CN218371311U - Roof flower frame beam ring-shaped track - Google Patents

Roof flower frame beam ring-shaped track Download PDF

Info

Publication number
CN218371311U
CN218371311U CN202221892884.2U CN202221892884U CN218371311U CN 218371311 U CN218371311 U CN 218371311U CN 202221892884 U CN202221892884 U CN 202221892884U CN 218371311 U CN218371311 U CN 218371311U
Authority
CN
China
Prior art keywords
upright post
roof
arm end
roofing
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221892884.2U
Other languages
Chinese (zh)
Inventor
岳兵
雷森
邹文建
李瑞红
季秋余
张志顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202221892884.2U priority Critical patent/CN218371311U/en
Application granted granted Critical
Publication of CN218371311U publication Critical patent/CN218371311U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of the building, concretely relates to roofing flower frame roof beam ring rail, including the cell cube, the cell cube includes: the upright column comprises an outer upright column and an inner upright column; the bottom ends of the outer upright post and the inner upright post are respectively vertically connected with the roof frame beam; the inclined strut is obliquely connected with the top end of the outer upright post and the bottom end of the inner upright post; the cantilever support arm is connected with the top ends of the outer stand column and the inner stand column; the cantilever support arm is divided into a long arm end and a short arm end at the connecting node, the long arm end is close to the outer upright post, and the short arm end is close to the inner upright post; a rail disposed at one end of the long arm end; a plurality of cell cube connect gradually along roofing all around, and connect two adjacent short arm ends through the spliced pole, form annular track. Through a plurality of cell cube connection and form circular orbit on roofing frame roof beam, guarantee that circular orbit's atress is stable, can resist certain wind load to solve do not have the floor between two adjacent roofing frame roof beams on the roofing, lead to the stress point of hoist and mount curtain to be difficult to the fixed problem.

Description

Roof flower frame beam circular track
Technical Field
The utility model belongs to the technical field of the building, concretely relates to roofing flower frame roof beam circular orbit.
Background
When the curtain wall is constructed, the construction lifter is usually dismantled, and at the moment, the glass or aluminum plate is generally required to be vertically transported and lifted by an electric hoist arranged on an annular track of a roof or a middle layer. The roof usually has roof frame roof beams, and there is not the floor between the roof frame roof beams, consequently needs design a roof flower frame roof beam circular orbit to be convenient for the hoist and mount to the curtain.
SUMMERY OF THE UTILITY MODEL
The utility model provides a roofing flower frame roof beam circular orbit, through connecting the stand on roofing frame roof beam, and support the support arm of encorbelmenting through the stand, adopt spliced pole and track to realize the connection of a plurality of cell cube, and form circular orbit on the roofing, guarantee circular orbit's atress stable, and can resist certain wind load, do not have the floor between two adjacent roofing frame roof beams on the roofing with the solution, the stress point that leads to hoist and mount curtain is difficult to the fixed problem.
A roofing flower frame roof beam circular orbit, includes the cell unit, the cell unit includes:
the upright column comprises an outer upright column and an inner upright column; the bottom ends of the outer stand columns and the inner stand columns are respectively and vertically connected with a roof frame beam;
the inclined strut is obliquely connected with the top end of the outer upright post and the bottom end of the inner upright post;
the cantilever support arm is connected with the top ends of the outer upright post and the inner upright post; the cantilever support arm is divided into a long arm end and a short arm end by a connecting node, the long arm end is close to the outer upright post, and the short arm end is close to the inner upright post;
a plurality of the unit bodies are connected in sequence around the roof, and are connected with two adjacent short arm ends through connecting columns, connected with two adjacent long arm ends through tracks to form annular tracks.
Through connect the stand on roofing frame roof beam to support the support arm of encorbelmenting through the stand, adopt spliced pole and track to realize the connection of a plurality of cell cube, and form circular orbit on the roofing, guarantee that circular orbit's atress is stable, and can resist certain wind load, do not have the floor between two adjacent roofing frame roof beams on the roofing in order to solve, lead to the stress point of hoist and mount curtain to be difficult to the problem of fixing.
Furthermore, the top of the roof frame beam is provided with an embedded part, and the outer upright post, the bottom end of the inner upright post and the roof frame beam are bolted through the embedded part respectively.
The stand column and the roof frame beam are connected through the embedded part, and meanwhile, the integrated stress frame is formed by matching with the cantilever support arm, so that the stand column is guaranteed to be stably connected.
Further, the rail is bolted to the long arm end through a steel plate.
Furthermore, the connecting column penetrates through the short arm end in sequence and is used for connecting two adjacent cantilever support arms.
The stress of the annular rail is strengthened by arranging the connecting columns, and the safety of the construction process is ensured.
Further, the embedded part is connected with the upright post through an M12 bolt.
Furthermore, the outer upright post, the inner upright post, the inclined strut and the connecting column are all made of square steel; the track the cantilever support arm is the I-steel.
Further, the circular orbit is hoisted by hoisting equipment, and the hoisting equipment comprises:
the electric hoist is hung below the track;
a first winch disposed on a floor;
a first ear plate disposed on a floor;
the cable wind rope is sequentially connected with the first winch, the first lug plate and the electric hoist;
the first winch drives the cable rope arranged by the electric hoist in a matching mode to install the curtain wall.
The curtain wall is convenient to hoist by arranging the hoisting equipment.
Further, the circular orbit is assisted to hoist through auxiliary assembly, auxiliary assembly includes:
the second winch is arranged on the roof;
the second ear plate is arranged on the roof and is arranged close to the bottom of the roof frame beam;
the third ear plate is arranged on the side wall of the roof frame beam opposite to the wall surface of the hanging curtain, is connected with the second winch through a first steel wire rope and is used for fixing the second winch;
and one end of the second steel wire rope is connected with the short arm end, and the other end of the second steel wire rope penetrates through the second lug plate and is connected with the second winch.
The overall stability of the device is ensured through auxiliary equipment, and the construction safety of the electric hoist is ensured.
The utility model has the advantages that:
the utility model discloses a connect the stand on the roofing frame roof beam, and support the support arm of encorbelmenting through the stand, adopt spliced pole and track to realize the connection of a plurality of cell cube, and form the circular orbit on the roofing, guarantee circular orbit's atress stable, and can resist certain wind load, in order to solve on the roofing there is not the floor between two adjacent roofing frame roof beams, lead to the problem that the stress point of hoist and mount curtain is difficult to fix; meanwhile, the device can be used in the existing place reasonably, can be used repeatedly in a turnover mode, saves construction cost, saves construction operation time and improves construction efficiency.
Drawings
FIG. 1 is a schematic view of the overall installation of the present invention;
fig. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic structural diagram according to a first embodiment;
FIG. 4 is a schematic structural diagram of the second embodiment;
fig. 5 is a schematic structural diagram of the third embodiment.
Reference numerals are as follows:
1. a unit body; 111. an outer column; 112. an inner upright post; 113. embedding parts; 12. bracing; 13. a cantilever arm; 131. a short arm end; 132. a long arm end;
21. connecting columns; 22. a track; 221. a steel plate;
31. an electric hoist; 32. a first winch; 33. a first ear plate; 34. a guy rope;
41. a second hoist; 42. a second ear plate; 43. a third ear plate; 44. a first wire rope; 45. a second wire rope;
5. roof frame beam.
Detailed Description
The technical solutions of the present invention will be described more clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Example one
Fig. 1-3 show a roofing flower frame roof beam ring rail, including cell cube 1, cell cube 1 includes stand, bracing 12, the support arm 13 of encorbelmenting, and a plurality of cell cubes 1 connect gradually around the roofing, and connect adjacent two short arm ends 131, connect adjacent two through track 22 through spliced pole 21 long arm end 132 forms ring rail. Through connecting the stand on roofing frame roof beam 5 to support through the stand and encorbelment support arm 13, adopt spliced pole 21 and track 22 to realize the connection of a plurality of cell cube 1, and form the circular orbit on the roofing, guarantee that circular orbit's atress is stable, and can resist certain wind load, do not have the floor between adjacent two roofing frame roof beams 5 on the roofing in order to solve, lead to the stress point of hoist and mount curtain to be difficult to the problem of fixing.
Specifically, the column, which includes an outer column 111, an inner column 112; the bottom ends of the outer upright posts 111 and the inner upright posts 112 are respectively vertically connected with the roof frame beam 5; the top of the roof frame beam 5 is provided with an embedded part 113, the bottom ends of the outer upright columns 111 and the inner upright columns 112 are bolted with the roof frame beam 5 through the embedded part 113 respectively, the upright columns and the roof frame beam 5 are connected through the embedded part 113, and meanwhile, the integrated stress frame is formed by matching with the cantilever support arm 13, so that the stable connection of the upright columns is ensured.
Specifically, the inclined strut 12 connects the top end of the outer column 111 and the bottom end of the inner column 112 in an inclined manner, so that the columns and the inclined strut 12 form a triangular supporting structure, and the stability is better.
Specifically, the cantilever arm 13 is connected with the top ends of the outer upright 111 and the inner upright 112; the cantilever arm 13 is divided into a long arm end 132 and a short arm end 131 at the connecting node, the long arm end 132 is close to the outer upright post 111, and the short arm end 131 is close to the inner upright post 112; the connecting column 21 sequentially penetrates through the short arm end 131 and is used for connecting two adjacent cantilever support arms 13, and the stress of the annular track is enhanced by the connecting column 21, so that the safety of the construction process is ensured; track 22 is disposed at one end of long arm end 132 and is bolted to long arm end 132 by steel plate 221; the rail 22 is arranged in parallel with the connection column 21.
In this embodiment, the circular orbit is hoisted by hoisting equipment, and hoisting equipment includes:
an electric hoist 31 suspended below the rail 22;
a first hoist 32 placed on a floor;
a first ear plate 33 placed on a floor;
a guy rope 34 connected to the first hoist 32, the first lug plate 33, and the electric block 31 in this order;
the first winch 32 drives the electric hoist 31 to cooperate with a cable rope 34 for curtain wall installation.
The curtain wall is convenient to hoist by arranging the hoisting equipment.
In this embodiment, the circular orbit is hoisted by the assistance of the auxiliary equipment, and the auxiliary equipment comprises:
a second hoist 41 placed on the roof;
a second ear plate 42, which is arranged on the roof and is arranged near the bottom of the roof frame beam 5;
a third ear plate 43, which is disposed on the side wall of the roof frame beam 5 opposite to the wall surface of the hanging curtain, is connected to the second winding machine 41 through a first wire rope 44, and is used for fixing the second winding machine 41;
one end of the second wire rope 45 is connected to the short arm end 131, and the other end thereof passes through the second lug 42 and is connected to the second hoist 41.
The integral stability of the device is ensured through auxiliary equipment, and the construction safety of the electric hoist 31 is ensured.
In the present embodiment, the embedment 113 is bolted to the column by M12.
In this embodiment, the outer column 111, the inner column 112, the inclined strut 12 and the connecting column 21 are all square steel; the track 22 and the cantilever arm 13 are all made of I-steel.
In this embodiment, the outer column 111 and the inner column 112 are made of 140 × 80 × 4mm square steel, the inclined strut 12 and the connecting column 21 are made of 60 × 60 × 4mm square steel, the cantilever arm 13 is made of 20b i-steel, the rail 22 is made of 18# i-steel, and the steel plate 221 is 12mm thick.
In the implementation, the length of each of the outer upright column 111 and the inner upright column 112 is 2720mm, and the distance between the outer upright column 111 and the inner upright column 112 is 1500mm; long arm end 132 extends 600mm outside of outer column 111 and track 22 is 450mm outside of outer column 111.
In this embodiment, the first winding machine 32 is a 2T winding machine, the first ear plate 33 is 3.5m from the bottom of the curtain wall, the second winding machine 41 is a 1T winding machine, and the second ear plate 42 is 1.8m from the bottom of the roof frame beam 5.
The installation and disassembly method of the embodiment comprises the following steps:
a second winch 41, a second lug plate 42 and a third lug plate 43 are arranged on the roof;
the upright post, the inclined strut 12, the cantilever support arm 13, the connecting post 21 and the track 22 are sequentially arranged, and a second steel wire rope 45 is adopted to be connected with the short arm end 131 of the cantilever support arm 13 and penetrate through the second lug plate 42 until being connected with the second winch 41;
a first winch 32 and a first lug plate 33 are arranged on the ground of one floor; the track 22 is provided with pulleys, and the bottom of the track is connected with an electric hoist 31; a hawser 34 is adopted to be connected with the electric hoist 31 and penetrates through the first lug plate 33 until being connected with the first winch 32;
the first winch 32 is used for driving a cable rope 34 arranged in a matched mode on the electric hoist 31, and the pulley in the track 22 is used for changing the position of the electric hoist 31 to complete curtain wall installation;
when the device is disassembled, the device is disassembled according to the reverse sequence construction of the installation method.
Example two
As shown in fig. 4, the difference between the present embodiment and the first embodiment is that the length of each of the outer upright 111 and the inner upright 112 is 1700mm, and the distance between the outer upright 111 and the inner upright 112 is 900mm.
EXAMPLE III
As shown in fig. 5, the difference between the present embodiment and the first embodiment is that the outer vertical columns 111 and the inner vertical columns 112 are 1700mm long, and the distance between the outer vertical columns 111 and the inner vertical columns 112 is 3600mm.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a roofing flower frame roof beam circular orbit which characterized in that, includes cell cube (1), cell cube (1) includes:
the upright column comprises an outer upright column (111) and an inner upright column (112); the bottom ends of the outer upright columns (111) and the inner upright columns (112) are respectively vertically connected with a roof frame beam (5);
the inclined strut (12) is obliquely connected with the top end of the outer upright post (111) and the bottom end of the inner upright post (112);
the cantilever support arm (13) is connected with the top ends of the outer upright post (111) and the inner upright post (112); the cantilever support arm (13) is divided into a long arm end (132) and a short arm end (131) at a connecting node, the long arm end (132) is close to the outer upright post (111), and the short arm end (131) is close to the inner upright post (112);
a plurality of unit body (1) connect gradually all around along the roofing, and connect adjacent two through spliced pole (21) short arm end (131), connect adjacent two through track (22) long arm end (132) form the annular track.
2. The annular rail of roof truss girder as defined in claim 1, wherein: the roof frame beam is characterized in that an embedded part (113) is arranged at the top of the roof frame beam (5), and the outer upright columns (111), the bottom ends of the inner upright columns (112) and the roof frame beam (5) are respectively bolted through the embedded part (113).
3. The annular rail for the roof truss girder of claim 1, wherein: the rail (22) is bolted to the long arm end (132) by a steel plate (221).
4. The annular rail of roof truss girder as defined in claim 1, wherein: the connecting column (21) penetrates through the short arm end (131) in sequence and is used for connecting two adjacent cantilever support arms (13).
5. A roof truss beam circular track as defined in claim 2 wherein: the embedded part (113) is connected with the upright post through an M12 bolt.
6. The annular rail of roof truss girder as defined in claim 1, wherein: the outer upright post (111), the inner upright post (112), the inclined strut (12) and the connecting post (21) are all made of square steel; the track (22) and the cantilever support arm (13) are all made of I-shaped steel.
7. The annular rail for the roof truss girder of claim 1, wherein: the annular rail is hoisted through hoisting equipment, the hoisting equipment comprises:
an electric hoist (31) hung below the rail (22);
a first winch (32) disposed on a floor;
a first ear plate (33) placed on a floor;
a hawser (34) which is connected with the first winch (32), the first lug plate (33) and the electric hoist (31) in sequence;
the first winch (32) drives the cable wind rope (34) arranged by the electric hoist (31) in a matched mode to install the curtain wall.
8. The annular rail for the roof truss girder of claim 1, wherein: the circular orbit passes through auxiliary assembly auxiliary hoist and mount, auxiliary assembly includes:
a second winch (41) placed on the roof;
a second ear plate (42) which is arranged on the roof and is arranged close to the bottom of the roof frame beam (5);
the third ear plate (43) is arranged on the side wall of the roof frame beam (5) opposite to the wall surface of the hanging curtain, is connected with the second winch (41) through a first steel wire rope (44) and is used for fixing the second winch (41);
and one end of the second steel wire rope (45) is connected with the short arm end (131), and the other end of the second steel wire rope passes through the second lug plate (42) and is connected with the second winch (41).
CN202221892884.2U 2022-07-21 2022-07-21 Roof flower frame beam ring-shaped track Active CN218371311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221892884.2U CN218371311U (en) 2022-07-21 2022-07-21 Roof flower frame beam ring-shaped track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221892884.2U CN218371311U (en) 2022-07-21 2022-07-21 Roof flower frame beam ring-shaped track

Publications (1)

Publication Number Publication Date
CN218371311U true CN218371311U (en) 2023-01-24

Family

ID=84963397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221892884.2U Active CN218371311U (en) 2022-07-21 2022-07-21 Roof flower frame beam ring-shaped track

Country Status (1)

Country Link
CN (1) CN218371311U (en)

Similar Documents

Publication Publication Date Title
JPH04111829A (en) Method for constructing large-span roof
CN216587766U (en) Hoisting facility and hoisting structure of large-span overhanging steel structural member
CN218371311U (en) Roof flower frame beam ring-shaped track
CN113136961A (en) Lifting structure for large-span truss and lifting method thereof
CN109989590B (en) Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN215907357U (en) High-rise building curtain wall circular orbit installation device
CN113756592B (en) Lifting system of truss roof when height of upper lifting point is limited and construction method thereof
CN109440942A (en) A kind of factory building roof rack mounting structure and construction technology
CN215107474U (en) Truss roof lifting system capable of increasing lifting height
CN115583584A (en) Unequal-height double-fulcrum full-rotation type light truss hoisting device and construction method
CN112502473B (en) Supporting bearing capacity conversion device and method for dismantling large steel framework by using same
JP3905103B2 (en) Tower-like building erection method and erection device
CN211312514U (en) Movable ground anchor device for mounting conical section of steel structure cooling tower
CN113494127A (en) Construction method for layered lifting of large-span open-web corridor steel platform
CN107700363B (en) Bridge tower rack with lifting system and construction method
CN217053072U (en) Multifunctional steel cable tower cap and stay cable installation device
CN212222218U (en) Single-point hoisting pile erecting system
CN217808432U (en) Indoor portable lifting device
CN215249197U (en) Combined hoisting equipment for fixed winch reinforced by pulley block
CN216196735U (en) Quick tipping arrangement of standardized installation module of roofing system
CN209855253U (en) Auxiliary fixing device for mounting roof super-long steel beam
CN215670956U (en) Scaffold-free supporting construction device for large concrete structure thin-shell dome
CN212612028U (en) Temporary support system for basket type steel box tied arch
CN213976725U (en) Simple and easy wall formula hoist device that rides
CN214885809U (en) Steel net rack suspension system

Legal Events

Date Code Title Description
GR01 Patent grant