CN218375409U - Energy-concerving and environment-protective building device of laying bricks - Google Patents

Energy-concerving and environment-protective building device of laying bricks Download PDF

Info

Publication number
CN218375409U
CN218375409U CN202222292002.5U CN202222292002U CN218375409U CN 218375409 U CN218375409 U CN 218375409U CN 202222292002 U CN202222292002 U CN 202222292002U CN 218375409 U CN218375409 U CN 218375409U
Authority
CN
China
Prior art keywords
brick
fragment
electronic slide
slide rail
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222292002.5U
Other languages
Chinese (zh)
Inventor
周荣
李林洁
刘佳蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Greenland Construction Design Research Institute Co ltd
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Greenland Construction Group Co Ltd filed Critical Shanghai Greenland Construction Group Co Ltd
Priority to CN202222292002.5U priority Critical patent/CN218375409U/en
Application granted granted Critical
Publication of CN218375409U publication Critical patent/CN218375409U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a construction especially relates to an energy-concerving and environment-protective building device of laying bricks. The utility model provides an energy-concerving and environment-protective building brick laying device that can advance line location to laying bricks. The utility model provides an energy-concerving and environment-protective building device of laying bricks, including mounting bracket, controller, electronic slide rail, electronic slider, installing frame and place the board etc. front portion upside on the left of mounting bracket is connected with the controller, and the side sliding type is connected with two electronic slide rails on the mounting bracket right part, and both sides set up around two electronic slide rails are, and equal slidingtype is connected with electronic slider on the electronic slide rail, is connected with the installing frame between two electronic slider right parts, and the inside slidingtype of installing frame is connected with places the board. The utility model discloses movable clamp plate on link upper right portion, movable clamp plate can fix a position the fragment of brick to avoid the position of fragment of brick to take place the skew, so can improve the efficiency of laying bricks of this device.

Description

Energy-concerving and environment-protective building device of laying bricks
Technical Field
The utility model relates to a construction especially relates to an energy-concerving and environment-protective building device of laying bricks.
Background
With the continuous development of society, rural areas are slowly urbanized, and more buildings come out at the same time, and in the process of building construction, a wall body is an extremely important part and is generally built by cement and bricks.
At first put the fragment of brick on the board of placing of the device of laying bricks, then the cylinder on the device of laying bricks is opened, cylinder telescopic link this moment can make the rack, place board and fragment of brick rebound, when the fragment of brick moves the wall body top, will place the board and move forward, this moment under the gravity of fragment of brick self, the fragment of brick will drop to the wall body on, so can be to laying bricks, nevertheless when using traditional device of laying bricks to lay bricks, the device of laying bricks is difficult to fix a position the fragment of brick, the skew takes place easily in the position of fragment of brick, lead to falling on the wall body that the fragment of brick can not be accurate, can pound the workman even, not only lay bricks inefficiency, it is extremely dangerous still.
Therefore, an energy-saving and environment-friendly building bricklaying device capable of positioning bricklaying is developed.
SUMMERY OF THE UTILITY MODEL
In order to overcome and be difficult to fix a position the fragment of brick, the position of fragment of brick takes place the skew easily, leads to the fragment of brick can not be accurate fall on the shortcoming of wall body, and the technical problem who solves is: the utility model provides an energy-concerving and environment-protective building brick laying device that can advance line location to laying bricks.
The technical scheme of the utility model is that: the utility model provides an energy-concerving and environment-protective building brick laying device, including the mounting bracket, a controller, electronic slide rail, electronic slider, the installing frame, place the board, fragment of brick body and clamping mechanism, the anterior upside in the left side of mounting bracket is connected with the controller, the upside slidingtype in the mounting bracket right part is connected with two electronic slide rails, both sides setting around two electronic slide rails are, equal slidingtype is connected with electronic slider on the electronic slide rail, be connected with the installing frame between two electronic slider right parts, the inside slidingtype of installing frame is connected with places the board, it has placed the fragment of brick body to place the board upside, installing frame left part upside is equipped with the clamping mechanism who is used for fixing a position the fragment of brick.
Further, clamping mechanism is including link, removal splint and drive assembly, and the installing frame left part upside intermediate junction has the link, and the upper right portion sliding connection of link has the removal splint that are used for fixing a position the fragment of brick, removes splint and the contact of fragment of brick body right side, and the link right part upside is equipped with drive assembly.
Further, drive assembly is including motor and screw rod, and the link right part upside is connected with the motor, is connected with the screw rod that is used for removing movable clamp plate on the motor output shaft, and the screw rod left part is connected with the link rotary type, and screw rod and movable clamp plate upper portion screw thread formula are connected, when needing to fix a position the fragment of brick, will remove movable clamp plate left through the screw rod for remove movable clamp plate left side and the laminating of fragment of brick right side.
Further, still including being used for promoting the frame mechanism that pushes away of electronic slide rail, push away a mechanism including the support frame, electric putter and connecting rod, mounting bracket left side intermediate junction has the support frame, is connected with electric putter on the support frame, and electric putter telescopic link right part is connected with the connecting rod that is used for removing electronic slide rail, around the connecting rod two with electronic slide rail sub-unit connection, when needing to remove electronic slide rail, move the connecting rod through electric putter for electronic slide rail moves right.
Furthermore, the installation frame further comprises a limiting plate, and the limiting plate is connected to the lower side of the left portion of the installation frame.
Furthermore, still including the universal wheel, the equal bilateral symmetry rotary type in both sides is connected with the universal wheel that is used for removing the mounting bracket around the mounting bracket bottom.
The utility model has the advantages that: 1. the utility model discloses the movable clamp plate on link upper right portion removes movable clamp plate and can fixes a position the fragment of brick to avoid the position of fragment of brick to take place the skew, so can improve the efficiency of laying bricks of this device.
2. The utility model discloses a cooperation between connecting rod and the electronic slide rail can make fragment of brick automatic movement to cement top, does not need people to remove whole device, and then reduces people's labour, so can improve people's work efficiency.
Drawings
Fig. 1 is a schematic view of the three-dimensional structure of the present invention.
Fig. 2 is a schematic view of a first partial body structure of the clamping mechanism of the present invention.
Fig. 3 is a schematic diagram of a second partial structure of the clamping mechanism of the present invention.
Fig. 4 is a schematic perspective view of the pushing frame mechanism of the present invention.
Reference numerals: 1_ mounting bracket, 2_ universal wheel, 3_ controller, 4_ electronic slide rail, 5_ electronic slider, 6_ installing frame, 7_ place the board, 8_ fragment of brick body, 9_ clamping mechanism, 91_ link, 92_ motor, 93_ screw rod, 94_ removal splint, 95_ limiting plate, 10_ push away a mechanism, 101_ support frame, 102_ electric putter, 103_ connecting rod.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
Example 1
The utility model provides an energy-concerving and environment-protective building brick laying device, as figure 1, figure 2 and figure 4 are shown, including mounting bracket 1, controller 3, electronic slide rail 4, electronic slider 5, the installing frame 6, place board 7, fragment of brick body 8 and clamping mechanism 9, there is controller 3 mounting bracket 1 left front portion upside has through bolted connection, 1 right part upside sliding connection of mounting bracket has two electronic slide rails 4, both sides set up around two electronic slide rails 4 are, equal sliding connection has electronic slider 5 on electronic slide rail 4, fixedly connected with installing frame 6 between two electronic slider 5 right parts, electronic slider 5 can make installing frame 6 remove, board 7 is placed to the inside sliding connection of installing frame, it is used for placing the fragment of brick to place board 7, place board 7 upside and placed body 8, 6 left part upside of installing frame is equipped with clamping mechanism 9.
As shown in fig. 1, 2 and 3, the clamping mechanism 9 includes a connecting frame 91, a movable clamping plate 94 and a driving assembly, the connecting frame 91 is welded in the middle of the upper side of the left portion of the mounting frame 6, the movable clamping plate 94 is slidably connected to the upper right portion of the connecting frame 91, the movable clamping plate 94 contacts with the right side of the brick body 8, the movable clamping plate 94 can position the brick body 8, and the driving assembly is arranged on the upper right portion of the connecting frame 91.
As shown in fig. 2 and 3, the driving assembly includes a motor 92 and a screw 93, the upper side of the right portion of the connecting frame 91 is connected with the motor 92 through a bolt, the output shaft of the motor 92 is connected with the screw 93 through a coupler, the left portion of the screw 93 is rotatably connected with the connecting frame 91, the screw 93 is in threaded connection with the upper portion of the movable clamp plate 94, and the screw 93 can move the movable clamp plate 94.
As shown in fig. 2, the installation frame further comprises a limiting plate 95, the limiting plate 95 is connected to the lower side of the left portion of the installation frame 6, and the limiting plate 95 can limit the installation frame 6.
As shown in fig. 1, the mobile mounting rack further comprises universal wheels 2, the universal wheels 2 are rotatably connected to the front side and the rear side of the bottom of the mounting rack 1 in a bilateral symmetry mode, and the universal wheels 2 are used for moving the mounting rack 1.
When people need to lay bricks, the device can be used for operation, cement is firstly smeared on the upper side of a wall body, initially, the brick body 8 is not placed on the placing plate 7, the motor 92 is firstly turned on, the output shaft of the motor 92 drives the screw 93 to rotate, then the movable clamping plate 94 is rightwards moved, when the movable clamping plate 94 moves to the rightmost side, the brick body 8 is placed on the placing plate 7, the brick body 8 is positioned between the connecting frame 91 and the movable clamping plate 94, after the brick body 8 is placed, the output shaft of the motor 92 is controlled to reversely rotate, then the screw 93 is reversely rotated and reset, further the movable clamping plate 94 moves leftwards and is attached to the right side of the brick, therefore, the brick body 8 can be limited, and because the heights of different walls can be adjusted according to different heights of the wall body 8, therefore, people can control the electric slider 5 to move upwards through the controller 3, and further drive the installation frame 6 and parts on the installation frame 6 to move upwards, when the brick body 8 moves to a position higher than the wall body, the electric slider 5 can be controlled to stop moving through the controller 3, then the brick body 8 can be moved rightwards to the position above the wall body, the brick body 8 can move rightwards by pushing the device to move rightwards, in the moving process, the movable clamp plate 94 can position the brick body 8, so that the position of the brick body 8 is prevented from shifting, when the limiting plate 95 moves rightwards and the left side of the wall body is contacted, the device stops moving, at the moment, the brick body 8 is positioned right above cement, then the placing plate 7 moves rightwards, the placing plate 7 moves rightwards to not accept the brick body 8, at the moment, under the gravity action of the brick body 8, fragment of brick body 8 will drop to cement on, so can build the brick automatically, and once can build the polylith brick, remove splint 94 simultaneously and can carry on spacingly to fragment of brick body 8, prevent fragment of brick body 8 and remove at will, make dropping to cement that fragment of brick body 8 can be accurate, after finishing building the brick, will place board 7 and remove left and reset, remove this device left again, make limiting plate 95 and wall body separation, remove down through controller 3 control electric slider 5 and reset afterwards, and then drive installing frame 6 and remove down and reset, also will repeat the above operation simultaneously, can build the brick automatically, and remove splint 94 and can fix a position the fragment of brick, thereby avoid the position of fragment of brick to take place the skew, so can improve the efficiency of building the brick of this device.
Example 2
On the basis of embodiment 1, as shown in fig. 1 and 4, the electric slide rail device further comprises a pushing frame mechanism 10, wherein the pushing frame mechanism 10 comprises a support frame 101, an electric push rod 102 and a connecting rod 103, the support frame 101 is fixedly connected to the middle of the left side of the mounting frame 1, the electric push rod 102 is connected to the support frame 101 through a bolt, the connecting rod 103 is connected to the right portion of an expansion rod of the electric push rod 102, the front portion and the rear portion of the connecting rod 103 are connected with the lower portion of the electric slide rail 4, and the connecting rod 103 can enable the electric slide rail 4 to move.
When people need fragment of brick automatic movement to the cement top, can use and push away a mechanism 10 and operate, at first open electric putter 102, make electric putter 102 telescopic link carry out the extension motion, then make connecting rod 103 remove right, and then make the part on electric slide rail 4 and the electric slide rail 4 remove right, so can make fragment of brick automatic movement to the cement top, thereby do not need people to remove whole device, and then reduce people's work load, people can step the fragment of brick on the cement afterwards, after the fragment of brick has been laid, control electric putter 102 telescopic link and carry out the extension motion, make connecting rod 103, the part on electric slide rail 4 and the electric slide rail 4 removes the reset left, operation more than the repetition, can remove the fragment of brick to the cement top automatically, do not need people to remove whole device, thereby reduce people's labour, so can improve people's work efficiency.
The above-mentioned embodiments only express the preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be understood as the limitation of the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several changes, modifications and substitutions can be made, which are all within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.

Claims (6)

1. The utility model provides an energy-concerving and environment-protective building device of laying bricks, including mounting bracket (1), controller (3), electronic slide rail (4), electronic slider (5), installing frame (6), place board (7) and fragment of brick body (8), mounting bracket (1) left side front portion upside is connected with controller (3), mounting bracket (1) right part upside slidingtype is connected with two electronic slide rails (4), both sides set up around two electronic slide rails (4) are, equal slidingtype is connected with electronic slider (5) on electronic slide rail (4), be connected with installing frame (6) between two electronic slider (5) right parts, installing frame (6) inside slidingtype is connected with places board (7), place board (7) upside and placed fragment of brick body (8), its characterized in that: the brick positioning device is characterized by further comprising a clamping mechanism (9), wherein the clamping mechanism (9) for positioning bricks is arranged on the upper side of the left part of the mounting frame (6).
2. The energy-saving environment-friendly building brick laying device according to claim 1, characterized in that: clamping mechanism (9) is including link (91), removal splint (94) and drive assembly, and installing frame (6) left part upside intermediate junction has link (91), and link (91) upper right portion sliding connection has removal splint (94) that are used for fixing a position the fragment of brick, removes splint (94) and the contact of fragment of brick body (8) right side, and link (91) right part upside is equipped with drive assembly.
3. An energy-saving environment-friendly building brick laying device according to claim 2, characterized in that: drive assembly is including motor (92) and screw rod (93), link (91) right part upside is connected with motor (92), be connected with screw rod (93) that are used for removing movable clamp plate (94) on motor (92) output shaft, screw rod (93) left part and link (91) rotary type are connected, screw rod (93) and movable clamp plate (94) upper portion screw thread formula are connected, when needing to fix a position the fragment of brick, will remove movable clamp plate (94) through screw rod (93) and remove left for movable clamp plate (94) left side and the laminating of fragment of brick right side.
4. An energy-saving environment-friendly building brick laying device according to claim 3, characterized in that: still including pushing away a mechanism (10) that is used for promoting electronic slide rail (4), push away a mechanism (10) including support frame (101), electric putter (102) and connecting rod (103), mounting bracket (1) left side intermediate junction has support frame (101), be connected with electric putter (102) on support frame (101), electric putter (102) telescopic link right part is connected with connecting rod (103) that are used for removing electronic slide rail (4), two and electronic slide rail (4) sub-unit connection around connecting rod (103), when needing to remove electronic slide rail (4), move connecting rod (103) right through electric putter (102), make electronic slide rail (4) move to the right.
5. The energy-saving environment-friendly building brick laying device according to claim 4, characterized in that: the mounting frame is characterized by further comprising a limiting plate (95), wherein the limiting plate (95) is connected to the lower side of the left portion of the mounting frame (6).
6. An energy-saving environment-friendly building brick laying device according to claim 5, characterized in that: the device is characterized by further comprising universal wheels (2), wherein the front side and the rear side of the bottom of the mounting rack (1) are respectively connected with the universal wheels (2) used for moving the mounting rack (1) in a bilateral symmetry rotating mode.
CN202222292002.5U 2022-08-30 2022-08-30 Energy-concerving and environment-protective building device of laying bricks Active CN218375409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222292002.5U CN218375409U (en) 2022-08-30 2022-08-30 Energy-concerving and environment-protective building device of laying bricks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222292002.5U CN218375409U (en) 2022-08-30 2022-08-30 Energy-concerving and environment-protective building device of laying bricks

Publications (1)

Publication Number Publication Date
CN218375409U true CN218375409U (en) 2023-01-24

Family

ID=84968853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222292002.5U Active CN218375409U (en) 2022-08-30 2022-08-30 Energy-concerving and environment-protective building device of laying bricks

Country Status (1)

Country Link
CN (1) CN218375409U (en)

Similar Documents

Publication Publication Date Title
CN110094073B (en) Wall building mechanical claw
CN218375409U (en) Energy-concerving and environment-protective building device of laying bricks
CN211727330U (en) Mesh placing machine
CN209293244U (en) Wallboard mounting device
CN114370148A (en) Vertical wall tile sticking equipment for building
CN210369973U (en) Wall masonry robot system
CN107642246A (en) A kind of build concrete hollow brick masonry device
CN210177989U (en) Wall building gripper
CN113765042B (en) Special-shaped cable trench cover plate building device and method
CN215412583U (en) Solar air heat collection control equipment for communication base station
CN210177990U (en) Can build gripper on indoor wall top
CN207177315U (en) A kind of build concrete hollow brick masonry device
CN113530256A (en) Auxiliary installation method for automatic unhooking type laminated slab with assembled structure
CN218258244U (en) Integrated elevator installation structure
CN210756171U (en) Internal aligning device for hydraulic pipeline
CN218224421U (en) Unloader for numerical control pipe bending machine
CN217028174U (en) Steel member slope fixing device
CN216996632U (en) A wallboard installation device for indoor decoration
CN221270905U (en) Fixing tool for exhaust pipe detection
CN219330978U (en) Workbench for design
CN219268366U (en) Support for pipeline assembly construction
CN221143609U (en) Assembled steel construction post hanging mechanism
CN214144697U (en) Building templates strutting arrangement
CN219471540U (en) Reinforcing device for house building frame beam template
CN210890758U (en) Electronic communication device convenient to dismantle installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231218

Address after: No.500 xijiangwan Road, Hongkou District, Shanghai

Patentee after: SHANGHAI GREENLAND CONSTRUCTION GROUP Co.,Ltd.

Patentee after: SHANGHAI GREENLAND CONSTRUCTION DESIGN RESEARCH INSTITUTE Co.,Ltd.

Address before: No.500 xijiangwan Road, Hongkou District, Shanghai

Patentee before: SHANGHAI GREENLAND CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right