CN212534106U - Super high-rise assembled house mounting structure - Google Patents

Super high-rise assembled house mounting structure Download PDF

Info

Publication number
CN212534106U
CN212534106U CN202020997440.XU CN202020997440U CN212534106U CN 212534106 U CN212534106 U CN 212534106U CN 202020997440 U CN202020997440 U CN 202020997440U CN 212534106 U CN212534106 U CN 212534106U
Authority
CN
China
Prior art keywords
ground
prefabricated house
pour
wall
trapezoidal plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020997440.XU
Other languages
Chinese (zh)
Inventor
李伟奇
陈超灵
冯泱人
黄隆盛
谭颖
王文浩
赵芝飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Construction Engineering Supervision Co ltd
Original Assignee
Guangdong Construction Engineering Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Construction Engineering Supervision Co ltd filed Critical Guangdong Construction Engineering Supervision Co ltd
Priority to CN202020997440.XU priority Critical patent/CN212534106U/en
Application granted granted Critical
Publication of CN212534106U publication Critical patent/CN212534106U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a super high-rise assembled house mounting structure, including assembled house and the ground that sets up on the ground, the bottom fixed mounting of assembled house has the installation piece, the bottom of installation piece agrees with the ground mutually, be provided with on the ground and pour the chamber, pour the groove on the bottom inner wall of chamber and both sides inner wall and all seted up, and pour the groove and extend to in the ground, be provided with on the ground and be used for installing the buffering buffer assembly of buffering to the installation piece, set up two symmetrical two pouring holes that set up on the top inner wall of pouring the chamber, the top of ground can movably clamp two that set up and carry out spacing supporting component to the assembled house; the utility model is convenient and fast to operate, this prefabricated building need not to use the bolt alright with fixing on the ground, utilize spacing supporting component and buffer unit to place the prefabricated building simultaneously and cushion and spacing at the ground, make things convenient for follow-up use to mix earth grout and fix the prefabricated building.

Description

Super high-rise assembled house mounting structure
Technical Field
The utility model relates to an assembly building technical field specifically is a super high-rise assembled house mounting structure.
Background
The fabricated building is a building which is formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories (such as floor slabs, wall slabs, stairs, balconies and the like) in the factory, transporting the components and accessories to a building construction site, and assembling and installing the components and the accessories on the site in a reliable connection mode.
At present, when some rural areas build houses, in order to save building time, the houses are often built by using fabricated buildings, but when the fabricated houses are installed, a plurality of fixing bolts are often needed to be fixed on a foundation, the bolts are used, on one hand, the fixation is unstable, on the other hand, the operation is complex, meanwhile, the exposed bolts are required to be cut off, and further, the work burden is brought to constructors, so that a super high-rise fabricated house installation structure is provided, and the problem is solved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a super high-rise assembled house mounting structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a super high-rise prefabricated house mounting structure, includes prefabricated house and sets up subaerial ground, prefabricated house's bottom fixed mounting has the installation piece, the bottom and the ground of installation piece agree with each other, be provided with on the ground and pour the chamber, pour on the bottom inner wall in chamber and both sides inner wall all seted up pour the groove, and pour in the groove extends to the ground, be provided with on the ground and be used for installing the buffering's buffer assembly to the installation piece, set up two holes of pouring of symmetry setting on pouring the top inner wall in chamber, the top of ground is mobile to be clamped two that the symmetry set up and carries out spacing supporting component to prefabricated house.
Preferably, there is a thread plugging shaft in the hole, and a semicircular ring is fixedly mounted on the top of the thread plugging shaft, so that the hole can be plugged by the thread plugging shaft, the hole can be conveniently opened by a constructor, and concrete mortar is poured into the pouring cavity.
Preferably, the buffering subassembly is including seting up two dashpots that the symmetry set up on the ground, fixed mounting has buffering gasbag on the bottom inner wall of dashpot, the top fixed mounting of buffering gasbag has the buffer board with dashpot sliding connection, and the top of two buffer boards all laminates with the bottom of installation piece mutually, when needs will assemble house fixed mounting on the ground, needs will assemble the slow placing of installation piece of house bottom on the ground, utilizes the buffering subassembly can place the impact force on the ground to the installation piece and cushion, has effectually prevented that the external impact force is too big and lead to the ground to take place to damage.
Preferably, the limiting support component comprises a limiting seat movably clamped at the top of the foundation, the top of the limiting seat is fixedly mounted on the adjusting box, a first trapezoidal plate is slidably connected to the inner wall of one side of the adjusting box, a damping spring is fixedly mounted at the bottom of the first trapezoidal plate, the bottom of the damping spring is fixedly connected with the inner wall of the bottom of the adjusting box, a screw rod is fixedly mounted at the top of the first trapezoidal plate, a threaded sleeve in threaded connection is sleeved outside the screw rod, the top of the threaded sleeve extends to the upper side of the adjusting box, a second trapezoidal plate is transversely slidably connected to the adjusting box, one side of the first trapezoidal plate is attached to the inclined plane of the second trapezoidal plate, an L-shaped support plate is fixedly mounted at one side of the second trapezoidal plate and is slidably connected with the adjusting box, one side, close to each other, of the two L-shaped support plates is respectively attached to two sides of the assembled house, when placing the assembled house on the ground, when convenient subsequent installation operation for the steadiness that keeps the assembled house, at first clamp two spacing seat activities at the top of ground, then clockwise two rotation axes of rotation respectively, and the rotation axis can drive the screw sleeve and rotate, and screw sleeve and screw rod threaded connection, so can promote first trapezoidal plate and remove downwards, and first trapezoidal plate promotes the second trapezoidal plate and can remove, and then can make two L shape backup pads remove and laminate mutually with the outside of assembled house to the one side that is close to each other, so utilize two L shape backup pads to carry out the centre gripping to the assembled house fixedly, make things convenient for follow-up cement injection.
Preferably, the bottom of the limiting seat is fixedly provided with two symmetrically-arranged clamping blocks, the top of the foundation is provided with two symmetrically-arranged clamping grooves, the clamping blocks and the corresponding clamping grooves are clamped, the limiting seat is movably clamped at the top of the foundation by utilizing the clamping blocks and the clamping grooves, and the follow-up dismounting and mounting of the limiting seat are facilitated.
Preferably, the outer side of the screw rod is provided with an external thread, the inner ring of the threaded sleeve is provided with an internal thread, the external thread is connected with the internal thread, and the threaded connection of the screw rod and the threaded sleeve is realized by utilizing the external thread and the internal thread.
Compared with the prior art, the beneficial effects of the utility model are that:
1. on will assembling the slow placing of installation piece of house bottom at the ground, utilize the buffering gasbag in the buffering subassembly can cushion the impact force that the installation piece was placed on the ground, effectually prevented that the external impact force is too big and lead to the ground to take place to damage.
2. Through clamping two spacing seat activities at the top of ground, then clockwise rotation two rotation axes promote first trapezoidal plate and remove downwards respectively, and first trapezoidal plate promotes the second trapezoidal plate and can remove, and then can make two L shape backup pads remove and laminate mutually with the outside of assembled house to the one side that is close to each other, so utilize two L shape backup pads to carry out the centre gripping to the assembled house fixed, make things convenient for follow-up cement injection.
3. Through opening and pouring the hole, will mix the earth mortar and pour the intracavity, and pour the intracavity muddy earth and can flow into each and pour the inslot, through will pour the chamber and pour the inslot and fill up and mix the earth mortar, be convenient for accomplish and fix the prefabricated house on the ground for this prefabricated house need not to use the bolt fastening, has saved installation time, and convenient operation is swift.
The utility model is convenient and fast to operate, this prefabricated building need not to use the bolt alright with fixing on the ground, utilize spacing supporting component and buffer unit to place the prefabricated building simultaneously and cushion and spacing at the ground, make things convenient for follow-up use to mix earth grout and fix the prefabricated building.
Drawings
Fig. 1 is a schematic structural view of an installation structure of a super high-rise prefabricated house according to the present invention;
FIG. 2 is a schematic view of a portion of the structure of FIG. 1;
FIG. 3 is a schematic view of a portion of the cross-sectional structure of FIG. 1;
fig. 4 is a three-dimensional structure diagram of the airbag of fig. 2.
In the figure: the prefabricated house comprises a prefabricated house body 1, a mounting block 2, a foundation 3, a pouring cavity 4, a pouring groove 5, a buffer groove 6, a buffer plate 7, a buffer air bag 8, a limiting seat 9, an adjusting box 10, a first trapezoidal plate 11, a damping spring 12, a screw rod 13, a threaded sleeve 14, a rotating shaft 15, a second trapezoidal plate 16, a supporting plate 17L, a pouring hole 18, a threaded plugging shaft 19, a clamping groove 20 and a clamping block 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Examples
As shown in fig. 1-3, the utility model relates to a super high-rise assembled house mounting structure, including assembled house 1 and the ground 3 that sets up subaerial, assembled house 1's bottom fixed mounting has installation piece 2, the bottom of installation piece 2 agrees with mutually with ground 3, be provided with on the ground 3 and pour chamber 4, pour on the bottom inner wall of chamber 4 and all seted up with the both sides inner wall and pour groove 5, and pour in groove 5 extends to ground 3, be provided with on the ground 3 and be used for installing the buffer component of buffering to installation piece 2, pour two holes 18 of seting up two of symmetry setting on the top inner wall of chamber 4, ground 3's top mobile two that clamp the symmetry setting carry out spacing supporting component to assembled house 1.
In this embodiment, there is threaded plugging shaft 19 in threaded connection on pouring hole 18, and top fixed mounting of threaded plugging shaft 19 has a semicircle ring, utilizes threaded plugging shaft 19 to carry out the shutoff to pouring hole 18, makes things convenient for constructor to open pouring hole 8, pours into concrete mortar and pours in the chamber 4.
In this embodiment, the buffering subassembly is including seting up two dashpots 6 that the symmetry set up on ground 3, fixed mounting has buffering gasbag 8 on the bottom inner wall of dashpot 6, the top fixed mounting of buffering gasbag 8 has buffer board 7 with 6 sliding connection of dashpot, and the top of two buffer boards 7 is all laminated with the bottom of installing block 2 mutually, when needs will assemble 1 fixed mounting in house on ground 3, need will assemble the slow placing on ground 3 of installing block 2 of 1 bottom in house, utilize the buffering subassembly can place the impact force on ground 3 to installing block 2 and cushion, effectually prevented that external impact force is too big and lead to ground 3 to take place to damage.
In this embodiment, the limiting support assembly includes a limiting seat 9 movably clamped on the top of the foundation 3, the top of the limiting seat 9 is fixedly mounted on an adjusting box 10, a first trapezoidal plate 11 is slidably connected to an inner wall of one side of the adjusting box 10, a damping spring 12 is fixedly mounted at the bottom of the first trapezoidal plate 11, the bottom of the damping spring 12 is fixedly connected to an inner wall of the bottom of the adjusting box 10, a screw 13 is fixedly mounted at the top of the first trapezoidal plate 11, a threaded sleeve 14 in threaded connection is sleeved outside the screw 13, the top of the threaded sleeve 14 extends to the upper side of the adjusting box 10, a second trapezoidal plate 16 is slidably connected to the adjusting box 10 in the transverse direction, one side of the first trapezoidal plate 11 is attached to an inclined surface of the second trapezoidal plate 16, an L-shaped support plate 17 is fixedly mounted at one side of the second trapezoidal plate 16, the L-shaped support plate 17 is slidably connected to the adjusting box 10, one side of the two L-shaped support plates 17 close to each other is respectively, when placing assembled house 1 on ground 3, when convenient subsequent installation operation for keeping the steadiness of assembled house 1, at first clamp two spacing seat 9 activities at the top of ground 3, then clockwise two rotation axis 15 respectively, and rotation axis 15 can drive threaded sleeve 14 and rotate, and threaded sleeve 14 and screw 13 threaded connection, so can promote first trapezoidal plate 11 and remove downwards, and first trapezoidal plate 11 promotes second trapezoidal plate 16 and can remove, and then can make two L shape backup pads 17 remove to the one side that is close to each other and laminate mutually with the outside of assembled house 1, so utilize two L shape backup pads 17 to carry out the centre gripping fixed to assembled house 1, make things convenient for follow-up water injection mud.
In this embodiment, two symmetrically arranged clamping blocks 21 are fixedly mounted at the bottom of the limiting seat 9, two symmetrically arranged clamping grooves 20 are formed in the top of the foundation 3, the clamping blocks 21 and the corresponding clamping grooves 20 are clamped, the limiting seat 9 is movably clamped at the top of the foundation 3 by the aid of the clamping blocks 21 and the clamping grooves 20, and the subsequent limiting seat 9 is convenient to disassemble and assemble.
In this embodiment, the outside of screw rod 13 is provided with the external screw thread, and the inner circle of threaded sleeve 14 is provided with the internal thread, and external screw thread and female connection have realized screw rod 13 and threaded sleeve 14 threaded connection with the internal thread.
The working principle is as follows: when the assembled house 1 needs to be fixed on the foundation 3, the assembled house 1 is placed on the foundation 3 by using external hoisting equipment, the installation block 2 at the bottom of the assembled house 1 is slowly placed on the foundation 3 at the moment, the impact force of the installation block 2 on the foundation 3 can be buffered by using the buffering air bag 8 in the buffering component, after the assembled house 4 is placed on the foundation 3, the two limit seats 9 can be movably clamped on the top of the foundation 3 by using the clamping blocks 21 and the clamping grooves 20 respectively, then the first trapezoidal plate 11 is pushed to move downwards by clockwise rotating the two rotating shafts 15 respectively, the second trapezoidal plate 16 is pushed by the first trapezoidal plate 11 to move, and then the two L-shaped support plates 17 can move towards the mutually close sides and are attached to the outer sides of the assembled house 1, so that the assembled house 1 can be clamped and fixed by using the two L-shaped support plates 17, at this moment, the pouring hole 8 is opened again, concrete mortar is poured into the pouring cavity 4, the concrete in the pouring cavity 4 can flow into each pouring groove 5, the pouring cavity 4 and the pouring grooves 5 are filled with the concrete mortar, and the prefabricated house 1 is conveniently fixed on the foundation 3, so that the prefabricated house 1 is not required to be fixed by using bolts, and the installation time is saved.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a super high-rise prefabricated house mounting structure, includes prefabricated house (1) and sets up ground (3) subaerial, its characterized in that: the utility model discloses a prefabricated house, including prefabricated house (1), the bottom fixed mounting of prefabricated house (1) has installation piece (2), the bottom and the ground (3) of installation piece (2) agree with mutually, be provided with on ground (3) and pour chamber (4), pour on the bottom inner wall of chamber (4) and both sides inner wall all seted up and pour groove (5), and pour in groove (5) extend to ground (3), be provided with on ground (3) and be used for installing the buffer assembly of buffering to installation piece (2), two of seting up the symmetry on the top inner wall of pouring chamber (4) set up hole (18) are pour to two, the top of ground (3) is mobile to be clamped two that the symmetry set up and carries out spacing supporting component to prefabricated house (1).
2. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: the pouring hole (18) is in threaded connection with a threaded plugging shaft (19), and a semicircular ring is fixedly mounted at the top of the threaded plugging shaft (19).
3. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: buffering subassembly is including seting up two dashpot (6) that the symmetry set up on ground (3), fixed mounting has buffering gasbag (8) on the bottom inner wall of dashpot (6), the top fixed mounting of buffering gasbag (8) have buffer board (7) with dashpot (6) sliding connection, and the top of two buffer boards (7) all laminate with the bottom of installation piece (2).
4. The structure of installing a super high-rise prefabricated house according to claim 1, wherein: the limiting support assembly comprises a limiting seat (9) movably clamped at the top of a foundation (3), the top of the limiting seat (9) is fixedly installed on an adjusting box (10), a first trapezoidal plate (11) is connected to the inner wall of one side of the adjusting box (10) in a sliding mode, a damping spring (12) is fixedly installed at the bottom of the first trapezoidal plate (11), the bottom of the damping spring (12) is fixedly connected with the inner wall of the bottom of the adjusting box (10), a screw rod (13) is fixedly installed at the top of the first trapezoidal plate (11), a threaded sleeve (14) in threaded connection is sleeved on the outer side of the screw rod (13), the top of the threaded sleeve (14) extends to the upper portion of the adjusting box (10), a second trapezoidal plate (16) is connected to the adjusting box (10) in a transverse sliding mode, and the inclined surface of one side of the first trapezoidal plate (11) and the inclined surface of the second trapezoidal plate (16) are attached to each, one side fixed mounting of second trapezoidal plate (16) has L shape backup pad (17), and L shape backup pad (17) and regulating box (10) sliding connection, and two L shape backup pads (17) are close to each other one side respectively with assemble the both sides of house (1) and laminate mutually.
5. The structure of installing a super high-rise prefabricated house according to claim 4, wherein: two symmetrically-arranged clamping blocks (21) are fixedly mounted at the bottom of the limiting seat (9), two symmetrically-arranged clamping grooves (20) are formed in the top of the foundation (3), and the clamping blocks (21) are clamped with the corresponding clamping grooves (20).
6. The structure of installing a super high-rise prefabricated house according to claim 4, wherein: the outer side of the screw rod (13) is provided with an external thread, the inner ring of the threaded sleeve (14) is provided with an internal thread, and the external thread is connected with the internal thread.
CN202020997440.XU 2020-06-04 2020-06-04 Super high-rise assembled house mounting structure Active CN212534106U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020997440.XU CN212534106U (en) 2020-06-04 2020-06-04 Super high-rise assembled house mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020997440.XU CN212534106U (en) 2020-06-04 2020-06-04 Super high-rise assembled house mounting structure

Publications (1)

Publication Number Publication Date
CN212534106U true CN212534106U (en) 2021-02-12

Family

ID=74639602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020997440.XU Active CN212534106U (en) 2020-06-04 2020-06-04 Super high-rise assembled house mounting structure

Country Status (1)

Country Link
CN (1) CN212534106U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562066A (en) * 2022-04-26 2022-05-31 龙信集团江苏建筑产业有限公司 Assembled concrete wallboard steel construction connecting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562066A (en) * 2022-04-26 2022-05-31 龙信集团江苏建筑产业有限公司 Assembled concrete wallboard steel construction connecting device

Similar Documents

Publication Publication Date Title
CN212534106U (en) Super high-rise assembled house mounting structure
CN110725419A (en) Method for installing included angle of assembled wall and special connecting device for method
CN108035546B (en) Template fixing device is pour to shear force wall for building
CN107476583A (en) A kind of concrete assembled building builds construction method
CA2797192A1 (en) Building block, system and method
CN210888330U (en) Prefabricated building enclosure
CN207003673U (en) A kind of connecting node of beam and wallboard
CN213897521U (en) Support column for prefabricated building
CN216586499U (en) Positioning device for concrete cast-in-place pile reinforcement cage
CN214574832U (en) Energy-concerving and environment-protective assembled building wall
CN210685049U (en) Assembled building board mixes formula wallboard
CN115853211A (en) Prefabricated staircase support connecting structure and construction method
CN211691542U (en) Assembled component hoist and mount positioner
CN211229781U (en) Novel prefabricated hollow enclosure
CN211172554U (en) Assembled building element that can hoist fast
CN218522304U (en) Wallboard auxiliary mounting mechanism
CN210598208U (en) Precast concrete wallboard installing support frame
CN216587494U (en) Keel mounting system for decorative wallboard
CN218813852U (en) Prefabricated equipment foundation of assembly damping formula
CN215291757U (en) Anti-seismic pre-pouring base suitable for pole tower
CN217268165U (en) Prefabricated wall body of building engineering heat preservation assembled
CN219710382U (en) Composite soil nailing wall building base
CN216553077U (en) Formwork support taking rectangular square steel as main beam
CN215443258U (en) Basement outer wall reinforcing structure
CN113982102B (en) Assembled reinforced concrete building major structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant