CN218438267U - Wall pipeline reservation device for finishing work - Google Patents

Wall pipeline reservation device for finishing work Download PDF

Info

Publication number
CN218438267U
CN218438267U CN202222673023.1U CN202222673023U CN218438267U CN 218438267 U CN218438267 U CN 218438267U CN 202222673023 U CN202222673023 U CN 202222673023U CN 218438267 U CN218438267 U CN 218438267U
Authority
CN
China
Prior art keywords
butt joint
framework
bottom plate
wall
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222673023.1U
Other languages
Chinese (zh)
Inventor
王大鹏
武静
马克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Dingze Construction Engineering Co ltd
Original Assignee
Anhui Dingze Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Dingze Construction Engineering Co ltd filed Critical Anhui Dingze Construction Engineering Co ltd
Priority to CN202222673023.1U priority Critical patent/CN218438267U/en
Application granted granted Critical
Publication of CN218438267U publication Critical patent/CN218438267U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a fluting wiring technical field just discloses a wall pipeline reservation device for finishing work, and this scheme includes the framework, framework top joint has the roof, framework bottom joint has the bottom plate, the framework surface is equipped with the baffle, the bottom plate bottom is equipped with reserves the subassembly, reserve the subassembly including butt joint piece, the butt joint breach has been seted up to butt joint piece both sides, the joint has aluminum alloy module in the butt joint breach, aluminum alloy module bottom end is equipped with the butt joint groove, butt joint inslot endotheca is equipped with the installed part, the mounting groove has been seted up at the framework top, the mounting groove has been seted up down to the framework bottom, the equal fixedly connected with installation piece in roof bottom and bottom plate top adopts the fashioned construction mode of integral type can realize the construction of pipeline preformed groove when the construction of pipeline preformed groove through the reservation subassembly is reserved to the design, has avoided carrying out the fluting construction to the wall, can not destroy the structural strength of wall body, reduces the production of building rubbish simultaneously.

Description

Wall pipeline reservation device for finishing work
Technical Field
The application relates to a fluting wiring technical field especially relates to a wall pipeline reservation device for finishing work.
Background
At present, building water and electricity pipelines are generally installed in a hidden mode, namely, the pipelines are arranged inside a wall structure. For pipelines hidden in a wall body, most of construction methods at the present stage are that after a concrete wall body structure is poured, construction grooving is carried out on the surface of the wall body, a cutting machine is used for cutting the groove of the wall body, then an electric drill is used for chiseling the groove on the surface of the wall body, the pipeline is installed in the groove after the required pipeline groove is formed, and finally cement mortar is used for plugging and closing the surface. But the main structure in the wall body can not be seen when the wall body is grooved, so that the reinforcing steel bars are easily damaged or even cut off in the grooving process, great potential safety hazards are brought to the structural strength of the wall body, a large amount of building wastes can be generated during grooving construction, and the cleaning work of workers is increased.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that above-mentioned proposes, this application provides a wall pipeline reservation device for fitment engineering.
The application provides a wall pipeline reservation device for finishing work adopts following technical scheme:
the utility model provides a wall pipeline reservation device for finishing, includes the framework, framework top joint has the roof, framework bottom joint has the bottom plate, the framework surface is equipped with the baffle, the bottom plate bottom is equipped with the reservation subassembly.
Through adopting above-mentioned technical scheme, form a box through framework, roof, bottom plate and baffle combination, place this box when the wall is pour and dismantle after inside shaping and take out the box, form circuit box preformed groove in the wall, put into inside shaping when pouring through the reservation subassembly wall body again and dismantle the back, form the pipeline preformed groove at the wall.
Preferably, reserve the subassembly and include the butt joint piece, the butt joint breach has been seted up to butt joint piece both sides, the joint has aluminum alloy module in the butt joint breach, aluminum alloy module bottom end is equipped with the butt joint groove, the butt joint inslot cover is equipped with the installed part, the mounting groove has been seted up at the framework top, the mounting groove has been seted up down to the framework bottom, roof bottom and the equal fixedly connected with installation piece in bottom plate top, the inside symmetry fixedly connected with fixed plate of framework, both sides the fixed plate surface all is equipped with the through-hole.
Through adopting above-mentioned technical scheme, it is fixed with the butt joint piece joint with the aluminum alloy module, the installation and the dismantlement of the aluminum alloy module of being convenient for, make the aluminum alloy module form the pipeline preformed groove at the wall when the wall is pour, installation piece joint through the roof bottom is inside last mounting groove, install the roof at the framework top, installation piece joint through the bottom plate top is inside the mounting groove under, install the bottom plate in the framework bottom, the installation of the baffle of being convenient for through the through-hole on fixed plate surface.
Preferably, the mounting block at the bottom of the top plate and the mounting block at the top of the bottom plate are respectively clamped in the upper mounting groove and the lower mounting groove.
Through adopting above-mentioned technical scheme, inside last mounting groove through the installation piece joint of roof bottom, install the roof at the framework top, inside the installation piece joint through the bottom plate top is mounting groove down, install the bottom plate in the framework bottom for framework, roof, bottom plate and baffle combination form a box.
Preferably, the butt joint block is fixed at the bottom of the bottom plate, and the baffle plate is fixed on a fixing plate in the frame body through bolts.
Through adopting above-mentioned technical scheme, will dock the piece and fix the composite set of the aluminum alloy module of being convenient for in the bottom plate, fix the baffle on the fixed plate of framework inside through the bolt, inside concrete entering framework when avoiding pouring, the dismantlement of the concrete shaping back device of being convenient for simultaneously.
Preferably, the frame body, the top plate, the bottom plate and the baffle plate are all made of aluminum alloy materials.
Through adopting above-mentioned technical scheme, the whole intensity of device is ensured through framework, roof, bottom plate and the baffle that aluminium alloy material made to subsequent cycle uses.
To sum up, this application includes following beneficial technological effect:
when reserving the subassembly at the construction of wall pipeline preformed groove through the design, installation piece joint through the roof bottom is inside last mounting groove, install the roof at the framework top, installation piece joint through the bottom plate top is inside the mounting groove down, install the bottom plate in the framework bottom, fix the baffle on the inside fixed plate of framework through the bolt, make the framework, the roof, bottom plate and baffle combination form a box, place this box inside the wall when the wall is pour, dismantle after the shaping and take out the box and form circuit box preformed groove in the wall, it is fixed with the butt joint block joint again, make the aluminum alloy module form the pipeline preformed groove at the wall when the wall is pour, the construction mode that adopts this kind of integral type shaping has avoided carrying out the fluting construction to the wall, can not destroy the structural strength of wall, reduce the production of building rubbish simultaneously.
Drawings
FIG. 1 is a schematic view of the overall structure of the application embodiment.
FIG. 2 is a schematic diagram of a rear view structure of an embodiment of the application.
FIG. 3 is a schematic structural diagram of an embodiment of the application.
Fig. 4 is a schematic front view of the application example.
Description of the reference numerals: 1. a frame body; 2. a top plate; 3. a base plate; 4. a baffle plate; 5. reserving a component; 6. a bolt; 7. mounting a mounting groove; 8. a lower mounting groove; 9. a fixing plate; 10. a through hole; 11. mounting blocks; 12. a butt joint block; 13. butting the notches; 14. an aluminum alloy module; 15. a butt joint groove; 16. and (4) a mounting piece.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses wall pipeline reservation device for finishing work. Referring to fig. 1-2, the wall surface pipeline reservation device for decoration engineering comprises a frame body 1, wherein a top plate 2 is clamped at the top of the frame body 1, a bottom plate 3 is clamped at the bottom of the frame body 1, a baffle plate 4 is arranged on the surface of the frame body 1, the top plate 2, the bottom plate 3 and the baffle plate 4 are all made of aluminum alloy materials, and a reservation component 5 is arranged at the bottom of the bottom plate 3;
framework 1 through aluminium alloy material makes, roof 2, the bulk strength of device is ensured to bottom plate 3 and baffle 4, so that subsequent recycle, through framework 1, roof 2, box is formed in combination of bottom plate 3 and baffle 4, place this box and dismantle after inside shaping and take out the box when the wall is pour, form circuit box preformed groove in the wall, put into inside shaping through preformed assembly 5 when the wall is pour and dismantle the back, form the pipeline preformed groove at the wall.
Referring to fig. 3-4, the reserved assembly 5 comprises a butt joint block 12, the butt joint block 12 is fixed at the bottom of the bottom plate 3, butt joint notches 13 are formed in two sides of the butt joint block 12, an aluminum alloy module 14 is clamped in the butt joint notches 13, a butt joint groove 15 is formed in the tail end of the bottom of the aluminum alloy module 14, a mounting piece 16 is sleeved in the butt joint groove 15, an upper mounting groove 7 is formed in the top of the frame body 1, a lower mounting groove 8 is formed in the bottom of the frame body 1, mounting blocks 11 are fixedly connected to the bottom of the top plate 2 and the top of the bottom plate 3, the mounting blocks 11 at the bottom of the top plate 2 and the mounting blocks 11 at the top of the bottom plate 3 are respectively clamped in the upper mounting groove 7 and the lower mounting groove 8, fixing plates 9 are symmetrically and fixedly connected to the inside of the frame body 1, through holes 10 are formed in the surfaces of the fixing plates 9 on two sides, and the baffle plate 4 is fixed on the fixing plates 9 inside the frame body 1 through bolts 6;
the butt joint block 12 is fixed at the bottom of the bottom plate 3, so that the aluminum alloy module 14 can be conveniently assembled and assembled, the aluminum alloy module 14 and the butt joint block 12 are fixedly clamped, the aluminum alloy module 14 can form a pipeline preformed groove on the wall surface when the wall surface is poured, the installation block 11 at the bottom of the top plate 2 is clamped inside the upper installation groove 7, the top plate 2 is installed at the top of the frame body 1, the installation block 11 at the top of the bottom plate 3 is clamped inside the lower installation groove 8, the bottom plate 3 is installed at the bottom of the frame body 1, the installation of the baffle 4 can be conveniently realized through the through hole 10 in the surface of the fixing plate 9, the frame body 1, the top plate 2, the bottom plate 3 and the baffle 4 are combined to form a box body, the box body is disassembled and taken out after the box body is placed inside the inner forming when the wall surface is poured, so that the circuit box preformed groove is formed in the wall surface, the butt joint groove 15 at the bottom of the aluminum alloy module 14 is used for facilitating the installation and connection of a plurality of the aluminum alloy modules 14, the length of the pipeline preformed groove is prolonged, the butt joint groove 15 is protected by the mounting piece 16, and the concrete is prevented from being adhered inside the butt joint groove 15, and the subsequent use is influenced.
The embodiment of the application provides a wall pipeline reservation device for decoration engineering's implementation principle does: when the wall pipeline preformed groove is under construction, install 11 joints through the installation piece of roof 2 bottom inside last mounting groove 7, install roof 2 at 1 top of framework, install 11 joints through the installation piece at 3 tops of bottom plate inside mounting groove 8 down, install bottom plate 3 in 1 bottom of framework, fix baffle 4 on the fixed plate 9 of framework 1 inside through bolt 6, the concrete gets into framework 1 inside when avoiding pouring, and be convenient for the dismantlement of concrete shaping back-end device, make framework 1, roof 2, bottom plate 3 and baffle 4 combination form a box, place this box inside the wall when the wall is pour, dismantle after the shaping and take out the box and form circuit box preformed groove in the wall, again with aluminum alloy module 14 and butt-joint block 12 joint fixed, make aluminum alloy module 14 form the pipeline preformed groove at the wall when the wall is pour.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a wall pipeline reservation device for finishing work, includes framework (1), its characterized in that: the top of the frame body (1) is connected with a top plate (2) in a clamped mode, the bottom of the frame body (1) is connected with a bottom plate (3) in a clamped mode, a baffle (4) is arranged on the surface of the frame body (1), and a reserved assembly (5) is arranged at the bottom of the bottom plate (3).
2. The wall surface pipeline reservation device for decoration engineering of claim 1, characterized in that: reserve subassembly (5) including butt joint piece (12), butt joint breach (13) have been seted up to butt joint piece (12) both sides, joint has aluminum alloy module (14) in butt joint breach (13), aluminum alloy module (14) bottom end is equipped with butt joint groove (15), butt joint groove (15) endotheca is equipped with installed part (16), mounting groove (7) have been seted up at framework (1) top, mounting groove (8) have been seted up down to framework (1) bottom, roof (2) bottom and the equal fixedly connected with installation piece (11) in bottom plate (3) top, framework (1) inside symmetry fixedly connected with fixed plate (9), both sides fixed plate (9) surface all is equipped with through-hole (10).
3. The wall surface pipeline reservation device for decoration engineering of claim 2, characterized in that: the mounting block (11) at the bottom of the top plate (2) and the mounting block (11) at the top of the bottom plate (3) are respectively clamped in the upper mounting groove (7) and the lower mounting groove (8).
4. The wall surface pipeline reservation device for decoration engineering of claim 2, characterized in that: the butt joint block (12) is fixed to the bottom of the bottom plate (3), and the baffle (4) is fixed to a fixing plate (9) inside the frame body (1) through bolts (6).
5. The wall surface pipeline reservation device for finishing work of claim 1, characterized in that: the frame body (1), the top plate (2), the bottom plate (3) and the baffle (4) are all made of aluminum alloy materials.
CN202222673023.1U 2022-10-11 2022-10-11 Wall pipeline reservation device for finishing work Active CN218438267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222673023.1U CN218438267U (en) 2022-10-11 2022-10-11 Wall pipeline reservation device for finishing work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222673023.1U CN218438267U (en) 2022-10-11 2022-10-11 Wall pipeline reservation device for finishing work

Publications (1)

Publication Number Publication Date
CN218438267U true CN218438267U (en) 2023-02-03

Family

ID=85041778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222673023.1U Active CN218438267U (en) 2022-10-11 2022-10-11 Wall pipeline reservation device for finishing work

Country Status (1)

Country Link
CN (1) CN218438267U (en)

Similar Documents

Publication Publication Date Title
CN202390925U (en) Composite decorative concrete
CN210947188U (en) Connecting joint of U-shaped steel-concrete composite beam and steel pipe concrete column
CN108222066A (en) A kind of combined steel formwork support system and its construction method
CN114704080A (en) Aluminum template and PC (polycarbonate) component combined mold hanging system and construction method
CN218438267U (en) Wall pipeline reservation device for finishing work
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN111608314B (en) Bidirectional superimposed sheet concrete structure and integral joint construction method thereof
CN213971755U (en) Lintel integrated prefabricated combined type water and electricity switch control box die
CN204645415U (en) A kind of precast beam with liner plate
CN104746791A (en) Wallboard manufactured by filling semi-rigid frame with recycled concrete and manufacturing method
CN108894518A (en) A kind of supporter and its construction method of erecting plate
CN210622327U (en) Concrete pouring and tamping construction device for reinforced dense beam column joints
CN212641881U (en) Bidirectional laminated slab concrete structure
CN212385649U (en) Flashing PC steel mould is decorated to roofing parapet
CN211447752U (en) Early-dismantling aluminum alloy template supporting structure
CN111535581A (en) Convenient and fast mounting and dismounting type combined prefabricated formwork applicable to building floor lowering position
CN208594743U (en) Environment-friendly type floor reserves post-cast strip mold
CN208996473U (en) A kind of supporter of erecting plate
CN112809891A (en) Construction method of prefabricated wall board and used preformed hole tool
CN108643557A (en) Environment-friendly type floor reserves post-cast strip mold
CN206539052U (en) A kind of both balconied strengthening reconstruction structure
CN217501048U (en) Shear force wall water supply pipe secretly applies preformed groove mould
CN211037825U (en) K board corner connection reinforcing apparatus
CN208363615U (en) A kind of door opening template mounting structure
CN212001577U (en) Reinforcement subassembly of usefulness is connected to light gauge steel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant