CN218323872U - Corner constructional column reinforced structure - Google Patents

Corner constructional column reinforced structure Download PDF

Info

Publication number
CN218323872U
CN218323872U CN202222777450.4U CN202222777450U CN218323872U CN 218323872 U CN218323872 U CN 218323872U CN 202222777450 U CN202222777450 U CN 202222777450U CN 218323872 U CN218323872 U CN 218323872U
Authority
CN
China
Prior art keywords
mould
splint
screw rod
constructional column
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222777450.4U
Other languages
Chinese (zh)
Inventor
王蓓蓓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222777450.4U priority Critical patent/CN218323872U/en
Application granted granted Critical
Publication of CN218323872U publication Critical patent/CN218323872U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a construction technical field specifically is a corner constructional column reinforced structure, including two wall bodies, be provided with first mould and second mould between two wall bodies, set up a plurality of first splint and a plurality of second splint on first mould and the second mould respectively, through first mould, the second mould, first splint, the cooperation of first pair of screw rod etc. be convenient for form between first mould and the second mould and pour the chamber, thereby be convenient for the staff uses the concrete to pour, through first pair of screw rod, the cooperation of first thread sleeve pipe etc. be convenient for quick to first mould, dismantle second mould etc. thereby be convenient for use common bolt on the market plug up first thread sleeve pipe and second thread sleeve pipe, make in the bolt screw gets into the concrete constructional column that solidifies, be convenient for improve the bulk strength of concrete constructional column, comparatively convenient and fast, the manpower has been practiced thrift, the practicality is higher.

Description

Corner constructional column reinforced structure
Technical Field
The utility model relates to a construction technical field specifically is a corner constructional column reinforced structure.
Background
As is well known, in modern society, the concrete construction industry has become mature, and a constructor can skillfully complete concrete construction work, and when the concrete construction work is performed, after the construction work of a wall body is completed, the construction work of a corresponding corner constructional column needs to be performed, and in order to smoothly complete the concrete pouring work of the corner constructional column, a corresponding formwork needs to be provided, and the formwork needs to be reinforced.
Through retrieval, the utility model with chinese patent publication (publication) No. CN216713921U discloses a corner constructional column reinforced structure, which is roughly described as comprising an aerated concrete block wall, a reinforced template, L-shaped angle molds, etc., when in use, although a concrete constructional column connecting the aerated concrete block walls can be poured into a pouring cavity, and the L-shaped angle molds are fixed between the aerated concrete block walls through a first pair of pulling screws, and peripheral plates are fixed between the aerated concrete block walls through a fixing mechanism; have the characteristics of being convenient for installation and dismantlement, can effectively improve corner constructional column template efficiency of construction, and have stronger stability, thereby improve concrete shaping quality, but it solidifies the back at the concrete constructional column, still need to pull screw rod and second to pulling the screw rod to dismantle to first pair, it can leave a plurality of holes on dismantling the concrete constructional column after accomplishing, the later stage still needs to fill these holes, its process is comparatively loaded down with trivial details, extravagant manpower, and the condition such as infiltration probably takes place still, consequently, above-mentioned structure practicality is relatively poor.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a corner constructional column reinforced structure to solve the prior art that proposes in the background art, after concrete constructional column solidifies, still need to pull screw rod and second to pulling the screw rod to dismantle to first pair, it can leave a plurality of holes on dismantling the concrete constructional column after accomplishing, the later stage still needs to fill these holes, its process is comparatively loaded down with trivial details, extravagant manpower, and the condition such as infiltration, the relatively poor problem of practicality probably takes place still.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a corner constructional column reinforced structure, includes two wall bodies, two be provided with first mould and second mould between the wall body, set up a plurality of first splint and a plurality of second splint on first mould and the second mould respectively, first splint and second splint draw screw rod threaded connection through two first pairs, first pair draws the screw rod to run through first mould and second mould, the equal threaded connection in both ends that first pair drawn the screw rod has first nut, first splint and second splint draw screw rod threaded connection through the second pair, the second pair draws the screw rod to run through first mould and second mould, the second pair draws the equal threaded connection in both ends of screw rod to have the second nut, the screw thread cover is equipped with first thread sleeve pipe on the screw rod is drawn to first pair, the second pair draws the screw rod to go up the thread cover and is equipped with second thread sleeve pipe.
Preferably, the first threaded sleeve is communicated with a first sleeve for accommodating a bolt cap.
Furthermore, a second sleeve for accommodating a bolt cap is communicated with the second threaded sleeve.
Still further, the both ends of first mould are first rubber strip of equal fixedly connected with.
Furthermore, both ends of the second mold are fixedly connected with second rubber strips.
On the basis of the scheme, the first clamping plates are mutually attached to the first mold, and the second clamping plates are mutually attached to the second mold.
(III) advantageous effects
Compared with the prior art, the utility model provides a corner constructional column reinforced structure possesses following beneficial effect:
this corner constructional column reinforced structure, through first mould, the second mould, first splint, the cooperation of first counter-pull screw rod etc. be convenient for form between first mould and the second mould and pour the chamber, thereby the staff of being convenient for uses the concrete to pour, through first counter-pull screw rod, the cooperation of first thread bush etc., be convenient for quick to first mould, dismantle second mould etc. to, thereby be convenient for use common bolt on the market plugs up first thread bush and second thread bush, make in the bolt screw thread gets into the concrete constructional column that solidifies, be convenient for improve the bulk strength of concrete constructional column, comparatively convenient and fast, the manpower has been practiced thrift, the practicality is higher.
Drawings
Fig. 1 is a partially sectional schematic view of a main view plane effect of the present invention;
fig. 2 is a schematic diagram of the plane effect of the first mold, the second mold, the first rubber strip and the like;
FIG. 3 is a schematic view of a portion of the enlarged structure of FIG. 1;
fig. 4 is a schematic diagram of a partial enlarged structure at B in fig. 1 according to the present invention.
In the figure: 1. a wall body; 2. a first mold; 3. a second mold; 4. a first splint; 5. a second splint; 6. a first counter-pulling screw; 7. a first nut; 8. a second pair of pull screws; 9. a second nut; 10. a first threaded bushing; 11. a second threaded bushing; 12. a first sleeve; 13. a second sleeve; 14. a first rubber strip; 15. a second rubber strip.
Detailed Description
Examples
Referring to fig. 1-4, a corner constructional column reinforcing structure comprises two walls 1, a first mold 2 and a second mold 3 are arranged between the two walls 1, the first mold 2 and the second mold 3 are respectively provided with a plurality of first clamping plates 4 and a plurality of second clamping plates 5, the first clamping plates 4 and the second clamping plates 5 are in threaded connection through two first counter-pulling screws 6, the first counter-pulling screws 6 penetrate through the first mold 2 and the second mold 3, both ends of the first counter-pulling screws 6 are in threaded connection with first nuts 7, the first clamping plates 4 and the second clamping plates 5 are in threaded connection through second counter-pulling screws 8, the second counter-pulling screws 8 penetrate through the first mold 2 and the second mold 3, both ends of the second counter-pulling screws 8 are in threaded connection with second nuts 9, a first threaded sleeve 10 is in threaded sleeve on the first counter-pulling screws 6, a second threaded sleeve 11 is in threaded sleeve on the second counter-pulling screws 8, the first threaded sleeve 10 is communicated with a first sleeve 12 for accommodating a bolt cap, a bolt cap for shielding and accommodating the bolt, a second sleeve 13 for accommodating the bolt cap is communicated with the second threaded sleeve 11, used for shielding and containing the bolt cap of the bolt, the two ends of the first die 2 are fixedly connected with first rubber strips 14, for preventing concrete from permeating out at the inner corners of the wall body 1 during pouring, the two ends of the second mould 3 are fixedly connected with second rubber strips 15, a carry out the centre gripping to first mould 2 and second mould 3 for preventing when pouring concrete permeates out in the external angle department of wall body 1, a plurality of first splint 4 all laminate each other with first mould 2, and a plurality of second splint 5 all laminate each other with second mould 3, and be convenient for better, the area is bigger, makes first mould 2 and the fixed more fastening of second mould 3.
In summary, the working principle and the working process of the corner constructional column reinforcing structure are that, when in use, the corner constructional column reinforcing structure is firstly placed at a place to be used, then, when in use, the first mold 2 is firstly attached to two walls, the first clamping plate 4 is attached to the first mold 2, then, the two first counter screw rods 6 are in threaded connection with the first clamping plate 4, the first counter screw rods 6 penetrate through the first mold 2, the first threaded sleeves 10 are in threaded connection with the first counter screw rods 6, then, the second counter screw rods 8 are in threaded connection, the second counter screw rods 8 penetrate through the first mold 2, the second threaded sleeves 11 are in threaded connection with the second counter screw rods 8, then, the second mold 3 is attached to the two walls 1, the second clamping plate 5 is also attached to the second mold 3, and when the first counter screw rods 6 and the second counter screw rods 8 are rotated, the concrete constructional column is made to penetrate through the second mould 3 and is in threaded connection with the second clamping plate 5, then the first nuts 7 are in threaded connection with the two ends of the first pair of pulling screws 6, the second nuts 9 are in threaded connection with the two ends of the second pair of pulling screws 8, so that the two wall bodies 1 can be tightly clamped by the first mould 2 and the second mould 3, then a worker can pour in a pouring cavity formed between the first mould 2 and the second mould 3, after the poured concrete constructional column is solidified, the steps are reversed to disassemble, and then the bolts purchased in the market or the customized bolts are used to be in threaded connection with the first threaded sleeve 10 and the second threaded sleeve 11, so that the water permeation at the position of the threaded sleeves is prevented, the concrete constructional column is reinforced, and the overall strength of the concrete constructional column is improved, when the device is used, the device is convenient for workers and saves manpower.

