CN207582983U - A kind of supporting apparatus of steel structure hoisting construction - Google Patents

A kind of supporting apparatus of steel structure hoisting construction Download PDF

Info

Publication number
CN207582983U
CN207582983U CN201721408555.5U CN201721408555U CN207582983U CN 207582983 U CN207582983 U CN 207582983U CN 201721408555 U CN201721408555 U CN 201721408555U CN 207582983 U CN207582983 U CN 207582983U
Authority
CN
China
Prior art keywords
support bar
lower support
upper support
connect
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721408555.5U
Other languages
Chinese (zh)
Inventor
丁波
黄永斌
陈�峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201721408555.5U priority Critical patent/CN207582983U/en
Application granted granted Critical
Publication of CN207582983U publication Critical patent/CN207582983U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of supporting apparatus of steel structure hoisting construction, including fixed frame, further include upper support bar, lower support bar, connecting rod and height adjustment device, one end of upper support bar and one end of lower support bar are connect respectively with fixed frame by connecting seat, the other end of upper support bar and the other end of lower support bar are connected by latch fitting, one end of connecting rod is connect with upper support bar, the other end of connecting rod is connect with lower support bar, and the both ends of height adjustment device are connect respectively with upper support bar and lower support bar.The beneficial effects of the utility model are using above-mentioned technical solution, shaft is installed in the centre position of fixed seat, upper support bar is connect with lower support bar by multi-directional ball with shaft respectively simultaneously, upper support bar is allowd to be relatively fixed frame rotation with lower support bar, angle between supporting rod and lower support bar is adjusted, it can adapt to angular adjustment of the steel construction in lifting construction, when fixation for facilitating different height truss uses.

Description

A kind of supporting apparatus of steel structure hoisting construction
Technical field
The utility model belongs to steel structure hoisting technical field of construction, more particularly, to a kind of facing for steel structure hoisting construction When support device.
Background technology
Supporting apparatus is needed when steel construction is lifted in the construction process, supporting apparatus is by roof plate template branch Support three composite structure, framed column template support combinations structure, shear wall formwork support combinations structure series compositions, three sets of systems Combination is flexible, vertebration, can be designed configuration according to the different requirements of each engineering of client.
Supporting apparatus of the prior art, including support column and steel grit box, the support column is hollow for bottom end closure Tube body, the concrete beam or the height of steel construction that height and the construction site of the support column support in advance are adapted;The steel grit box is top Open babinet, the side wall of the steel grit box are equipped with hole, which is used to inject steel sand into steel grit box;The support column is located at Above the steel sand injected in the steel grit box, the steel sand of injection is used to that the top of support column to be made to support with the concrete beam or steel construction supported in advance Top.
But disadvantage is that existing supporting apparatus can not adjust the height between two supporting rods, Wu Fashi Answer the fixation of different height truss.
Invention content
In view of the above problems, problem to be solved in the utility model is to provide a kind of temporary support of steel structure hoisting construction Device is especially suitable for steel construction and is applied in lifting construction, to solve the height between the supporting rod of existing supporting apparatus The problem of degree can not be adjusted so that supporting apparatus can adapt to the fixation problem of different height truss.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of steel structure hoisting construction is faced When support device, including fixed frame, further include upper support bar, lower support bar, connecting rod and height adjustment device, upper support bar One end and one end of lower support bar are connect respectively with fixed frame by connecting seat, the other end of upper support bar and lower support bar it is another One end is connected by latch fitting, and one end of connecting rod is connect with upper support bar, and the other end of connecting rod is connect with lower support bar, height The both ends of regulating device are connect respectively with upper support bar and lower support bar.
Further, height adjustment device includes locating rod, lifters, clamp, bar, leading screw and connecting rod is turned up, connecting rod One end is connect by the first buckle with lower support bar, and the other end of connecting rod is rotatablely connected by clamp with one end of bar is turned up, and is adjusted The other end of high bar is snapped connection with upper support bar by second, and one end of locating rod is connect by lifters with leading screw, leading screw It is connect with rod slide, the other end of locating rod is connect with adjusting rod by adjusting nut, and the other end and the connecting rod of adjusting rod connect It connects.
Further, connecting seat includes shaft and fixed seat, and shaft connect by fixed seat with fixed frame, upper support bar and Lower support bar is flexibly connected respectively by multi-directional ball with shaft.
Further, supporting apparatus further includes threaded sleeve, and threaded sleeve is sheathed on upper support bar and lower branch respectively On strut, one end of threaded sleeve is fixedly connected with shaft.
Further, connecting rod is vertically arranged with lower support bar.
Further, upper support bar is vertically arranged with fixed frame.
The utility model has the advantages and positive effects of:
1. using above-mentioned technical solution so that the structure of the supporting apparatus of steel structure hoisting construction is compacter, Easy to repair simultaneously, easy to use, when fixation for facilitating different height truss, uses;
2. using shaft is installed in the centre position of fixed seat, while upper support bar passes through multi-directional ball respectively with lower support bar It is connect with shaft so that upper support bar can be relatively fixed frame rotation with lower support bar so that between supporting rod and lower support bar Angle can adjust, can adapt to angular adjustment of the steel construction in lifting construction;
3. the angular adjustment between the setting upper support bar and lower support bar that pass through height adjustment device is more convenient Fast, the angle between upper support bar and lower support bar need to can be only adjusted in the adjusting of adjusting nut so that steel Structure working efficiency in lifting construction effectively improves, simultaneously so that the supporting apparatus use scope is wider;
4. buckle and latch fitting two supporting rods are connected with connecting rod, and locating rod and height-regulating bar respectively with two supporting rods It is fixedly connected, is used cooperatively and is adjusted come the height between two supporting rods by lifters and height-regulating bar so that interim branch Support arrangement adapts to the fixation of different truss.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the height adjustment device schematic diagram of the utility model;
Fig. 3 is the structure expansion exploded view of the shaft of the utility model.
In figure:
1st, fixed frame 2, connecting rod 3, latch fitting
4th, height adjustment device 401, locating rod 402, lifters
403rd, clamp 404, height-regulating bar 405, leading screw
406th, connecting rod 5, adjusting nut 6, buckle
7th, lower support bar 8, threaded sleeve 9, shaft
10th, upper support bar
Specific embodiment
The utility model is further described in the following with reference to the drawings and specific embodiments.
As shown in Figure 1, the utility model is related to a kind of supporting apparatus of steel structure hoisting construction, for steel construction Use during lifting construction is carried out, the angle between the upper support bar 10 of the supporting apparatus and lower support bar 7 can be adjusted, be made The fixation of different height truss can be applicable in by obtaining the supporting apparatus of steel structure hoisting construction.Steel structure hoisting construction Supporting apparatus includes fixed frame 1, further includes upper support bar 10, lower support bar 7, connecting rod 2 and height adjustment device 4, Gu Determine the structure that frame 1 is used for supporting entire supporting apparatus, play the role of support, every other structure is set on fixed frame 1 On, in the supporting apparatus that the steel structure hoisting is constructed when in use, fixed frame 1 is contacted with ground, is fixedly mounted on construction On ground, one end of upper support bar 10 and one end of lower support bar 7 are connect respectively with fixed frame 1 by connecting seat, upper support bar 10 other end is connect with the other end of lower support bar 7 by latch fitting 3, and one end of connecting rod 2 is connect with upper support bar 10, connection The other end of bar 2 is connect with lower support bar 7, and the both ends of height adjustment device 4 connect respectively with upper support bar 10 and lower support bar 7 It connects.That is, being installed with connecting seat respectively in the upper and lower part of fixed frame 1, have between connecting seat setting up and down A certain distance, during the setting of the distance can be according to practice of construction, the weight for the steel construction that supporting apparatus is born It measures to determine, one end of upper support bar 10 is connect with the connecting seat on 1 top of fixed frame, under one end of lower support bar 7 and fixed frame 1 The connecting seat connection in portion, while the other end of upper support bar 10 is connect with the other end of lower support bar 7 by latch fitting 3, latch fitting 3 will Upper support bar 10 and the other end of lower support bar 7 connect so that fixed frame 1, upper support bar 10 and lower support bar 7 form three It is angular, since the structure of triangle is most stable of structure on mechanical structure, when 10 stress of upper support bar, lower support bar 7 To upper support bar 10 there are support force, so as to carry out temporary support in lifting to steel construction.In fixed frame 1, upper support bar 10 In the triangular structure formed with lower support bar 7, if there are one connecting rods 2, one end and the upper support bar 10 of the connecting rod 2 connect It connects, the other end is connect with lower support bar 7, and certain support force is further provided upper support bar 10 in structure so that entire Supporting apparatus structure is more firm.One end of above-mentioned height adjustment device 4 and one of upper support bar 10 far from fixed frame 1 End connection, the other end are connect with lower support bar 7 by buckle 6, and upper support bar 10 and lower branch are adjusted by height adjustment device 4 Angle between strut 7 so that the supporting apparatus can adapt to the fixation of different height truss.
Upper support bar 10 is attached with lower support bar 7 and fixed frame 1 by connecting seat, as shown in figure 3, the connecting seat packet Shaft 9 and fixed seat are included, fixed seat is mounted by means of bolts on fixed frame 1, and fixed seat can be welded on fixed frame 1, It can also be that other are fixedly connected with mode, selected according to actual demand, shaft 9 is connect by fixed seat with fixed frame 1, is turned Axis 9 is fixedly mounted in fixed seat, and is movably installed with multi-directional ball, upper support bar in the space formed in shaft 9 and fixed seat 10 are flexibly connected with lower support bar 7 by multi-directional ball with shaft 9 respectively, it is, upper support bar 10 and lower support bar 7 are with fixing One end that frame 1 connects is actually to be connect with multi-directional ball so that upper support bar 10 is relatively fixed frame 1 with lower support bar 7 being capable of phase To rotation.Angle between upper support bar 10 and fixed frame 1 is preferably right angle, according to upper support bar 10, fixed frame 1 and lower support Bar 7 form mechanical structure it is recognised that when the angle between upper support bar 10 and fixed frame 1 be 90 ° when, upper support bar 10 by To the resultant force of pressure act on completely on lower support bar 7 and fixed frame 1, at this point, the supporting apparatus stress is stablized the most.
In upper support bar 10 and lower support bar 7 respectively with being arranged with threaded sleeve 8 on 1 connecting pin of fixed frame, the thread bush One end of pipe 8 is fixedly connected with shaft 9, and upper support bar 10 and lower support bar 7 and the connecting pin of fixed frame 1 are protected, and For being attached with shaft 9 by screw thread, the outside of the threaded sleeve 8 is screw thread shape texture, be wrapped in upper support bar 10 with On lower support bar 7, upper support bar 10 and lower support bar 7 are protected.
In addition, be vertically arranged when connecting rod 2 and the junction of lower support bar 7, it is, connecting rod 2 and lower support bar 7 it Between angle for 90 °, connecting rod 2 forms a triangular structure of right angle with lower support bar 7 and upper support bar 10, convenient for connecting rod 2 pairs of upper support bars 10 and lower support bar 7 are supported, and upper support bar 10 will not be caused to be deformed since stress is larger.
Advanced optimize scheme, one end and the one end of upper support bar 10 far from fixed frame 1 of above-mentioned height adjustment device 4 It is connected by a snap, and the junction is located at the outside of upper support bar 10 and 7 junction of lower support bar, it is, the height is adjusted Regulating device 4 is located at the outside for the triangular structure that upper support bar 10, fixed frame 1 and lower support bar 7 are formed so that height adjusts dress Put 4 to slide upper support bar 10 is opposite, be moved to suitable position, and be moved to behind suitable position buckle can will be high Degree regulating device 4 is fixed, and after fixed, height adjustment device 4 will not generate relative movement with upper support bar 10;The height is adjusted The other end of regulating device 46 is connect by buckle with lower support bar 7 so that height adjustment device 4 can with respect to lower support bar 7 into Row is opposite to be slided, and after the other end of height adjustment device 4 is moved to suitable position, buckle 6 is by height adjustment device 4 and lower branch Strut 7 is fixed, and after fixed, lower support bar 7 will not generate relative movement with height adjustment device 4, and buckle 6 is in lower support The centre position of bar 7, then the centre position of the other end of height adjustment device 4 and lower support bar 7 connect by buckle 6, that is, height Degree regulating device 4 is in the outside middle and upper part for the triangular structure that fixed frame 1, upper support bar 10 and lower support bar 7 are formed, the position The setting put is convenient for providing certain pulling force to lower support bar 7 and upper support bar 10, meanwhile, conducive to entire temporary support dress is kept The stability for the structure put also allows for the adjusting of the angle between upper support bar 10 and lower support bar 7.
As shown in Fig. 2, above-mentioned height adjustment device 4 includes locating rod 401, lifters 402, clamp 403, bar is turned up 404th, leading screw 405 and connecting rod 406, one end of connecting rod 406 are connect by buckle 6 with lower support bar 7, which can when fixing Lower support bar 7 and connecting rod 406 are connected as one, which enables to connecting rod 406 can be along lower support bar 7 when unclamping It is moved up and down on length direction, carries out upper-lower position adjusting;The other end of connecting rod 406 is by clamp with bar 404 is turned up One end is rotatablely connected so that bar 404 is turned up and produces relative rotation with respect to connecting rod 406, changes and is turned up between bar 404 and connecting rod 406 Angle, it is circular ring type that the structure of clamp 403, which is one end, be turned up bar 404 run through clamp 403 circular ring type end, pass through the other end Locking nut locked, the other end and the connecting rod 406 of clamp 403 are connected through a screw thread, according to the spy of 403 structure of clamp Point so that bar 404 is turned up can be with activity adjustment with connecting rod 406.The other end and upper support bar 10 that bar 404 is turned up pass through the company of buckle It connects, which is located at the outside of upper support bar 10 and 7 junction of lower support bar, and buckle is located on upper support bar 10 so that adjusts High bar 404 can be slid back and forth with respect to upper support bar 10, meanwhile, buckle can will be turned up bar 404 and upper support bar 10 into Row tightening is fixed.A leading screw 405 is equipped on connecting rod 406, leading screw 405 is slidably connected with connecting rod 406, it is, 405 energy of leading screw It is slid back and forth on enough length directions along connecting rod 406, meanwhile, leading screw 405 is vertically arranged with connecting rod 406, and leading screw 405 is logical It crosses buckle to connect with connecting rod 406, can also be attached by other mechanical structures, be selected according to actual demand, as long as Leading screw 405 is enabled to be slided and fixed on connecting rod 406, leading screw 405 is by being buckled in front and rear cunning on connecting rod 406 It is dynamic, be changed position of the leading screw 405 on connecting rod 406, and leading screw 405 be moved to suitable position after be fixed so that silk Thick stick 405 will not generate movement with connecting rod 406.One end of locating rod 401 is connect by lifters 402 with leading screw 405, lifters 402 are sheathed on leading screw 405, and lifters 402 can slide up and down on leading screw 405, the screw thread and silk of lifters 402 Thick stick 405 screw thread engagement move up and down, lifters 402 can be sliding sleeve or other can leading screw 405 cooperation make Mechanical mechanism is selected according to actual demand, passes through moving up and down and then drive locating rod 401 for lifters 402 It moves up and down, the other end of locating rod 401 is connect with adjusting rod by adjusting nut 5, and the other end and connecting rod 406 of adjusting rod are remote From one end connection that bar 404 is turned up, it is, adjusting rod, locating rod 401 form one with connecting rod 406 in the lower part of connecting rod 406 Triangular structure, and locating rod 401 is connect with the junction of adjusting rod by adjusting nut 5, by adjusting nut 5 to locating rod 401 are adjusted so that locating rod 401 can produce relative rotation with adjusting rod, enterprising in leading screw 405 convenient for locating rod 401 It is capable to slide up and down, convenient for adjusting the height of locating rod 401, that is, convenient for the adjusting of the height of bar 404 is turned up, and then propped up in guarantee The adjusting of angle between strut 10 and lower support bar 7, and during adjusting, connecting rod 406 remains horizontality so that it adjusts High bar 404 and the cooperation of lifters 402 carry out the adjusting of angle between upper support bar 10 and lower support bar 7.
When angle between upper support bar 10 and lower support bar 7 tunes up, locating rod 401, lifting are adjusted by adjusting nut 5 Part 402 moves down, and lifters 402 are matched with bar 404 is turned up, and bar 404 is turned up and moves down so that lower support bar 7 and upper support It being moved to 1 side of fixed frame 10 junction of bar so that the angle between upper support bar 10 and lower support bar 7 becomes larger, so that on Supporting rod 10 becomes larger with 7 height of lower support bar;Conversely, the angle between upper support bar 10 and lower support bar 7 becomes smaller, so that Upper support bar 10 becomes smaller with 7 height of lower support bar.
Above-mentioned upper support bar 10 is made of stainless steel with lower support bar 7.
The course of work of this example:By being combined with each other for above-mentioned component, then installed and turned with the centre position of fixed seat Axis 9 connects upper support bar 10 and lower support bar 7 and threaded sleeve 8, angle then is adjusted by shaft 9, steel construction is made to exist It is adjusted, then two supporting rods and two connecting rods is connected by buckle 6 with latch fitting 3, then when lifting construction 7 one end of lower support bar is fixedly connected with locating rod 401, then again supporting rod is carried out to adjust up and down with height-regulating bar 404, be used The control of bar 404 is turned up in the cooperation of lifters 402, thus can easily adjust the height between two supporting rods, adapts to different The fixation of height truss.
The utility model has the advantages and positive effects of:
1. using above-mentioned technical solution so that the structure of the supporting apparatus of steel structure hoisting construction is compacter, Easy to repair simultaneously, easy to use, when fixation for facilitating different height truss, uses;
2. using shaft is installed in the centre position of fixed seat, while upper support bar passes through multi-directional ball respectively with lower support bar It is connect with shaft so that upper support bar can be relatively fixed frame rotation with lower support bar so that between supporting rod and lower support bar Angle can adjust, can adapt to angular adjustment of the steel construction in lifting construction;
3. the angular adjustment between the setting upper support bar and lower support bar that pass through height adjustment device is more convenient Fast, the angle between upper support bar and lower support bar need to can be only adjusted in the adjusting of adjusting nut so that steel Structure working efficiency in lifting construction effectively improves, simultaneously so that the supporting apparatus use scope is wider;
4. buckle and latch fitting two supporting rods are connected with connecting rod, and locating rod and height-regulating bar respectively with two supporting rods It is fixedly connected, is used cooperatively and is adjusted come the height between two supporting rods by lifters and height-regulating bar so that interim branch Support arrangement adapts to the fixation of different truss.
One embodiment of the utility model is described in detail above, but the content is only the utility model Preferred embodiment, it is impossible to be construed as limiting the scope of the utility model.It is all to be made according to application scope of the utility model All the changes and improvements etc., should all still belong within the patent covering scope of the utility model.

Claims (6)

1. a kind of supporting apparatus of steel structure hoisting construction, including fixed frame, it is characterised in that:Further include upper support bar, One end of lower support bar, connecting rod and height adjustment device, one end of the upper support bar and the lower support bar respectively with institute It states fixed frame to connect by connecting seat, the other end of the upper support bar and the other end of the lower support bar are connected by latch fitting It connects, one end of the connecting rod is connect with the upper support bar, and the other end of the connecting rod is connect with the lower support bar, institute The both ends for stating height adjustment device are connect respectively with the upper support bar and the lower support bar.
2. the supporting apparatus of steel structure hoisting construction according to claim 1, it is characterised in that:The height is adjusted Device includes locating rod, lifters, clamp, is turned up bar, leading screw and connecting rod, one end of the connecting rod by the first buckle with it is described Lower support bar connects, and the other end of the connecting rod is rotatablely connected by clamp and described one end that bar is turned up, the height-regulating bar The other end is snapped connection with the upper support bar by second, and one end of the locating rod is connected by lifters and the leading screw It connects, the leading screw is connect with the rod slide, and the other end of the locating rod is connect with adjusting rod by adjusting nut, described The other end of adjusting rod is connect with the connecting rod.
3. the supporting apparatus of steel structure hoisting construction according to claim 1 or 2, it is characterised in that:The connection Seat includes shaft and fixed seat, and the shaft connect by the fixed seat with the fixed frame, the upper support bar with it is described Lower support bar is flexibly connected respectively by multi-directional ball with the shaft.
4. the supporting apparatus of steel structure hoisting construction according to claim 3, it is characterised in that:The temporary support Device further includes threaded sleeve, and the threaded sleeve is sheathed on respectively on the upper support bar and the lower support bar, the spiral shell One end of line casing is fixedly connected with the shaft.
5. the supporting apparatus of the steel structure hoisting construction according to claims 1 or 2 or 4, it is characterised in that:The company Extension bar is vertically arranged with the lower support bar.
6. the supporting apparatus of the steel structure hoisting construction according to claims 1 or 2 or 4, it is characterised in that:On described Supporting rod is vertically arranged with the fixed frame.
CN201721408555.5U 2017-10-30 2017-10-30 A kind of supporting apparatus of steel structure hoisting construction Active CN207582983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721408555.5U CN207582983U (en) 2017-10-30 2017-10-30 A kind of supporting apparatus of steel structure hoisting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721408555.5U CN207582983U (en) 2017-10-30 2017-10-30 A kind of supporting apparatus of steel structure hoisting construction

Publications (1)

Publication Number Publication Date
CN207582983U true CN207582983U (en) 2018-07-06

Family

ID=62730245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721408555.5U Active CN207582983U (en) 2017-10-30 2017-10-30 A kind of supporting apparatus of steel structure hoisting construction

Country Status (1)

Country Link
CN (1) CN207582983U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487792A (en) * 2018-10-19 2019-03-19 中建华东投资有限公司 The interim stress system conversion method and mating adjustable device that lattice column underpins
CN112983015A (en) * 2021-02-24 2021-06-18 中国建筑第八工程局有限公司 Installation device and installation method of multilayer inclined steel shutter

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487792A (en) * 2018-10-19 2019-03-19 中建华东投资有限公司 The interim stress system conversion method and mating adjustable device that lattice column underpins
CN109487792B (en) * 2018-10-19 2024-01-09 中建华东投资有限公司 Temporary stress system conversion method for lattice column underpinning and matched adjustable device
CN112983015A (en) * 2021-02-24 2021-06-18 中国建筑第八工程局有限公司 Installation device and installation method of multilayer inclined steel shutter
CN112983015B (en) * 2021-02-24 2022-09-23 中国建筑第八工程局有限公司 Installation device and installation method of multilayer inclined steel shutter

Similar Documents

Publication Publication Date Title
CN203347262U (en) Adjustable diagonal bar used for installation of assembly-type dwelling prefabricated component (PC)
CN207582983U (en) A kind of supporting apparatus of steel structure hoisting construction
CN208415926U (en) A kind of jacking supporting Curved beam template
CN105003091A (en) Sway brace for prefabricated buildings
CN112900858A (en) Adjustable beam bottom template supporting device
CN208749145U (en) A kind of architectural engineering support device
CN207620814U (en) A kind of adjustable folding formula support component
CN108818414A (en) A kind of thermal power station's high temperature heater (HTH) manhole door dismantling device
CN203347260U (en) Supporting fixing system for installation of assembly-type dwelling prefabricated component (PC)
CN210141014U (en) Reinforced supporting structure for constructional engineering
CN209874484U (en) Aluminum alloy template bracing device
CN209742404U (en) assembled building stand bearing diagonal structure
CN206530077U (en) A kind of support frame
CN215407592U (en) Be used for civil engineering construction strutting arrangement convenient to remove
CN206815161U (en) A kind of tiltedly T-shaped combination beam fixing device
CN216616849U (en) Adjustable support jacking for concrete inclined structure
CN204385885U (en) There is the bridge construction tower crane pile foundation sustaining wall of two governor motion
CN104481032B (en) One nuclear power plant body of wall hanger and construction method thereof
CN207228691U (en) A kind of shelter of top installation solar protection devices
CN205389189U (en) Photovoltaic support with adjustable it is fixed
CN111851998A (en) Make things convenient for building templates strutting arrangement of dismouting
CN213539781U (en) A novel alignment bracing for assembled wall body
CN219825803U (en) Portable furred ceiling hanging bar
CN221298605U (en) Diagonal bracing device for building
CN220928739U (en) Building template for concrete building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant