CN108584553A - A kind of road construction is received with hose around ash removing equipment - Google Patents

A kind of road construction is received with hose around ash removing equipment Download PDF

Info

Publication number
CN108584553A
CN108584553A CN201711445205.0A CN201711445205A CN108584553A CN 108584553 A CN108584553 A CN 108584553A CN 201711445205 A CN201711445205 A CN 201711445205A CN 108584553 A CN108584553 A CN 108584553A
Authority
CN
China
Prior art keywords
hose
block
screw rod
sliding rail
mounting post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711445205.0A
Other languages
Chinese (zh)
Other versions
CN108584553B (en
Inventor
刘城
陈耕南
王秋萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Wan'ao Technology Development Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711445205.0A priority Critical patent/CN108584553B/en
Publication of CN108584553A publication Critical patent/CN108584553A/en
Application granted granted Critical
Publication of CN108584553B publication Critical patent/CN108584553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H71/00Moistening, sizing, oiling, waxing, colouring or drying filamentary material as additional measures during package formation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/40Arrangements for rotating packages
    • B65H54/54Arrangements for supporting cores or formers at winding stations; Securing cores or formers to driving members
    • B65H54/553Both-ends supporting arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • B65H54/702Arrangements for confining or removing dust
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • B65H54/72Framework; Casings; Coverings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • B65H54/74Driving arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/04Arrangements for removing completed take-up packages and or replacing by cores, formers, or empty receptacles at winding or depositing stations; Transferring material between adjacent full and empty take-up elements
    • B65H67/0405Arrangements for removing completed take-up packages or for loading an empty core
    • B65H67/0411Arrangements for removing completed take-up packages or for loading an empty core for removing completed take-up packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/33Hollow or hose-like material

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
  • Catching Or Destruction (AREA)

Abstract

The present invention relates to a kind of receive to be received around ash removing equipment around equipment more particularly to a kind of road construction hose.The technical problem to be solved in the present invention is to provide a kind of can facilitate to be dismantled, wiping deashing can be carried out to hose and can received the road construction hose that hose one end is fixed around ash removing equipment before hose receiving to receiving the hose around completion.In order to solve the above-mentioned technical problem, the present invention provides such a road construction hoses to receive around ash removing equipment, includes mounting plate, the first sliding rail, the first sliding block, mounting post, bearing block, bull stick, handle, fixed link, the first screw rod, fixed block, fixture block, reel etc.;Mounting plate or so two is respectively connected with the first sliding rail, and slidingtype is connected with the first sliding block on the first sliding rail.Invention achieves can facilitate dismantled to receiving the hose around completion, wiping deashing can be carried out to hose and can be when receiving around hose the effect that is fixed of one end.

Description

A kind of road construction is received with hose around ash removing equipment
Technical field
The present invention relates to a kind of receive to be received around ash removing equipment around equipment more particularly to a kind of road construction hose.
Background technology
Road is from the infrastructure that the meaning of a word is exactly for various trackless vehicles and walk;It is divided by its handling characteristics Highways and streets, backroad, factories and mines road, forestry road, examination road, contest road, automobile test road, workshop Channel and school's road etc., ancient china also has post road.In addition also refer to the approach for reaching certain target, things development, variation Approach.Construction, meaning engineering are built according to plan.
Due to it is existing to hose received around during be mostly all by manually completing to receive around receiving Leave with use, causes hand labor intensity big in this way.
Therefore there is an urgent need for research and develop it is a kind of can facilitate the hose for receiving around completion is dismantled, hose can be carried out wiping it is clear It ash and can be received around ash removing equipment receiving the road construction hose that hose one end is fixed before hose, it is existing to overcome Have and carries out that disassembling section is cumbersome, can not carry out wiping to hose deashing and can not receive in technology to the hose for receiving around completion The shortcomings that hose one end is fixed before hose.
Invention content
(1) technical problems to be solved
The present invention in order to overcome in the prior art to receive around completion hose carry out disassembling section it is cumbersome, can not be to hose Carry out wiping deashing and can not receive hose one end is fixed before hose the shortcomings that, the invention solves technology Problem is to provide a kind of can facilitate and is dismantled to the hose for receiving around completion, can carry out wiping deashing to hose and can be It receives and the road construction hose that hose one end is fixed is received around ash removing equipment before hose.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a road construction hoses to receive around ash removing equipment, Include mounting plate, the first sliding rail, the first sliding block, mounting post, bearing block, bull stick, handle, fixed link, the first screw rod, fixation Block, fixture block, reel, servo motor, worm gear and worm screw, mounting plate or so two are respectively connected with the first sliding rail, on the first sliding rail Equal slidingtype is connected with the first sliding block, and the first sliding block coordinates with the first sliding rail, and the first slider top is respectively connected with mounting post, pacifies Dress column top is respectively connected with bearing block, is respectively connected with bull stick on bearing block, and bull stick end is respectively connected with fixed block, on fixed block It is provided with groove, fixture block is equipped in groove, fixture block coordinates with groove, and reel is connected between the fixture block of the left and right sides, right The bull stick of side passes through the bearing block on right side, the mounting post right upper portion on right side to be connected with servo motor, the output shaft of servo motor The bull stick right end of upper connecting worm, right side is connected with worm gear, and worm gear is located at the rear side of worm screw, and worm gear is engaged with worm screw, mounting plate Above symmetrical to be connected with fixed link, fixed link is located at the inside of mounting post, and fixed link is provided with threaded hole with mounting post lower part, The mode being connected through a screw thread in threaded hole is connected with the first screw rod, and the first screw rod both passes through threaded hole, on the outside of mounting post under Portion is respectively connected with handle.
Preferably, further include having the second sliding rail, the second sliding block, elevating lever, hairbrush, mobile bar, strut and inserted link, right side Mounting post lower inside is connected with the second sliding rail, and slidingtype is connected with the second sliding block on the second sliding rail, and the second sliding block and second are slided Rail coordinates, and is connected with elevating lever on the left of the second sliding block, the both sides up and down of elevating lever are respectively connected with hairbrush, and hairbrush is being located at reel just Lower section, elevating lever left end are connected with mobile bar, and strut is connected on the left of mounting plate, and strut is located on the right side of mobile bar, strut and shifting Lever lower part is provided with through-hole, and the through-hole being provided on the through-hole and mobile bar that strut lower part is provided with is located in same horizontal line, leads to Inserted link is equipped in hole, inserted link passes through through-hole.
Preferably, further include having the second screw rod, threaded rod and briquetting, reel top left side is connected with the second screw rod, the The second screw rod is equipped in two screw rod roofs, the second screw rod passes through the second screw rod roof, and the second screw rod bottom end is connected with briquetting.
Operation principle:In use, user of service first by receive around hose one end bypass reel, then enable Servo motor drives worm screw rotation, and worm screw can then drive the bar rotation on right side by worm gear, and then the bull stick on right side then can Drive bar rotation of the reel by left side, in this way, can be realized to hose received around purpose, when receive around completion Afterwards, servo motor is closed, then user of service takes off fixture block by holding handle movement mounting post by screwing out the first screw rod From groove, it can conveniently remove receipts and be collected come the hose to receipts around completion around cylinder, be collected after completing, will be received around the soft of completion Guan Congshou is removed around cylinder and then will be received to be continued to stick into groove by fixture block come to receiving around the position of cylinder around cylinder, finally by The position of mounting post is fixed in the first screw rod of precession, in this way can facilitate to be collected hose next time.
Because further including having the second sliding rail, the second sliding block, elevating lever, hairbrush, mobile bar, strut and inserted link, the peace on right side Dress column lower inside is connected with the second sliding rail, and slidingtype is connected with the second sliding block, the second sliding block and the second sliding rail on the second sliding rail Cooperation, the second sliding block left side are connected with elevating lever, and the both sides up and down of elevating lever are respectively connected with hairbrush, under hairbrush is located at reel just Side, elevating lever left end are connected with mobile bar, and strut is connected on the left of mounting plate, and strut is located on the right side of mobile bar, strut and movement Bar lower part is provided with through-hole, and the through-hole being provided on the through-hole and mobile bar that strut lower part is provided with is located in same horizontal line, through-hole Interior to be equipped with inserted link, inserted link passes through through-hole.Received around when, user of service by extract inserted link, push elevating lever pass through second slide Block has been adjusted up after deashing height, and inserted link is inserted into through-hole corresponding with mobile bar can be to elevating lever to up-regulation The position of section is fixed, and can then realize that allowing receipts to be contacted with hairbrush around the hose risen is wiped by the rotation of reel Deashing, when receive around the hose number of turns increase, just by extracting inserted link, the height of adjusting elevating lever allows hairbrush can continue to pair downwards Receive the purpose that deashing is carried out around the hose risen.
Because further including having the second screw rod, threaded rod and briquetting, reel top left side is connected with the second screw rod, the second spiral shell The second screw rod is equipped in bar roof, the second screw rod passes through the second screw rod roof, and the second screw rod bottom end is connected with briquetting.In order to Receive around hose when one end be fixed completion receive around, solve receive at the beginning around when need pull one end complete receive around mesh , receive around when, by screwing off the second screw rod, one end that crush block pushes down hose is drawn to be fixed.
(3) advantageous effect
Invention achieves can facilitate to receive around completion hose dismantled, hose can be carried out wiping deashing and The effect that is fixed of one end that can be when receiving around hose, by be provided with the second sliding rail, the second sliding block, elevating lever, hairbrush, Mobile bar, strut and inserted link, can be received according to hose around the number of turns difference height of hairbrush is adjusted, complete to carry out hose Completion receipts are fixed in the purpose of deashing, the second screw rod, threaded rod and the briquetting of setting, one end that can be when receiving around hose Around, solve receive at the beginning around when need pull one end complete receive around purpose.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Label in attached drawing be:1- mounting plates, the first sliding rails of 2-, the first sliding blocks of 3-, 4- mounting posts, 5- bearing blocks, 6- turn Bar, 7- handles, 8- fixed links, 9- threaded holes, the first screw rods of 10-, 11- fixed blocks, 12- grooves, 13- fixture blocks, 14- reels, 15- servo motors, 16- worm gears, 17- worm screws, the second sliding rails of 18-, the second sliding blocks of 19-, 20- elevating levers, 21- hairbrush, 22- movements Bar, 23- struts, 24- through-holes, 25- inserted links, the second screw rods of 26-, 27- threaded rods, 28- briquettings.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of road construction is received with hose around ash removing equipment, includes mounting plate 1, the first sliding rail 2, the as shown in Figs. 1-3 One sliding block 3, mounting post 4, bearing block 5, bull stick 6, handle 7, fixed link 8, the first screw rod 10, fixed block 11, fixture block 13, reel 14, servo motor 15, worm gear 16 and worm screw 17, mounting plate 1 or so two are respectively connected with the first sliding rail 2, are slided on the first sliding rail 2 Dynamic formula is connected with the first sliding block 3, and the first sliding block 3 coordinates with the first sliding rail 2, and 3 top of the first sliding block is respectively connected with mounting post 4, 4 top of mounting post is respectively connected with bearing block 5, and bull stick 6 is respectively connected on bearing block 5, and 6 end of bull stick is respectively connected with fixed block 11, It is provided with groove 12 on fixed block 11, fixture block 13 is equipped in groove 12, fixture block 13 coordinates with groove 12, the card of the left and right sides Reel 14 is connected between block 13, the bull stick 6 on right side passes through the bearing block 5 on right side, 4 right upper portion of the mounting post connection on right side There is a servo motor 15, connecting worm 17 on the output shaft of servo motor 15,6 right end of bull stick on right side is connected with worm gear 16, worm gear 16 are located at the rear side of worm screw 17, and worm gear 16 is engaged with worm screw 17, symmetrical on mounting plate 1 to be connected with fixed link 8, fixed link 8 Positioned at the inside of mounting post 4, fixed link 8 is provided with threaded hole 9 with 4 lower part of mounting post, is connected through a screw thread in threaded hole 9 Mode is connected with the first screw rod 10, and the first screw rod 10 both passes through threaded hole 9, and 4 outer lower portion of mounting post is respectively connected with handle 7.
Embodiment 2
A kind of road construction is received with hose around ash removing equipment, includes mounting plate 1, the first sliding rail 2, the as shown in Figs. 1-3 One sliding block 3, mounting post 4, bearing block 5, bull stick 6, handle 7, fixed link 8, the first screw rod 10, fixed block 11, fixture block 13, reel 14, servo motor 15, worm gear 16 and worm screw 17, mounting plate 1 or so two are respectively connected with the first sliding rail 2, are slided on the first sliding rail 2 Dynamic formula is connected with the first sliding block 3, and the first sliding block 3 coordinates with the first sliding rail 2, and 3 top of the first sliding block is respectively connected with mounting post 4, 4 top of mounting post is respectively connected with bearing block 5, and bull stick 6 is respectively connected on bearing block 5, and 6 end of bull stick is respectively connected with fixed block 11, It is provided with groove 12 on fixed block 11, fixture block 13 is equipped in groove 12, fixture block 13 coordinates with groove 12, the card of the left and right sides Reel 14 is connected between block 13, the bull stick 6 on right side passes through the bearing block 5 on right side, 4 right upper portion of the mounting post connection on right side There is a servo motor 15, connecting worm 17 on the output shaft of servo motor 15,6 right end of bull stick on right side is connected with worm gear 16, worm gear 16 are located at the rear side of worm screw 17, and worm gear 16 is engaged with worm screw 17, symmetrical on mounting plate 1 to be connected with fixed link 8, fixed link 8 Positioned at the inside of mounting post 4, fixed link 8 is provided with threaded hole 9 with 4 lower part of mounting post, is connected through a screw thread in threaded hole 9 Mode is connected with the first screw rod 10, and the first screw rod 10 both passes through threaded hole 9, and 4 outer lower portion of mounting post is respectively connected with handle 7.
Further include having the second sliding rail 18, the second sliding block 19, elevating lever 20, hairbrush 21, mobile bar 22, strut 23 and inserted link 25,4 lower inside of mounting post on right side is connected with the second sliding rail 18, and slidingtype is connected with the second sliding block 19 on the second sliding rail 18, Second sliding block 19 and the second sliding rail 18 coordinate, and 19 left side of the second sliding block is connected with elevating lever 20, and the both sides up and down of elevating lever 20 are equal It is connected with hairbrush 21, hairbrush 21 is located at immediately below reel 14, and 20 left end of elevating lever is connected with mobile bar 22,1 left side of mounting plate It is connected with strut 23, strut 23 is located at 22 right side of mobile bar, and strut 23 and 22 lower part of mobile bar are provided with through-hole 24, under strut 23 The through-hole 24 that portion is provided with and the through-hole 24 being provided in mobile bar 22 are located in same horizontal line, and inserted link 25 is equipped in through-hole 24, is inserted Bar 25 passes through through-hole 24.
Embodiment 3
A kind of road construction is received with hose around ash removing equipment, includes mounting plate 1, the first sliding rail 2, the as shown in Figs. 1-3 One sliding block 3, mounting post 4, bearing block 5, bull stick 6, handle 7, fixed link 8, the first screw rod 10, fixed block 11, fixture block 13, reel 14, servo motor 15, worm gear 16 and worm screw 17, mounting plate 1 or so two are respectively connected with the first sliding rail 2, are slided on the first sliding rail 2 Dynamic formula is connected with the first sliding block 3, and the first sliding block 3 coordinates with the first sliding rail 2, and 3 top of the first sliding block is respectively connected with mounting post 4, 4 top of mounting post is respectively connected with bearing block 5, and bull stick 6 is respectively connected on bearing block 5, and 6 end of bull stick is respectively connected with fixed block 11, It is provided with groove 12 on fixed block 11, fixture block 13 is equipped in groove 12, fixture block 13 coordinates with groove 12, the card of the left and right sides Reel 14 is connected between block 13, the bull stick 6 on right side passes through the bearing block 5 on right side, 4 right upper portion of the mounting post connection on right side There is a servo motor 15, connecting worm 17 on the output shaft of servo motor 15,6 right end of bull stick on right side is connected with worm gear 16, worm gear 16 are located at the rear side of worm screw 17, and worm gear 16 is engaged with worm screw 17, symmetrical on mounting plate 1 to be connected with fixed link 8, fixed link 8 Positioned at the inside of mounting post 4, fixed link 8 is provided with threaded hole 9 with 4 lower part of mounting post, is connected through a screw thread in threaded hole 9 Mode is connected with the first screw rod 10, and the first screw rod 10 both passes through threaded hole 9, and 4 outer lower portion of mounting post is respectively connected with handle 7.
Further include having the second sliding rail 18, the second sliding block 19, elevating lever 20, hairbrush 21, mobile bar 22, strut 23 and inserted link 25,4 lower inside of mounting post on right side is connected with the second sliding rail 18, and slidingtype is connected with the second sliding block 19 on the second sliding rail 18, Second sliding block 19 and the second sliding rail 18 coordinate, and 19 left side of the second sliding block is connected with elevating lever 20, and the both sides up and down of elevating lever 20 are equal It is connected with hairbrush 21, hairbrush 21 is located at immediately below reel 14, and 20 left end of elevating lever is connected with mobile bar 22,1 left side of mounting plate It is connected with strut 23, strut 23 is located at 22 right side of mobile bar, and strut 23 and 22 lower part of mobile bar are provided with through-hole 24, under strut 23 The through-hole 24 that portion is provided with and the through-hole 24 being provided in mobile bar 22 are located in same horizontal line, and inserted link 25 is equipped in through-hole 24, is inserted Bar 25 passes through through-hole 24.
Further include having the second screw rod 26, threaded rod 27 and briquetting 28,14 top left side of reel is connected with the second screw rod 26, The second screw rod 26 is equipped in second screw rod, 26 roof, the second screw rod 26 passes through 26 roof of the second screw rod, 26 bottom end of the second screw rod to connect It is connected to briquetting 28.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (3)

1. a kind of road construction with hose receive around ash removing equipment, which is characterized in that include mounting plate (1), the first sliding rail (2), First sliding block (3), mounting post (4), bearing block (5), bull stick (6), handle (7), fixed link (8), the first screw rod (10), fixed block (11), fixture block (13), reel (14), servo motor (15), worm gear (16) and worm screw (17), mounting plate (1) left and right two is It is connected with the first sliding rail (2), slidingtype is connected with the first sliding block (3) on the first sliding rail (2), and the first sliding block (3) is with first Sliding rail (2) coordinates, and mounting post (4) is respectively connected at the top of the first sliding block (3), and mounting post (4) top is respectively connected with bearing block (5), Bull stick (6) is respectively connected on bearing block (5), bull stick (6) end is respectively connected with fixed block (11), is provided on fixed block (11) recessed Slot (12) is equipped with fixture block (13) in groove (12), and fixture block (13) coordinates with groove (12), the fixture block (13) of the left and right sides it Between be connected with reel (14), the bull stick (6) on right side passes through the bearing block (5) on right side, mounting post (4) right upper portion on right side to connect It is connected to servo motor (15), connecting worm (17) on the output shaft of servo motor (15), bull stick (6) right end on right side is connected with snail It takes turns (16), worm gear (16) is located at the rear side of worm screw (17), and worm gear (16) is engaged with worm screw (17), symmetrical on mounting plate (1) It is connected with fixed link (8), fixed link (8) is located at the inside of mounting post (4), and fixed link (8) is provided with spiral shell with mounting post (4) lower part Pit (9), the interior mode being connected through a screw thread of threaded hole (9) are connected with the first screw rod (10), and the first screw rod (10) both passes through Threaded hole (9), mounting post (4) outer lower portion are respectively connected with handle (7).
2. a kind of road construction according to claim 1 is received with hose around ash removing equipment, which is characterized in that further include having the Two sliding rails (18), the second sliding block (19), elevating lever (20), hairbrush (21), mobile bar (22), strut (23) and inserted link (25), it is right Mounting post (4) lower inside of side is connected with the second sliding rail (18), and slidingtype is connected with the second sliding block on the second sliding rail (18) (19), the second sliding block (19) coordinates with the second sliding rail (18), and elevating lever (20), elevating lever are connected on the left of the second sliding block (19) (20) both sides up and down are respectively connected with hairbrush (21), and hairbrush (21) is located at immediately below reel (14), and elevating lever (20) left end connects It is connected to mobile bar (22), strut (23) is connected on the left of mounting plate (1), strut (23) is located on the right side of mobile bar (22), strut (23) it is provided with through-hole (24) with mobile bar (22) lower part, the through-hole (24) that strut (23) lower part is provided with is opened in mobile bar (22) Some through-holes (24) are located in same horizontal line, and inserted link (25) is equipped in through-hole (24), and inserted link (25) passes through through-hole (24).
3. a kind of road construction according to claim 2 is received with hose around ash removing equipment, which is characterized in that further include having the Two screw rods (26), threaded rod (27) and briquetting (28), reel (14) top left side are connected with the second screw rod (26), the second screw rod (26) the second screw rod (26) is equipped in roof, the second screw rod (26) passes through the second screw rod (26) roof, the second screw rod (26) bottom end It is connected with briquetting (28).
CN201711445205.0A 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction Active CN108584553B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711445205.0A CN108584553B (en) 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711445205.0A CN108584553B (en) 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction

Publications (2)

Publication Number Publication Date
CN108584553A true CN108584553A (en) 2018-09-28
CN108584553B CN108584553B (en) 2020-07-24

Family

ID=63633269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711445205.0A Active CN108584553B (en) 2017-12-27 2017-12-27 Hose winding and ash removing equipment for road construction

Country Status (1)

Country Link
CN (1) CN108584553B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109081181A (en) * 2018-10-15 2018-12-25 王晨晨 A kind of easy-to-dismount coiling apparatus of textile machinery
CN109453857A (en) * 2018-09-30 2019-03-12 颍上县永军建材有限责任公司 A kind of ball mill
CN109592510A (en) * 2018-12-06 2019-04-09 丁予泽 A kind of textile cloth wrapping head
CN110040576A (en) * 2019-03-02 2019-07-23 莆田市宸桸装饰设计工程有限公司 A kind of road construction is orderly received with plastic flexible pipe around comprehensive deashing water removal device
CN110217644A (en) * 2019-07-03 2019-09-10 苏州悦莱美纺织科技有限公司 A kind of textile yarn winding device
CN110422699A (en) * 2019-08-13 2019-11-08 义乌市拾町服饰有限公司 A kind of weaving replacement mechanism of tube
CN110467051A (en) * 2019-08-27 2019-11-19 三门前庭机械科技有限公司 A kind of wirerope winding apparatus that can remove flash removed
CN111547574A (en) * 2020-05-14 2020-08-18 刘凯莉 Electric power is with receiving line equipment
CN111776840A (en) * 2020-07-22 2020-10-16 东莞新恩祥机械配件有限公司 Permanent magnet type pay-off device capable of avoiding disordered pay-off
CN114476837A (en) * 2022-03-30 2022-05-13 南通锦琪合纤有限公司 High strength composite fiber processing is with having weaving yarn section of thick bamboo of preventing eccentric protection

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0958933A (en) * 1995-08-21 1997-03-04 Yoshihiro Miyazaki Winding machine
CN205709155U (en) * 2016-04-21 2016-11-23 丁黎明 A kind of quick wrap-up of water pipe for building
CN106966228A (en) * 2017-04-06 2017-07-21 南昌安润科技有限公司 A kind of cable processing cable fast winding equipment
CN107381230A (en) * 2017-08-07 2017-11-24 寿涵红 A kind of retracting device for municipal electric cable transporting
CN206720463U (en) * 2017-04-10 2017-12-08 徐州市苏能供电工程有限公司 A kind of portable power cable wrap-up

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0958933A (en) * 1995-08-21 1997-03-04 Yoshihiro Miyazaki Winding machine
CN205709155U (en) * 2016-04-21 2016-11-23 丁黎明 A kind of quick wrap-up of water pipe for building
CN106966228A (en) * 2017-04-06 2017-07-21 南昌安润科技有限公司 A kind of cable processing cable fast winding equipment
CN206720463U (en) * 2017-04-10 2017-12-08 徐州市苏能供电工程有限公司 A kind of portable power cable wrap-up
CN107381230A (en) * 2017-08-07 2017-11-24 寿涵红 A kind of retracting device for municipal electric cable transporting

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109453857A (en) * 2018-09-30 2019-03-12 颍上县永军建材有限责任公司 A kind of ball mill
CN109081181A (en) * 2018-10-15 2018-12-25 王晨晨 A kind of easy-to-dismount coiling apparatus of textile machinery
CN109081181B (en) * 2018-10-15 2021-07-09 台州宝诚科技服务有限公司 Winding device convenient to detach for textile machinery
CN109592510A (en) * 2018-12-06 2019-04-09 丁予泽 A kind of textile cloth wrapping head
CN109592510B (en) * 2018-12-06 2020-09-29 平顶山市碧盈家纺有限公司 Textile fabric winding device
CN110040576B (en) * 2019-03-02 2020-10-16 新昌县铎瞿环保科技有限公司 Plastic hose orderly winding and winding comprehensive ash removal and water removal equipment for road construction
CN110040576A (en) * 2019-03-02 2019-07-23 莆田市宸桸装饰设计工程有限公司 A kind of road construction is orderly received with plastic flexible pipe around comprehensive deashing water removal device
CN110217644A (en) * 2019-07-03 2019-09-10 苏州悦莱美纺织科技有限公司 A kind of textile yarn winding device
CN110422699A (en) * 2019-08-13 2019-11-08 义乌市拾町服饰有限公司 A kind of weaving replacement mechanism of tube
CN110467051A (en) * 2019-08-27 2019-11-19 三门前庭机械科技有限公司 A kind of wirerope winding apparatus that can remove flash removed
CN111547574A (en) * 2020-05-14 2020-08-18 刘凯莉 Electric power is with receiving line equipment
CN111776840A (en) * 2020-07-22 2020-10-16 东莞新恩祥机械配件有限公司 Permanent magnet type pay-off device capable of avoiding disordered pay-off
CN111776840B (en) * 2020-07-22 2022-03-18 东莞新恩祥机械配件有限公司 Permanent magnet type pay-off device capable of avoiding disordered pay-off
CN114476837A (en) * 2022-03-30 2022-05-13 南通锦琪合纤有限公司 High strength composite fiber processing is with having weaving yarn section of thick bamboo of preventing eccentric protection

Also Published As

Publication number Publication date
CN108584553B (en) 2020-07-24

Similar Documents

Publication Publication Date Title
CN108584553A (en) A kind of road construction is received with hose around ash removing equipment
CN104614191B (en) Experiment table of relationship between top coal's recovery ratio and strata behavior, application method thereof
CN111005315B (en) Bridge bottom surface detection structure and detection method thereof
CN209102424U (en) A kind of detachable coal bed gas coal core sampler
CN107138445A (en) A kind of special cleaning plant of building implement
CN202793835U (en) Fully-automatic insertion type sampler
CN106097837B (en) A kind of teaching experiment vehicle motor drive system
CN201047819Y (en) Novel dual-purpose Marshall compaction apparatus
CN203292828U (en) Automatic straightening and cutting device for copper bar for test detection
CN110031236B (en) Dynamic environmental parameter-based whole vehicle performance dynamic simulation test system and method
CN208653920U (en) A kind of automatic detection vehicle track tester
CN209413853U (en) A kind of automobile-used drilling equipment of road drilling
CN205259074U (en) Basket traveling system is hung to triangle
CN106769183A (en) A kind of resource exploration fast drilling device
CN215005859U (en) Device for monitoring mine geological environment
CN215518702U (en) Sampling device for roadbed detection
CN211504745U (en) Soil sampling device for environmental detection
CN109174574A (en) A kind of automobile gear device for being adjusted by rotation uniform japanning
CN208366666U (en) A kind of sampling check equipment of the food traceability system based on Internet of Things
CN201212857Y (en) Novel multi-span sampling device for train
CN205224708U (en) Formula of sideslipping parking equipment
CN206450509U (en) A kind of material testing apparatus of bridge reinforcement
CN105328159A (en) Tube drawing mechanism for centrifugal machine
CN207502199U (en) A kind of environmental improvement sampling apparatus
CN207469216U (en) A kind of highway engineering sampler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200701

Address after: 314000 No. 1188 Dongsheng Middle Road, Jiaxing, Zhejiang Province

Applicant after: Zhejiang Fuxing Garment Co.,Ltd.

Address before: Zhenjiang City, Jiangsu Province, 212013 Jingkou District Road No. 301

Applicant before: Liu Cheng

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221115

Address after: Room 1812, Administrative Service Center, No. 1, Renmin Road, Pingshang Town, Lingang Economic Development Zone, Linyi City, Shandong Province, 276000

Patentee after: Linyi Wan'ao Technology Development Co.,Ltd.

Address before: 1188 Dongsheng Middle Road, Jiaxing, Zhejiang 314000

Patentee before: Zhejiang Fuxing Garment Co.,Ltd.

TR01 Transfer of patent right