Claims (6)

1. The utility model provides a corner constructional column reinforced structure, includes two wall bodies (1), its characterized in that: two be provided with first mould (2) and second mould (3) between wall body (1), set up a plurality of first splint (4) and a plurality of second splint (5) on first mould (2) and second mould (3) respectively, first splint (4) and second splint (5) are through two first pair screw rod (6) threaded connection that draw, first pair draw screw rod (6) to run through first mould (2) and second mould (3), the equal threaded connection in both ends that first pair drawn screw rod (6) has first nut (7), first splint (4) and second splint (5) are through second pair screw rod (8) threaded connection, the second is to drawing screw rod (8) and running through first mould (2) and second mould (3), the second is to drawing the both ends of screw rod (8) and all threaded connection has second nut (9), first pair is drawn screw rod (6) to go up the screw thread cover and is equipped with first screw rod (10), the second is equipped with second sleeve pipe (8) screw thread cover.
2. A corner construction column reinforcing structure according to claim 1, wherein: the first threaded sleeve (10) is communicated with a first sleeve (12) for accommodating a bolt cap.
3. A corner construction column reinforcing structure according to claim 2, wherein: and a second sleeve (13) for accommodating a bolt cap is communicated with the second threaded sleeve (11).
4. A corner construction column reinforcing structure according to claim 3, wherein: and both ends of the first die (2) are fixedly connected with first rubber strips (14).
5. A corner construction column reinforcing structure according to claim 4, wherein: and both ends of the second die (3) are fixedly connected with second rubber strips (15).
6. A corner construction column reinforcing structure according to claim 5, wherein: a plurality of first splint (4) all laminate each other with first mould (2), and are a plurality of second splint (5) all laminate each other with second mould (3).
CN202222777450.4U 2022-10-20 2022-10-20 Corner constructional column reinforced structure Expired - Fee Related CN218323872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222777450.4U CN218323872U (en) 2022-10-20 2022-10-20 Corner constructional column reinforced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222777450.4U CN218323872U (en) 2022-10-20 2022-10-20 Corner constructional column reinforced structure

Publications (1)

Publication Number Publication Date
CN218323872U true CN218323872U (en) 2023-01-17

Family

ID=84826306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222777450.4U Expired - Fee Related CN218323872U (en) 2022-10-20 2022-10-20 Corner constructional column reinforced structure

Country Status (1)

Country Link
CN (1) CN218323872U (en)

Similar Documents

Publication Publication Date Title
CN208168368U (en) A kind of construction wall construction template connector
CN218323872U (en) Corner constructional column reinforced structure
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN217512810U (en) Water-soluble sand mandrel of serial-type
CN208633523U (en) A kind of large size cylinder reinforcing connector
CN213476636U (en) Preformed hole forming device and pouring mold
CN211967880U (en) Large die table die for plate type prefabricated part assembly line construction
CN213055291U (en) Adjustable mould of marking time of prefabricated staircase
CN213288579U (en) Combined casting die
CN221186942U (en) Concrete prefabricated component mould convenient to drawing of patterns
CN221697294U (en) Mould that prefabricated component processing was used
CN214725107U (en) Evaporate and press aerated concrete block and pour forming die
CN215094359U (en) Precast concrete mould demoulding structure
CN220377836U (en) Municipal administration lighting works hand hole well quick detach steel form structure
CN209907926U (en) Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column
CN221546385U (en) Concrete pouring semi-rigid opposite-pulling template in narrow demolding space
CN110465624A (en) A kind of the ultra-large type craft core mould and core-making method of V-type engine cylinder block
CN215202985U (en) Conveniently dismantle integrated formula plastic mould
CN211278953U (en) Splitting tensile method test concrete interlayer mechanical property's layering pouring mould
CN214687136U (en) Environment-friendly concrete well room forming device
CN220280005U (en) Prefabricated round pipe culvert mould
CN221087236U (en) Casting mold of bearing chamber
CN215319533U (en) Tubular pile stretch-draw lead screw fixing device
CN211369522U (en) Cast-in-place lightweight concrete non-bearing wall with aluminum template
CN216139121U (en) Mould fixing device is used in prefabricated component superimposed sheet production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230117