CN218386647U - Cable bridge support device - Google Patents

Cable bridge support device Download PDF

Info

Publication number
CN218386647U
CN218386647U CN202222031543.2U CN202222031543U CN218386647U CN 218386647 U CN218386647 U CN 218386647U CN 202222031543 U CN202222031543 U CN 202222031543U CN 218386647 U CN218386647 U CN 218386647U
Authority
CN
China
Prior art keywords
cable
plate
fixing
wall
support device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222031543.2U
Other languages
Chinese (zh)
Inventor
晋登泽
薛翔天
焦冰
张学美
李娜
程鹏
韩文磊
沈山
隋学颍
管路开
曹新宇
薛晓阳
石晓璇
夏正义
薛敬著
薛翔琳
刘昱辉
于冲冲
杨清峰
高俊杰
薛蒙
王云
丁常春
许宏智
薛军晓
刘甜
付延军
张冠丽
陈俊宇
王琪
薛程
杨小峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yutong Electric Group Jinhe Equipment Co ltd
Original Assignee
Shandong Yutong Electric Group Jinhe Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yutong Electric Group Jinhe Equipment Co ltd filed Critical Shandong Yutong Electric Group Jinhe Equipment Co ltd
Priority to CN202222031543.2U priority Critical patent/CN218386647U/en
Application granted granted Critical
Publication of CN218386647U publication Critical patent/CN218386647U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bridge support device for cable, which belongs to the technical field of cable bridges and comprises a wall fixing mechanism, a triangular keel fixing mechanism, a cable fixing mechanism and a hinge shaft connecting mechanism, wherein the wall fixing mechanism is provided with a first vertical plate which can be directly connected with a wall surface through bolts, and the installation and the transformation are convenient; the transverse plates are arranged to be of a stretchable structure, so that the bridge support device can be pulled and adjusted according to the horizontal distance between the cable and the wall surface; through adopting hinge shaft coupling mechanism to be connected dead lever and fixed plate, make the fixed plate rotate simultaneously, through setting up a plurality of mounting grooves on the fixed plate for the second card keeps off the piece and can select suitable mounting groove according to actual conditions, fixes the cable of placing on the fixed plate, and the fixed plate prevents that the cable from dropping through rotatory with the cable chucking, makes accomodating of cable neater more pleasing to the eye.

Description

Cable bridge support device
Technical Field
The utility model belongs to the technical field of the cable testing bridge, particularly, relate to a crane span structure strutting arrangement for cable.
Background
The cable is a wire product for transmitting electric energy and information and realizing electromagnetic energy conversion, is mainly used in the fields of power systems, information transportation systems, mechanical equipment, instrument and meter systems and the like, and mainly comprises an overhead bare wire, a power cable, an electromagnetic wire, a television cable, an electronic cable, a data cable and the like.
At present, interior decoration often involves the problem of cable laying, current cable laying is usually directly to lay thick and heavy cable on ground, perhaps use the simple and easy support of scaffold frame temporary collocation, use the manual cable drum to hang on simple and easy frame temporarily, and the length of cable is longer, thereby lead to cable support in large quantity, the workman need lift the cable repeatedly, the installation is complicated, and the cable is amazing, this kind of way not only influences the availability factor of cable, simple and easy support easily collapses moreover, there is the potential safety hazard. When needs change cable run, it is big with the dismantlement change work load of placing the mode at simple and easy support temporarily to directly lay, and the cable need be reorganized and the cable is difficult to carry out reutilization, directly influences work efficiency.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a crane span structure strutting arrangement for cable aims at solving the installation transformation complicacy that current crane span structure strutting arrangement for cable exists, the cable easily drops, beautifully spends poor problem.
The utility model discloses a realize like this:
the utility model provides a crane span structure strutting arrangement for cable, wherein, including wall fixed establishment, triangular keel fixed establishment and cable fixed establishment, wall fixed establishment with it is fixed to connect through triangular keel fixed establishment between the cable fixed establishment, wall fixed establishment includes first riser, diaphragm and second riser, the one end of diaphragm is provided with the first riser, the other end of diaphragm is provided with the second riser, cable fixed establishment includes dead lever, fixed plate and second card fender piece, the fixed plate with second card fender piece passes through bolted connection, the fixed plate with the dead lever passes through hinge shaft coupling mechanism and connects, the symmetry is provided with two spliced poles on the lateral wall on the fixed plate.
The utility model provides a pair of crane span structure strutting arrangement for cable's technological effect as follows: the bridge support device can be fixed on the wall surface through the wall fixing mechanism, so that the bridge support device is safer and more convenient to install; the wall fixing mechanism and the cable fixing mechanism can be stably connected by arranging the triangular keel fixing mechanism, all parts are not easy to fall off, and the overall stability of the structure is enhanced; through adopting hinge shaft coupling mechanism to connect dead lever and fixed plate for the fixed plate can rotate, thereby blocks the cable, makes the cable be difficult for dropping, increases pleasing to the eye degree.
On the basis of the technical scheme, the utility model discloses a crane span structure strutting arrangement for cable can also do following improvement:
optionally, hinge shaft coupling mechanism includes base and draw-in groove, the base cover is established on the second riser, the draw-in groove sets up on the lateral wall of base, two connecting holes have been seted up to the symmetry on the draw-in groove, the size of connecting hole with the size looks adaptation of connecting post.
The beneficial effect who adopts above-mentioned improvement scheme does: the fixing plate can be more firmly fixed on the fixing rod by arranging the base and the clamping groove, and meanwhile, the fixing plate can rotate; the spliced pole is connected hinge shaft coupling mechanism and fixed plate for the rotation of fixed plate is more smooth and easy.
Optionally, a first clamping block is arranged at the top end of the second vertical plate.
Optionally, a clamping arm is arranged on the triangular keel fixing mechanism, and a second clamping block is arranged at the end of the clamping arm.
Optionally, the diaphragm includes fixed diaphragm and pull diaphragm, fixed diaphragm cover is established on the pull diaphragm, be provided with the slide rail on the fixed diaphragm, be provided with the pulley on the pull diaphragm, fixed diaphragm with the pull diaphragm can realize the pull function.
The beneficial effect who adopts above-mentioned improvement scheme does: the horizontal distance between the cable and the wall surface can be adjusted by adjusting the length of the transverse plate in a telescopic manner.
Optionally, the fixing plate is provided with a plurality of mounting grooves, the size of each mounting groove is the same as that of the corresponding second blocking piece, and the fixing plate and the second blocking pieces are connected by using a plug-in connection mechanism.
The beneficial effect who adopts above-mentioned improvement scheme does: through setting up the mounting groove, thereby can adjust the length of fixed plate, convenient to use, flexibility according to the position of condition adjustment second card fender spare.
Optionally, the surfaces of the second vertical plate and the fixing plate are provided with insulating coatings.
The beneficial effect who adopts above-mentioned improvement scheme does: the insulating coating can prevent the phase line from being in direct contact with the cable bridge support device to generate ground faults due to the fact that the cable is damaged in an insulating mode, and potential safety hazards are eliminated.
Optionally, a rubber pad is arranged on the fixing plate.
The beneficial effect who adopts above-mentioned improvement scheme does: the rubber pad has oil-resistant and skid-proof effects and high elasticity, can reduce friction and damage of the cable and prolong the service life.
Optionally, the first vertical plate is fixed on the wall through a bolt structure.
The beneficial effect who adopts above-mentioned improvement scheme does: through setting up the direct and wall connection of first riser, simple to operate, be liable to change.
Optionally, the wall fixing mechanism is integrally formed by aluminum alloy materials.
The beneficial effect who adopts above-mentioned improvement scheme does: the aluminum alloy material has light weight, high strength, good mechanical property and higher bending strength; the blocking performance is good, the damage of sunlight, oxygen and moist environment to the bridge support device can be blocked, and the bridge support device is durable.
Compared with the prior art, the utility model provides a pair of crane span structure strutting arrangement for cable's beneficial effect is: the first vertical plate is directly connected with the wall surface, so that the wall fixing mechanism can be fixed on the wall, and the installation and the disassembly are more convenient; the fixed rod and the fixed plate are connected by adopting the hinge shaft connecting mechanism, so that the fixed plate can rotate, and the base can fix the fixed plate to be horizontal without excessively rotating to make the cable slide; inserting the second blocking piece into the mounting groove at a proper position, and then rotating the fixing plate to be vertical, so that the cable is blocked and fixed and is not easy to fall off; through the scheme, the cable bridge support device is simple and convenient to mount, attractive and firm in cable fixing.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments of the present invention will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor.
FIG. 1 is an overall schematic view of a cable tray support assembly;
FIG. 2 is a schematic view of a wall mounting mechanism of a cable tray support apparatus;
FIG. 3 is a schematic view of a triangular keel fixing mechanism of the cable tray support device;
FIG. 4 is a schematic view of a hinge shaft coupling mechanism of the cable tray support;
in the drawings, the components represented by the respective reference numerals are listed below:
1. a wall fixing mechanism; 11. a first vertical plate; 12. a transverse plate; 121. fixing the transverse plate; 122. Drawing the transverse plate; 13. a second vertical plate; 131. a first clamping block; 2. a triangular keel fixing mechanism; 21. a catch arm; 22. a second fixture block; 3. a cable fixing mechanism; 30. fixing the rod; 301. a first stopper; 31. a fixing plate; 311. connecting columns; 32. a second stopper; 4. the hinge shaft connecting mechanism; 41. a base; 42. a card slot; 421. and connecting the holes.
Detailed Description
To make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the attached drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the described embodiments are part of the embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and for simplicity of description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
As shown in fig. 1-3, be a pair of the utility model provides a first embodiment of crane span structure strutting arrangement for cable, in this embodiment, including wall fixed establishment 1, triangle fossil fragments fixed establishment 2 and cable fixed establishment 3, it is fixed to be connected through triangle fossil fragments fixed establishment 2 between wall fixed establishment 1 and the cable fixed establishment 3, wall fixed establishment 1 includes first riser 11, diaphragm 12 and second riser 13, the one end of diaphragm 12 is provided with first riser 11, the other end of diaphragm 12 is provided with second riser 13, cable fixed establishment 3 includes dead lever 30, fixed plate 31 and second card fender piece 32 pass through bolted connection, fixed plate 31 is connected through hinge shaft connecting mechanism 4 with dead lever 30, the symmetry is provided with two spliced poles 311 on the lateral wall on the fixed plate 31.
When in use, firstly, the triangular keel fixing mechanism 2 is sleeved on the first blocking piece 301 and the first fixture block 131, and the second fixture block 22 is clamped in the first blocking piece 301; then, the first latch 131 is clamped on the first latch member 301 to prevent the wall fixing mechanism 1 from sliding off; fixing the wall fixing mechanism 1 on the wall surface by using bolts, and adjusting the length of the transverse plate 12 to a proper position; the fixing rod 30 and the fixing plate 31 are coupled using the hinge shaft coupling mechanism 4, the fixing plate 31 is rotated to be horizontal, the cable is placed on the fixing plate 31, the second catching member 32 is inserted into the mounting groove to fix the cable, and the fixing plate 31 is rotated to catch the cable.
Optionally, as shown in fig. 4, in the above technical solution, the hinge shaft connecting mechanism 4 includes a base 41 and a clamping groove 42, the base 41 is sleeved on the second vertical plate 13, the clamping groove 42 is disposed on a side wall of the base 41, two connecting holes 421 are symmetrically disposed on the clamping groove 42, and the size of the connecting hole 421 is matched with the size of the connecting column 311.
When in use, the connecting column 311 is inserted into the connecting holes 421 at the two sides, and the fixing rod 30 is inserted into the clamping groove 42, so that the fixing plate 31 is connected with the hinge shaft connecting mechanism 4; when the cable is placed, the fixing plate 31 is rotated to be horizontal, and the base 41 can fix the fixing plate 31 to be horizontal without excessively rotating to slide the cable; the second catching member 32 is inserted into the mounting groove at a proper position, and then the fixing plate 31 is rotated to be vertical, fixing the cable.
Optionally, in the above technical solution, a first fixture block 131 is disposed at a top end of the second vertical plate 13.
When the wall fixing mechanism is used, the first fixture block 131 fixedly connects the wall fixing mechanism 1 with the triangular keel fixing mechanism 2, and simultaneously the first fixture block 131 is clamped with the first clamping piece 301, so that the second vertical plate 13 and the fixing rod 30 are tightly attached and are not easy to fall off.
Optionally, in the above technical solution, the triangular keel fixing mechanism 2 is provided with a blocking arm 21, and an end of the blocking arm 21 is provided with a second blocking block 22.
Optionally, in the above technical scheme, the transverse plate 12 includes a fixing transverse plate 121 and a pulling transverse plate 122, the fixing transverse plate 121 is sleeved on the pulling transverse plate 122, a slide rail is arranged on the fixing transverse plate 121, a pulley is arranged on the pulling transverse plate 122, and the fixing transverse plate 121 and the pulling transverse plate 122 can realize a pulling function.
Optionally, in the above technical solution, the fixing plate 31 is provided with a plurality of mounting grooves, the size of the mounting grooves is the same as that of the second blocking member 32, and the fixing plate 31 and the second blocking member 32 are connected by using a plug-in connection mechanism.
In use, the second blocking member 32 is inserted into the mounting groove at different positions to adjust the length of the fixing plate 31.
Optionally, in the above technical solution, the surfaces of the second riser 13 and the fixing plate 31 are provided with an insulating coating.
Optionally, in the above technical solution, a rubber pad is disposed on the fixing plate 31.
The rubber pad pastes on fixed plate 31 surface, with cable direct contact, prevents that cable and fixed plate 31 friction from damaging.
Optionally, in the above technical solution, the first vertical plate 11 is fixed on the wall through a bolt structure.
Optionally, in the above technical solution, the wall fixing mechanism 1 is integrally formed by using an aluminum alloy material.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. The utility model provides a crane span structure strutting arrangement for cable, characterized in that, including wall fixed establishment (1), triangular keel fixed establishment (2) and cable fixed establishment (3), wall fixed establishment (1) with be connected fixedly between cable fixed establishment (3) through triangular keel fixed establishment (2), wall fixed establishment (1) includes riser (11), diaphragm (12) and second riser (13), the one end of diaphragm (12) is provided with riser (11), the other end of diaphragm (12) is provided with second riser (13), cable fixed establishment (3) include dead lever (30), fixed plate (31) and second card fender piece (32), fixed plate (31) with second card fender piece (32) pass through bolted connection, fixed plate (31) with dead lever (30) are connected through hinge shaft connecting mechanism (4), the symmetry is provided with two spliced poles (311) on the lateral wall on fixed plate (31).
2. The bridge support device for cables as claimed in claim 1, wherein the hinge shaft connecting mechanism (4) comprises a base (41) and a clamping groove (42), the base (41) is sleeved on the second vertical plate (13), the clamping groove (42) is disposed on a side wall of the base (41), two connecting holes (421) are symmetrically disposed on the clamping groove (42), and the size of each connecting hole (421) is adapted to the size of the corresponding connecting column (311).
3. A cable tray support as claimed in claim 1, wherein the second riser (13) is provided with a first detent (131) at its top end.
4. The bridge support device for cables as claimed in claim 1, wherein the triangular keel fixing mechanism (2) is provided with a blocking arm (21), and the end of the blocking arm (21) is provided with a second blocking block (22).
5. The bridge support device for cables as claimed in claim 1, wherein the transverse plate (12) comprises a fixing transverse plate (121) and a drawing transverse plate (122), the fixing transverse plate (121) is sleeved on the drawing transverse plate (122), a slide rail is arranged on the fixing transverse plate (121), a pulley is arranged on the drawing transverse plate (122), and the fixing transverse plate (121) and the drawing transverse plate (122) can realize a drawing function.
6. The bridge support device for cables of claim 1, wherein said fixing plate (31) is provided with a plurality of mounting slots, the size of said mounting slots is the same as the size of said second stopper (32), and said fixing plate (31) and said second stopper (32) are connected by a plug-in connection mechanism.
7. A cable tray support according to claim 1, wherein the surfaces of said second riser (13) and said fixing plate (31) are provided with an insulating coating.
8. A cable tray support device as claimed in claim 1, characterised in that said fixing plate (31) is provided with rubber pads.
9. A cable tray support according to claim 1, wherein said first riser (11) is secured to the wall by a bolt arrangement.
10. A cable tray support device as claimed in claim 1, wherein said wall fixing means (1) is integrally formed from an aluminium alloy material.
CN202222031543.2U 2022-08-03 2022-08-03 Cable bridge support device Active CN218386647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222031543.2U CN218386647U (en) 2022-08-03 2022-08-03 Cable bridge support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222031543.2U CN218386647U (en) 2022-08-03 2022-08-03 Cable bridge support device

Publications (1)

Publication Number Publication Date
CN218386647U true CN218386647U (en) 2023-01-24

Family

ID=84964633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222031543.2U Active CN218386647U (en) 2022-08-03 2022-08-03 Cable bridge support device

Country Status (1)

Country Link
CN (1) CN218386647U (en)

Similar Documents

Publication Publication Date Title
US8919584B2 (en) Electrical equipment mounting frame
CN201323409Y (en) Tool for live line replacing of high voltage transmission line V-shaped insulator chain
US8398057B2 (en) Stringing block for aerial electric conductor
CN102856838B (en) Tubular bus support insulator changing tool and method
CN105322482B (en) A kind of general street code
CN105305337A (en) Cable bridge stand
CN211046242U (en) Multifunctional paying-off tackle for distribution lines
CN218386647U (en) Cable bridge support device
CN205123170U (en) Cable bridge
CN210326920U (en) Temporary fixing support for high-voltage cable
CN205141528U (en) Three angle steel mounts
US10557568B2 (en) Multi-sided cable clamps
CN103035368A (en) 10kV transformer frame
CN206602725U (en) Wire-management device and rack
CN207518244U (en) A kind of 220kV double backs overhead transmission line cable cut-offs bar
JP2009141999A (en) Uninterruptive work method for distribution line on utility pole
CN112448310A (en) Multifunctional paying-off tackle for distribution lines
CN213212961U (en) Temporary cable lifting device for electric power construction
CN102064495B (en) Lead wire brace rod for double-circuit lines on same pole
CN210430803U (en) Convenient bridge device that adjusts of network engineering integrated wiring
CN105060154A (en) Suspension installation machine of suspended load type transformer
CN216927213U (en) Universal wire hanging fitting for electric power communication optical cable line
CN219018357U (en) Cable fixing device
CN220291553U (en) Cable branching device for power cable construction
KR102521123B1 (en) Insulator-mounted fixture for safety support of overhead distribution lines

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant