CN218381676U - Core sample clamp for pavement concrete drill core - Google Patents
Core sample clamp for pavement concrete drill core Download PDFInfo
- Publication number
- CN218381676U CN218381676U CN202222052874.4U CN202222052874U CN218381676U CN 218381676 U CN218381676 U CN 218381676U CN 202222052874 U CN202222052874 U CN 202222052874U CN 218381676 U CN218381676 U CN 218381676U
- Authority
- CN
- China
- Prior art keywords
- core
- handle
- core sample
- mounting bracket
- road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model belongs to the technical field of the technique that road detected and specifically relates to a road surface concrete bores core sample and presss from both sides, it includes the mounting bracket, set up in core sample on the mounting bracket presss from both sides, core sample presss from both sides including two handles, two the handle cross arrangement, two the handle cross section rotates to be connected, two the one end tip of handle all is provided with the clamping bar, two be connected with the connection chain between the other end tip of handle, the vertical zip fastener that is provided with on the mounting bracket, the one end of zip fastener connect in the middle part of connection chain. The utility model discloses have the effect of taking out the core appearance more smoothly.
Description
Technical Field
The utility model belongs to the technical field of the technique that the road detected and specifically relates to a road surface concrete bores core appearance and presss from both sides.
Background
The road is an infrastructure for various trackless vehicles and pedestrians to pass through in terms of word meaning; the road is divided into a road, an urban road, a rural road, an industrial road, a forestry road, an examination road, a competition road, an automobile test road, a workshop passage, a school road and the like according to the use characteristics of the road.
After the road is finished, the road surface needs to be subjected to related detection, some key data need to be sampled, meanwhile, in order to measure the thickness of concrete road pouring, the road needs to be drilled and cored, a core drilling machine is generally used for drilling the concrete road at present, an operator inserts a clamp into a gap between the road and a core sample after drilling, the core sample is directly pulled out of the road, but the core drilling mode has high labor intensity, the core sample clamp cannot be well kept perpendicular to the road during core drilling, and therefore the friction force between the core sample clamp and the inner wall of the road is increased, and core drilling failure is caused.
SUMMERY OF THE UTILITY MODEL
The utility model discloses problem to prior art provides a road surface concrete bores core appearance and presss from both sides, aims at solving prior art's technical problem.
The utility model provides a pair of pavement concrete bores core appearance and presss from both sides adopts following technical scheme:
the utility model provides a road surface concrete bores core sample and presss from both sides, includes the mounting bracket, set up in core sample on the mounting bracket presss from both sides, core sample presss from both sides including two handles, two the handle setting of crossing mutually, two the handle cross section rotates to be connected, two the one end tip of handle all is provided with the clamping bar, two be connected with the connecting link between the other end tip of handle, the vertical zip fastener that is provided with on the mounting bracket, the one end of zip fastener connect in the middle part of connecting link.
Preferably, the mounting frame is provided with a fixed pulley, and the zipper is wound on the fixed pulley in a penetrating manner.
Preferably, the mounting bracket include the mounting disc and circumference interval set up in many spinal branchs pole at mounting disc border, the top of branch rotate connect in the mounting disc, the fixed pulley set up in on the mounting disc.
Preferably, a winch is rotatably arranged on the supporting rod, and the zipper is wound on the winch.
Preferably, one end of the winch is provided with a hand wheel.
Preferably, the bottom of the supporting rod is provided with a backing plate.
To sum up, the utility model discloses a following at least one kind of useful technological effect:
operating personnel stretches into the gap between road and the core appearance with two clamping bars that the core appearance pressed from both sides, then rotates the capstan winch, and capstan winch pulling zip fastener is pressed from both sides the core appearance and is mentioned, and the one end that the clamping bar was kept away from to two handles that the core appearance pressed from both sides draws close each other to make two clamping bars press from both sides the core appearance tightly, and take out the core appearance from the road simultaneously, whole coring process has kept the core appearance and has pressed from both sides perpendicular with the road, thereby make to get the core more convenient smoothly.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
In the figure: 1. a mounting frame; 11. mounting a disc; 12. a strut; 121. a base plate; 13. a fixed pulley; 14. a winch; 141. a hand wheel; 2. a core sample clamp; 21. a handle; 22. a clamping bar; 23. a connecting chain; 3. a zipper.
Detailed Description
The present invention will be described in further detail with reference to fig. 1.
The embodiment of the utility model discloses road surface concrete bores core appearance and presss from both sides, as shown in fig. 1, including mounting bracket 1, mounting bracket 1 is including the mounting disc 11 that is circular setting, and the circumference interval sets up in many spinal branchs pole 12 at mounting disc 11 side border, in this embodiment, the quantity of branch 12 is preferably three, the top of branch 12 articulates at the border of mounting disc 11, the bottom butt of branch 12 is in road surface, need not rotate branch 12 at ordinary times and accomodate together, thereby reduce the space and occupy, and simultaneously, in order to reduce the pressure of branch 12 bottom to road surface, the welding of the bottom of branch 12 has backing plate 121, backing plate 121 laminates with road surface mutually.
Referring to fig. 1, be provided with core appearance on the mounting bracket 1 and press from both sides 2, core appearance presss from both sides 2 and is located the mounting disc 11 under, and core appearance presss from both sides 2 and includes two handles 21, and two handles 21 cross setting mutually, and the cross section of two handles 21 is connected through articulated, and the equal integrated into one piece in bottom end tip of two handles 21 has clamping bar 22, after boring the core to the road, during the sample, clamping bar 22 stretches into in the gap between road and the core appearance. Simultaneously, be connected with connecting chain 23 between the other end tip of two handles 21, the one end fixed connection of connecting chain 23 in one of them handle 21, the other end fixed connection of connecting chain 23 in another handle 21, vertically be provided with zip fastener 3 on the mounting bracket 1, the bottom fixed connection of zip fastener 3 is in the middle part of connecting chain 23, the lower fixed surface of mounting disc 11 installs fixed pulley 13, fixed pulley 13 is located directly over core appearance presss from both sides 2, zip fastener 3 wears around fixed pulley 13. By pulling the zipper 3, the zipper 3 pulls the two handles 21 of the core sample clamp 2 away from the ends of the clamping rods 22 close to each other through the connecting chain 23, so that the two clamping rods 22 tightly clamp the core sample clamp 2 and simultaneously take out the core sample from the road. In addition, a winch 14 is horizontally installed on the support rod 12, one end of the winch 14 is rotatably supported on the side wall of the support rod 12, the zipper 3 is wound on the winch 14, a hand wheel 141 is welded to the other end of the winch 14, and an operator can pull the zipper 3 and store the zipper 3 by rotating the winch 14.
The embodiment of the utility model provides a road surface concrete bores implementation principle of core sample clamp and does: the operating personnel stretches into two clamping bars 22 of core appearance clamp 2 in the gap between road and the core appearance, then rotates capstan winch 14, and capstan winch 14 pulling zip fastener 3 lifts core appearance clamp 2, and the one end that clamping bar 22 was kept away from to two handles 21 of core appearance clamp 2 draws close each other to make two clamping bars 22 press from both sides 2 tightly with the core appearance, and take out the core appearance in the road simultaneously, whole coring process has kept core appearance clamp 2 perpendicular with the road, thereby makes to get the core more convenient smooth.
The above description is only for the preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention is disclosed in the preferred embodiment, it is not limited to the above description, and any person skilled in the art can make some changes or modifications to equivalent embodiments without departing from the scope of the present invention, but all the technical solutions of the present invention are within the scope of the present invention.
Claims (6)
1. The utility model provides a road surface concrete bores core appearance and presss from both sides which characterized in that: including mounting bracket (1), set up in core appearance clamp (2) on mounting bracket (1), core appearance clamp (2) are including two handles (21), two handle (21) setting of crossing mutually, two handle (21) cross section rotates to be connected, two the one end tip of handle (21) all is provided with clamping bar (22), two be connected with between the other end tip of handle (21) and connect chain (23), vertically on mounting bracket (1) be provided with zip fastener (3), the one end of zip fastener (3) connect in the middle part of connecting chain (23).
2. The pavement concrete core drilling core sample clamp according to claim 1, wherein: the mounting rack (1) is provided with a fixed pulley (13), and the zipper (3) is wound around the fixed pulley (13).
3. The pavement concrete core drilling core sample clamp according to claim 2, wherein: mounting bracket (1) including mounting disc (11) and circumference interval set up in many spinal branchs pole (12) at mounting disc (11) border, the top of branch (12) rotate connect in mounting disc (11), fixed pulley (13) set up in on mounting disc (11).
4. The pavement concrete core drilling core sample clamp according to claim 3, wherein: a winch (14) is arranged on the supporting rod (12) in a rotating mode, and the zipper (3) is wound on the winch (14).
5. The core sample clamp for pavement concrete drill cores of claim 4, wherein: and a hand wheel (141) is arranged at one end of the winch (14).
6. The pavement concrete core drilling core sample clamp according to claim 3, wherein: the bottom of the support rod (12) is provided with a backing plate (121).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222052874.4U CN218381676U (en) | 2022-08-04 | 2022-08-04 | Core sample clamp for pavement concrete drill core |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222052874.4U CN218381676U (en) | 2022-08-04 | 2022-08-04 | Core sample clamp for pavement concrete drill core |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218381676U true CN218381676U (en) | 2023-01-24 |
Family
ID=84965050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222052874.4U Active CN218381676U (en) | 2022-08-04 | 2022-08-04 | Core sample clamp for pavement concrete drill core |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218381676U (en) |
-
2022
- 2022-08-04 CN CN202222052874.4U patent/CN218381676U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108584553B (en) | Hose winding and ash removing equipment for road construction | |
CN211954752U (en) | Soil sampling device for soil remediation | |
CN218381676U (en) | Core sample clamp for pavement concrete drill core | |
CN106216408A (en) | A kind of device for changing wide and heavy plate mill hydraulic AGC cylinder and using method thereof | |
CN110426281B (en) | Building steel structure strength detection device | |
CN210214639U (en) | Plug borer device | |
CN207037925U (en) | A kind of traffic lights being easily installed | |
CN111964953A (en) | Sampling analysis and storage equipment for deep-field mineral resource exploration and exploitation | |
CN210422595U (en) | Monitoring well maximum water level monitoring device | |
CN212553620U (en) | Device for mounting and replacing rope supporting wheel of endless rope | |
CN206076846U (en) | Insulator hoisting bracket | |
CN212851427U (en) | Intelligent analysis device for monitoring big data | |
CN210967618U (en) | Welding device for steel structure bridge | |
CN211877434U (en) | Core drilling sampling device for integrity of pile body | |
CN211397522U (en) | Geological core rope coring drilling well depth measuring device | |
CN112726552A (en) | Compaction degree detection rapid soil sampling device | |
CN205892520U (en) | Lifting device of railway rails board | |
CN220199285U (en) | Subway vehicle floor inspection door | |
CN213930417U (en) | High-pressure air source vehicle-carrying hanging device | |
CN210396665U (en) | Drilling rod draw gear for drilling construction | |
CN211060772U (en) | Utensil is examined to upset support about front suspension | |
CN212025939U (en) | Support pre-compaction device is used in construction of cast-in-place box girder | |
CN110953953A (en) | Utensil is examined to upset support about front suspension | |
CN210422483U (en) | Bottom support frame for petroleum mechanical drill | |
CN211622853U (en) | Telescopic combination formula view rail guard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |