CN218346924U - Temporary protective railing for roof - Google Patents

Temporary protective railing for roof Download PDF

Info

Publication number
CN218346924U
CN218346924U CN202222466728.6U CN202222466728U CN218346924U CN 218346924 U CN218346924 U CN 218346924U CN 202222466728 U CN202222466728 U CN 202222466728U CN 218346924 U CN218346924 U CN 218346924U
Authority
CN
China
Prior art keywords
roofing
installation
clamp
roof
guard rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222466728.6U
Other languages
Chinese (zh)
Inventor
李成群
袁鹏
袁学良
雷坡
李伟
武风杨
吴明
孟刚
张帅
刘宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 3 Construction Group Co Ltd
Original Assignee
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 3 Construction Group Co Ltd filed Critical China Coal No 3 Construction Group Co Ltd
Priority to CN202222466728.6U priority Critical patent/CN218346924U/en
Application granted granted Critical
Publication of CN218346924U publication Critical patent/CN218346924U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to a roofing guards railing temporarily, including the installation clamping, the installation clamping constitutes detachable connection with the side of roofing or the anti-bank of roofing, the installation clamping sets up the multiunit along the side of roofing or the anti-bank length direction interval of roofing, is provided with a grade pole between the adjacent installation clamping, grade pole level just arranges along the side of roofing or the anti-bank length direction of roofing, and when this roofing guards railing temporarily uses, will install the clamping and set up along the side of roofing or the anti-bank length direction interval of roofing to set up a grade pole between adjacent installation clamping, install safety net or safe climbing rope on a grade pole, and then make the roofing form netted safety fence all around, in order to ensure the safety of whole roofing, and this guard railing and easy dismounting can realize the cyclic utilization of spare part, reduce construction cost.

Description

Temporary protective railing for roof
Technical Field
The utility model relates to an engineering construction technical field, concretely relates to railing is prevented temporarily to roofing.
Background
When the scaffold frame was demolishd outside the building, each decorative surface layer of roofing if not accomplish the construction, need install around the roofing and prevent guardrail bar to ensure the operation safety of roofing surface layer construction, the tradition is prevented guardrail bar and is generally adopted the inflation screw anchor fixed, and the dismouting is very inconvenient, wastes time and energy, and construction cost is higher.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an: the utility model provides a railing is prevented temporarily to roofing, when can ensureing construction safety, makes things convenient for the dismouting, realizes cyclic utilization, reduces construction cost.
The utility model provides a solve technical problem and adopt following technical scheme:
the utility model provides a roofing prevents guardrail bar temporarily, includes the installation clamping, the side of installation clamping and roofing or the anti-bank constitution detachable connection of roofing, the installation clamping sets up the multiunit along the side of roofing or the anti-bank length direction interval of roofing, is provided with the shelves pole between the adjacent installation clamping, the shelves pole level just arranges along the side of roofing or the anti-bank length direction of roofing.
The utility model discloses still have following technical characterstic:
the whole installation clamp is of a U-shaped structure, and an opening of the installation clamp is clamped on the side face of the roof or the anti-ridge position of the roof.
A locking screw is arranged on one side of the mounting clamp, the locking screw is perpendicular to one side of the mounting clamp, and the locking screw is matched with a locking nut arranged on one side of the mounting clamp.
And the rod end of the locking screw rod extends out of the notch of the mounting clamp and abuts against the side face of the reversed ridge of the roof.
And the rod end of the locking screw rod extends out of the notch of the mounting clamp and abuts against the lower plate surface on one side of the roof.
The installation clamping is provided with an inserting pipe, the inserting pipe is arranged on the outer side face of the bottom of the installation clamping, and the inserting pipe is vertical and perpendicular to the bottom of the installation clamping.
The installation clamp is provided with an insertion pipe, the insertion pipe is arranged on the outer wall of a groove plate on one side of the installation clamp, and the insertion pipe is vertical and perpendicular to the groove plate on one side of the installation clamp.
The inserting pipe is internally provided with upright posts, and the stop rods are arranged at intervals along the length direction of the upright posts.
The combination position of shelves pole and stand is provided with the fastener, it is fixed to install through the fastener between shelves pole and the stand.
The mounting structure is characterized in that a mounting sleeve is arranged on the stand column, a fastening screw is arranged on the mounting sleeve and is abutted against the stand column, a fixing clamping groove is formed in the mounting sleeve, and two ends of the blocking rod are clamped in the fixing clamping groove.
Compared with the prior art, the beneficial effects of the utility model embody: when this roofing temporary protection railing uses, will install the clamping along the side of roofing or the anti-bank length direction interval setting of roofing to set up a grade pole between adjacent installation clamping, install safety net or safe climbing rope on a grade pole, and then make the roofing form netted safety fence all around, with the safety of guaranteeing whole roofing, and this protection railing and roofing easy dismounting, can realize the cyclic utilization of spare part, reduce construction cost.
Drawings
Fig. 1 is a front view of a first form of mounting structure for a temporary roof guard rail.
Fig. 2 is a left side view of a first form of mounting structure for a temporary roof guard rail.
Fig. 3 is a front view of a second form of mounting structure for a temporary roof guard rail.
Fig. 4 is a left side view of a second form of mounting structure for a roofing temporary guard rail.
Fig. 5 is a front view of a mounting structure of a stop rod and a stand column in the temporary roof guard rail.
Fig. 6 is a left side view of the installation structure of the stop rod and the upright post in the roof temporary guard rail.
Detailed Description
Referring to fig. 1 to 6, the structural features of the temporary roof protection rail are detailed as follows:
the utility model provides a roofing temporary protection railing, includes installation clip 100, removable connection is constituteed with the side of roofing or the anti-bank of roofing to installation clip 100, installation clip 100 sets up the multiunit along the side of roofing or the anti-bank length direction interval of roofing, is provided with shelves pole 200 between the adjacent installation clip 100, shelves pole 200 level just arranges along the side of roofing or the anti-bank length direction of roofing.
When this interim guardrail bar of roofing uses, will install clamping 100 along the side of roofing or the anti-bank length direction interval setting of roofing to set up shelves pole 200 between adjacent installation clamping 100, install safety net or safe climbing rope on shelves pole 200, and then make the roofing form netted safety fence all around, with the safety of guaranteeing whole roofing, and this guardrail bar and roofing easy dismounting, can realize the cyclic utilization of spare part, reduce construction cost.
During actual construction of the roof, a reverse ridge or a gutter tail surface sometimes exists, and if the roof has the reverse ridge or the gutter tail surface, the mounting clamp 100 is fixed on the reverse ridge or the gutter tail surface.
Specifically, when the mounting clip 100 is mounted on a roof, the mounting clip 100 is in a U-shaped configuration as a whole, and an opening of the mounting clip 100 is engaged with a side surface of the roof or a raised position of the roof.
When the installation clamp 100 is fixed to the side surface of a roof or the reverse ridge, a locking screw 110 is arranged on one side plate surface of the installation clamp 100, the locking screw 110 is perpendicular to one side surface of the installation clamp 100, and the locking screw 110 is matched with a locking nut 120 arranged on one side surface of the installation clamp 100.
Through set up locking screw 110 on lock nut 120, support through locking screw 110 and the anti-bank of roofing or roofing one side bottom surface and lean on, and then realize the fixed of installation clamping 100 and roofing.
As a first form of the mounting clip 100 of the present invention, as shown in fig. 1 and 2, the rod end of the locking screw 110 extends out of the notch of the mounting clip 100 and abuts against the reverse ridge side of the roof.
Referring to fig. 3 and 4, as a second form of the mounting clip 100 of the present invention, the rod end of the locking screw 110 extends out of the notch of the mounting clip 100 and abuts against a lower plate on one side of the roof.
As a first form of the mounting clip 100, the mounting clip 100 is fixed to a reversed ridge of a roof, and during actual installation, an insertion pipe 130 is arranged on the mounting clip 100, the insertion pipe 130 is arranged on the outer side surface of the bottom of the mounting clip 100, and the insertion pipe 130 is vertical and perpendicular to the bottom of the mounting clip 100.
As a second form of the installation clip 100, the installation clip 100 is fixed to one side of the roof, the installation clip 100 is provided with an insertion pipe 130, the insertion pipe 130 is arranged on the outer wall of a side groove plate of the installation clip 100, and the insertion pipe 130 is vertical and perpendicular to the side groove plate of the installation clip 100.
When the stop lever 200 is actually fixed, the upright post 300 is disposed in the insertion tube 130, and the stop lever 200 is disposed at intervals along the longitudinal direction of the upright post 300.
In order to realize the fixed connection between the stop lever 200 and the upright column 200, as a first fixing manner, a fastener is disposed at a joint position of the stop lever 200 and the upright column 300, and the stop lever 200 and the upright column 300 are fixed by the fastener.
As shown in fig. 5 and fig. 6, as a second installation manner of the upright post 300 and the blocking rod 200, in order to improve installation efficiency, an installation sleeve 310 is provided on the upright post 300, a fastening screw 320 is provided on the installation sleeve 310, the fastening screw 320 abuts against the upright post 300, a fixing slot 330 is provided on the installation sleeve 310, and two ends of the blocking rod 200 are clamped in the fixing slot 330.
The notch of the fixing slot 330 faces upwards, and the notch of the fixing slot 330 is of a closed structure, so that when the two ends of the blocking rod 200 are clamped in the fixing slot 330, the two ends of the blocking rod 200 are prevented from being randomly moved out of the fixing slot 330, and the overall safety is ensured.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (10)

1. The utility model provides a railing is prevented temporarily to roofing which characterized in that: including installation clip (100), installation clip (100) constitute detachable connection with the side of roofing or the anti-bank of roofing, installation clip (100) set up the multiunit along the side of roofing or the anti-bank length direction interval of roofing, are provided with shelves pole (200) between adjacent installation clip (100), shelves pole (200) level just arranges along the side of roofing or the anti-bank length direction of roofing.
2. The temporary protective roofing rail of claim 1, wherein: the installation clamp (100) is integrally in a U-shaped structure, and an opening of the installation clamp (100) is clamped on the side face of the roof or the reverse ridge position of the roof.
3. The temporary protective roofing rail of claim 2, wherein: a locking screw rod (110) is arranged on one side plate surface of the installation clamp (100), the locking screw rod (110) is perpendicular to one side surface of the installation clamp (100), and the locking screw rod (110) is matched with a locking nut (120) arranged on one side surface of the installation clamp (100).
4. A roofing temporary guard rail according to claim 3, wherein: the rod end of the locking screw rod (110) extends out of the notch of the mounting clamp (100) and is abutted against the side face of the reverse ridge of the roof.
5. A roofing temporary guard rail according to claim 3, wherein: the rod end of the locking screw rod (110) extends out of the notch of the mounting clamp (100) and is abutted against the lower plate surface on one side of the roof.
6. A roofing temporary guard rail according to claim 4, wherein: an inserting pipe (130) is arranged on the mounting clamp (100), the inserting pipe (130) is located on the outer side face of the groove bottom of the mounting clamp (100), and the inserting pipe (130) is vertical and perpendicular to the groove bottom of the mounting clamp (100).
7. A roofing temporary guard rail according to claim 5, wherein: the installation clamp (100) is provided with an insertion pipe (130), the insertion pipe (130) is arranged on the outer wall of a groove plate on one side of the installation clamp (100), and the insertion pipe (130) is vertical and is perpendicular to the groove plate on one side of the installation clamp (100).
8. A roofing temporary guard rail according to claim 6 or 7, wherein: upright posts (300) are arranged in the insertion pipe (130), and the stop rods (200) are arranged at intervals along the length direction of the upright posts (300).
9. The roofing temporary guard rail of claim 8, wherein: the combination position of shelves pole (200) and stand (300) is provided with the fastener, it is fixed through the fastener installation between shelves pole (200) and stand (300).
10. The roofing temporary guard rail of claim 8, wherein: be provided with installation sleeve pipe (310) on stand (300), be provided with fastening screw (320) on installation sleeve pipe (310), fastening screw (320) support with stand (300) and lean on, be provided with fixed slot (330) on installation sleeve pipe (310), the both ends card of shelves pole (200) is put in fixed slot (330).
CN202222466728.6U 2022-09-19 2022-09-19 Temporary protective railing for roof Active CN218346924U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222466728.6U CN218346924U (en) 2022-09-19 2022-09-19 Temporary protective railing for roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222466728.6U CN218346924U (en) 2022-09-19 2022-09-19 Temporary protective railing for roof

Publications (1)

Publication Number Publication Date
CN218346924U true CN218346924U (en) 2023-01-20

Family

ID=84917766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222466728.6U Active CN218346924U (en) 2022-09-19 2022-09-19 Temporary protective railing for roof

Country Status (1)

Country Link
CN (1) CN218346924U (en)

Similar Documents

Publication Publication Date Title
CN218346924U (en) Temporary protective railing for roof
CN114308976A (en) Special-shaped foundation pit dustproof canopy and installation and use method thereof
CN205637555U (en) A fixing device for coiling detain external safety net of formula scaffold frame
CN110714603A (en) Steel pipe and steel rope composite scaffold system and construction method thereof
CN212249150U (en) Scaffold gangboard
CN217001001U (en) Edge-facing regularization protection structure adaptable to different wall thicknesses
EP0168294A2 (en) Mounting post
CN210658139U (en) Road protective fence
CN209816653U (en) Guardrail for municipal bridge
CN220570186U (en) Building construction site cable is built on stilts and protective cradle
CN218623259U (en) Can splice formula scaffold frame design rail guard
CN214786573U (en) Safety protection device for building construction safety foundation pit
CN217353285U (en) Simple and reliable roof protection rail
CN216617155U (en) Steel construction safety protection rail base
CN217517608U (en) Steel sheet pile supported foundation pit limb enclosure structure
CN214740131U (en) Edge-facing guardrail convenient to mount
CN215760088U (en) Dedicated maintenance packway system of metal roofing
CN216740648U (en) Outer protector of high-rise building construction building body
CN216649126U (en) Make things convenient for combination ladder-type crane span structure of dismouting
CN211736468U (en) Guardrail bar is prevented to limit regularization by floor
CN216866063U (en) Building construction protective fence
CN219910126U (en) Safety protection fence
CN220377997U (en) Nonstandard fence piece suitable for field installation and use
CN213087390U (en) Improved generation climbs outer protector of frame
CN211647197U (en) Steel pipe and steel rope composite scaffold system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant