CN218406078U - Cutting-free recyclable inner frame steel pipe bottom support - Google Patents

Cutting-free recyclable inner frame steel pipe bottom support Download PDF

Info

Publication number
CN218406078U
CN218406078U CN202222661924.9U CN202222661924U CN218406078U CN 218406078 U CN218406078 U CN 218406078U CN 202222661924 U CN202222661924 U CN 202222661924U CN 218406078 U CN218406078 U CN 218406078U
Authority
CN
China
Prior art keywords
sleeve
reinforcing bar
steel
steel pipe
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222661924.9U
Other languages
Chinese (zh)
Inventor
杜云龙
付冠杰
陈雨生
陈惠�
葛巧治
刘昂
余承浩
卓立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Technology Construction Co Ltd
Original Assignee
China Construction Eighth Engineering Division Technology Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Technology Construction Co Ltd filed Critical China Construction Eighth Engineering Division Technology Construction Co Ltd
Priority to CN202222661924.9U priority Critical patent/CN218406078U/en
Application granted granted Critical
Publication of CN218406078U publication Critical patent/CN218406078U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/80Packaging reuse or recycling, e.g. of multilayer packaging

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a stair bench construction technical field specifically is exempt from to cut but recovery's inner tower steel pipe collet, include reinforcing bar one, reinforcing bar two and wait to water the landing slab, still include: three reinforcing bars, sleeve and inner tower steel pipe, the utility model discloses a make processing reinforcing bar three in advance, it is half with sleeve car silk installation, realize sleeve and three being connected of reinforcing bar, during ligature landing slab reinforcing bar, embedded reinforcing bar three and sleeve in advance, and fill up marble cushion under three reinforcing bars, pass through spot welding with three reinforcing bars and board reinforcing bar and be connected, control sleeve elevation is put down with the face of pouring of waiting to water stair landing slab, when setting up the inner tower structure, screw into telescopic upper portion with the bottom of reinforcing bar one earlier, then install the inner tower steel pipe, concreting, when demolising the inner tower steel pipe, only need to screw out reinforcing bar one from the sleeve, can reuse, do labour saving and time saving promptly so, can also avoid taking place the seepage, quality problems such as floor crack.

Description

Cutting-free recyclable inner frame steel pipe bottom support
Technical Field
The utility model relates to a stair bench construction technical field specifically is exempt from to cut recoverable inner tower steel pipe collet.
Background
In cast-in-place reinforced concrete structures, stairways and decks are often cast with the roof of the floor.
When the support frame is arranged in the construction site, the inner frame steel pipe of a certain section of floor slab needs to be supported on a template of the stair platform plate to be poured, and therefore, the inner frame steel pipe can be poured into the stair platform plate together when concrete is poured.
When the inner frame and the template are dismantled in the later stage, the steel pipe poured with the concrete cannot be taken out and only a cutting mode can be adopted. Doing so wastes time and labor, and has the quality problems of leakage, floor slab cracks and the like.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a exempt from to cut recoverable inner tower steel pipe collet to solve the problem that proposes in the above-mentioned background art.
The technical scheme of the utility model is that: exempt from to cut recoverable inner tower steel pipe collet, include reinforcing bar one, reinforcing bar two and treat to water the stair platform board, still include:
the steel bars are arranged in two, the two steel bars are L-shaped, and the two steel bars are welded in three phases;
the sleeve is arranged at the top end of one of the third steel bars, and the inner wall of the sleeve is also provided with the first steel bar;
the two second steel bars are fixedly connected with the first steel bar;
the inner frame steel pipe is arranged at the top end of the first steel bar;
and the third reinforcing steel bar and the sleeve are arranged inside the stair platform plate to be poured.
Preferably, the third reinforcing steel bar and the sleeve are arranged inside the stair platform plate to be poured in a pre-buried mode.
Preferably, marble cushion blocks are padded under the three reinforcing steel bars.
Preferably, the two second reinforcing steel bars are connected with the first reinforcing steel bar through welding.
The utility model discloses an improve and provide here and exempt from to cut recoverable inner tower steel pipe collet, compare with prior art, have following improvement and advantage:
through making processing reinforcing bar three in advance, reinforcing bar three is formed by the welding preparation of both ends L shape reinforcing bar, then three welded connection of two reinforcing bars, half with sleeve car silk installation at last, realize sleeve and the connection of reinforcing bar three, when ligature landing slab reinforcing bar, pre-buried reinforcing bar three and sleeve in advance, and fill up the marble cushion under reinforcing bar three, pass through spot welding with the slab reinforcing bar three and be connected, control sleeve elevation is level mutually with the face of pouring of waiting to pour the stair platform board, when setting up the inner frame structure, twist into telescopic upper portion with the bottom of reinforcing bar one earlier, then install the inner frame steel pipe, concreting, when demolising the inner frame steel pipe, only need to twist out reinforcing bar one from the sleeve, can reuse, do so promptly labour saving and time saving, can also avoid taking place quality problems such as seepage, floor crack.
Drawings
The invention is further explained below with reference to the drawings and examples:
FIG. 1 is an elevation view showing the effect of the present invention;
fig. 2 is a schematic perspective view of the steel pipe bottom support model of the present invention.
Description of the reference numerals:
1. reinforcing steel bars I; 2. reinforcing steel bars II; 3. reinforcing steel bars III; 4. a sleeve; 5. an inner frame steel pipe; 6. a marble cushion block; 7. and (5) pouring the stair platform plate.
Detailed Description
The present invention will be described in detail below, and it is apparent that the technical solutions in the embodiments of the present invention are described clearly and completely. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses an improve and provide here and exempt from to cut recoverable inner tower steel pipe collet, the technical scheme of the utility model is:
as shown in fig. 1-2, exempt from to cut recoverable inner tower steel pipe collet, including reinforcing bar 1, reinforcing bar two 2 and treat to water building stair platform board 7, still include:
the number of the steel bars III 3 is two, the two steel bars III 3 are both L-shaped, the two steel bars III 3 are welded, and the two steel bars III 3 are arranged in a poor welding mode, so that the steel bars III can be stably fixed in the stair platform plate 7 to be poured;
the sleeve 4 is arranged at the top end of one of the steel bars III 3, the inner wall of the sleeve 4 is also provided with a steel bar I1, the inner wall of the sleeve 4 is provided with a turning wire, and the steel bar III 3 and the steel bar I1 can be connected with the sleeve 4 through the turning wire;
the two steel bars 2 are fixedly connected with the steel bar 1;
the inner frame steel pipe 5 is arranged at the top end of the first steel bar 1;
the three reinforcing steel bars 3 and the sleeve 4 are arranged inside the stair platform plate 7 to be poured.
Further, three 3 reinforcing bars and sleeve 4 all set up in the inside of waiting to water stair platform board 7 through pre-buried mode, and this kind of setting mode makes three 3 reinforcing bars, sleeve 4 and wait to water stair platform 7 structure as an organic whole.
Further, a marble cushion block 6 is padded under the steel bars 3.
Furthermore, the two steel bars 2 are connected with the steel bar 1 through welding.
The construction flow of the scheme is as follows:
firstly, manufacturing and processing a steel bar III 3 in advance, wherein the steel bar III 3 is manufactured by welding L-shaped steel bars at two ends, then welding and connecting the two steel bars III 3, and finally threading and installing a sleeve 4 by half to realize the connection of the sleeve 4 and the steel bar III 3;
step two, when binding the steel bars of the landing slab, pre-burying a steel bar III 3 and a sleeve 4 in advance, padding a marble cushion block 6 under the steel bar III 3, connecting the steel bar III 3 and the slab steel bars through spot welding, and controlling the elevation of the sleeve 4 to be level with the pouring surface of the landing slab to be poured;
step three, when the inner frame structure is erected, the bottom end of the first steel bar 1 is screwed into the upper part of the sleeve 4, and then an inner frame steel pipe 5 is installed;
step four, pouring concrete;
fifthly, when the inner frame steel pipe 5 is dismantled, the first reinforcing steel bar 1 is screwed out of the sleeve 4 and can be recycled;
doing so and labour saving and time saving promptly, can also avoid taking place quality problems such as seepage, floor crack, and used spare part is convenient obtains at the job site, easily preparation, and the preparation principle is simple, is fit for using widely on a large scale.
The previous description is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (4)

1. Exempt from to cut recoverable inner tower steel pipe collet, include reinforcing bar (1), reinforcing bar two (2) and treat to water stair platform board (7), its characterized in that: further comprising:
the steel bars III (3) are provided with two steel bars III, the two steel bars III (3) are L-shaped, and the two steel bars III (3) are welded;
the sleeve (4) is arranged at the top end of one of the steel bars III (3), and the inner wall of the sleeve (4) is also provided with a steel bar I (1);
the two second steel bars (2) are fixedly connected with the first steel bar (1);
the inner frame steel pipe (5) is arranged at the top end of the first steel bar (1);
the three reinforcing steel bars (3) and the sleeves (4) are arranged inside the stair platform plate (7) to be poured.
2. The cutting-free recyclable inner frame steel tube collet as claimed in claim 1, wherein: and the third reinforcing steel bar (3) and the sleeve (4) are arranged in the stair platform plate (7) to be poured in a pre-buried mode.
3. The cutting-free recyclable inner frame steel pipe bottom support according to claim 1, characterized in that: and a marble cushion block (6) is padded under the steel bar III (3).
4. The cutting-free recyclable inner frame steel pipe bottom support according to claim 1, characterized in that: the two steel bars II (2) are connected with the steel bar I (1) through welding.
CN202222661924.9U 2022-10-10 2022-10-10 Cutting-free recyclable inner frame steel pipe bottom support Active CN218406078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222661924.9U CN218406078U (en) 2022-10-10 2022-10-10 Cutting-free recyclable inner frame steel pipe bottom support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222661924.9U CN218406078U (en) 2022-10-10 2022-10-10 Cutting-free recyclable inner frame steel pipe bottom support

Publications (1)

Publication Number Publication Date
CN218406078U true CN218406078U (en) 2023-01-31

Family

ID=85001871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222661924.9U Active CN218406078U (en) 2022-10-10 2022-10-10 Cutting-free recyclable inner frame steel pipe bottom support

Country Status (1)

Country Link
CN (1) CN218406078U (en)

Similar Documents

Publication Publication Date Title
CN108678258A (en) Large span hemispherical armored concrete dome structure and its construction method
CN105863253B (en) Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN107327050B (en) Disassembly-free basement exterior wall flanging unilateral formwork supporting device and construction method
CN105507476B (en) A kind of construction method of even arch covering
CN111535579A (en) Construction method for support-free mold hanging tool for horizontal post-pouring belt
CN208455910U (en) Large span hemispherical armored concrete dome structure and its template system
CN102383593A (en) Support formwork device and construction method for one-step formed flange concrete in kitchens and toilets
CN105401679A (en) Large-gradient cast-in-place concrete inclined roof construction method
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN111236620A (en) Anchor bolt sleeve and construction method for recoverable cantilever scaffold anchor bolt
CN205894670U (en) Concrete connects template structure of stubble construction between floor
CN104594633A (en) Construction method and template structure for umbrella-shaped spatial curved-surface bare concrete
CN218406078U (en) Cutting-free recyclable inner frame steel pipe bottom support
CN102936953B (en) Construction method of a bridging-arm stiffened steel structure template
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN101693389A (en) Method for precast concrete template
CN213952981U (en) Steel pipe supporting base of stair platform
CN212359061U (en) PC staircase safety protection operation platform
CN211447283U (en) Connecting beam of main building and skirt house
CN205875706U (en) Asynchronous stairwell wall post formwork system that pours of whole formwork
CN220705169U (en) Tool type stair formwork device
CN212895926U (en) Operating platform of hollow bridge tower
CN216380574U (en) Assembled steel-wood mixed stair template
CN109853793A (en) A kind of self-compaction regeneration monolith overlapped shear wall and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant