CN218385056U CN202222618022.7U CN202222618022U CN218385056U CN 218385056 U CN218385056 U CN 218385056U CN 202222618022 U CN202222618022 U CN 202222618022U CN 218385056 U CN218385056 U CN 218385056U
Authority
CN
China
Prior art keywords
circuit breaker
pole
mounting
rod
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222618022.7U
Other languages
Chinese (zh)
Inventor
徐哲
包定
赵娥嫦
曾方明
杨镖
武建
王泽�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Great Wall Electrical Appliance Group Zhejiang Technology Co ltd
Original Assignee
Great Wall Electrical Appliance Group Zhejiang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Wall Electrical Appliance Group Zhejiang Technology Co ltd filed Critical Great Wall Electrical Appliance Group Zhejiang Technology Co ltd
Priority to CN202222618022.7U priority Critical patent/CN218385056U/en
Application granted granted Critical
Publication of CN218385056U publication Critical patent/CN218385056U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a circuit breaker technical field specifically is a novel circuit breaker on primary and secondary fusion post, including the circuit breaker main part, circuit breaker main part lower extreme is equipped with the mounting panel, the mounting panel lower extreme is equipped with the installation component, the installation component openly is close to mounting panel department with the back and is equipped with first spacing post, be connected with oblique pull rod on the first spacing post, the pull rod lower extreme is connected with the maintenance subassembly to one side, the maintenance subassembly openly is close to first spacing post department with the back and is equipped with the spacing post of second, maintenance subassembly upper end is connected with the otter board of standing, the adjustment tank has all been seted up to the both sides of otter board and mounting panel of standing, maintenance subassembly upper end is close to otter board department of standing and is equipped with the second spliced pole, the installation subassembly upper end is close to mounting panel department and is equipped with first spliced pole, installation subassembly and maintenance subassembly are by connecting rod, regulation pole, connecting hole, installation staple bolt, connecting screw rod and cup joint the pole and constitute.

Description

Novel breaker on primary and secondary fusion post
Technical Field
The utility model relates to a circuit breaker technical field specifically is a novel circuit breaker on secondary fusion post.
Background
The circuit breaker main part is installed mostly between two sets of wire poles on the large-scale one secondary fusion post, overhaul and during the use, constructor is located the operation inconvenience in wire pole, be difficult to operate the circuit breaker main part that is located two sets of wire poles middlings, and because the construction environment influences, the distance of two sets of wire poles can finely tune according to site environment, fixed mounting structure, be difficult to match on-the-spot construction demand, the stress point is located both sides during the installation, department yielding in the middle of installation component and the maintenance subassembly, and the support nature is poor.
Therefore, a new primary and secondary fused pole-mounted circuit breaker is needed to solve the above-mentioned problems in the background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel circuit breaker on secondary fusion post to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a novel circuit breaker on secondary fusion post, includes circuit breaker main part, circuit breaker main part lower extreme is equipped with the mounting panel, the mounting panel lower extreme is equipped with the installation subassembly, the installation subassembly openly is close to mounting panel department with the back and is equipped with first spacing post, be connected with the diagonal draw bar on the first spacing post, the diagonal draw bar lower extreme is connected with the maintenance subassembly, the maintenance subassembly openly is close to first spacing post department with the back and is equipped with the spacing post of second, maintenance subassembly upper end is connected with the otter board of standing, the adjustment tank has all been seted up to the both sides of otter board and mounting panel of standing, maintenance subassembly upper end is close to the otter board department of standing and is equipped with the second spliced pole, installation subassembly upper end is close to mounting panel department and is equipped with first connecting rod, installation subassembly and maintenance subassembly constitute by connecting rod, regulation pole, connecting hole, installation staple bolt, connecting screw rod and cup joint the pole, just it is connected with the connecting rod to adjust the pole both ends, the connecting rod is kept away from the one end of adjusting the pole and is equipped with the installation staple bolt, installation staple bolt both sides are connected with connecting screw rod, the pole, department is equipped with the pole in the middle of regulation pole and cup joints the pole, installation staple bolt upper end, the connecting hole has been seted up, the connecting rod in the connecting rod has the bracing piece.
As the utility model discloses preferred scheme, the connecting rod in mounting panel and the installation component cup joints the connection, connect and through the spacing locking of nut through cup jointing between the first spliced pole of connecting rod upper end and the adjustment tank on the mounting panel.
As the utility model discloses preferred scheme, the connecting rod in otter board and the maintenance subassembly of standing cup joints and connects, connect and through the spacing locking of nut through cup jointing between the second spliced pole of connecting rod upper end and the adjustment tank on the otter board of standing.
As the utility model discloses preferred scheme, connect and through the spacing locking of nut through cup jointing between diagonal draw bar and first spacing post, the spacing post of second.
As the utility model discloses preferred scheme, adjust pole and connecting rod and cup joint the connection back bottom and pass through the spacing locking of bolt, it is two sets of cup joint the connection through cup jointing the pole between the regulation pole.
As the utility model discloses preferred scheme, bracing piece and connecting hole plug are connected, installation staple bolt and wire pole cup joint and connect and through the spacing locking of connecting screw rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, installation component and maintenance subassembly through setting up, during the installation, install the upper end at the installation component with the circuit breaker main part, the maintenance subassembly is established in the below department of installation component, when later stage overhauls and uses, constructor can directly stand and operate on the otter board of standing, it is very convenient to be under construction, and the lateral distance accessible of connecting rod adjusts the flexible fine setting of pole, the lateral distance accessible of connecting rod is installed the staple bolt and is cup jointed the pole and adjust, thereby adapt to on-the-spot installation more, holistic suitability and practicality have been improved.
2. The utility model discloses in, through oblique pull rod and the bracing piece that sets up, through oblique pull rod, bracing piece, connecting rod, regulation pole and cup joint the pole and constitute multiple spot bearing structure during the installation, oblique pull rod installs and has formed the triangle location between two sets of connecting rods, and the bracing piece is installed and is reduced the change of distance between two sets of installation staple bolts between the installation staple bolts, cup joints the pole and establishes department in the middle of, has improved the support nature of middle department, and is whole more firm, reduces deformation.
Drawings
FIG. 1 is an overall structure diagram of the present invention;
FIG. 2 is a top view of the mounting assembly of the present invention;
FIG. 3 is a top view of the standing net plate of the present invention;
fig. 4 is a top view of the maintenance assembly of the present invention.
In the figure: 1. a circuit breaker main body; 2. mounting the component; 3. a diagonal member; 4. a support bar; 5. Maintaining the assembly; 501. a connecting rod; 502. adjusting a rod; 503. connecting holes; 504. installing a hoop; 505. connecting a screw rod; 506. a sleeved rod; 6. mounting a plate; 7. a first limit post; 8. A first connecting column; 9. standing the screen plate; 10. an adjustment groove; 11. a second limit post; 12. a second connecting column.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
In order to facilitate understanding of the invention, the invention will be described more fully hereinafter with reference to the accompanying drawings, in which several embodiments of the invention are shown, but which can be embodied in many different forms and are not limited to the embodiments described herein, but which are provided so as to render the disclosure of the invention more thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Please refer to fig. 1-4, the present invention provides a technical solution:
the utility model provides a novel circuit breaker on secondary fusion post, including circuit breaker main part 1, 1 lower extreme of circuit breaker main part is equipped with mounting panel 6, the mounting panel 6 lower extreme is equipped with installation component 2, installation component 2 openly and the back are close to mounting panel 6 department and are equipped with first spacing post 7, be connected with diagonal draw bar 3 on the first spacing post 7, the 3 lower extreme of diagonal draw bar is connected with maintenance subassembly 5, maintenance subassembly 5 openly and the back are close to first spacing post 7 department and are equipped with the spacing post of second 11, maintenance subassembly 5 upper end is connected with the otter board 9 of standing, the adjustment tank 10 has all been seted up to the both sides of otter board 9 and mounting panel 6 of standing, maintenance subassembly 5 upper end is close to otter board 9 department of standing and is equipped with second spliced pole 12, installation subassembly 2 upper end is close to mounting panel 6 department and is equipped with first staple bolt 8, installation subassembly 2 and maintenance subassembly 5 are by connecting rod 501, adjust pole 502, connecting hole 503, installation staple bolt 504, connecting hole 505 is cup jointed in the middle of adjusting pole 502, connecting rod 504, connecting rod 503 has been seted up and has been seted up connecting hole 503 on the bracing piece 503, connecting hole 503.
In the embodiment, please refer to fig. 1-4, most of the large-sized breaker bodies 1 on the primary and secondary fusion posts are installed between two groups of poles, when in maintenance and use, the constructors are inconvenient to operate at the poles, and are difficult to operate the breaker body 1 located in the middle of the two groups of poles, and due to the influence of the construction environment, the distance between the two groups of poles can be finely adjusted according to the site environment, the fixed installation structure is difficult to match the site construction requirements, the installation plate 6 is connected with the connection rod 501 in the installation assembly 2 in a sleeved manner, the first connection post 8 at the upper end of the connection rod 501 is connected with the adjustment groove 10 on the installation plate 6 in a sleeved manner and is limited and locked by a nut, the standing net plate 9 is connected with the connection rod 501 in the maintenance assembly 5 in a sleeved manner, connect and through the spacing locking of nut between the second spliced pole 12 of connecting rod 501 upper end and the adjustment tank 10 on the otter board 9 of standing, adjust pole 502 and connecting rod 501 and cup joint the back bottom and pass through the spacing locking of bolt, cup joint the connection through cup jointing the pole 506 between two sets of regulation poles 502, during the installation, install the upper end at installation component 2 with circuit breaker main part 1, maintenance component 5 establishes the below department at installation component 2, later stage is overhauld and is used the time, constructor can directly stand and operate on the otter board 9 of standing, it is very convenient to be under construction, and connecting rod 501's transverse distance accessible adjusts the flexible fine setting of pole 502, connecting rod 501's transverse distance accessible installation staple bolt 504 and cup jointing the pole 506 are adjusted, thereby adapt to on-the-spot installation more, holistic suitability and practicality have been improved.
The embodiment, please refer to fig. 1-4, the stress point is located on both sides during installation, the middle of the installation component 2 and the maintenance component 5 is easy to deform, and the support performance is poor, the diagonal draw bar 3 and the first spacing post 7, the second spacing post 11 are connected through a socket joint and locked through a nut, the support bar 4 and the connection hole 503 are connected in a plug-in manner, the installation hoop 504 and the telegraph pole are connected in a socket joint and locked through a connection screw 505, the multipoint support structure is formed through the diagonal draw bar 3, the support bar 4, the connection rod 501, the adjustment rod 502 and the socket joint 506 during installation, the diagonal draw bar 3 is installed between the two sets of connection rods 501 to form triangular positioning, the support bar 4 is installed between the installation hoop 504 to reduce the change of the distance between the two sets of installation hoops 504, the socket joint 506 is arranged in the middle, the support performance of the middle is improved, the whole is firmer, and the deformation is reduced.
The working principle is as follows: during the use, install circuit breaker main part 1 in the upper end of installation component 2, maintenance subassembly 5 is established in the below department of installation component 2, later stage overhauls during with the use, constructor can directly stand and operate on the otter board 9 of standing, it is very convenient to construct, and the lateral distance accessible of connecting rod 501 adjusts the flexible fine setting that adjusts pole 502, the lateral distance accessible of connecting rod 501 is adjusted staple bolt 504 and cup jointed the pole 506 and is adjusted, thereby adapt to the installation on-the-spot more, through diagonal draw bar 3 during the installation, bracing piece 4, connecting rod 501, adjusting pole 502 and cup jointed the pole 506 and having constituteed multipoint supporting structure, diagonal draw bar 3 has installed and has formed the triangle location between two sets of connecting rods 501, bracing piece 4 installs and reduces the change of distance between two sets of installation staple bolts 504 between the installation staple bolt 504, cup jointed the pole 506 and establish in the centre, the support nature of centre department has been improved, it is whole more firm.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a novel circuit breaker on secondary fusion post, includes circuit breaker main part (1), its characterized in that: the circuit breaker comprises a breaker main body (1), a mounting plate (6) is arranged at the lower end of the breaker main body (1), a mounting assembly (2) is arranged at the lower end of the mounting plate (6), a first limiting column (7) is arranged at the position, close to the mounting plate (6), of the front surface and the back surface of the mounting assembly (2), a diagonal draw bar (3) is connected to the first limiting column (7), a maintenance assembly (5) is connected to the lower end of the diagonal draw bar (3), a second limiting column (11) is arranged at the position, close to the first limiting column (7), of the front surface and the back surface of the maintenance assembly (5), a standing screen plate (9) is connected to the upper end of the maintenance assembly (5), adjusting grooves (10) are formed in the two sides of the standing screen plate (9) and the mounting plate (6), a second connecting column (12) is arranged at the position, close to the mounting plate (6), of the upper end of the mounting assembly (2), a first connecting column (8) is arranged at the upper end of the mounting assembly (2), the mounting assembly (2) and the maintenance assembly (5) are respectively formed by a connecting rod (501), an adjusting rod (502), a connecting rod (504), a connecting rod (506) is arranged at the two ends of the mounting hoop, the mounting hoop (504) is connected with connecting screw rods (505) on two sides, a sleeved rod (506) is arranged in the middle of the adjusting rod (502), a connecting hole (503) is formed in the upper end of the mounting hoop (504), and a supporting rod (4) is connected in the connecting hole (503).
2. The novel primary and secondary fused pole-mounted circuit breaker as claimed in claim 1, wherein: connecting rod (501) in mounting panel (6) and installation component (2) cup joint the connection, through cup jointing the connection and through the spacing locking of nut between regulation groove (10) on first spliced pole (8) and mounting panel (6) of connecting rod (501) upper end.
3. The novel primary and secondary fused pole-mounted circuit breaker as claimed in claim 1, wherein: the standing net plate (9) is connected with a connecting rod (501) in the maintenance assembly (5) in a sleeved mode, and a second connecting column (12) at the upper end of the connecting rod (501) is connected with an adjusting groove (10) in the standing net plate (9) in a sleeved mode and is limited and locked through nuts.
4. The novel primary and secondary fused pole-mounted circuit breaker as claimed in claim 1, wherein: the diagonal draw bar (3) is connected with the first limiting column (7) and the second limiting column (11) through sleeving and is limited and locked through nuts.
5. The novel primary and secondary fused pole-mounted circuit breaker as claimed in claim 1, wherein: the bottom of the adjusting rod (502) is limited and locked by a bolt after the adjusting rod (502) and the connecting rod (501) are connected in a sleeved mode, and the two groups of adjusting rods (502) are connected in a sleeved mode through sleeved connecting rods (506).
6. The novel primary and secondary fused pole-mounted circuit breaker as claimed in claim 1, wherein: the supporting rod (4) is connected with the connecting hole (503) in a plugging and pulling mode, and the mounting anchor ear (504) is connected with the telegraph pole in a sleeved mode and is limited and locked through the connecting screw rod (505).
CN202222618022.7U 2022-09-28 2022-09-28 Novel breaker on primary and secondary fusion column Active CN218385056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222618022.7U CN218385056U (en) 2022-09-28 2022-09-28 Novel breaker on primary and secondary fusion column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222618022.7U CN218385056U (en) 2022-09-28 2022-09-28 Novel breaker on primary and secondary fusion column

Publications (1)

Publication Number Publication Date
CN218385056U true CN218385056U (en) 2023-01-24

Family

ID=84926797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222618022.7U Active CN218385056U (en) 2022-09-28 2022-09-28 Novel breaker on primary and secondary fusion column

Country Status (1)

Country Link
CN (1) CN218385056U (en)

Similar Documents

Publication Publication Date Title
CN202616247U (en) Solar assembly installation support
KR101626593B1 (en) Solar cell construction installation process
CN218385056U (en) Novel breaker on primary and secondary fusion column
CN115051630B (en) Assembled solar photovoltaic power generation support and construction method
CN109538903B (en) Fixing device for monitoring equipment on power transmission tower
CN218364613U (en) Vertical fixing and supporting device for tower drum
CN207782705U (en) Photovoltaic panel fixed frame and photovoltaic tree
CN206759374U (en) A kind of novel foundation stake adjustable photovoltaic support
KR101427764B1 (en) a solar truss using a multi-joint
CN214530758U (en) Wind power generation foundation pre-stressed anchor bolt assembly
CN210273900U (en) Quadrangular pyramid connecting piece for prestressed suspension cable photovoltaic power station
CN213028966U (en) Steel frame structure of switch cabinet and electrical cabinet
CN210927536U (en) Photovoltaic module fixing device
CN106559031A (en) A kind of support body installed for photovoltaic panel
CN215990632U (en) Photovoltaic support mounting base
CN215407780U (en) Tent support coupling assembling
CN220673682U (en) Solar photovoltaic panel assembly
CN210469200U (en) Photovoltaic module mounting structure
CN204886813U (en) Photovoltaic board mounting bracket that has good adaptability to mounting point topography
CN213691126U (en) Photovoltaic power generation system simulation mounting platform
CN213477844U (en) Novel tent roof connecting piece
CN213521781U (en) Installing support for solar energy component
CN211557207U (en) Solar panel support frame
CN204103831U (en) A kind of photovoltaic cell component support
CN204886811U (en) Photovoltaic grillage convenient to installation of photovoltaic board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant