CN112983015A - Installation device and installation method of multilayer inclined steel shutter - Google Patents

Installation device and installation method of multilayer inclined steel shutter Download PDF

Info

Publication number
CN112983015A
CN112983015A CN202110207656.0A CN202110207656A CN112983015A CN 112983015 A CN112983015 A CN 112983015A CN 202110207656 A CN202110207656 A CN 202110207656A CN 112983015 A CN112983015 A CN 112983015A
Authority
CN
China
Prior art keywords
shutter
layer
frame
lower frame
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110207656.0A
Other languages
Chinese (zh)
Other versions
CN112983015B (en
Inventor
王俊伟
周磊
李晨
王刚
高鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202110207656.0A priority Critical patent/CN112983015B/en
Publication of CN112983015A publication Critical patent/CN112983015A/en
Application granted granted Critical
Publication of CN112983015B publication Critical patent/CN112983015B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Abstract

The invention relates to a mounting device and a mounting method of multilayer inclined steel shutters, which are used for mounting upper shutters on the inclined upper part of lower shutters, and the mounting device comprises: the lower frame is fixed on the lower layer shutter in a detachable mode; the upper frame is fixed on the lower frame in a height-adjustable mode and located obliquely above the lower frame, the upper frame is cantilevered on the lower frame, and a bearing surface for bearing the upper layer shutter is formed at the top of the upper frame. The mounting device is adopted to conveniently adjust the position of the device according to the position of the upper layer of the louver to be mounted, the upper layer of the louver is supported by the upper frame, the position stability of the upper layer of the louver and the main steel structure in the mounting process is ensured, the accuracy of the mounting position of the upper layer of the louver is improved, and the problem that the accuracy of the mounting position of the large louver is difficult to ensure in the prior art is solved.

Description

Installation device and installation method of multilayer inclined steel shutter
Technical Field
The invention relates to the field of building construction, in particular to a device and a method for installing multilayer inclined steel shutters.
Background
The multilayer large steel shutter building with the steel structure and the inclined upward has a unique shape. In the prior art, the installation of a main steel structure is generally carried out firstly, and then the installation of large-scale shutters is carried out.
In the installation process, hoisting machinery is adopted to directly hoist each layer of steel shutter units to the installation position, the shutter specifications are different, the heights are different, the horizontal position and the height direction of each layer of steel shutter units are adjusted to be in place, the accuracy of the installation position of the large shutter is difficult to guarantee, and the installation efficiency is low.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides a device and a method for mounting multilayer inclined steel shutters, and solves the problem that the accuracy of the mounting position of large shutters is difficult to ensure in the prior art.
The technical scheme for realizing the purpose is as follows:
the invention provides a mounting device for multilayer inclined steel shutters, which is used for mounting an upper layer of shutters on the inclined upper part of a lower layer of shutters, and comprises:
the lower frame is fixed on the lower layer shutter in a detachable mode; and
the upper frame is fixed on the lower frame in a height-adjustable mode and located obliquely above the lower frame, the upper frame is cantilevered to the lower frame, and a bearing surface for bearing the upper layer shutter is formed at the top of the upper frame.
The mounting device for the multilayer inclined steel shutter is further improved in that one side of the lower frame is provided with a clamping structure, and the lower frame is clamped and fixed on the lower layer shutter through the clamping structure.
The mounting device of the multi-layer inclined steel shutter is further improved in that the clamping structure comprises:
the clamping rod is vertically fixed on one side of the lower frame;
the level is fixed in the bottom of clamping bar and to the splint that extend bottom the underframe, splint are vertical to be worn to be equipped with adjusting bolt, through the underframe is located on the top surface of lower floor's tripe, the clamping bar support lean on in the side of lower floor's tripe, splint are located the bottom surface of lower floor's tripe through vertical regulation adjusting bolt shore in the bottom surface of lower floor's tripe realizes that the centre gripping is fixed.
The mounting device for the multilayer inclined steel shutter is further improved in that a vertical rod is fixed on the other opposite side of the lower frame, a sleeve is fixed on the upper frame, the sleeve is sleeved on the vertical rod so as to achieve height adjustment, and a bolt penetrates through the sleeve and the vertical rod to achieve fixedly connecting the upper frame and the lower frame.
The mounting device for the multilayer inclined steel shutter is further improved in that the mounting device further comprises a lower inclined rod obliquely fixed on the lower frame and the vertical rod.
The mounting device for the multilayer inclined steel shutter is further improved in that the mounting device further comprises an upper inclined rod obliquely fixed on the upper frame and the vertical rod.
The invention also provides an installation method of the installation device of the multilayer inclined steel shutter, which comprises the following steps:
fixing a lower frame on the installed lower layer shutter in a detachable mode, and adjusting the horizontal position of the lower frame according to the installation position of the upper layer shutter to be installed;
adjusting the height position of the upper frame according to the mounting position of the upper layer of the shutter to be mounted;
and arranging the upper layer of the shutter to be installed on the bearing surface of the upper frame, and connecting the upper layer of the shutter to be installed with the main steel structure.
The mounting method of the mounting device of the multilayer inclined steel shutter is further improved in that the mounting device further comprises the following steps:
providing a clamping rod, and vertically fixing the clamping rod on one side of the lower frame;
providing a clamping plate and an adjusting bolt, horizontally fixing the clamping plate at the bottom end of the clamping rod and extending towards the bottom of the lower frame, and vertically penetrating the adjusting bolt through the clamping plate;
removably securing a lower frame to an installed lower layer of louvers, comprising:
the lower frame is arranged on the top surface of the lower layer shutter, the clamping rods are abutted against the side surfaces of the lower layer shutter, and the clamping plates are arranged on the bottom surface of the lower layer shutter;
and vertically adjusting the adjusting bolt to prop against the bottom surface of the lower layer of shutter to realize fixation.
The mounting method of the mounting device of the multilayer inclined steel shutter is further improved in that the mounting device further comprises the following steps:
providing a vertical rod, and fixing the vertical rod on the other opposite side of the lower frame;
providing a sleeve, fixing the sleeve on the upper frame, and sleeving the sleeve on the vertical rod;
the height position of the upper frame is adjusted according to the installation position of the upper layer shutter to be installed, and the method comprises the following steps:
and moving the sleeve along the vertical rod to realize height adjustment, and fixedly connecting the upper frame and the lower frame by adopting bolts to penetrate through the sleeve and the vertical rod.
The mounting device and the mounting method of the multilayer inclined steel shutter have the beneficial effects that:
according to the invention, the lower frame is detachably fixed on the lower layer of shutter, so that the horizontal position of the lower frame can be adjusted according to the mounting position of the upper layer of shutter to be mounted; the upper frame is fixed on the lower frame in a height-adjustable mode, the upper frame is cantilevered to the lower frame, and the height position of the upper frame can be adjusted according to the installation position of the upper layer shutter to be installed. After the adjusting in place, the upper layer of the louver is placed on the upper frame, so that the upper layer of the louver and the main steel structure are installed and fixed subsequently, and the installation and construction of the plurality of layers of inclined steel louvers are completed. The mounting device is adopted to conveniently adjust the position of the device according to the position of the upper layer of the louver to be mounted, the upper layer of the louver is supported by the upper frame, the position stability of the upper layer of the louver and the main steel structure in the mounting process is ensured, the accuracy of the mounting position of the upper layer of the louver is improved, and the problem that the accuracy of the mounting position of the large louver is difficult to ensure in the prior art is solved.
Drawings
FIG. 1 is a schematic view showing the installation state of the installation device for multi-layer inclined steel shutters of the present invention.
FIG. 2 is a schematic structural diagram of a mounting device for multi-layer inclined steel shutters of the present invention.
Detailed Description
The invention is further described with reference to the following figures and specific examples.
Referring to fig. 1, a schematic view of the installation state of the installation device of the multi-layer inclined steel shutter of the present invention is shown. As shown in fig. 1, the installation device for multi-layer inclined steel shutter of the present invention is used for installing an upper layer shutter 11 on an upper incline of a lower layer shutter 10, and the installation device comprises:
a lower frame 20 detachably fixed to the lower louver 10; and
the upper frame 30 is fixed to the lower frame 20 in a height-adjustable manner and located obliquely above the lower frame 20, the upper frame 30 is cantilevered to the lower frame 20, and a supporting surface for supporting the upper layer louver 11 is formed at the top of the upper frame 30.
As a preferred embodiment of the installation device for the multi-layer inclined steel shutter of the present invention, refer to FIG. 2, which is a schematic structural diagram of the installation device for the multi-layer inclined steel shutter of the present invention. Referring to fig. 1 and 2, one side of the lower frame 20 is provided with a clamping structure, and the lower frame is clamped and fixed to the lower layer louver 10 by the clamping structure. The invention is detachably and fixedly connected with the lower layer shutter 10 through the clamping structure, thereby being convenient for installation and disassembly. After the upper layer of shutter is installed, the device is separated from the lower layer of shutter through the clamping structure so as to carry out installation construction of the next shutter.
As a preferred embodiment of the installation device of the multi-layer inclined steel shutter of the present invention, the clamping structure comprises: a clamping bar 40 vertically fixed to one side of the lower frame 20; the level is fixed in the bottom of clamping bar 40 and the splint 41 that extend to the lower frame 20 bottom, and adjusting bolt 42 is vertically worn to be equipped with by splint 41, locates on the top surface of lower floor's tripe 10 through underframe 20, and clamping bar 40 supports the side that leans on in lower floor's tripe 10, and lower floor's tripe 10 bottom surface is located to splint 41, props in the bottom surface of lower floor's tripe 10 through vertical adjusting bolt 42 apical strut, realizes that the centre gripping is fixed.
Specifically, the lower frame 20, the clamping bar 40, and the clamping plate 41 are connected to form a U-shaped clamping structure. The distance between the lower frame 20 and the clamping plate 41 is adapted to the thickness of the lower layer louver 10, so that the lower frame 20 and the clamping plate 41 are respectively arranged at the upper and lower sides of the lower layer louver 10 to be clamped on the lower layer louver 10. The clamping fixation is realized on the bottom surface of the lower layer shutter 10 through the top support of the vertical adjusting bolt 42, and the bottom surface of the lower layer shutter 10 is kept away from through the adjusting bolt 42, so that the clamping structure and the lower layer shutter 10 are conveniently separated, and the dismounting and mounting device is used in a turnover manner.
As a preferred embodiment of the installation device for the multi-layer inclined steel shutter of the present invention, a vertical rod 50 is fixed to the opposite other side of the lower frame 20, a sleeve 51 is fixed to the upper frame 30, the sleeve 51 is sleeved on the vertical rod 50 to achieve height adjustment, and a bolt 52 is inserted through the sleeve 51 and the vertical rod 50 to achieve the fixed connection between the upper frame 30 and the lower frame 20.
As a preferred embodiment of the installation device for the multi-layer inclined steel shutter of the present invention, the installation device further comprises a lower inclined rod 21 obliquely fixed to the lower frame 20 and the vertical rod 50, for enhancing the firmness and bearing capacity of the lower frame 20.
In the present embodiment, the lower frame 20 is a rectangular frame. The vertical bar 50 and the clamping bar 40 are vertically fixed to two opposite sides of the rectangular frame, and are located at the upper and lower sides of the rectangular frame.
The upper frame 30 is sleeved on the vertical rods 50 through the sleeves 51 so as to be cantilevered to the lower frame 20, and the upper frame 30 corresponds to a position to be installed of the upper layer louver 11 to be installed.
As a preferred embodiment of the installation device for the multi-layer inclined steel shutter of the present invention, an upper inclined rod 31 obliquely fixed to the upper frame 30 and the vertical rod 50 is further included for enhancing the firmness and bearing capacity of the upper frame 30.
Further, the upper frame 30 is fixed with a reinforcing bar 32. Specifically, the upper frame 30 is a rectangular frame. The reinforcing bars 32 are fixed in the rectangular frame to enhance the firmness of the upper frame 30.
The invention also provides an installation method of the installation device of the multilayer inclined steel shutter, which comprises the following steps:
detachably fixing the lower frame 20 to the installed lower layer shutter 10, and adjusting the horizontal position of the lower frame 20 according to the installation position of the upper layer shutter 11 to be installed;
adjusting the height position of the upper frame 30 according to the installation position of the upper louver 11 to be installed;
the upper layer shutter 11 to be installed is arranged on the bearing surface of the upper frame 30, and the upper layer shutter 11 to be installed is connected with the main steel structure.
As a preferred embodiment of the installation method of the installation device of the multi-layer inclined steel shutter of the present invention, the installation method further comprises: providing a clamping rod 40, and vertically fixing the clamping rod 40 on one side of the lower frame 20; providing a clamping plate 41 and an adjusting bolt 42, horizontally fixing the clamping plate 41 at the bottom end of the clamping rod 40 and extending towards the bottom of the lower frame 20, and vertically penetrating the adjusting bolt 42 through the clamping plate 41; the lower frame 20 is detachably fixed to the lower shutter 10, which is installed, and includes: arranging the lower frame 20 on the top surface of the lower layer shutter 10, abutting the clamping rod 40 on the side surface of the lower layer shutter 10, and arranging the clamping plate 41 on the bottom surface of the lower layer shutter 10; the vertical adjusting bolt 42 is supported on the bottom surface of the lower layer shutter 10 to realize fixation.
As a preferred embodiment of the installation method of the installation device of the multi-layer inclined steel shutter of the present invention, the installation method further comprises: providing a vertical rod 50, fixing the vertical rod 50 to the opposite side of the lower frame 20; providing a sleeve 51, fixing the sleeve 51 on the upper frame 30, and sleeving the sleeve 51 on the vertical rod 50; the height position of the upper frame 30 is adjusted according to the installation position of the upper louver 10 to be installed, including: the sleeve 51 moves along the vertical rod 50 to realize height adjustment, and the bolt 52 is arranged through the sleeve 51 and the vertical rod 50 to realize the fixed connection of the upper frame 30 and the lower frame 20.
The following will specifically describe the installation method of the installation device for the multi-layer inclined steel shutter of the present invention:
arranging the lower frame 20 of the manufactured installation device on the top surface of the lower layer shutter 10, abutting the clamping rod 40 on the side surface of the lower layer shutter 10, and arranging the clamping plate 41 on the bottom surface of the lower layer shutter 10; the vertical adjusting bolt 42 is supported on the bottom surface of the lower shutter 10 to fix the device on the lower shutter 10.
The height position of the upper frame 30 is adjusted according to the installation position of the upper louver 11 to be installed.
After the position of the upper frame 30 is adjusted in place, the upper layer of the shutter 11 to be installed is arranged on the bearing surface of the upper frame 30 by using a hoisting machine, the upper layer of the shutter 11 to be installed is adjusted in place according to the position to be installed, and the upper layer of the shutter 11 to be installed is connected with the main steel structure.
The bolts 52 are adjusted to lower the upper frame 30 with the sleeves as the mounting device has received pressure from the upper louvers 11. The adjusting bolts 42 are loosened so that the lower frame 20 is detached from the lower shutter 10, and the device is removed for the next installation.
The mounting device and the mounting method of the multilayer inclined steel shutter have the beneficial effects that:
according to the invention, the lower frame is detachably fixed on the lower layer of shutter, so that the horizontal position of the lower frame can be adjusted according to the mounting position of the upper layer of shutter to be mounted; the upper frame is fixed on the lower frame in a height-adjustable mode, the upper frame is cantilevered to the lower frame, and the height position of the upper frame can be adjusted according to the installation position of the upper layer shutter to be installed. After the adjusting in place, the upper layer of the louver is placed on the upper frame, so that the upper layer of the louver and the main steel structure are installed and fixed subsequently, and the installation and construction of the plurality of layers of inclined steel louvers are completed. The mounting device is adopted to conveniently adjust the position of the device according to the position of the upper layer of the louver to be mounted, the upper layer of the louver is supported by the upper frame, the position stability of the upper layer of the louver and the main steel structure in the mounting process is ensured, the accuracy of the mounting position of the upper layer of the louver is improved, and the problem that the accuracy of the mounting position of the large louver is difficult to ensure in the prior art is solved.
While the present invention has been described in detail and with reference to the embodiments thereof as illustrated in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments are not to be interpreted as limiting, and the scope of the invention is to be determined by the appended claims.

Claims (9)

1. A mounting device for multi-layer inclined steel shutter is used for mounting the upper shutter on the inclined upper side of the lower shutter, and is characterized in that the mounting device comprises:
the lower frame is fixed on the lower layer shutter in a detachable mode; and
the upper frame is fixed on the lower frame in a height-adjustable mode and located obliquely above the lower frame, the upper frame is cantilevered to the lower frame, and a bearing surface for bearing the upper layer shutter is formed at the top of the upper frame.
2. The apparatus for installing multi-layer inclined steel shutter as claimed in claim 1, wherein one side of said lower frame is provided with a clamping structure, and said lower frame is clamped and fixed to said lower shutter by said clamping structure.
3. The apparatus for mounting multi-layer inclined steel shutter as claimed in claim 2, wherein said clamping structure comprises:
the clamping rod is vertically fixed on one side of the lower frame;
the level is fixed in the bottom of clamping bar and to the splint that extend bottom the underframe, splint are vertical to be worn to be equipped with adjusting bolt, through the underframe is located on the top surface of lower floor's tripe, the clamping bar support lean on in the side of lower floor's tripe, splint are located the bottom surface of lower floor's tripe through vertical regulation adjusting bolt shore in the bottom surface of lower floor's tripe realizes that the centre gripping is fixed.
4. The device for installing the multi-layer inclined steel shutter as claimed in claim 3, wherein a vertical rod is fixed to the other opposite side of the lower frame, a sleeve is fixed to the upper frame, the sleeve is sleeved on the vertical rod so as to achieve height adjustment, and bolts are arranged through the sleeve and the vertical rod so as to achieve fixing of the upper frame and the lower frame.
5. The apparatus for installing multi-layer inclined steel shutter as claimed in claim 4, further comprising a lower inclined rod obliquely fixed to said lower frame and said vertical rod.
6. The apparatus for installing multi-layer inclined steel shutter as claimed in claim 4, further comprising an upper inclined rod obliquely fixed to said upper frame and said vertical rod.
7. The method for installing the installation device of the multi-layer inclined steel shutter as claimed in claim 1, comprising the following steps:
fixing a lower frame on the installed lower layer shutter in a detachable mode, and adjusting the horizontal position of the lower frame according to the installation position of the upper layer shutter to be installed;
adjusting the height position of the upper frame according to the mounting position of the upper layer of the shutter to be mounted;
and arranging the upper layer of the shutter to be installed on the bearing surface of the upper frame, and connecting the upper layer of the shutter to be installed with the main steel structure.
8. The method of installing a multi-layer slanted steel shutter as claimed in claim 7, further comprising:
providing a clamping rod, and vertically fixing the clamping rod on one side of the lower frame;
providing a clamping plate and an adjusting bolt, horizontally fixing the clamping plate at the bottom end of the clamping rod and extending towards the bottom of the lower frame, and vertically penetrating the adjusting bolt through the clamping plate;
removably securing a lower frame to an installed lower layer of louvers, comprising:
the lower frame is arranged on the top surface of the lower layer shutter, the clamping rods are abutted against the side surfaces of the lower layer shutter, and the clamping plates are arranged on the bottom surface of the lower layer shutter;
and vertically adjusting the adjusting bolt to prop against the bottom surface of the lower layer of shutter to realize fixation.
9. The method of installing a multi-layer slanted steel shutter as claimed in claim 8, further comprising:
providing a vertical rod, and fixing the vertical rod on the other opposite side of the lower frame;
providing a sleeve, fixing the sleeve on the upper frame, and sleeving the sleeve on the vertical rod;
the height position of the upper frame is adjusted according to the installation position of the upper layer shutter to be installed, and the method comprises the following steps:
and moving the sleeve along the vertical rod to realize height adjustment, and fixedly connecting the upper frame and the lower frame by adopting bolts to penetrate through the sleeve and the vertical rod.
CN202110207656.0A 2021-02-24 2021-02-24 Installation device and installation method of multilayer inclined steel shutter Active CN112983015B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110207656.0A CN112983015B (en) 2021-02-24 2021-02-24 Installation device and installation method of multilayer inclined steel shutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110207656.0A CN112983015B (en) 2021-02-24 2021-02-24 Installation device and installation method of multilayer inclined steel shutter

Publications (2)

Publication Number Publication Date
CN112983015A true CN112983015A (en) 2021-06-18
CN112983015B CN112983015B (en) 2022-09-23

Family

ID=76350147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110207656.0A Active CN112983015B (en) 2021-02-24 2021-02-24 Installation device and installation method of multilayer inclined steel shutter

Country Status (1)

Country Link
CN (1) CN112983015B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203834956U (en) * 2014-05-13 2014-09-17 莱芜钢铁集团有限公司 Adjusting device for installation and positioning of steel structure beam
CN205314585U (en) * 2015-07-15 2016-06-15 中建八局第三建设有限公司 Superelevation layer steel construction steel beam mounting construction equipment
JP2017066771A (en) * 2015-09-30 2017-04-06 大和ハウス工業株式会社 Panel temporary placing tool for construction
CN207582983U (en) * 2017-10-30 2018-07-06 中冶天工集团天津有限公司 A kind of supporting apparatus of steel structure hoisting construction
CN208380118U (en) * 2018-07-10 2019-01-15 华国辉 Steel construction piece in-site installation positioning device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203834956U (en) * 2014-05-13 2014-09-17 莱芜钢铁集团有限公司 Adjusting device for installation and positioning of steel structure beam
CN205314585U (en) * 2015-07-15 2016-06-15 中建八局第三建设有限公司 Superelevation layer steel construction steel beam mounting construction equipment
JP2017066771A (en) * 2015-09-30 2017-04-06 大和ハウス工業株式会社 Panel temporary placing tool for construction
CN207582983U (en) * 2017-10-30 2018-07-06 中冶天工集团天津有限公司 A kind of supporting apparatus of steel structure hoisting construction
CN208380118U (en) * 2018-07-10 2019-01-15 华国辉 Steel construction piece in-site installation positioning device

Also Published As

Publication number Publication date
CN112983015B (en) 2022-09-23

Similar Documents

Publication Publication Date Title
CN112983015B (en) Installation device and installation method of multilayer inclined steel shutter
CN206383280U (en) Precast T-Beam wing plate framework of steel reinforcement molding bed rack
CN211647368U (en) Portable concrete levels device for building
CN204456850U (en) Just dismounting building floor mould bracing frame and mould disposed thereon
CN113123614B (en) Purified glass wallboard installation auxiliary device and installation method thereof
CN216893474U (en) Shaped angle iron bracket for descending plate hoisting die
CN210315558U (en) Telescopic and deformable plug-in concrete vibrating bent
CN212769594U (en) Auxiliary hanging bracket for electromechanical installation
CN209741897U (en) Quick-release supporting structure for foundation cup opening template
CN111501762B (en) Steel structure building foundation ground construction treatment method
CN209742348U (en) Wall connecting piece for erecting cantilever frame
CN212388363U (en) A auxiliary device for construction of hollow mound cross slab of bridge
CN1200185C (en) Construction method and concrete-steel beams and floor slabs of building with steel frame and its form hoist
CN207188452U (en) Polishing machine work roller frame
CN220521931U (en) Hanging basket suspension mechanism bracket fixing device suitable for steel structure beam
CN220468578U (en) Auxiliary frame for installing templates
CN220008215U (en) Light environment-friendly aerated brick floor bottom skin overturning device
CN206476956U (en) A kind of track foundation support precise adjusting device
CN216422938U (en) Clamp device for adjusting support protection distance of template
CN217531929U (en) Lifting mechanism of hot melt welding machine heating plate
CN220888141U (en) Paper machine net case deflector roll advance and retreat auxiliary device and system
CN220247462U (en) Stone dry hanging anti-falling structure
CN210501377U (en) Rim charge finishing device
CN215544587U (en) Steel reinforcement cage segmentation processing platform frame
CN219931047U (en) Adjustable tripod inclined plane template strutting arrangement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant