CN206289964U CN201620525995.8U CN201620525995U CN206289964U CN 206289964 U CN206289964 U CN 206289964U CN 201620525995 U CN201620525995 U CN 201620525995U CN 206289964 U CN206289964 U CN 206289964U
Authority
CN
China
Prior art keywords
creeping formwork
sloping core
support
rail
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620525995.8U
Other languages
Chinese (zh)
Inventor
唐际宇
戈祥林
林忠和
陈勇辉
唐阁威
梁月利
陆仕颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan No.6 Construction Co., Ltd.
China Construction Eighth Engineering Division Co Ltd
China Huashi Enterprises Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620525995.8U priority Critical patent/CN206289964U/en
Application granted granted Critical
Publication of CN206289964U publication Critical patent/CN206289964U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to a kind of climbing form system for sloping core construction, and the system includes:Attached wall guide rail, is attached in the first sloping core section on stalk section;It is connected to the creeping formwork rail on the attached wall guide rail;The support platform at the top of the creeping formwork rail is layed in, the support platform is hinged with the creeping formwork rail;Branch is located at the regulation support bar between the support platform and the creeping formwork rail;And branch is located at the support platform and adjustable inclination creeping formwork support body, the creeping formwork support body is inclined by adjusting inclination angle with to first sloping core section.Using adjusting the inclination angle of creeping formwork support body, and reduce the distance of the operation platform on creeping formwork support body and sloping core section construction area, convenient construction operation reduces construction safety risk.

Description

For the climbing form system of sloping core construction
Technical field
The utility model is related to the realm of building construction, refers in particular to a kind of climbing form system for sloping core construction.
Background technology
At present, general plate uses hydraulic climbing formwork system in the construction of high-rise or Super High Core Walls Structure.Creeping formwork has saves mould Plate, easy, the easy to operate, security of installation, speed of application are fast, labour puts into low plurality of advantages.Constructed for sloping core When, because the sloping core section on stalk section slopes inwardly so that lifting rail can be in heeling condition, and then cause creeping formwork Support body is correspondingly also at heeling condition, does not meet the requirement of construction safety.Existing common practices is that sloping core section sets what is protruded out Ruggedized construction, to cause that lifting rail fixed in sloping core section and stalk section is in plumbness, so that it is guaranteed that at creeping formwork support body In stable state both vertically and horizontally, it is ensured that the safety of construction.But due to the sloping core intilted angle of section compared with Greatly, cause distance between the construction area of the vertical operation platform hanging on the climbing form system of stalk section and sloping core section compared with Far, the operation inconvenience of workmen is caused, is that the construction of sloping core section brings security risk.In addition, it is necessary to individually construction is protruded out The ruggedized construction later stage also need to remove so that working procedure is relatively complicated, and increased construction procedure, when abolishing ruggedized construction Also more bother, and then the construction period can be influenceed.
Utility model content
The purpose of this utility model is the defect for overcoming prior art, there is provided a kind of creeping formwork system for sloping core construction Unite, the construction distance for solving to use the ruggedized construction that setting is protruded out to carry out climbing formwork for construction presence in the prior art far causes to operate It is more troublesome and the influence construction period when inconvenience, construction safety risk, cumbersome working procedure, increase working procedure, dismounting Problem.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of climbing form system for sloping core construction, including:
Attached wall guide rail, is attached in the first sloping core section on stalk section;
It is connected to the creeping formwork rail on the attached wall guide rail;
The support platform at the top of the creeping formwork rail is layed in, the support platform is hinged with the creeping formwork rail;
Branch is located at the regulation support bar between the support platform and the creeping formwork rail;And
Branch is located at the support platform and adjustable inclination creeping formwork support body, and the creeping formwork support body is by adjusting inclination angle Inclined with to first sloping core section.
Using adjusting the inclination angle of creeping formwork support body, and reduce the operation platform on creeping formwork support body and sloping core section construction area away from From convenient construction operation reduces construction safety risk.And creeping formwork support body is when inclining, it can be ensured that operation platform for horizontal, Stability Analysis of Structures is firm, it is ensured that construction safety.In the climbing formwork for construction of stalk section and sloping core section, climbed still according to conventional method Attached wall guide rail, although attached wall guide rail is inclined at sloping core, but by adjusting regulation support bar to cause support platform It is horizontal, the stability of the creeping formwork support body on support platform would not be influenceed, it is ensured that the construction safety of creeping formwork support body.This practicality New climbing form method, compared to the method for the existing ruggedized construction set up and protrude out, easy construction, operation is simple, that is, utilize The regulation support bar of setting is horizontal to adjust support platform, can be effectively time-consuming, and then can shorten and apply The work duration.
The utility model be used for sloping core construction it is climbing form system further improvement is that, the creeping formwork support body include erect The carrier unit of the adjustable inclination on the support platform, the corner of the carrier unit is to be hinged, and the support Regulation push rod has been installed on unit.
The utility model be used for sloping core construction it is climbing form system further improvement is that, the creeping formwork support body also include branch Located at the bracket unit of the support mesa base, the corner of the bracket unit installs to be hinged in the bracket unit There is regulation screw mandrel.
The utility model be used for sloping core construction it is climbing form system further improvement is that, it is described regulation support bar include position Adjusting sleeve pipe and the studdle for being screwed together in the adjusting sleeve pipe two ends, the superposed studdle and institute in middle part State support platform to be fastenedly connected, the studdle and the creeping formwork rail positioned at bottom are fastenedly connected.
The utility model be used for the climbing form system of sloping core construction further improvement is that, the bottom of the attached wall guide rail leads to Attached wall cushion block is crossed to be connected with stalk section.
Brief description of the drawings
Fig. 1 is that the utility model is used for the climbing form system of sloping core construction in the structural representation of the first sloping core section of constructing.
Fig. 2 is the structure that the utility model is used for sloping core of the climbing form system of sloping core construction on the first sloping core section of constructing Schematic diagram.
Fig. 3 is the structural representation of support platform when the utility model is used in the climbing form system of sloping core construction be located at stalk section Figure.
Fig. 4 be Fig. 3 in save stalk section and bracket unit structural representation.
Fig. 5 and Fig. 6 are the structural representation in the first sloping core section regulation support plateau levels shape.
Fig. 7 is the structural representation that the utility model is used for the carrier unit in creeping formwork support body in the climbing form system of sloping core construction Figure.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
The utility model provides the climbing form system for sloping core construction, is primarily adapted for use in and is constructed to wall on stalk section The situation of the inclined sloping core section in body inner or outer side.Because the sloping core section on top is inclined to wall inner or outer side, and cause perpendicular To attached wall guide rail cannot climb, and then it is difficult to result in the creeping formwork of climbing form system.In the prior art frequently with sloping core section The ruggedized construction that setting is protruded out, to make attached wall guide rail continue vertically to climb, it is ensured that the normal creeping formwork of climbing form system, but due to Sloping core section is inclined, and climbing form system vertically climbs, between result in operating platform and sloping core the section construction area on climbing form system It is distant so that constructing operation inconvenience, there is construction safety risk.It is of the present utility model to be used for solve the above problems The climbing form system and its construction method of sloping core construction employ the creeping formwork support body of adjustable inclination, when sloping core section is constructed, adjustment The inclination angle of creeping formwork support body is close with the inclination angle of sloping core section, reduces the spacing of operating platform and construction area, and convenient construction is operated, Ensure construction safety.The climbing form system for being used for sloping core construction to the utility model below in conjunction with the accompanying drawings is illustrated.
Refering to shown in Fig. 1, it is shown that the utility model is used for the climbing form system of sloping core construction in the first sloping core section of constructing Structural representation.With reference to Fig. 1, the climbing form system that sloping core construction is used for the utility model is illustrated.
As shown in figure 1, the climbing form system that the utility model is used for sloping core construction includes attached wall guide rail 23, creeping formwork rail 24, holds Support platform 31, regulation support bar 32 and creeping formwork support body 40, attached wall guide rail 23 are fixedly connected with the climbing boots 21 in stalk section 11, Now be used for construct stalk section 11 on the first sloping core section 12, with reference to shown in Fig. 2, construction complete the first sloping core section 12 it Afterwards, climbing boots 21 are installed in the first sloping core section 12, climb attached wall guide rail 23, by the sloping core of attached wall guide rail 23 and first section 12 Climbing boots 21 are fixedly connected, and the attached wall guide rail 23 is in the heeling condition drawn close to the first sloping core section 12.The attached wall guide rail 23 is to leaning on First sloping core section, 12 directions incline on nearly wall 10.Creeping formwork rail 24 is connected on attached wall guide rail 23, and the creeping formwork rail 24 is with attached wall The inclination of guide rail 23 and it is oblique.Support platform 31 is layed in the top of creeping formwork rail 24, the support platform 31 and creeping formwork rail 24 Top is hinged so that support platform 31 can be rotated around the end being hinged, and creeping formwork rail 24 not only supports support platform 31, Simultaneously also for the adjustable offer of support platform 31 may.Regulation support bar 32 located at support platform 31 and creeping formwork rail 24 it Between, the regulation support bar 32 is length-adjustable structure, is adjusted to support platform 31 using the adjustment length of support bar 32 is adjusted It is horizontal so that support platform 31 is not influenceed by attached wall guide rail 23 is inclined, continue to keep horizontal, there is provided the support of flat Structure.The adjustable ground of creeping formwork support body 40 branch is located at support platform 31, and creeping formwork support body 40 can adjust the inclination angle of itself, flat positioned at support Creeping formwork support body 40 above and below platform 31 can adjustable inclination.When the first sloping core section 12 is constructed, adjustment is flat positioned at support The inclination angle of the creeping formwork support body 40 of the top of platform 31 causes creeping formwork to cause that the creeping formwork support body is inclined to the first sloping core section 12 by inclining The construction area spacing of operating platform and the first sloping core section 12 on support body 40 reduces, and facilitates the construction of the first sloping core section 12 to grasp Make, also ensure that construction safety.After the completion of the construction of the first sloping core section 12, climb attached wall guide rail 23, and the attached wall guide rail 23 is in incline It is horizontal by adjusting the adjustment support platform 31 of support bar 32 when ramp-like, it is that the creeping formwork support body 40 of the top of support platform 31 is carried For the support for consolidating.
At the sloping core of wall 10, because during the climbing of climbing form system, attached wall guide rail 23 is inclined with sloping core State, it is horizontal followed by the regulation adjustment support platform 31 of support bar 32, there is provided the support of stabilization, it is ensured that climbing form frame The steadiness of body 40, it is ensured that the safety of construction.The working procedure of the process of climbing is also simplify, with easy construction, is effectively saved About the engineering time, the construction period can be shortened.
As shown in Figure 3 and Figure 4, regulation support bar 32 includes being located at the adjusting sleeve pipe 321 at middle part and is screwed together in adjusting sleeve pipe The studdle 322,323 at 321 two ends, superposed studdle 322 is fastenedly connected with support platform 31, the support on top Screw rod 322 is connected by connecting channel-section steel with support platform 31.Studdle 323 positioned at bottom is fastenedly connected with creeping formwork rail 24, By screwing the precession of studdle 322,323 at the regulation of adjusting sleeve pipe 321 two ends or screwing out to realize adjusting the length of support bar 32 Degree regulation.It is preferred that 32 sides and the bottom of creeping formwork rail 24 being located on support platform 31 away from creeping formwork rail 24 of regulation support bar Between portion, to facilitate regulation.Specifically regulation process is:Adjusting sleeve pipe 321 is screwed clockwise, with turning for adjusting sleeve pipe 321 It is dynamic, coordinate the studdle 322,323 for causing two ends to be screwed out to outside adjusting sleeve pipe 321 by screw thread, realize regulation support bar 32 length, now, the side that support platform 31 is connected with regulation support bar 32 can be with the length of regulation support bar 32 It is elongated and be lifted up.Adjusting sleeve pipe 321 is screwed counterclockwise, with the rotation of adjusting sleeve pipe 321, is coordinated by screw thread and is caused two The studdle 322,323 at end is screwed in in adjusting sleeve pipe 321, and the length for realizing regulation support bar 32 shortens, now, support The side that platform 31 is connected with regulation support bar 32 can downwards sink as the length of regulation support bar 32 shortens, regulation support The length of bar 32 shortens suitable for the first sloping core 12 inward slant states of section.
As depicted in figs. 1 and 2, creeping formwork support body 40 includes being erected on the support list of the adjustable inclination on support platform 31 Unit 41 and branch are located at the bracket unit 42 of the bottom of support platform 31, and the setting height of carrier unit 41 and bracket unit 42 can basis Practice of construction needs to be selected.The corner of carrier unit 41 is to be hinged so that the carrier unit 41 being capable of being hinged with corner Based on realize the regulation at inclination angle, regulation push rod 411 has been installed on carrier unit 41, by adjusting the adjusting bracket of push rod 411 The inclination angle of unit 41.The corner of bracket unit 42 is also to be hinged so that the bracket unit 42 can be based on being hinged of corner The regulation at inclination angle is realized, regulation screw mandrel 421 has been installed in bracket unit 42, bracket unit 42 is adjusted by adjusting screw mandrel 421 Inclination angle.
As shown in fig. 7, the vertical rod 412 of carrier unit 41 and the cross bar 413 being connected with vertical rod 412, vertical rod 412 and cross bar 413 constitute frame-type support body.Enclosed by cross bar 413 and vertical rod 412 and form carrier unit 41, can on support platform 31 According to required using height, multiple carrier units 41 are set, a regulation push rod has been installed on each carrier unit 41 411.The bottom of vertical rod 412 is hingeably secured on support platform 31 so that the vertical rod 412 can be around the end being hinged to wall 10 Direction draw close or away from.The two ends of cross bar 413 are hinged fixation with vertical rod 412 so that the connection of cross bar 413 and vertical rod 412 Place can relatively rotate.It is angularly disposed between the vertical rod 412 between two cross bars 413 to have regulation push rod 411, the regulation push rod 411 On creeping formwork support body 40 between two vertical rods 412 of the side of the alien invasion of wall 10, controlled by adjusting push rod 411 Vertical rod processed 412 drawn close to wall 10 or away from angle of inclination.Regulation push rod 411 is length-adjustable structure, by regulation The length adjustment of push rod 411, with reference to being articulated and connected between cross bar 413 and vertical rod 412 so that creeping formwork support body 40 can be in square frame Structure, it is also possible to the framework of parallelogram.Regulation push rod 411 is in higher than away from the one of wall 10 near one end of wall 10 End is set.Certainly, regulation push rod 411 can also be propped up between cross bar 413 and vertical rod 412, it is also possible to will adjust push rod 411 Between two cross bars 413, the regulation at the inclination angle to carrier unit 41 can be realized.
It is specific to regulation push rod 411 as a example by push rod 411 is adjusted shown in Fig. 7 between two vertical rods 412 below Regulatory function illustrate:With reference to shown in Fig. 1 and Fig. 7, the length of adjustment regulation push rod 411 so that vertical rod 412 is to wall The direction that body 10 is drawn close inclines, and when vertical rod 412 is inclined, cross bar 413 keeps horizontal, and whole creeping formwork support body 40 is rendered as to wall The inclined state in the close direction of body 10, so that the operating platform of creeping formwork support body 40 is still horizontal, using the teaching of the invention it is possible to provide firm The operation platform of safety, also causes operation platform closer to wall 10, convenient construction.The length of regulation regulation push rod 411 diminishes, So that vertical rod 412 to wall 10 away from direction incline, when vertical rod 412 is inclined, cross bar 413 keeps horizontal, whole creeping formwork Support body 40 be rendered as to wall 10 away from the inclined state in direction, so that the operating platform of creeping formwork support body 40 still be level Shape, using the teaching of the invention it is possible to provide consolidate the operation platform of safety so that operation platform, away from wall 10, is that the construction of wall 10 avoids space.
To ensure the firm of climbing mould system structure, when rising to attached wall guide rail 23 at first sloping core section 12, by attached wall The bottom of guide rail 23 is connected with the attached wall cushion block 111 in stalk section 11.When attached wall guide rail 23 needs to climb, then by the connection solution Remove.
As shown in figure 1, the work progress to the first sloping core section is illustrated below.During the section construction of the first sloping core, attached wall is led Rail 23 is fixed in stalk section 11, and attached wall guide rail 23 and creeping formwork rail 24 are in vertical configuration, and support platform 31 is in horizontal, movement Formwork erecting structure 51 on support platform 31 so that the template on the formwork erecting structure 51 is resisted against at the first sloping core section to be onstructed, The inner side formwork erecting structure 13 in wall 10 is coordinated to together form the casting space of the first sloping core section.Now adjust support platform 31 The creeping formwork support body 40 of top, with reference to shown in Fig. 7, i.e., adjusts the regulation push rod 411 set on carrier unit 41, by adjustment simultaneously The length of push rod 411 is adjusted so that the direction to the first sloping core 12 of carrier unit 41 inclines, it is preferred that the branch of adjustment The inclination angle of frame unit 41 is identical with the inclination angle of the first sloping core 12.When carrier unit 41 is inclined, vertical rod 412 is inclined, cross bar 413 are still the level of state, and the operating platform set at the top of carrier unit 41 is also horizontality, using operating platform to first Casting concrete to be to form the first sloping core section 12 in the casting space of sloping core section, using the creeping formwork support body of adjustable inclination ensuring The convenience and safety of construction.
As shown in Fig. 2 being illustrated to the sloping core work progress on the first sloping core section below.First sloping core section 12 is to wall The inner side of body 10 inclines, the attached wall guide rail 23 for climbing, and is connected to the climbing boots 21 installed in the first sloping core section 12, the attached wall guide rail 23 bottom is connected with attached wall cushion block 111 fixed in stalk section 11, and attached wall guide rail 23 is in be inclined to the first sloping core section 12 State, creeping formwork rail 24 is fixed on attached wall guide rail 23, the creeping formwork rail 24 also in the first sloping core 12 inclined states of section, with reference to figure Shown in 5, result in side that support platform 31 is connected with creeping formwork rail 24 downwards, be connected with regulation support bar 32 on the side, The side that i.e. support platform 31 is connected with regulation support bar 32 is moved along the direction of arrow A in Fig. 5, now, regulation regulation branch The length of strut 32 diminishes, and the connection due to support platform 31 and creeping formwork rail 24 is to be hinged so that the support platform 31 can be around Rotated with the articulated section of creeping formwork rail 24, it is by adjusting support bar 32 that support platform 31 is lateral with adjust that support bar 32 is connected one It is drop-down, with reference to shown in Fig. 6, using adjust support bar 32 by support platform 31 with the side that is connected of regulation support bar 32 along Fig. 6 The direction movement of arrow B, until the support platform 31 is horizontal, it is ensured that the support of creeping formwork support body 40 is consolidated, firm safety. After support platform 31 is horizontal, because when the first sloping core section 12 is constructed, carrier unit 41 is as skewed, now the branch Frame unit 41 is still skewed, can directly move the formwork knot on support platform 31 without the inclination angle of adjustment carrier unit 41 Structure 51 carries out formwork, coordinates inner side formwork erecting structure 13 to form the casting space of sloping core, then using the operation on carrier unit 41 Platform in casting space casting concrete formed sloping core, circulate it is above-mentioned climb attached wall guide rail the step of, until sloping core has been constructed Into.
The bracket unit 42 installed in the bottom of support platform 31 can be arranged as required to multiple, example shown in the figure In, the bottom of support platform 31 is provided with two bracket units 42.Bracket unit 41 includes vertical rod 422 and cross bar 423, vertical rod Be hinged between 422 and cross bar 423, regulation screw mandrel 421 oblique branch located at two vertical rods 422 perpendicular to the side of Core Walls Structure 10 it Between, the adjustable length of screw mandrel 421 is adjusted, by the length adjustment of regulation 421, control the angle of inclination of vertical rod 422.Certainly, adjust Section screw mandrel 421 can also be propped up between two cross bars 423, it is also possible to will regulation screw mandrel branch located at cross bar 423 and vertical rod 422 it Between, can all realize adjusting the inclination angle of bracket unit 42.Two tops of vertical rod 422 of the bracket unit 42 at top pass through I-steel Support is connected to the bottom of support platform 31.Bracket unit 42 provides operating space for operating personnel, in creeping formwork, constructor Member is arrived at bracket unit 42 under needing, and the attached wall guide rail to bottom is checked.
Using adjusting the inclination angle of creeping formwork support body, and reduce the operation platform on creeping formwork support body and sloping core section construction area away from From convenient construction operation reduces construction safety risk.And creeping formwork support body is when inclining, it can be ensured that operation platform for horizontal, Stability Analysis of Structures is firm, it is ensured that construction safety.In the climbing formwork for construction of stalk section and sloping core section, climbed still according to conventional method Attached wall guide rail, although attached wall guide rail is inclined at sloping core, but by adjusting regulation support bar to cause support platform It is horizontal, the stability of the creeping formwork support body on support platform would not be influenceed, it is ensured that the construction safety of creeping formwork support body.This practicality New climbing form method, compared to the method for the existing ruggedized construction set up and protrude out, easy construction, operation is simple, that is, utilize The regulation support bar of setting is horizontal to adjust support platform, can be effectively time-consuming, and then can shorten and apply The work duration.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some of embodiment details should not be constituted to this practicality New restriction, the scope that the utility model will be defined using appended claims is used as protection domain of the present utility model.

Claims (4)

1. it is a kind of for sloping core construction climbing form system, it is characterised in that including:
Attached wall guide rail, is attached in the first sloping core section on stalk section;
It is connected to the creeping formwork rail on the attached wall guide rail;
The support platform at the top of the creeping formwork rail is layed in, the support platform is hinged with the creeping formwork rail;
Branch is located at the regulation support bar between the support platform and the creeping formwork rail;And
Branch located at the support platform and adjustable inclination creeping formwork support body, the creeping formwork support body by adjust inclination angle with to The first sloping core section is inclined, and the creeping formwork support body includes being erected on the support list of the adjustable inclination on the support platform Unit, the corner of the carrier unit has installed regulation push rod to be hinged on the carrier unit.
2. it is as claimed in claim 1 to be used for the climbing form system that sloping core is constructed, it is characterised in that the creeping formwork support body also includes branch Located at the bracket unit of the support mesa base, the corner of the bracket unit installs to be hinged in the bracket unit There is regulation screw mandrel.
3. it is as claimed in claim 1 to be used for the climbing form system that sloping core is constructed, it is characterised in that the regulation support bar includes position Adjusting sleeve pipe and the studdle for being screwed together in the adjusting sleeve pipe two ends, the superposed studdle and institute in middle part State support platform to be fastenedly connected, the studdle and the creeping formwork rail positioned at bottom are fastenedly connected.
4. it is as claimed in claim 1 to be used for the climbing form system that sloping core is constructed, it is characterised in that the bottom of the attached wall guide rail leads to Attached wall cushion block is crossed to be connected with stalk section.
CN201620525995.8U 2016-06-02 2016-06-02 For the climbing form system of sloping core construction Active CN206289964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620525995.8U CN206289964U (en) 2016-06-02 2016-06-02 For the climbing form system of sloping core construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620525995.8U CN206289964U (en) 2016-06-02 2016-06-02 For the climbing form system of sloping core construction

Publications (1)

Publication Number Publication Date
CN206289964U true CN206289964U (en) 2017-06-30

Family

ID=59094029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620525995.8U Active CN206289964U (en) 2016-06-02 2016-06-02 For the climbing form system of sloping core construction

Country Status (1)

Country Link
CN (1) CN206289964U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908966A (en) * 2016-06-02 2016-08-31 中国建筑第八工程局有限公司 Creeping formwork system for oblique wall construction and construction method of creeping formwork system
CN108678366A (en) * 2018-06-13 2018-10-19 四川省第六建筑有限公司 From the huge column form frame system of angle
CN109707155A (en) * 2019-01-14 2019-05-03 深圳市特辰科技股份有限公司 Guide rail climbs frame body inclination prevention structure, mounting structure and creeping formwork mounting structure
CN115324328A (en) * 2022-08-09 2022-11-11 中国建筑第四工程局有限公司 Construction method for moving jacking upright post in high altitude for jacking mould

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908966A (en) * 2016-06-02 2016-08-31 中国建筑第八工程局有限公司 Creeping formwork system for oblique wall construction and construction method of creeping formwork system
CN105908966B (en) * 2016-06-02 2017-12-22 中国建筑第八工程局有限公司 Climbing form system and its construction method for sloping core construction
CN108678366A (en) * 2018-06-13 2018-10-19 四川省第六建筑有限公司 From the huge column form frame system of angle
CN108678366B (en) * 2018-06-13 2024-02-09 华西工程科技(深圳)股份有限公司 Self-angle-changing large column formwork system
CN109707155A (en) * 2019-01-14 2019-05-03 深圳市特辰科技股份有限公司 Guide rail climbs frame body inclination prevention structure, mounting structure and creeping formwork mounting structure
CN109707155B (en) * 2019-01-14 2021-08-17 深圳市特辰科技股份有限公司 Anti-tilt structure of guide rail climbing frame body, mounting structure and creeping formwork mounting structure
CN115324328A (en) * 2022-08-09 2022-11-11 中国建筑第四工程局有限公司 Construction method for moving jacking upright post in high altitude for jacking mould
CN115324328B (en) * 2022-08-09 2023-12-08 中国建筑第四工程局有限公司 Construction method for moving jacking upright column in high air aiming at top die

Similar Documents

Publication Publication Date Title
CN105908966B (en) Climbing form system and its construction method for sloping core construction
CN206289964U (en) For the climbing form system of sloping core construction
CN106401174A (en) Creeping formwork system used for construction of variable cross-section core tube and construction method of creeping formwork system
KR100707549B1 (en) Rail mounted climbing system
CN109537865A (en) A kind of Super High multi-curvature variation camber line outer climbing frame
CN103276886B (en) Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof
CN106917497A (en) A kind of socket joint disk button-type frame set
CN206736864U (en) Hydraulic self-lifting cantilever heavy type arch dam shuttering work platform
CN206289963U (en) For the climbing form system of section Core tube construction
CN206667708U (en) A kind of socket joint disk button-type frame set
CN212802720U (en) Temporary support capable of being adjusted in multiple directions
FI126773B (en) Vertical support structure for guardrail construction in roofing
CN205475707U (en) A jacking platform for super high -rise building
CN205421330U (en) A formwork support system for construction of vault underground structure engineering
CN108678366A (en) From the huge column form frame system of angle
CN109019420B (en) Multi-functional cat ladder is used in architectural decoration
CN211114732U (en) Portable movable reinforcement operation platform
CN210288387U (en) Static pile machine flatness control device
CN210239139U (en) Cornice template supporting device
CN209907435U (en) Pipe rack platform truck for comprehensive pipe rack building construction
CN107461029B (en) Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting
CN206888488U (en) Anti-dumping inclined scaffold
CN204163369U (en) A kind of collapsible attaching lifting exterior wall scaffold
CN109469308A (en) The structure of major diameter group storehouse support platform
CN207609155U (en) Hydraulic pressure is from climbing construction operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190121

Address after: 200122 Pudong New Area, Shanghai, China (Shanghai) free trade trial area 1568 Century Avenue 27

Co-patentee after: China Huashi Enterprises Co., Ltd.

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Co-patentee after: Sichuan No.6 Construction Co., Ltd.

Address before: 27th Floor, 1568 Century Avenue, China (Shanghai) Free Trade Pilot Area, Pudong New Area, Shanghai, 2013

Patentee before: China Construction Eighth Engineering Division Co., Ltd.