CN218405296U - Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction - Google Patents

Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction Download PDF

Info

Publication number
CN218405296U
CN218405296U CN202222601883.4U CN202222601883U CN218405296U CN 218405296 U CN218405296 U CN 218405296U CN 202222601883 U CN202222601883 U CN 202222601883U CN 218405296 U CN218405296 U CN 218405296U
Authority
CN
China
Prior art keywords
wall body
inserted block
fixed
loop bar
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222601883.4U
Other languages
Chinese (zh)
Inventor
王冉强
王海东
吕永奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222601883.4U priority Critical patent/CN218405296U/en
Application granted granted Critical
Publication of CN218405296U publication Critical patent/CN218405296U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a prevention of seepage water wall body technical field's a hydraulic and hydroelectric engineering construction prevention of seepage water wall body, including first wall body and inserted block, one side of first wall body is equipped with the inserted block, inserted block and first wall body fixed connection, one side of inserted block is equipped with the fixed orifices, the fixed orifices is equipped with a plurality ofly, one side of first wall body is equipped with the second wall body, one side of inserted block is equipped with the jack, one side of second wall body is equipped with the slot, inserted block and slot are fixed through alternating, the inside of slot is equipped with the inserted bar, inserted bar and jack are fixed through alternating, one side of slot is equipped with the bolt, bolt and fixed orifices pass through threaded connection, one side of first wall body is equipped with the viscose, through the inserted block that is equipped with, the slot, the jack, inserted bar and viscose, leakproofness when having improved two wall bodies concatenation, the phenomenon of avoiding appearing oozing water, the life of this wall body has been improved.

Description

Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction
Technical Field
The utility model relates to a prevention of seepage water wall body technical field especially relates to a prevention of seepage water wall body of hydraulic and hydroelectric engineering construction.
Background
The water conservancy and hydropower engineering construction anti-seepage wall body with the authorization publication number of CN202122520455.4 comprises an inclined plate, wherein an anti-seepage structure is arranged on the right side of the inclined plate, the anti-seepage structure comprises a reinforcing layer, a rock heap and a viscous layer, the lower part of the outer wall of the reinforcing layer is fixedly connected with the right side of the inclined plate, and the rock heap is laid on the inner wall of the reinforcing layer.
Present hydraulic and hydroelectric engineering construction prevention of seepage water wall body still has some defects, and most waterproof performance is relatively poor, and the leakproofness is not enough in the concatenation department of two wall bodies, and the phenomenon of infiltration still can appear in gap department, has reduced the life of this wall body, and we propose a hydraulic and hydroelectric engineering construction prevention of seepage water wall body for this reason.
SUMMERY OF THE UTILITY MODEL
To the above problem, the utility model discloses in order to solve and to provide a hydraulic and hydroelectric engineering construction prevention of seepage water wall body in the above-mentioned background art, the not enough problem of waterproof performance.
The technical scheme of the utility model is that:
the utility model provides a prevention of seepage water wall body of hydraulic and hydroelectric engineering construction, includes first wall body and inserted block, one side of first wall body is equipped with the inserted block, inserted block and first wall body fixed connection, one side of inserted block is equipped with the fixed orifices, the fixed orifices is equipped with a plurality ofly, one side of first wall body is equipped with the second wall body, one side of inserted block is equipped with the jack, one side of second wall body is equipped with the slot, inserted block and slot are fixed through alternating, the inside of slot is equipped with the inserted bar, inserted bar and jack are fixed through alternating, one side of slot is equipped with the bolt, bolt and fixed orifices pass through threaded connection, one side of first wall body is equipped with the viscose.
The working principle of the technical scheme is as follows:
insert the inside of slot with the inserted block, the inserted bar can insert the inside of jack simultaneously, makes two wall body coupling back inseparabler stable more, is difficult for appearing rocking, and is difficult for appearing the gap, connects the completion back, and the viscose can bond with one side of second wall body, has improved the waterproof performance of this wall body, and after the concatenation was accomplished, twists the inside of fixed orifices with the bolt again, further consolidates two wall bodies.
In a further technical scheme, the first fixing piece is arranged on the back face of the first wall body, the first fixing piece is fixedly connected with the first wall body, a loop bar is arranged on the inner side of the first fixing piece, and the loop bar is rotatably connected with the first fixing piece.
Through the first mounting that is equipped with, realized the fixed and rotation of loop bar to the angle of adjustment of being convenient for supports the wall body, makes it be difficult for empting, uses safelyr.
In a further technical scheme, the inside of loop bar is equipped with the bracing piece, bracing piece and loop bar are fixed through alternating, one side of loop bar is equipped with first locating hole.
Through the loop bar and the bracing piece that are equipped with, realized the length adjustment function to bearing structure to make it can be applicable to different topography, powerful the device's function.
In a further technical scheme, a second positioning hole is formed in one side of the supporting rod, a fixing rod is arranged inside the second positioning hole, and the fixing rod and the second positioning hole are fixed in a penetrating mode.
When adjusting this bearing structure's length, only need stimulate the bracing piece, make it stretch out and draw back in the inside of loop bar, when adjusting to suitable position, insert the inside of two locating holes with the dead lever, alright completion loop bar and bracing piece fixed, simple structure, the operation of being convenient for.
In a further technical scheme, the bottom of loop bar is equipped with the second mounting, second mounting and loop bar fixed connection, the inboard of second mounting is equipped with the connecting rod, connecting rod and second mounting rotate to be connected.
Through the second mounting that is equipped with, realized the fixed of connecting rod and rotated to better start the effect of supporting to the loop bar, improved the stability of loop bar.
In a further technical scheme, one side of the first wall body is provided with a sliding groove, a sliding block is arranged inside the sliding groove, the sliding block is connected with the sliding groove in a sliding mode, and the sliding block is connected with the connecting rod in a rotating mode.
When the angle of the loop bar needs to be adjusted, the connecting rod can be driven to rotate only by sliding the sliding block in the sliding groove, so that the angle of the loop bar can be adjusted.
In a further technical scheme, a guide rod is arranged inside the sliding groove and is in sliding connection with the sliding block.
Through the guide rod that is equipped with, can make the slider more stable when the inside of spout slides, improve the security.
The utility model has the advantages that:
1. adopt the utility model discloses a prevention of seepage water wall body is under construction to hydraulic and hydroelectric engineering, through inserted block, slot, jack, inserted bar and the viscose that is equipped with, leakproofness when having improved two wall bodies concatenations avoids appearing the phenomenon of infiltration, has improved the life of this wall body.
2. Adopt the utility model discloses a prevention of seepage water wall body is under construction to hydraulic and hydroelectric engineering, through loop bar, bracing piece and the first mounting that is equipped with, realized this bearing structure's length adjustment and angle modulation, make it can be applicable to various topography, powerful the device's function.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic diagram of the explosion structure of the present invention;
fig. 3 is a schematic view of the structure of the jack of the present invention;
fig. 4 is the utility model discloses a structure sketch map after two wall bodies splice.
Description of the reference numerals:
1. a first wall; 2. inserting a block; 3. a fixing hole; 4. a second wall; 5. a jack; 6. a slot; 7. inserting a rod; 8. a bolt; 9. gluing; 10. a loop bar; 11. a support bar; 12. a first positioning hole; 13. a second positioning hole; 14. fixing the rod; 15. a second fixing member; 16. a connecting rod; 17. a chute; 18. a guide bar; 19. a first fixing member.
Detailed Description
The embodiments of the present invention will be further explained with reference to the drawings.
Example 1
As shown in fig. 1-4, the utility model provides a prevention of seepage water wall body of hydraulic and hydroelectric engineering construction, including first wall body 1 and inserted block 2, one side of first wall body 1 is equipped with inserted block 2, inserted block 2 and 1 fixed connection of first wall body, one side of inserted block 2 is equipped with fixed orifices 3, fixed orifices 3 are equipped with a plurality ofly, one side of first wall body 1 is equipped with second wall body 4, one side of inserted block 2 is equipped with jack 5, one side of second wall body 4 is equipped with slot 6, inserted block 2 and slot 6 are fixed through alternating, the inside of slot 6 is equipped with inserted bar 7, inserted bar 7 and jack 5 are fixed through alternating, one side of slot 6 is equipped with bolt 8, bolt 8 and fixed orifices 3 pass through threaded connection, one side of first wall body 1 is equipped with viscose 9.
Specifically, a first fixing part 19 is arranged on the back surface of the first wall body 1, the first fixing part 19 is fixedly connected with the first wall body 1, a loop bar 10 is arranged on the inner side of the first fixing part 19, the loop bar 10 is rotatably connected with the first fixing part 19, a supporting bar 11 is arranged inside the loop bar 10, the supporting bar 11 and the loop bar 10 are fixed through insertion, a first positioning hole 12 is arranged on one side of the loop bar 10, a second positioning hole 13 is arranged on one side of the supporting bar 11, a fixing bar 14 is arranged inside the second positioning hole 13, the fixing bar 14 and the second positioning hole 13 are fixed through insertion, a second fixing part 15 is arranged at the bottom of the loop bar 10, the second fixing part 15 is fixedly connected with the loop bar 10, a connecting bar 16 is arranged inside the second fixing part 15, the connecting bar 16 is rotatably connected with the second fixing part 15, a sliding groove 17 is arranged on one side of the first wall body 1, a sliding block is arranged inside the sliding groove 17, the sliding block is slidably connected with the sliding groove 17, a guide bar 18 is arranged inside the sliding block.
The working principle and the beneficial effects of the embodiment are achieved.
When the anti-seepage wall body is installed, the insert block 2 is inserted into the slot 6, and the insert rod 7 is inserted into the jack 5, so that the two wall bodies are connected to be more compact and stable, and are not easy to shake and crack, after the connection is completed, the adhesive 9 is adhered to one side of the second wall body 4, so that the waterproof performance of the wall body is improved, after the splicing is completed, the bolt 8 is screwed into the fixing hole 3, so that the two wall bodies are further reinforced, the stability is improved, the wall body is more durable, when the length of the support structure is adjusted, only the support rod 11 needs to be pulled to be stretched in the loop bar 10, when adjusting to suitable position, insert the inside of two locating holes with dead lever 14, alright accomplish the fixed of loop bar 10 and bracing piece 11, moreover, the steam generator is simple in structure, and the operation is convenient, through the second mounting 15 that is equipped with, connecting rod 16's fixed and rotation have been realized, thereby the better effect of starting the support to loop bar 10, loop bar 10's stability has been improved, when needs are adjusted the angle of loop bar 10, only need make the slider slide in the inside of spout 17, alright drive connecting rod 16 and rotate, thereby the realization carries out angle modulation to loop bar 10, through the guide bar 18 that is equipped with, can make the slider more stable when the inside of spout 17 slides, and the safety is improved.
The above embodiments only express the specific embodiments of the present invention, and the description thereof is specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the concept of the present invention, several variations and modifications can be made, which all fall within the scope of the present invention.

Claims (7)

1. The utility model provides a prevention of seepage water wall body of hydraulic and hydroelectric engineering construction, includes first wall body and inserted block, its characterized in that: one side of first wall body is equipped with the inserted block, inserted block and first wall body fixed connection, one side of inserted block is equipped with the fixed orifices, the fixed orifices is equipped with a plurality ofly, one side of first wall body is equipped with the second wall body, one side of inserted block is equipped with the jack, one side of second wall body is equipped with the slot, inserted block and slot are fixed through alternating, the inside of slot is equipped with the inserted bar, inserted bar and jack are fixed through alternating, one side of slot is equipped with the bolt, bolt and fixed orifices pass through threaded connection, one side of first wall body is equipped with the viscose.
2. The water conservancy and hydropower engineering construction water seepage prevention wall body of claim 1, which is characterized in that: the utility model discloses a wall body, including first wall body, first mounting and first wall body fixed connection, the inboard of first mounting is equipped with the loop bar, loop bar and first mounting rotate to be connected.
3. The water conservancy and hydropower engineering construction water seepage prevention wall body of claim 2, which is characterized in that: the inside of loop bar is equipped with the bracing piece, bracing piece and loop bar are fixed through alternating, one side of loop bar is equipped with first locating hole.
4. The water conservancy and hydropower engineering construction water seepage prevention wall body of claim 3, which is characterized in that: one side of the supporting rod is provided with a second positioning hole, a fixing rod is arranged inside the second positioning hole, and the fixing rod and the second positioning hole are fixed in an inserting mode.
5. The water conservancy and hydropower engineering construction water seepage prevention wall body of claim 3, characterized in that: the bottom of loop bar is equipped with the second mounting, second mounting and loop bar fixed connection, the inboard of second mounting is equipped with the connecting rod, connecting rod and second mounting rotate to be connected.
6. The water conservancy and hydropower engineering construction water seepage prevention wall body of claim 5, which is characterized in that: one side of first wall body is equipped with the spout, the inside of spout is equipped with the slider, slider and spout sliding connection, slider and connecting rod rotate to be connected.
7. The water conservancy and hydropower engineering construction water seepage prevention wall body as claimed in claim 6, which is characterized in that: the inside of spout is equipped with the guide bar, guide bar and slider sliding connection.
CN202222601883.4U 2022-09-30 2022-09-30 Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction Active CN218405296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222601883.4U CN218405296U (en) 2022-09-30 2022-09-30 Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222601883.4U CN218405296U (en) 2022-09-30 2022-09-30 Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction

Publications (1)

Publication Number Publication Date
CN218405296U true CN218405296U (en) 2023-01-31

Family

ID=84998409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222601883.4U Active CN218405296U (en) 2022-09-30 2022-09-30 Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction

Country Status (1)

Country Link
CN (1) CN218405296U (en)

Similar Documents

Publication Publication Date Title
CN206298170U (en) A kind of carbon cloth production winding barrel structure
CN105401599A (en) Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof
CN208982896U (en) A kind of water conservancy construction water pump Steady base
CN216999710U (en) Hydraulic engineering is with pulling out post device
CN218405296U (en) Prevention of seepage water wall body of hydraulic and hydroelectric engineering construction
CN108331313A (en) A kind of construction and decoration with sanding grey equipment automatically
CN114370065A (en) High slope retaining wall structure and construction method
CN108516864A (en) A kind of watering curing means for constructing tunnel lining concrete
CN207211231U (en) A kind of hydraulic engineering high-efficient dredging device
CN201535071U (en) Retractor for quickly adjusting verticality of steel column
CN213653381U (en) Quick patching device of gate for water conservancy water and electricity
CN208826611U (en) A kind of cutter device for petroleum pipeline
CN210978734U (en) Supporting device for laying water conservancy and hydropower pipelines
CN211285651U (en) Road slope reinforcing apparatus for civil engineering
CN210370730U (en) Underground pneumatic high-pressure liquid output device
CN208844542U (en) A kind of reinforcing soft foundation device
CN208472749U (en) A kind of support stake of building construction ground
CN214832474U (en) Gate cleaning device for hydraulic and hydroelectric engineering
CN208564034U (en) A kind of waterproof construction high-pressure grout injector
CN219386400U (en) Water conservancy combination retaining wall structure
CN219366473U (en) Slope anchoring drilling machine hydraulic mechanism
CN215629984U (en) Desert area photovoltaic pile foundation construction equipment
CN220318579U (en) Retaining wall reinforcing apparatus for hydraulic engineering
CN216587854U (en) Grouting device for waterproofing of constructional engineering