CN211172554U - Assembled building element that can hoist fast - Google Patents

Assembled building element that can hoist fast Download PDF

Info

Publication number
CN211172554U
CN211172554U CN201921536067.1U CN201921536067U CN211172554U CN 211172554 U CN211172554 U CN 211172554U CN 201921536067 U CN201921536067 U CN 201921536067U CN 211172554 U CN211172554 U CN 211172554U
Authority
CN
China
Prior art keywords
prefabricated
prefabricated wall
prefabricated wallboard
pouring
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921536067.1U
Other languages
Chinese (zh)
Inventor
邱朝立
肖连德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Xinji Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921536067.1U priority Critical patent/CN211172554U/en
Application granted granted Critical
Publication of CN211172554U publication Critical patent/CN211172554U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled building element that can hoist fast, include and fix two subaerial bases, two through first fixation nut the first prefabricated wallboard of fixedly connected with and the prefabricated wallboard of second respectively on the top of base, all be equipped with on the prefabricated wallboard of first prefabricated wallboard and second relative lateral wall and pour the groove with external communicating. The utility model discloses a draw-in groove and the fixture block that set up, with first prefabricated wallboard and the prefabricated wallboard joint of second, then the groove looks amalgamation of pouring between first prefabricated wallboard and the prefabricated wallboard of second forms a big concrete placement region, the existing constructor of taking the template earlier and pouring the concrete has been saved, the efficiency of construction is greatly improved, and through first fixation nut and second fixation nut, firmly fix first prefabricated wallboard and the prefabricated wallboard of second together, both have been guaranteed with the stability of concrete embedded column, the factor of safety of whole wall body has been improved.

Description

Assembled building element that can hoist fast
Technical Field
The utility model relates to an assembly type building element technical field especially relates to an assembly type building element that can hoist and mount fast.
Background
In recent years, with the continuous development of building construction technology, prefabricated building buildings gradually rise, and the prefabricated concrete structure is adopted, compared with the traditional construction technology, the prefabricated building has the advantages of being fast in forming, customizable and the like, and the competition is particularly intense in the large environment of market economy, so that the demand for prefabricated building components is continuously rising, and the quality requirements for the prefabricated building components are continuously improved.
When the prefabricated building is built, firstly, a concrete structure needs to be stabilized, particularly, a gap area between two prefabricated wall boards needs to be subjected to load bearing by pouring a concrete embedded column in consideration of safety, so that the stability between the prefabricated wall boards is ensured, but in the existing construction mode, a template is adopted to carry out formwork erection on the gap area, and then the prepared concrete building is built in the gap area to form the embedded column after solidification, so that the template needs to be dismantled after the embedded column is poured, solidified and molded, the construction efficiency is greatly reduced, the stability between the embedded column and the prefabricated wall boards is not enough, and in the past, potential safety hazards exist, and therefore, the design of the prefabricated building component capable of being quickly hoisted is particularly necessary.
Disclosure of Invention
The purpose of the utility model is to solve the shortcoming that exists among the prior art, if: the mode that current assembled building component was built to the interval region between to carry out the camera mast and pour is too loaded down with trivial details, and the efficiency of construction is low to stability is not enough.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an assembled building element that can hoist and mount fast, includes and fixes two subaerial bases, two through first fixation nut the top of base is the first prefabricated wallboard of fixedly connected with and the prefabricated wallboard of second respectively, all be equipped with on the relative lateral wall of first prefabricated wallboard and the prefabricated wallboard of second and pour the groove with external communicating, the bilateral symmetry of pouring the groove on the first prefabricated wallboard is equipped with two draw-in grooves, the bilateral symmetry of pouring the groove on the prefabricated wallboard of second is equipped with two fixture blocks, just fixture block and draw-in groove looks joint, all be equipped with the bolt hole with external intercommunication on the lateral wall of draw-in groove and fixture block, just threaded connection has second fixation nut in the bolt hole.
Preferably, two magnetic blocks are fixedly arranged on one side wall, close to the first prefabricated wall plate, of the second prefabricated wall plate, and the magnetic blocks are located at two sides of the two clamping blocks and symmetrically arranged.
Preferably, a foundation pit is arranged under the pouring groove.
Preferably, the height and width of the first prefabricated wall panel and the second prefabricated wall panel are the same.
Preferably, the first prefabricated wall panel and the second prefabricated wall panel are both made of galvanized iron material.
The utility model has the advantages that: through draw-in groove and the fixture block that sets up, with first prefabricated wallboard and the joint of second prefabricated wallboard mutually, then the groove looks amalgamation of pouring between first prefabricated wallboard and the second prefabricated wallboard forms a big concrete placement region, the existing construction procedure of building the template earlier and then pouring the concrete has been saved, construction efficiency has been improved greatly, and through first fixation nut and second fixation nut, firmly fix first prefabricated wallboard and second prefabricated wallboard together, both and the stability of concrete hidden column have been guaranteed, the factor of safety of whole wall body has been improved.
Drawings
Fig. 1 is a schematic top view of a fabricated building component capable of being hoisted rapidly according to the present invention;
fig. 2 is a schematic top view of the assembled building component that can be hoisted quickly in the unassembled state according to the present invention;
fig. 3 is a schematic side view of a first prefabricated wall panel of an assembled building component capable of being quickly hoisted according to the present invention;
fig. 4 is a schematic side view of a second prefabricated wall panel of an assembled building component capable of being quickly hoisted according to the present invention;
FIG. 5 is an enlarged view of the structure A in FIG. 1;
fig. 6 is an enlarged view of the structure B in fig. 2.
In the figure: the concrete pouring device comprises a ground 1, a first fixing nut 2, a base 3, a first prefabricated wallboard 4, a prefabricated wallboard 5 second, a pouring groove 6, a clamping groove 7, a clamping block 8, a second fixing nut 9, a bolt hole 10, a magnetic block 11 and a foundation pit 12.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-6, an assembled building component capable of being quickly hoisted comprises two bases 3 fixed on the ground 1 through first fixing nuts 2, the top ends of the two bases 3 are respectively and fixedly connected with a first prefabricated wall panel 4 and a second prefabricated wall panel 5, one side wall of the second prefabricated wall panel 5 close to the first prefabricated wall panel 4 is fixedly provided with two magnetic blocks 11, the magnetic blocks 11 are symmetrically arranged at two sides of two clamping blocks 8, the first prefabricated wall panel 4 and the second prefabricated wall panel 5 are both made of iron galvanized materials, in order to enable the first prefabricated wall panel 4 and the second prefabricated wall panel 5 to be better spliced together through the iron attraction of the magnetic blocks 11, the height and the width of the first prefabricated wall panel 4 and the second prefabricated wall panel 5 are the same, mainly in order to ensure the accurate installation of the building component at the later stage, one side wall of the first prefabricated wall panel 4 and the second prefabricated wall panel 5 opposite is provided with a pouring groove 6 communicated with the outside, a foundation pit 12 is arranged under the pouring groove 6, the two pouring grooves 6 are spliced together to form a large concrete pouring area, so that concrete can be conveniently poured into the foundation pit 12 and the whole pouring area is filled, the two sides of the pouring groove 6 on the first prefabricated wall board 4 are symmetrically provided with two clamping grooves 7, the two sides of the pouring groove 6 on the second prefabricated wall board 5 are symmetrically provided with two clamping blocks 8, the clamping blocks 8 are clamped with the clamping grooves 7, the side walls of the clamping grooves 7 and the clamping blocks 8 are respectively provided with a bolt hole 10 communicated with the outside, and a second fixing nut 9 is in threaded connection in the bolt hole 10, so that the first prefabricated wall board 4 and the second prefabricated wall board 5 can be well fixed and spliced together before concrete pouring operation, and meanwhile, the first prefabricated wall board 4 and the second prefabricated wall board 5 can be in a relatively stable state during concrete pouring, avoid because of concrete gravity or mechanical vibration's effect, lead to pouring groove 6 consequently to take place displacement or deformation to influence the formation of whole concrete hidden column.
The utility model discloses in, constructor is when using the device, at first fix first prefabricated wallboard 4 on ground 1 through first fixation nut 2, and aim at the foundation ditch 12 top of digging in advance with pouring groove 6 above it, then with fixture block 8 on the prefabricated wallboard 5 of second and the draw-in groove 7 looks joint on the prefabricated wallboard 4 of first, fix second prefabricated wallboard 5 on ground 1 through first fixation nut 4 simultaneously, and further fix first prefabricated wallboard 4 and second prefabricated wallboard 5 together through second fixation nut 9, 6 amalgamation of pouring groove on first prefabricated wallboard 4 and the prefabricated wallboard 5 of second forms a big pouring area together, with concrete placement in the middle of foundation ditch 12, and be full of whole pouring area, form required hidden pillar, increase whole building element's stability.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. An assembly type building component capable of being hoisted quickly comprises two bases (3) fixed on the ground (1) through first fixing nuts (2), and is characterized in that the top ends of the two bases (3) are respectively and fixedly connected with a first prefabricated wall plate (4) and a second prefabricated wall plate (5), one side wall of each of the first prefabricated wall plate (4) and the second prefabricated wall plate (5) opposite to each other is provided with a pouring groove (6) communicated with the outside, two clamping grooves (7) are symmetrically arranged on two sides of the pouring groove (6) on the first prefabricated wall plate (4), two clamping blocks (8) are symmetrically arranged on two sides of the pouring groove (6) on the second prefabricated wall plate (5), the clamping blocks (8) are clamped with the clamping grooves (7), bolt holes (10) communicated with the outside are arranged on the side walls of the clamping grooves (7) and the clamping blocks (8), and a second fixing nut (9) is connected in the bolt hole (10) through threads.
2. The assembly type building component capable of being hoisted quickly as claimed in claim 1, wherein two magnetic blocks (11) are fixedly arranged on one side wall of the second prefabricated wall panel (5) close to the first prefabricated wall panel (4), and the magnetic blocks (11) are symmetrically arranged on two sides of the two clamping blocks (8).
3. The rapidly hoistable fabricated building element according to claim 1, characterized in that a foundation pit (12) is provided directly below the casting trough (6).
4. A quickly hoistable prefabricated building component according to claim 1, characterized in that said first and second prefabricated wall panels (4, 5) have the same height and width dimensions.
5. A quickly hoistable prefabricated building element according to claim 1, characterized in that said first prefabricated wall panel (4) and said second prefabricated wall panel (5) are made of galvanized iron material.
CN201921536067.1U 2019-09-13 2019-09-13 Assembled building element that can hoist fast Expired - Fee Related CN211172554U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921536067.1U CN211172554U (en) 2019-09-13 2019-09-13 Assembled building element that can hoist fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921536067.1U CN211172554U (en) 2019-09-13 2019-09-13 Assembled building element that can hoist fast

Publications (1)

Publication Number Publication Date
CN211172554U true CN211172554U (en) 2020-08-04

Family

ID=71800515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921536067.1U Expired - Fee Related CN211172554U (en) 2019-09-13 2019-09-13 Assembled building element that can hoist fast

Country Status (1)

Country Link
CN (1) CN211172554U (en)

Similar Documents

Publication Publication Date Title
CN105756202A (en) Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
CN206646839U (en) The positioning installation apparatus of prefabricated panel
CN211172554U (en) Assembled building element that can hoist fast
CN113737936A (en) Connecting structure and construction method of prefabricated combined duplex balcony
CN207878468U (en) The lift steel trestle device to put in storage for grinding coagulation soil
CN207646855U (en) Prefabricated assembled light steel wallboard and prefabricated house building
CN212534106U (en) Super high-rise assembled house mounting structure
CN211229781U (en) Novel prefabricated hollow enclosure
CN206090822U (en) Concrete supporting frame and assembled concrete wall
CN210067011U (en) Assembled building convenient to installation
CN211007292U (en) Stable form assembled PC component
CN111734442B (en) Box roof structure of urban tunnel branch mouth
CN211523474U (en) Assembly type structure externally-hung wallboard mounting structure
CN210195331U (en) Wallboard preparation supporting component
CN112267594A (en) Connecting structure of prefabricated shear wall and assembled inner wall plate
CN217400079U (en) Precast concrete slab replacing brick bed film construction
CN214658259U (en) Engineering stand column structure with high bearing capacity
CN210342416U (en) Prefabricated wall panel
CN220433894U (en) Precast concrete balcony assembly structure
CN219118557U (en) Prefabricated cantilever beam
CN220620553U (en) Assembled shear wall
CN213449063U (en) Fully-prefabricated assembled concrete structure
CN218205693U (en) Step type concrete placement template
CN220565483U (en) Multifunctional prefabricated externally hung wall
CN219710636U (en) Wall component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201021

Address after: Fujian Xinji Construction Group Co., Ltd., No. 1969, Zhuxi Avenue, Jianyang District, Nanping City, Fujian Province

Patentee after: Fujian Xinji Construction Group Co.,Ltd.

Address before: Fujian Xinji Construction Group Co., Ltd., No. 1969, Zhuxi Avenue, Jianyang District, Nanping City, Fujian Province

Patentee before: Qiu Chaoli

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804

Termination date: 20210913

CF01 Termination of patent right due to non-payment of annual fee