first supporter 8 and second supporter 7 on 11 tops of shaft tower.
Reinforcing rib plates 5 are respectively arranged on two sides between the hoop 6 and the connecting part 4 of the first supporting body 8 or the second supporting body 7 of the supporting seat.
The connecting piece of the supporting seat is a bolt 1 and a nut 2.
The solidus frame is two anticreep poles 3, anticreep pole 3 is the stand, the side of first supporter 8 is arranged in to anticreep pole 3, and the lower part of anticreep pole 3 links firmly with the side of first supporter 8, and the upper portion of anticreep pole 3 is located the top of first supporter 8, has certain distance between the adjacent anticreep pole 3 for bring wire 9 into.
The present embodiment is manufactured using prior art techniques.
The working process of the embodiment is as follows: before dismantling cross arm 10, fix the supporting seat of the interim rack of wire of this embodiment on 11 tops of shaft tower, place the wire 9 that will dismantle between anticreep pole 3, treat that new cross arm 10 installs the back that finishes, install every wire 9 on post insulator one by one again, after 9 ligatures of whole wires finish, take off the interim rack of wire again, work finishes.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a wire rack temporarily, characterized by: the supporting seat is arranged above a cross arm of a tower, sleeved on the top end of the tower and fixedly connected, the wire fixing frame is arranged above the supporting seat and fixedly connected, and a wire is placed in the wire fixing frame so as to be temporarily fixed.
2. A temporary wire rack as recited in claim 1, wherein: the supporting seat comprises a first supporting body, a second supporting body and connecting pieces, the first supporting body and the second supporting body are oppositely arranged on the top end of the tower in a concave mode, the connecting pieces are located at two ends of the first supporting body and the second supporting body respectively and penetrate through the first supporting body and the second supporting body simultaneously, and therefore the first supporting body and the second supporting body are fixed on the top end of the tower to form the supporting seat.
3. A temporary wire rack as recited in claim 2, wherein: the first supporting body and the second supporting body are the same in structure and are symmetrically arranged, and the structure is as follows: it includes staple bolt and connecting portion, the staple bolt is the arc body, equally divide at the both ends of the staple bolt of the arc body and do not set up and link firmly as an organic whole connecting portion set up the through-hole that is used for wearing the dress connecting piece at connecting portion, and the staple bolt of first supporter and second supporter is concave to be set up on the shaft tower top relatively, and the dress is worn simultaneously in the through-hole that the connecting portion of first supporter and second supporter set up to fix first supporter and second supporter on the shaft tower top to the connecting piece.
4. The temporary lead placing rack according to claim 3, which is characterized in that: and reinforcing rib plates are respectively arranged on two sides between the anchor ear and the connecting part.
5. The temporary lead placing rack according to claim 2, which is characterized in that: the connecting piece is a bolt and a nut.
6. A temporary wire rack as recited in claim 1, wherein: the wire fixing frame is at least two anti-falling rods, the anti-falling rods are stand columns, the anti-falling rods are arranged on the side faces or the top faces of the first supporting body or/and the second supporting body, the lower portions of the anti-falling rods are fixedly connected with the side faces or the top faces of the first supporting body or/and the second supporting body, the upper portions of the anti-falling rods are located above the first supporting body or/and the second supporting body, and a certain distance is reserved between every two adjacent anti-falling rods and used for containing wires.
CN202222450857.6U 2022-09-16 2022-09-16 Interim rack of wire Active CN218449177U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222450857.6U CN218449177U (en) 2022-09-16 2022-09-16 Interim rack of wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222450857.6U CN218449177U (en) 2022-09-16 2022-09-16 Interim rack of wire

Publications (1)

Publication Number Publication Date
CN218449177U true CN218449177U (en) 2023-02-03

Family

ID=85105141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222450857.6U Active CN218449177U (en) 2022-09-16 2022-09-16 Interim rack of wire

Country Status (1)

Country Link
CN (1) CN218449177U (en)

Similar Documents

Publication Publication Date Title
CN107834434A (en) Crossing method for the construction of transmission line of electricity tension stringing
CN202206067U (en) Tool for replacing line tension insulator on live
CN203412354U (en) Cross arm clamp
CN218449177U (en) Interim rack of wire
CN105401776B (en) A kind of device being used to support transmission pressure in electric pole replacement process
CN210779825U (en) Device for replacing whole string of tension insulators at cross arm end and wire end of direct-current transmission line
CN203660423U (en) Lifting device for overhead ground wire of power transmission line
CN202339358U (en) Test lead supporting device
CN108462101B (en) Six-connection three-hanging-point tension string replacement method for +/-800 kV extra-high voltage direct-current line
CN102664377A (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN214255442U (en) Transmission line insulator chain that dangles changes operation fixture
CN102255261A (en) Shifting device for two-circuit hot-line work of transmission line
CN205489269U (en) Overhead earth wire hoisting device for high tension transmission line
CN204760979U (en) Straight line pole combination formula insulator crossarm
CN2904405Y (en) 10KV grounding wire mounting and detaching insulation holder
CN203119388U (en) Multifunctional mounting rack for changing tension-resistant crossarm
CN110854736B (en) Method for assisting electric field feeding by adopting insulating bottle supporting frame
CN210779813U (en) Special tool for adjusting sag of 220kV vertically-arranged double-bundle conductor in electrified manner
CN209844017U (en) Plug-in type grounding wire installation device
CN204258228U (en) For the fixing gold utensil of line terminal and lead-in wire
CN220985232U (en) Six-split large-section wire tension paying-off pulley hanger
CN202190023U (en) Wire bracing device for overhead wire
CN220976379U (en) Auxiliary replacing device for column type insulator
CN212751629U (en) 1000kV line strain insulator string insulator replacement tool
CN204391603U (en) Charged insulating ceiling plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant