CN218406696U - Super high-rise assembled house mounting structure - Google Patents
Super high-rise assembled house mounting structure Download PDFInfo
- Publication number
- CN218406696U CN218406696U CN202222477978.XU CN202222477978U CN218406696U CN 218406696 U CN218406696 U CN 218406696U CN 202222477978 U CN202222477978 U CN 202222477978U CN 218406696 U CN218406696 U CN 218406696U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- house body
- super high
- house
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003139 buffering effect Effects 0.000 claims abstract description 13
- 238000009434 installation Methods 0.000 abstract description 15
- 238000000034 method Methods 0.000 abstract description 10
- 230000000694 effects Effects 0.000 abstract description 4
- 239000011440 grout Substances 0.000 abstract description 3
- 230000009471 action Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model relates to a superelevation layer assembled house mounting structure, including ground and house body, the top fixedly connected with mounting panel of house body, be provided with on the ground and pour the chamber, be provided with supporting component on the house body, supporting component include quantity be two and with ground top fixedly connected with installation piece, the equal fixedly connected with in the left and right sides of house body connects the storehouse, the top threaded connection who connects the storehouse has the threaded rod, the outside threaded connection of threaded rod has the movable block. This super high-rise assembled house mounting structure through setting up supporting component, places at the ground buffering and support the house body, and convenient follow-up use concrete grout is fixed the house body to solved the house body and did not possess certain stability at the in-process that uses, under the effect that receives external factor, can lead to the house body phenomenon such as collapsing to appear, improved the fastness of prefabricated assembled house.
Description
Technical Field
The utility model relates to an assembly building technical field specifically is a super high-rise assembled house mounting structure.
Background
The super high-rise assembly type building refers to a building which is formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories in the factory, such as floor slabs, wall boards, stairs, balconies and the like, transporting the components and accessories to a building construction site, and assembling and installing the components and accessories on the site through a reliable connection mode.
However, when the super high-rise fabricated house is installed, the prefabricated fabricated house does not have certain stability in the using process, and the prefabricated fabricated house collapses under the action of external factors, so that safety accidents are easily caused.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a super high-rise assembled house mounting structure possesses advantages such as the installation is stable, has solved prefabricated assembled house and under the effect that receives external factor, can lead to the problem of phenomenon such as collapsing to appear in prefabricated assembled house.
In order to achieve the above object, the utility model provides a following technical scheme: a super high-rise assembled house installation structure comprises a foundation and a house body, wherein the top of the house body is fixedly connected with an installation plate, a pouring cavity is formed in the foundation, and a support assembly is arranged on the house body;
the utility model discloses a house body, including house body, supporting component, movable block, backup pad, mount block, second spring, first spring, the equal sliding connection in left and right sides has the gag lever post, the equal fixedly connected with in left and right sides of house body installation piece, the top threaded connection in connection storehouse has the threaded rod, the outside threaded connection of threaded rod has the movable block, the right side fixedly connected with backup pad of movable block, the one end fixedly connected with connecting block of backup pad, the interior diapire fixedly connected with attenuator of installation piece, the top fixedly connected with fly leaf of attenuator, first spring has been cup jointed in the outside of attenuator, the equal sliding connection in left and right sides of installation piece has the gag lever post, the second spring has been cup jointed in the outside of gag lever post.
Further, the inside of ground is provided with quantity and is two buffering gasbags, the top of buffering gasbag and the bottom butt of mounting panel.
Further, threaded rod one end through connection storehouse and with be connected the interior diapire rotation connection in storehouse, the inside of movable block is seted up with threaded rod threaded connection's screw through-hole.
Further, the right side inner wall of connecting the storehouse has seted up the spout, the right side fixedly connected with of movable block and spout sliding connection's slider.
Further, the movable hole that matches with backup pad width phase is seted up in the left side of connecting the storehouse, the spacing logical groove that matches with gag lever post width phase is all seted up to the left and right sides of connecting block.
Further, the connecting block is mutually abutted with the movable plate, and one end of the first spring is fixedly connected with the bottom of the movable plate and the inner bottom wall of the mounting block.
Furthermore, gag lever post one end is run through and is extended to the inside of installation piece, the both ends of second spring respectively with the outside of gag lever post and the outside fixed connection of installation piece.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. this super high-rise assembled house mounting structure through setting up supporting component, places at the ground buffering and support the house body, and convenient follow-up use concrete grout is fixed the house body to solved the house body and did not possess certain stability at the in-process that uses, under the effect that receives external factor, can lead to the house body phenomenon such as collapsing to appear, improved the fastness of prefabricated assembled house.
2. This super high-rise assembled house mounting structure through setting up buffering gasbag, can cushion the impact force that the house body was placed on the ground, has reduced the too big and condition that leads to the ground to take place to damage of external impact force.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is an enlarged view of the structure A of FIG. 1 according to the present invention;
fig. 3 is an enlarged view of the structure B in fig. 1 according to the present invention.
In the figure: the house comprises a foundation 1, a house body 2, a mounting plate 3, a pouring cavity 4, a mounting block 5, a connecting cabin 6, a threaded rod 7, a movable block 8, a supporting plate 9, a connecting block 10, a damper 11, a first spring 12, a limiting rod 13, a second spring 14, a buffering air bag 15, a movable plate 16, movable plates 17, 18, 19 and 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, the super high-rise assembled house installation structure in this embodiment includes a foundation 1 and a house body 2, the top of the house body 2 is fixedly connected with an installation plate 3, two buffering air bags 15 are arranged inside the foundation 1, the tops of the buffering air bags 15 are abutted to the bottom of the installation plate 3, a pouring cavity 4 is arranged on the foundation 1, when the house body 2 is fixed on the foundation 1, the house body 2 is placed on the foundation 1 by using an external hoisting device, at this time, the installation plate 3 at the bottom of the house body 2 is slowly placed on the foundation 1, the impact force of the installation plate 3 on the foundation 1 can be buffered by using the buffering air bags 15, and a support assembly is arranged on the house body 2.
Wherein, the supporting component comprises two installing blocks 5 fixedly connected with the top of the foundation 1, the left side and the right side of the house body 2 are fixedly connected with a connecting bin 6, the top of the connecting bin 6 is in threaded connection with a threaded rod 7, the outer side of the threaded rod 7 is in threaded connection with a movable block 8, the right side inner wall of the connecting bin 6 is provided with a sliding chute, the right side of the movable block 8 is fixedly connected with a sliding block in sliding connection with the sliding chute, one end of the threaded rod 7 penetrates through the connecting bin 6 and is rotatably connected with the inner bottom wall of the connecting bin 6, the inside of the movable block 8 is provided with a threaded through hole in threaded connection with the threaded rod 7, the right side of the movable block 8 is fixedly connected with a supporting plate 9, the left side of the connecting bin 6 is provided with a movable hole matched with the width of the supporting plate 9, one end of the supporting plate 9 is fixedly connected with a connecting block 10, the inner bottom wall of the installing block 5 is fixedly connected with a damper 11, and the top of the damper 11 is fixedly connected with a movable plate 16, the connecting block 10 is abutted against the movable plate 16, the first spring 12 is sleeved on the outer side of the damper 11, one end of the first spring 12 is fixedly connected with the bottom of the movable plate 16 and the inner bottom wall of the mounting block 5, the left side and the right side of the mounting block 5 are both connected with the limiting rods 13 in a sliding manner, the left side and the right side of the connecting block 10 are both provided with limiting through grooves matched with the widths of the limiting rods 13, the outer side of the limiting rods 13 is sleeved with the second spring 14, one end of each limiting rod 13 penetrates through and extends into the mounting block 5, two ends of each second spring 14 are respectively fixedly connected with the outer side of each limiting rod 13 and the outer side of the mounting block 5, after the house body 2 is placed on the foundation 1, the threaded rod 7 is rotated, the movable block 8 drives the supporting plate 9 to move on the sliding grooves through the sliding blocks, the limiting rods 13 are pulled, the connecting block 10 is placed inside the mounting block 5, and the connecting block 10 is contacted with the movable plate 16, loosen gag lever post 13 and carry on spacingly through the tension of second spring 14 to connecting block 10 to fix, conveniently support house body 2, through pouring the muddy earth mortar and pouring in chamber 4, the muddy earth of pouring in chamber 4 can flow into each and pour the inslot, through will pour chamber 4 and pour the inslot and fill up the muddy earth mortar, be convenient for accomplish and fix house body 2 on ground 1.
It should be noted that, through setting up supporting component, place house body 2 and cushion and support at ground 1, make things convenient for follow-up use concrete grout to fix house body 2, thereby solved house body 2 and did not possess certain stability at the in-process that uses, under the effect that receives external factors, can lead to the house body phenomenon such as collapsing to appear, the fastness of prefabricated assembled house has been improved, through setting up the buffering gasbag, can cushion the impact force that house body 2 was placed on ground 1, it is too big and lead to ground 1 to take place the condition of damaging to have reduced the external impact force.
The working principle of the embodiment is as follows:
this super high-rise assembled house mounting structure, when fixing house body 2 on ground 1, use outside hoisting equipment to place house body 2 on ground 1, the mounting panel 3 of house body 2 bottom is slowly placed on ground 1 this moment, utilize buffering gasbag 15 can cushion the impact force that mounting panel 3 placed on ground 1, place house body 2 behind ground 1, rotate threaded rod 7, movable block 8 drives backup pad 9 and moves on the spout through the slider, pulling gag lever post 13, place the inside of installation piece 5 with connecting block 10, connecting block 10 contacts with fly leaf 16, loosen gag lever post 13 and carry out spacing to connecting block 10 through the tension of second spring 14, thereby fix, conveniently support house body 2, through pouring the muddy earth mortar into pouring chamber 4, the muddy earth in pouring chamber 4 can flow into each and pour the inslot, through will pour chamber 4 and pour the inslot and fill with muddy earth, be convenient for accomplishing and fix house body 2 on ground 1.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a … …" does not exclude the presence of another identical element in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a super high-rise assembled house mounting structure, includes ground (1) and house body (2), its characterized in that: the top of the house body (2) is fixedly connected with a mounting plate (3), a pouring cavity (4) is arranged on the foundation (1), and a supporting component is arranged on the house body (2);
the supporting component comprises two supporting components and a foundation (1) top fixedly connected with mounting blocks (5), the left side and the right side of the house body (2) are fixedly connected with connecting bins (6), the top of the connecting bins (6) is connected with a threaded rod (7), the outer side of the threaded rod (7) is connected with a movable block (8), the right side of the movable block (8) is fixedly connected with a supporting plate (9), one end of the supporting plate (9) is fixedly connected with a connecting block (10), the inner bottom wall of the mounting block (5) is fixedly connected with a damper (11), the top of the damper (11) is fixedly connected with a movable plate (16), a first spring (12) is sleeved on the outer side of the damper (11), the left side and the right side of the mounting blocks (5) are connected with limiting rods (13) in a sliding mode, and a second spring (14) is sleeved on the outer side of the limiting rods (13).
2. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: the inside of ground (1) is provided with quantity and is two buffering gasbag (15), the top of buffering gasbag (15) and the bottom butt of mounting panel (3).
3. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: threaded rod (7) one end through connection storehouse (6) and with be connected the interior diapire rotation in storehouse (6) and be connected, the screw through-hole with threaded rod (7) threaded connection is seted up to the inside of movable block (8).
4. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: the right side inner wall of connecting storehouse (6) has seted up the spout, the right side fixedly connected with of movable block (8) and spout sliding connection's slider.
5. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: the left side of the connecting bin (6) is provided with a movable hole matched with the width of the supporting plate (9), and the left side and the right side of the connecting block (10) are provided with limiting through grooves matched with the width of the limiting rods (13).
6. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: the connecting block (10) is abutted against the movable plate (16), and one end of the first spring (12) is fixedly connected with the bottom of the movable plate (16) and the inner bottom wall of the mounting block (5).
7. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: one end of the limiting rod (13) penetrates through and extends to the inside of the mounting block (5), and two ends of the second spring (14) are fixedly connected with the outer side of the limiting rod (13) and the outer side of the mounting block (5) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222477978.XU CN218406696U (en) | 2022-09-19 | 2022-09-19 | Super high-rise assembled house mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222477978.XU CN218406696U (en) | 2022-09-19 | 2022-09-19 | Super high-rise assembled house mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218406696U true CN218406696U (en) | 2023-01-31 |
Family
ID=85033004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222477978.XU Expired - Fee Related CN218406696U (en) | 2022-09-19 | 2022-09-19 | Super high-rise assembled house mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218406696U (en) |
-
2022
- 2022-09-19 CN CN202222477978.XU patent/CN218406696U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111945928A (en) | Energy-saving heat-insulating wall and roof | |
CN106869368A (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN111677002A (en) | Adjustable formwork support frame for inclined top plate of new and old underground engineering | |
CN218406696U (en) | Super high-rise assembled house mounting structure | |
CN112112443A (en) | Assembly type building reinforcing assembly | |
CN105019598A (en) | Reinforced lightweight plate for grooved reinforced concrete pavement | |
CN106869379A (en) | A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure | |
CN206607724U (en) | A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure | |
CN212896972U (en) | Steel construction assembled wallboard is built in room | |
CN111677001A (en) | Adjustable structure support frame for new and old underground engineering roof | |
CN111395747A (en) | Formwork supporting device for horizontal construction joint of concrete structure and construction method thereof | |
CN206607709U (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN212534106U (en) | Super high-rise assembled house mounting structure | |
CN201133089Y (en) | Loading transferring device for roof beam changing to floor joist | |
CN115853211A (en) | Prefabricated staircase support connecting structure and construction method | |
CN204662771U (en) | A kind of cutting arrangement of reinforcement formula for building strengthens light weight board | |
CN213927170U (en) | Prefabricated building stair of assembled is with mould platform structure | |
CN213897521U (en) | Support column for prefabricated building | |
CN201424797Y (en) | Wood keel overhead wooden floor mounting base layer | |
CN208792537U (en) | A kind of prefabricated assembled exterior wall and prefabrication | |
CN112141908A (en) | Lifting device for building construction | |
CN209179240U (en) | The integrated mounting structure of wall thermal insulating | |
CN112252612A (en) | Prefabricated building stair of assembled is with mould platform structure | |
CN211666199U (en) | Leveling frame for building construction roof | |
CN219845920U (en) | Building fireproof wallboard erecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230131 |
|
CF01 | Termination of patent right due to non-payment of annual fee |