CN218438084U - Construction platform convenient to equipment - Google Patents

Construction platform convenient to equipment Download PDF

Info

Publication number
CN218438084U
CN218438084U CN202222443442.6U CN202222443442U CN218438084U CN 218438084 U CN218438084 U CN 218438084U CN 202222443442 U CN202222443442 U CN 202222443442U CN 218438084 U CN218438084 U CN 218438084U
Authority
CN
China
Prior art keywords
construction platform
platform
screw
support frame
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222443442.6U
Other languages
Chinese (zh)
Inventor
姜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhongxin Construction Engineering Co ltd
Original Assignee
Shaanxi Zhongxin Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Zhongxin Construction Engineering Co ltd filed Critical Shaanxi Zhongxin Construction Engineering Co ltd
Priority to CN202222443442.6U priority Critical patent/CN218438084U/en
Application granted granted Critical
Publication of CN218438084U publication Critical patent/CN218438084U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction platform convenient to equipment, which comprises a supporting rack, cross support bar and construction platform, the spout has been seted up to every support frame side, and the inside first screw of a plurality of having seted up of spout, and first screw is equidistant distribution along spout longitudinal position, fixedly connected with dead lever between two support frames, cross support bar runs through the axostylus axostyle and keeps rotating the setting, and the inboard fixedly connected with slider of cross support bar, the utility model discloses, when using, the support frame of staff pulling both sides, cross support bar passes through the axostylus axostyle and rotates, and the slider is close to along spout direction removal gradually, moves the certain distance when the support frame, uses the bolt to run through inside the first screw in through-hole until the spout, can fix cross support bar, rethread couple is fixed in on the dead lever, can fix fixing base and ladder, simultaneously according to the interval between the supporting legs, pulling extension platform, through the U-shaped buckle of extension platform and construction platform lower extreme be fixed in on the dead lever.

Description

Construction platform convenient to equipment
Technical Field
The utility model belongs to the technical field of the architectural equipment, concretely relates to construction platform convenient to equipment.
Background
The construction platform is a device for building construction of workers, is mainly used for providing a construction platform for constructors due to the fact that corresponding construction positions are lacked when the workers are in construction, and is convenient for the constructors to support and carry out construction operation.
Chinese patent application No. CN201820791164.4 discloses a construction platform convenient to installation, including the support frame, the quantity of support frame is four, and two are adjacent far away the support frame is a set of, every group fixedly connected with stabilizing rod between the support frame, and two are adjacent nearer the support frame is a set of, every group be connected with the connecting rod between the support frame, the one end of connecting rod runs through two support frames and extends to the right side and the threaded connection of support frame and fastening nut, and is adjacent be equipped with the connecting plate between the support frame, the equal fixedly connected with extension rod in both ends of connecting plate, two the extension rod extends to the inside of two support frames respectively, the bottom swing joint of support frame has the threaded rod, the surface screw thread of threaded rod has cup jointed the control cap, the top of control cap contacts with the bottom of support frame, the lateral surface fixedly connected with connecting bolt of support frame, the outside of connecting bolt is equipped with the fixed plate, the surface fixedly connected with inserted bar of fixed plate, the bottom of inserted bar is pegged graft with the top of connecting bolt mutually, the side fixedly connected with down tube and flat bar that the fixed plate kept away from the inserted bar stabilizes, the equal fixedly connected with adapter sleeve of the other side of down tube, two foot rests.
In view of the above-mentioned related art, the inventors found that at least the following problems exist in the art: this construction platform when the installation, need install parts such as firm foot rest, firm intersection pole and construction platform respectively, this mode leads to the part of equipment too much, and convenient and fast enough, good and young have reduced construction platform's packaging efficiency, and this construction platform's space is comparatively limited simultaneously, when many people are under construction on the platform, bumps easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction platform convenient to equipment to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a construction platform convenient to equipment, includes support frame, cross bracing piece and construction platform, every the spout has been seted up to the support frame side, and the inside first screw of a plurality of having seted up of spout to first screw is equidistant distribution, two along spout longitudinal position fixedly connected with dead lever between the support frame, cross bracing piece runs through the axostylus axostyle and keeps rotating the setting, and the inboard fixedly connected with slider of cross bracing piece, one of them the slider length on cross bracing piece surface is greater than another the slider length on cross bracing piece surface, and the slider all keeps sliding the setting with the spout, construction platform one side activity is provided with the extension platform, and construction platform and the equal fixedly connected with supporting seat of extension platform lower extreme to supporting seat lower extreme fixedly connected with U-shaped buckle to construction platform and extension platform are fixed in the support frame upper end through U-shaped buckle and dead lever.
As a preferred embodiment, a hook is arranged outside one of the fixing rods, the hook is fixed on the side surface of the fixing seat, and a ladder is fixedly connected to the lower end of the fixing seat.
As a preferred embodiment, a through hole is formed through the surface of the slider, and the slider is fixed inside the sliding chute through the through hole and the first screw hole by a bolt.
As a preferred embodiment, the lower end of the construction platform is provided with a slide rail, and the extension platform is slidably disposed in the slide rail.
In a preferred embodiment, a third screw hole is formed through the surface of the extension platform, and a second screw hole matched with the third screw hole is formed through the surface of the construction platform.
As a preferred embodiment, a universal wheel is fixedly connected to the lower end of each support frame.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses, when using, the staff stimulates the support frame of both sides, the cross bracing piece passes through the axostylus axostyle rotation, and the slider moves along the spout direction and is close to gradually, when the support frame moves a certain distance, use the bolt to run through the through-hole until inside the first screw in the spout, can fix the cross bracing piece, rethread couple are fixed on the dead lever, can fix fixing base and ladder, simultaneously according to the interval between the supporting legs, stimulate extension platform, fix on the dead lever through the U-shaped buckle of extension platform and construction platform lower extreme, can accomplish the installation of extension platform and construction platform, reuse the bolt to run through second screw and third screw, strengthen the fixing between extension platform and the construction platform, can accomplish the equipment of this platform, and when dismantling, only need to take out the bolt in the screw in first screw and second screw and the third screw, promote the support frame to the central direction, the slider moves along spout both sides direction, prolong the platform and slide to the construction platform in, can accomplish the accomodating of this platform, need not to carry out the multilayer dismantlement, alleviate the work burden of staff, through this mode, need not to install or dismantle a plurality of parts, and the staff's swiftly to use, and the efficiency has improved;
2. when the space that should make the platform is less, when the constructor of being not convenient for was under construction on construction platform, dismantle the screw in first screw and second screw and the third screw, once more to both sides pulling support frame, interval between the adjustment support frame, the slider slides once more at this moment and is close to, the extension platform is elongated immediately simultaneously, can reach the holistic length of adjustment platform, and then enlarge the platform space, make things convenient for the staff to be under construction, later with the bolt be fixed in again in first screw and second screw and third screw, be used for fixed cross bracing piece and extension platform.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of a construction platform and an extension platform of the structure of the present invention;
FIG. 3 is a schematic view of the structure of the cross support rod of the present invention;
fig. 4 is a schematic view of the supporting frame structure of the present invention.
In the figure: 1. a support frame; 101. a universal wheel; 2. a fixing rod; 3. a chute; 31. a first screw hole; 4. a fixed seat; 5. a ladder; 6. hooking; 7. a construction platform; 71. a slide rail; 72. a supporting seat; 73. a U-shaped buckle; 8. extending the platform; 9. a second screw hole; 10. a third screw hole; 11. cross bracing pieces; 12. a slider; 13. a shaft lever; 14. and a through hole.
Detailed Description
The present invention will be further described with reference to the following examples.
The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention. The condition in the embodiment can be further adjusted according to concrete condition the utility model discloses a it is right under the design prerequisite the utility model discloses a simple improvement of method all belongs to the utility model discloses the scope of claiming.
Referring to fig. 1-4, the utility model provides a construction platform convenient to assemble, including support frame 1, cross support bar 11 and construction platform 7, each support frame 1 side has seted up spout 3, and has seted up a plurality of first screw 31 in the spout 3, and first screw 31 is along spout 3 longitudinal position to be equidistant distribution, two fixedly connected with dead lever 2 between the support frame 1, cross support bar 11 runs through axostylus axostyle 13 and keeps rotating the setting, and cross support bar 11 inboard fixedly connected with slider 12, the slider 12 length on one of them cross support bar 11 surface is greater than the slider 12 length on the other cross support bar 11 surface, and slider 12 all keeps sliding arrangement with spout 3, construction platform 7 one side activity is provided with extension platform 8, and construction platform 7 and extension platform 8 lower extreme all fixedly connected with supporting seat 72, and supporting seat 72 lower extreme fixedly connected with U-shaped buckle 73, and construction platform 7 and extension platform 8 are fixed in support frame 1 upper end through U-shaped buckle 73 and dead lever 2; support frame 1 of staff pulling both sides, cross support bar 11 passes through axostylus axostyle 13 and rotates, and slider 12 removes along 3 directions of spout and is close to gradually, move the certain distance when support frame 1, use the bolt to run through inside first screw 31 in through-hole 14 until spout 3, can fix cross support bar 11, rethread couple 6 is fixed in on the dead lever 2, can fix fixing base 4 and ladder 5, simultaneously according to the interval between the supporting legs, pulling extension platform 8, U-shaped buckle 73 through extension platform 8 and construction platform 7 lower extreme is fixed in on the dead lever 2, can accomplish the installation of extension platform 8 and construction platform 7.
In the embodiment, a hook 6 is arranged on the outer side of one of the fixing rods 2, the hook 6 is fixed on the side surface of the fixing seat 4, and the lower end of the fixing seat 4 is fixedly connected with a ladder 5; through setting up couple 6 for be fixed in fixing base 4 dead lever 2 one side, the staff of being convenient for installs and dismantles ladder 5 at any time.
In this embodiment, a through hole 14 is formed through the surface of the slider 12, and the slider 12 is fixed inside the chute 3 through the through hole 14 and the first screw hole 31 by a bolt; through having set up first screw 31 and through-hole 14, cross support bar 11 is fixed in between support frame 1 through bolt through-hole 14 and first screw 31 for support and fixed support frame 1 avoid support frame 1 to receive universal wheel 101 to influence the removal.
In this embodiment, the lower end of the construction platform 7 is provided with a slide rail 71, and the extension platform 8 is slidably disposed in the slide rail 71; through having set up slide rail 71, extension platform 8 keeps sliding arrangement through slide rail 71 and construction platform 7, and then is convenient for the staff to adjust the whole length of support frame 1 upper end platform at any time to enlarge the platform space.
In this embodiment, a third screw hole 10 is formed through the surface of the extension platform 8, and a second screw hole 9 matched with the third screw hole 10 is formed through the surface of the construction platform 7; through having set up third screw 10 and second screw 9, run through third screw 10 and second screw 9 through the bolt, further fixed construction platform 7 and extension platform 8, when avoiding the staff to construct on the platform, produce between construction platform 7 and the extension platform 8 and slide.
In this embodiment, the lower end of each support frame 1 is fixedly connected with a universal wheel 101; through having set up universal wheel 101, the staff of being convenient for removes support frame 1, and then adjusts the interval between the support frame 1, or adjusts the overall position of support frame 1.
The utility model discloses a theory of operation and use flow: when the support frame is used, a worker pulls the support frames 1 on two sides, the cross support rods 11 rotate through the shaft rods 13, the sliding blocks 12 move along the sliding grooves 3 and gradually approach, when the support frame 1 moves for a certain distance, bolts penetrate through the through holes 14 to the inside of the first screw holes 31 in the sliding grooves 3, the cross support rods 11 can be fixed, the sliding blocks are fixed on the fixed rods 2 through the hooks 6, the fixed seats 4 and the ladders 5 can be fixed, meanwhile, the extension platforms 8 are pulled according to the distance between the supporting legs, the extension platforms 8 are fixed on the fixed rods 2 through the U-shaped buckles 73 at the lower ends of the extension platforms 8 and the construction platforms 7, installation of the extension platforms 8 and the construction platforms 7 can be completed, the bolts penetrate through the second screw holes 9 and the third screw holes 10, fixation between the extension platforms 8 and the construction platforms 7 is strengthened, assembly of the platforms can be completed, when the space between the platforms is small, the worker is inconvenient to construct on the construction platforms 7, the first screw holes 31, the second screw holes 9 and the third screw holes 10 are detached, the support frame 1 is pulled towards two sides again, the distance between the support frames 1 is adjusted, the sliding blocks 12 slide to approach immediately, the extension platforms 8, the integral length of the extension platforms can be adjusted, the integral support rods can be conveniently fixed with the third screw holes 10, and the cross support platforms, and the integral support platforms can be fixed in the extension platforms, and the cross support platforms can be conveniently.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction platform convenient to equipment, includes support frame (1), cross bracing piece (11) and construction platform (7), its characterized in that: every spout (3) have been seted up to support frame (1) side, and spout (3) are inside to be seted up a plurality of first screw (31), and first screw (31) are equidistant distribution, two along spout (3) longitudinal position fixedly connected with dead lever (2) between support frame (1), cross bracing piece (11) run through axostylus axostyle (13) and keep rotating the setting, and cross bracing piece (11) inboard fixedly connected with slider (12), one of them the slider (12) length on cross bracing piece (11) surface is greater than another slider (12) length on cross bracing piece (11) surface, and slider (12) all keep sliding the setting with spout (3), construction platform (7) one side activity is provided with extension platform (8), and construction platform (7) and extension platform (8) lower extreme equal fixedly connected with supporting seat (72), and supporting seat (72) lower extreme fixedly connected with U-shaped buckle (73), and construction platform (7) and extension platform (8) are fixed in support frame (1) upper end through U-shaped buckle (73) and dead lever (2).
2. The construction platform facilitating assembly of claim 1, wherein: one of them dead lever (2) outside is provided with couple (6), and couple (6) are fixed in fixing base (4) side, fixing base (4) lower extreme fixedly connected with ladder (5).
3. The construction platform facilitating assembly of claim 1, wherein: the surface of the sliding block (12) is provided with a through hole (14) in a penetrating mode, and the sliding block (12) is fixed inside the sliding groove (3) through the through hole (14) and the first screw hole (31) through bolts.
4. The construction platform facilitating assembly of claim 1, wherein: slide rail (71) have been seted up to construction platform (7) lower extreme, and extension platform (8) slide to be set up in slide rail (71).
5. The construction platform facilitating assembly of claim 1, wherein: the extension platform (8) surface runs through and has seted up third screw (10), the construction platform (7) surface runs through and has seted up with third screw (10) complex second screw (9).
6. The construction platform facilitating assembly of claim 1, wherein: the lower end of each support frame (1) is fixedly connected with a universal wheel (101).
CN202222443442.6U 2022-09-15 2022-09-15 Construction platform convenient to equipment Active CN218438084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222443442.6U CN218438084U (en) 2022-09-15 2022-09-15 Construction platform convenient to equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222443442.6U CN218438084U (en) 2022-09-15 2022-09-15 Construction platform convenient to equipment

Publications (1)

Publication Number Publication Date
CN218438084U true CN218438084U (en) 2023-02-03

Family

ID=85104574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222443442.6U Active CN218438084U (en) 2022-09-15 2022-09-15 Construction platform convenient to equipment

Country Status (1)

Country Link
CN (1) CN218438084U (en)

Similar Documents

Publication Publication Date Title
CN106088587B (en) A kind of Combined formwork support system
CN111335660A (en) Assembled wallboard strutting arrangement
CN206289964U (en) For the climbing form system of sloping core construction
CN107975251A (en) A kind of assembled architecture wallboard combines support device
CN218438084U (en) Construction platform convenient to equipment
CN205804939U (en) template assembly for subway station side wall
CN210239225U (en) Interim steel construction stair that building engineering used
CN206016258U (en) A kind of adjusting beam bed die plate supporting device
CN207582983U (en) A kind of supporting apparatus of steel structure hoisting construction
CN217151174U (en) Construction is with convenient to detach's supplementary installation device of scaffold frame
CN214006440U (en) Extensible scaffold platform is assisted in engineering construction
CN205189410U (en) Hang mould template triangle location support frame with adjustable
CN205591504U (en) Stair railing installs auxiliary device
CN205935654U (en) Modular formwork support system
CN205476383U (en) Novel high formwork combination formula support frame
CN213572923U (en) Portable stair scaffold
CN212453616U (en) Energy-conserving stable template fixed bolster for building
CN208949829U (en) A kind of truss-like cantilever form
CN209723600U (en) A kind of floor of steel structure construction suspension type exempts from support for shuttering
CN107461029B (en) Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting
CN207228594U (en) A kind of door-type scaffold of adjustment height
CN201574572U (en) Angle-adjustable hanging rack for operation platform
CN109518946B (en) Multidirectional positioning support frame for semi-solid forming
CN219281334U (en) Balcony facade protective structure
CN220954574U (en) Detachable wall connecting piece device of outer protection scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant