CN108584553B - Hose winding and ash removing equipment for road construction - Google Patents

Hose winding and ash removing equipment for road construction Download PDF

Info

Publication number
CN108584553B
CN108584553B CN201711445205.0A CN201711445205A CN108584553B CN 108584553 B CN108584553 B CN 108584553B CN 201711445205 A CN201711445205 A CN 201711445205A CN 108584553 B CN108584553 B CN 108584553B
Authority
CN
China
Prior art keywords
rod
hose
winding
slide rail
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711445205.0A
Other languages
Chinese (zh)
Other versions
CN108584553A (en
Inventor
刘城
陈耕南
王秋萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Wan'ao Technology Development Co.,Ltd.
Original Assignee
Zhejiang Fuxing Garment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Fuxing Garment Co Ltd filed Critical Zhejiang Fuxing Garment Co Ltd
Priority to CN201711445205.0A priority Critical patent/CN108584553B/en
Publication of CN108584553A publication Critical patent/CN108584553A/en
Application granted granted Critical
Publication of CN108584553B publication Critical patent/CN108584553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H71/00Moistening, sizing, oiling, waxing, colouring or drying filamentary material as additional measures during package formation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/40Arrangements for rotating packages
    • B65H54/54Arrangements for supporting cores or formers at winding stations; Securing cores or formers to driving members
    • B65H54/553Both-ends supporting arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • B65H54/702Arrangements for confining or removing dust
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • B65H54/72Framework; Casings; Coverings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • B65H54/74Driving arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/04Arrangements for removing completed take-up packages and or replacing by cores, formers, or empty receptacles at winding or depositing stations; Transferring material between adjacent full and empty take-up elements
    • B65H67/0405Arrangements for removing completed take-up packages or for loading an empty core
    • B65H67/0411Arrangements for removing completed take-up packages or for loading an empty core for removing completed take-up packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/33Hollow or hose-like material

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Catching Or Destruction (AREA)
  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The invention relates to winding equipment, in particular to flexible pipe winding and ash removing equipment for road construction. The invention aims to provide a hose winding and ash removing device for road construction, which can conveniently disassemble a wound hose, clean and remove ash from the hose and fix one end of the hose before winding the hose. In order to solve the technical problem, the invention provides a hose winding and ash removing device for road construction, which comprises a mounting plate, a first slide rail, a first slide block, a mounting column, a bearing seat, a rotating rod, a handle, a fixed rod, a first screw rod, a fixed block, a clamping block, a winding drum and the like; the mounting panel is controlled two portions and all is connected with first slide rail, all is connected with first slider on the first slide rail slidingly. The invention achieves the effects of conveniently disassembling the wound hose, cleaning the dust of the hose and fixing one end of the wound hose.

Description

Hose winding and ash removing equipment for road construction
Technical Field
The invention relates to winding equipment, in particular to flexible pipe winding and ash removing equipment for road construction.
Background
The road is an infrastructure for various trackless vehicles and pedestrians to pass through in terms of word meaning; the road is divided into a road, an urban road, a rural road, an industrial road, a forestry road, an examination road, a competition road, an automobile test road, a workshop channel, a school road and the like according to the use characteristics of the road, and the ancient China also has a post road. It also refers to the way to achieve a certain goal, the way things develop, change. And (4) construction, namely, construction of the project according to a plan.
The existing process of winding the hose is mostly finished manually by winding for winding, storing and storing, so that the labor intensity of workers is high.
Therefore, the hose winding and ash removing equipment for road construction, which can conveniently detach the hose after winding and can clean and remove ash from the hose and fix one end of the hose before winding and winding the hose, is urgently needed to be developed, so that the defects that the operation of detaching the hose after winding is complicated, the ash removal of the hose after cleaning can not be performed, and one end of the hose can not be fixed before winding and winding the hose in the prior art are overcome.
Disclosure of Invention
(1) Technical problem to be solved
The invention aims to overcome the defects that the operation of disassembling a wound hose is complicated, the hose cannot be cleaned and cleaned, and one end of the hose cannot be fixed before the wound hose in the prior art, and the technical problem to be solved by the invention is to provide a hose winding and cleaning device for road construction, which can conveniently disassemble the wound hose, clean and clean the hose, and fix one end of the hose before the wound hose.
(2) Technical scheme
In order to solve the technical problems, the invention provides a hose winding and dust removing device for road construction, which comprises a mounting plate, a first slide rail, a first slide block, a mounting column, a bearing seat, a rotating rod, a handle, a fixed rod, a first screw rod, a fixed block, a clamping block, a winding drum, a servo motor, a worm wheel and a worm, wherein the left part and the right part of the mounting plate are both connected with the first slide rail, the first slide block is connected on the first slide rail in a sliding way, the first slide block is matched with the first slide rail, the top of the first slide block is connected with the mounting column, the upper part of the mounting column is connected with the bearing seat, the rotating rod is connected on the bearing seat, the tail end of the rotating rod is connected with the fixed block, the fixed block is provided with a groove, the clamping block is arranged in the groove, the clamping block is matched with the groove, the winding drum is connected between the clamping, the worm is connected on servo motor's the output shaft, and the bull stick right-hand member on right side is connected with the worm wheel, and the worm wheel is located the rear side of worm, and worm wheel and worm meshing, bilateral symmetry are connected with the dead lever on the mounting panel, and the dead lever is located the inboard of erection column, and threaded hole has all been opened to dead lever and erection column lower part, and threaded hole all is connected with first screw rod through threaded connection's mode, and first screw rod all passes the threaded hole, and erection column outside lower part all is connected with the handle.
Preferably, still including the second slide rail, the second slider, the lifter, the brush, the carriage release lever, branch and inserted bar, the inboard sub-unit connection of erection column on right side has the second slide rail, the gliding style is connected with the second slider on the second slide rail, second slider and second slide rail cooperation, second slider left side is connected with the lifter, the upper and lower both sides of lifter all are connected with the brush, the brush is located under the receipts reel, the lifter left end is connected with the carriage release lever, the mounting panel left side is connected with branch, branch is located the carriage release lever right side, branch and carriage release lever lower part have all opened the through-hole, the through-hole that opens on the through-hole that the branch lower part had and the carriage release lever is located same water flat line, be equipped with the inserted bar in the through-hole.
Preferably, the winding device further comprises a second screw, a threaded rod and a pressing block, the left side of the top of the winding barrel is connected with the second screw, the top wall of the second screw is internally provided with the second screw, the second screw penetrates through the top wall of the second screw, and the bottom end of the second screw is connected with the pressing block.
The working principle is as follows: when in use, a user firstly winds one end of the hose to be wound around the winding drum, then starts the servo motor to drive the worm to rotate, the worm drives the rotating rod on the right side to rotate through the worm wheel, and then the rotating rod on the right side drives the winding drum to rotate through the rotating rod on the left side, so that, the purpose of winding the hose can be realized, after the winding is finished, the servo motor is closed, then a user rotates out the first screw rod, the mounting column is moved by holding the handle to separate the clamping block from the groove, can conveniently take off and collect the hose of winding the completion to receiving around a section of thick bamboo, after collecting the completion, will receive to wind the hose of completion and follow to receive around a section of thick bamboo and take off, will receive again and continue to block into the position of winding a section of thick bamboo in going into the recess through the fixture block around a section of thick bamboo, fix the position of erection column through precession first screw rod at last, can conveniently collect the hose next time like this.
Because still including the second slide rail, the second slider, the lifter, the brush, the carriage release lever, branch and inserted bar, the inboard sub-unit connection of erection column on right side has the second slide rail, the gliding style is connected with the second slider on the second slide rail, second slider and second slide rail cooperation, second slider left side is connected with the lifter, the upper and lower both sides of lifter all are connected with the brush, the brush is located under the receipts reel, the lifter left end is connected with the carriage release lever, the mounting panel left side is connected with branch, branch is located the carriage release lever right side, branch and carriage release lever lower part have all opened the through-hole, the through-hole that opens on the through-hole that the branch lower part had and the carriage release lever is located same water flat line, be equipped with the inserted bar in the through-. When winding, the user pushes the lifting rod to upwards adjust the ash removal height through the second slider by pulling out the inserted rod, the inserted rod is inserted into the through hole corresponding to the moving rod to fix the position of the lifting rod which is upwards adjusted, then the winding drum rotates to enable the wound hose to contact with the brush to clean the ash removal, the number of turns of the wound hose is increased, the inserted rod is pulled out, and the height of the lifting rod is downwards adjusted to enable the brush to continue to clean the wound hose.
Because still including second screw rod, threaded rod and briquetting, the winding barrel top left side is connected with the second screw rod, is equipped with the second screw rod in the second screw rod roof, and the second screw rod passes second screw rod roof, and the second screw rod bottom is connected with the briquetting. In order to fix one end when winding the hose and finish winding, the purpose that one end needs to be pulled to finish winding when winding is solved, and when winding, the pressing block is pulled to press one end of the hose to fix by screwing down the second screw rod.
(3) Advantageous effects
The invention achieves the effects of conveniently disassembling the wound hose, cleaning and deashing the hose and fixing one end of the wound hose, can adjust the height of the brush according to different winding turns of the hose by arranging the second slide rail, the second slide block, the lifting rod, the brush, the movable rod, the support rod and the inserted rod, and finishes the purpose of cleaning the dust of the hose.
Drawings
Fig. 1 is a first front view structure diagram of the present invention.
Fig. 2 is a second front view structure diagram of the present invention.
Fig. 3 is a third schematic view of the present invention.
The labels in the figures are: 1-mounting plate, 2-first slide rail, 3-first slide block, 4-mounting column, 5-bearing seat, 6-rotating rod, 7-handle, 8-fixing rod, 9-threaded hole, 10-first screw rod, 11-fixing block, 12-groove, 13-clamping block, 14-winding drum, 15-servo motor, 16-worm wheel, 17-worm, 18-second slide rail, 19-second slide block, 20-lifting rod, 21-brush, 22-moving rod, 23-supporting rod, 24-through hole, 25-insertion rod, 26-second screw rod, 27-threaded rod and 28-pressing block.
Detailed Description
The invention is further described below with reference to the figures and examples.
Example 1
A hose winding and dust removing device for road construction is shown in figures 1-3 and comprises a mounting plate 1, a first slide rail 2, a first slide block 3, a mounting post 4, a bearing seat 5, a rotating rod 6, a handle 7, a fixed rod 8, a first screw rod 10, a fixed block 11, a clamping block 13, a winding drum 14, a servo motor 15, a worm wheel 16 and a worm 17, wherein the left part and the right part of the mounting plate 1 are both connected with the first slide rail 2, the first slide block 3 is connected with the first slide rail 2 in a sliding way, the first slide block 3 is matched with the first slide rail 2, the top of the first slide block 3 is connected with the mounting post 4, the upper part of the mounting post 4 is connected with the bearing seat 5, the rotating rod 6 is connected with the bearing seat 5, the tail end of the rotating rod 6 is connected with the fixed block 11, grooves 12 are formed in the fixed block 11, grooves 13 are formed in the clamping block 12, the clamping block 13 is matched with, the bull stick 6 on right side passes bearing frame 5 on right side, 4 right side upper portions of erection column on right side are connected with servo motor 15, connect worm 17 on servo motor 15's the output shaft, 6 right-hand members on right side are connected with worm wheel 16, worm wheel 16 is located the rear side of worm 17, worm wheel 16 meshes with worm 17, bilateral symmetry is connected with dead lever 8 on the mounting panel 1, dead lever 8 is located the inboard of erection column 4, threaded hole 9 has all been opened with 4 lower parts of erection column to dead lever 8, all be connected with first screw rod 10 through threaded connection's mode in the threaded hole 9, first screw rod 10 all passes threaded hole 9, 4 outside lower parts of erection column all are connected with handle 7.
Example 2
A hose winding and dust removing device for road construction is shown in figures 1-3 and comprises a mounting plate 1, a first slide rail 2, a first slide block 3, a mounting post 4, a bearing seat 5, a rotating rod 6, a handle 7, a fixed rod 8, a first screw rod 10, a fixed block 11, a clamping block 13, a winding drum 14, a servo motor 15, a worm wheel 16 and a worm 17, wherein the left part and the right part of the mounting plate 1 are both connected with the first slide rail 2, the first slide block 3 is connected with the first slide rail 2 in a sliding way, the first slide block 3 is matched with the first slide rail 2, the top of the first slide block 3 is connected with the mounting post 4, the upper part of the mounting post 4 is connected with the bearing seat 5, the rotating rod 6 is connected with the bearing seat 5, the tail end of the rotating rod 6 is connected with the fixed block 11, grooves 12 are formed in the fixed block 11, grooves 13 are formed in the clamping block 12, the clamping block 13 is matched with, the bull stick 6 on right side passes bearing frame 5 on right side, 4 right side upper portions of erection column on right side are connected with servo motor 15, connect worm 17 on servo motor 15's the output shaft, 6 right-hand members on right side are connected with worm wheel 16, worm wheel 16 is located the rear side of worm 17, worm wheel 16 meshes with worm 17, bilateral symmetry is connected with dead lever 8 on the mounting panel 1, dead lever 8 is located the inboard of erection column 4, threaded hole 9 has all been opened with 4 lower parts of erection column to dead lever 8, all be connected with first screw rod 10 through threaded connection's mode in the threaded hole 9, first screw rod 10 all passes threaded hole 9, 4 outside lower parts of erection column all are connected with handle 7.
Still including second slide rail 18, second slider 19, lifter 20, brush 21, carriage release lever 22, branch 23 and inserted bar 25, 4 inboard sub-unit connections on the erection column on right side have second slide rail 18, second slide rail 18 goes up sliding connection has second slider 19, second slider 19 and the cooperation of second slide rail 18, 19 left sides of second slider are connected with lifter 20, the upper and lower both sides of lifter 20 all are connected with brush 21, brush 21 is located under the receipts reel 14, 20 left ends of lifter are connected with carriage release lever 22, mounting panel 1 left side is connected with branch 23, branch 23 is located the carriage release lever 22 right side, branch 23 and carriage release lever 22 lower part all open there is through-hole 24, the through-hole 24 that open on the through-hole 24 that branch 23 lower part was opened and the carriage release lever 22 are located same water flat line, be equipped with inserted bar 25 in the through-hole 24, inserted bar 25 passes through-hole 24.
Example 3
A hose winding and dust removing device for road construction is shown in figures 1-3 and comprises a mounting plate 1, a first slide rail 2, a first slide block 3, a mounting post 4, a bearing seat 5, a rotating rod 6, a handle 7, a fixed rod 8, a first screw rod 10, a fixed block 11, a clamping block 13, a winding drum 14, a servo motor 15, a worm wheel 16 and a worm 17, wherein the left part and the right part of the mounting plate 1 are both connected with the first slide rail 2, the first slide block 3 is connected with the first slide rail 2 in a sliding way, the first slide block 3 is matched with the first slide rail 2, the top of the first slide block 3 is connected with the mounting post 4, the upper part of the mounting post 4 is connected with the bearing seat 5, the rotating rod 6 is connected with the bearing seat 5, the tail end of the rotating rod 6 is connected with the fixed block 11, grooves 12 are formed in the fixed block 11, grooves 13 are formed in the clamping block 12, the clamping block 13 is matched with, the bull stick 6 on right side passes bearing frame 5 on right side, 4 right side upper portions of erection column on right side are connected with servo motor 15, connect worm 17 on servo motor 15's the output shaft, 6 right-hand members on right side are connected with worm wheel 16, worm wheel 16 is located the rear side of worm 17, worm wheel 16 meshes with worm 17, bilateral symmetry is connected with dead lever 8 on the mounting panel 1, dead lever 8 is located the inboard of erection column 4, threaded hole 9 has all been opened with 4 lower parts of erection column to dead lever 8, all be connected with first screw rod 10 through threaded connection's mode in the threaded hole 9, first screw rod 10 all passes threaded hole 9, 4 outside lower parts of erection column all are connected with handle 7.
Still including second slide rail 18, second slider 19, lifter 20, brush 21, carriage release lever 22, branch 23 and inserted bar 25, 4 inboard sub-unit connections on the erection column on right side have second slide rail 18, second slide rail 18 goes up sliding connection has second slider 19, second slider 19 and the cooperation of second slide rail 18, 19 left sides of second slider are connected with lifter 20, the upper and lower both sides of lifter 20 all are connected with brush 21, brush 21 is located under the receipts reel 14, 20 left ends of lifter are connected with carriage release lever 22, mounting panel 1 left side is connected with branch 23, branch 23 is located the carriage release lever 22 right side, branch 23 and carriage release lever 22 lower part all open there is through-hole 24, the through-hole 24 that open on the through-hole 24 that branch 23 lower part was opened and the carriage release lever 22 are located same water flat line, be equipped with inserted bar 25 in the through-hole 24, inserted bar 25 passes through-hole 24.
The winding drum is characterized by further comprising a second screw 26, a threaded rod 27 and a pressing block 28, the second screw 26 is connected to the left side of the top of the winding drum 14, the second screw 26 is arranged in the top wall of the second screw 26, the second screw 26 penetrates through the top wall of the second screw 26, and the pressing block 28 is connected to the bottom end of the second screw 26.
The above examples are merely representative of preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, various changes, modifications and substitutions can be made without departing from the spirit of the present invention, and these are all within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (1)

1. A hose winding and dust removing device for road construction is characterized by comprising a mounting plate (1), a first slide rail (2), a first slide block (3), a mounting column (4), a bearing seat (5), a rotating rod (6), a handle (7), a fixed rod (8), a first screw rod (10), a fixed block (11), a fixture block (13), a winding cylinder (14), a servo motor (15), a worm wheel (16) and a worm (17), wherein the left part and the right part of the mounting plate (1) are respectively connected with the first slide rail (2), the first slide rail (2) is respectively connected with the first slide block (3) in a sliding manner, the top of the first slide block (3) is respectively connected with the mounting column (4), the upper part of the mounting column (4) is respectively connected with the bearing seat (5), the rotating rod (6) is respectively connected with the rotating rod (6), the tail end of the rotating rod (6) is respectively connected with the fixed block (11), and the, clamping blocks (13) are arranged in the grooves (12), the clamping blocks (13) are matched with the grooves (12), winding drums (14) are connected between the clamping blocks (13) on the left side and the right side, a rotating rod (6) on the right side penetrates through a bearing seat (5) on the right side, a servo motor (15) is connected to the upper portion of the right side of the mounting column (4) on the right side, a worm (17) is connected to an output shaft of the servo motor (15), a worm wheel (16) is connected to the right end of the rotating rod (6) on the right side, the worm wheel (16) is located on the rear side of the worm (17), the worm wheel (16) is meshed with the worm (17), fixing rods (8) are symmetrically connected to the left side and the right side of the mounting plate (1), the fixing rods (8) are located on the inner side of the mounting column (4), threaded holes (9) are formed, the first screw rods (10) penetrate through the threaded holes (9), and the lower parts of the outer sides of the mounting columns (4) are connected with handles (7); the device is characterized by further comprising a second slide rail (18), a second slide block (19), a lifting rod (20), a brush (21), a moving rod (22), a support rod (23) and an inserting rod (25), wherein the second slide rail (18) is connected to the lower portion of the inner side of the mounting column (4) on the right side, the second slide rail (18) is connected with the second slide block (19) in a sliding mode, the lifting rod (20) is connected to the left side of the second slide block (19), the brush (21) is connected to the upper side and the lower side of the lifting rod (20), the brush (21) is located under the winding drum (14), the moving rod (22) is connected to the left end of the lifting rod (20), the support rod (23) is connected to the left side of the mounting plate (1), the support rod (23) is located on the right side of the moving rod (22), through holes (24) are formed in the lower portions of the support rod (23) and the moving rod (22), the through holes (, the inserted rod (25) passes through the through hole (24); the winding drum is characterized by further comprising a second screw (26), a threaded rod (27) and a pressing block (28), the left side of the top of the winding drum (14) is connected with the second screw (26), a threaded hole penetrating through the top wall is formed in the top wall of the second screw (26), the threaded rod (27) penetrates through the threaded hole formed in the top wall of the second screw (26), and the pressing block (28) is connected to the bottom end of the threaded rod (27).
CN201711445205.0A 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction Active CN108584553B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711445205.0A CN108584553B (en) 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711445205.0A CN108584553B (en) 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction

Publications (2)

Publication Number Publication Date
CN108584553A CN108584553A (en) 2018-09-28
CN108584553B true CN108584553B (en) 2020-07-24

Family

ID=63633269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711445205.0A Active CN108584553B (en) 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction

Country Status (1)

Country Link
CN (1) CN108584553B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109453857A (en) * 2018-09-30 2019-03-12 颍上县永军建材有限责任公司 A kind of ball mill
CN109081181B (en) * 2018-10-15 2021-07-09 台州宝诚科技服务有限公司 Winding device convenient to detach for textile machinery
CN109592510B (en) * 2018-12-06 2020-09-29 平顶山市碧盈家纺有限公司 Textile fabric winding device
CN110040576B (en) * 2019-03-02 2020-10-16 新昌县铎瞿环保科技有限公司 Plastic hose orderly winding and winding comprehensive ash removal and water removal equipment for road construction
CN110217644A (en) * 2019-07-03 2019-09-10 苏州悦莱美纺织科技有限公司 A kind of textile yarn winding device
CN110422699A (en) * 2019-08-13 2019-11-08 义乌市拾町服饰有限公司 A kind of weaving replacement mechanism of tube
CN110467051B (en) * 2019-08-27 2020-09-11 天长市润源金属制品有限公司 Steel wire rope winding equipment capable of removing burrs
CN111547574A (en) * 2020-05-14 2020-08-18 刘凯莉 Electric power is with receiving line equipment
CN111776840B (en) * 2020-07-22 2022-03-18 东莞新恩祥机械配件有限公司 Permanent magnet type pay-off device capable of avoiding disordered pay-off
CN114476837B (en) * 2022-03-30 2023-03-24 南通锦琪合纤有限公司 High strength composite fiber processing is with weaving yarn section of thick bamboo that has and prevent eccentric protection

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2702684B2 (en) * 1995-08-21 1998-01-21 義大 宮崎 Winder
CN205709155U (en) * 2016-04-21 2016-11-23 丁黎明 A kind of quick wrap-up of water pipe for building
CN106966228A (en) * 2017-04-06 2017-07-21 南昌安润科技有限公司 A kind of cable processing cable fast winding equipment
CN206720463U (en) * 2017-04-10 2017-12-08 徐州市苏能供电工程有限公司 A kind of portable power cable wrap-up
CN107381230A (en) * 2017-08-07 2017-11-24 寿涵红 A kind of retracting device for municipal electric cable transporting

Also Published As

Publication number Publication date
CN108584553A (en) 2018-09-28

Similar Documents

Publication Publication Date Title
CN108584553B (en) Hose winding and ash removing equipment for road construction
CN209349765U (en) A kind of workbench convenient for positioning fixation when door frame welding
CN214584157U (en) Soil sampling device is used to building structure specialty
CN216387353U (en) Tunnel lining quality test equipment
CN216876421U (en) Animal quarantine is with quarantine sample extraction element
CN108583635B (en) Road construction is with road template place small handcart
CN204947449U (en) A kind of line of power overhead device
CN208399192U (en) A kind of sewage treatment sampling apparatus
CN113500557A (en) Electric energy meter verification platform body surface support dismounting tool and dismounting method thereof
CN113250173A (en) Earth collection equipment suitable for frozen soil area
CN107762077B (en) Spliced solar-powered heating plate
CN112982214A (en) Indicating sign for rail transit
CN220954719U (en) Concrete beam steel reinforcement cage construction equipment
CN219882351U (en) Bolt quick assembly disassembly device for high-speed railway car seat
CN216201995U (en) Energy data acquisition device based on 5g
CN214723670U (en) Pipe pressing device
CN216645354U (en) Measuring device for drainage design
CN116397827B (en) Large-span magnesium aluminum manganese plate roof structure and construction method
CN215845843U (en) Fixed-point movable piston boring machine
CN218239414U (en) River deep water sampling device for environment detection
CN213747953U (en) Aluminum melting furnace with ash scraping mechanism
CN219061458U (en) Door and window sliding support with good self-locking effect
CN213561230U (en) Axle housing adds clamping apparatus
CN221260625U (en) Wire rod testing arrangement
CN216229125U (en) Filter element disassembling and replacing tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200701

Address after: 314000 No. 1188 Dongsheng Middle Road, Jiaxing, Zhejiang Province

Applicant after: Zhejiang Fuxing Garment Co.,Ltd.

Address before: Zhenjiang City, Jiangsu Province, 212013 Jingkou District Road No. 301

Applicant before: Liu Cheng

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221115

Address after: Room 1812, Administrative Service Center, No. 1, Renmin Road, Pingshang Town, Lingang Economic Development Zone, Linyi City, Shandong Province, 276000

Patentee after: Linyi Wan'ao Technology Development Co.,Ltd.

Address before: 1188 Dongsheng Middle Road, Jiaxing, Zhejiang 314000

Patentee before: Zhejiang Fuxing Garment Co.,Ltd.