CN218292785U - Aluminum alloy template and plank sheathing are connected and hang mould department reinforcing apparatus and prop up and establish structure - Google Patents

Aluminum alloy template and plank sheathing are connected and hang mould department reinforcing apparatus and prop up and establish structure Download PDF

Info

Publication number
CN218292785U
CN218292785U CN202222665313.1U CN202222665313U CN218292785U CN 218292785 U CN218292785 U CN 218292785U CN 202222665313 U CN202222665313 U CN 202222665313U CN 218292785 U CN218292785 U CN 218292785U
Authority
CN
China
Prior art keywords
aluminum alloy
connecting piece
template
concrete structure
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222665313.1U
Other languages
Chinese (zh)
Inventor
黄发飞
刘曲波
贺振扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202222665313.1U priority Critical patent/CN218292785U/en
Application granted granted Critical
Publication of CN218292785U publication Critical patent/CN218292785U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an aluminum alloy template is connected with plank sheathing and hangs mould department reinforcing apparatus, it includes the reinforcement, the whole H type that is of reinforcement, it includes the rectangular pipe that two parallel intervals set up, the fixed a plurality of first connecting pieces that are provided with between two rectangular pipe inboards, both fix between the same side and be provided with a plurality of second connecting pieces, the center department of first connecting piece has been seted up and has been provided with the counter-pull screw rod to the counter-pull screw rod fixed orifices, the pole body cover to the counter-pull screw rod is equipped with tubaeform PVC sleeve pipe, tubaeform PVC sheathed tube both sides are provided with adjustable nut and square gasket respectively, the center department of second connecting piece is provided with the connection anchor bayonet lock. The utility model provides an aluminum alloy template and plank sheathing are connected and are hung mould department reinforcing apparatus and prop up and establish the structure, can effectively solve the roofing structure or time-consuming and labor-consuming when abnormal shape structure preparation aluminum alloy template and reduce the concrete placement cold joint and ensured the one-time fashioned problem of pouring of turning over on roofing structure.

Description

Aluminum alloy template and plank sheathing are connected and are hung mould department reinforcing apparatus and prop up and establish structure
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to an aluminum alloy template is connected with plank sheathing and is hung mould department reinforcing apparatus and prop up and establish the structure, be applicable to the template and prop up and establish the in-process and receive the nonstandard layer aluminum mould board size restriction, parapet department and hang the mould and prop up the circumstances such as establish the difficulty.
Background
The building industry in China is developed rapidly, city development in various regions requires that construction period is urgent and quality requirements are high, and in order to guarantee the waterproof effect of a roof structure, when a roof structure template is erected, an aluminum alloy template cannot completely cover the roof structure, or the aluminum alloy template in a special-shaped structure position is difficult to manufacture and erect, and higher requirements are provided for the integrity and flexibility of template erection. The existing formwork erection conditions and technologies mainly adopt methods such as secondary forming of a roof structure or erection of a non-standard aluminum alloy formwork, and the like, and usually have the following defects: when erecting roofing structure or abnormal shape structure position template, if adopt the aluminum alloy template to have unable complete coverage usually, erect the problem of difficulty, its waterproof effect who goes out roofing structure and abnormal shape structure department of secondary casting shaping will receive the influence, will cause construction cold joint or increase the construction joint, influence concrete quality, even if can use the aluminum alloy template to carry out the template and erect work, its disposable use consumes highly, installation and reinforcement cost time and labor, be unfavorable for economic benefits, and easily cause the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
To the defect that exists among the above-mentioned background art, the utility model provides an aluminum alloy template is connected with plank sheathing and is hung mould department reinforcing apparatus and prop up and establish the structure, can effectively solve the roof structure or the special shaped structure when making aluminum alloy template waste time and work a lot of and reduce the concrete placement cold joint and ensured the one-time fashioned problem of pouring of turning over on of roof structure.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model relates to an aluminum alloy template and plank sheathing are connected and are hung mould department reinforcing apparatus, it includes the reinforcement, the whole H type that is of reinforcement, it includes the rectangular pipe that two parallel intervals set up, the fixed a plurality of first connecting pieces that are provided with between two rectangular pipe inboards, both fix between the same side and be provided with a plurality of second connecting pieces, the center department of first connecting piece has been seted up and has been provided with the counter-pull screw rod fixed orifices and be provided with the counter-pull screw rod, the pole body cover of counter-pull screw rod is equipped with tubaeform PVC sleeve pipe, tubaeform PVC sheathed tube both sides are provided with adjustable nut and square gasket respectively, the center department of second connecting piece is provided with the connection anchor bayonet lock.
Further, the rectangular pipe is an aluminum alloy rectangular pipe.
Further, the first connecting piece and the second connecting piece are both made of C-shaped channel steel.
The erecting structure of the reinforcing device at the position, where the aluminum alloy template and the wood template are connected and the suspended mold, comprises a concrete structure entity, wherein the aluminum alloy template is arranged on the outer side of the lower part of the concrete structure entity; the reinforced member is arranged on the outer side of the concrete structure entity, square timber is arranged between the reinforced member and the faced glued wooden template, counter-pull screws on the reinforced member respectively penetrate through counter-pull screw fixing holes in the first connecting member, the faced glued wooden template and the concrete structure entity, the outer sides of the first connecting member and the faced glued wooden template on the inner side of the concrete structure entity are respectively screwed and fixed through square gaskets and adjustable nuts, and the horn-shaped PVC sleeve is arranged inside the concrete structure entity; the top of the aluminum alloy template is L-shaped and is fixedly connected with a connecting anchoring bayonet lock on the second connecting piece; the concrete structure solid body inside cladding veneer timber formwork outside is provided with the square timber, is provided with regularization anchor clamps between the rectangular pipe outside of this square timber and reinforcement.
Compared with the prior art, an aluminum alloy template and plank sheathing are connected and are hung mould department reinforcing apparatus and prop up and establish the structure and possess following beneficial effect:
(1) The utility model has novel design, reasonable structure, convenient manufacture and repeated use, and can effectively solve the potential safety hazard in the process of dismounting and using the aluminum alloy template;
(2) The utility model makes full use of the material characteristics of the aluminum alloy, is convenient to use when supporting and removing the formwork, is convenient to split and assemble, can be operated by only 1 person, effectively avoids the limitation and high cost of the application of the aluminum alloy formwork in the position of a roof structure or a special-shaped structure, and effectively saves the construction period and labor cost;
(3) The utility model discloses can solve its water-proof effects who goes out roofing structure and abnormal shape structure department of secondary casting shaping and receive the influence, cause construction cold joint or increase the construction joint, influence structure waterproof performance scheduling problem, ensure the quality of upturning waterproof construction engineering.
Drawings
FIG. 1 is a schematic vertical plane view of a reinforcing device at a mold hanging position where an aluminum alloy mold plate and a wood mold plate are connected.
FIG. 2 is a schematic cross-sectional view of a reinforcing device at a position where an aluminum alloy template and a wood template are connected and suspended.
FIG. 3 is a schematic diagram of the use of an adjustable split screw set in a reinforcing device at the connection of an aluminum alloy template and a wood template and at a hanging mold.
FIG. 4 is a diagram showing the effect of the reinforcing device at the connection hanging position of the aluminum alloy template and the wood template in the template erecting process.
In the figure: 1. a reinforcement; 2. connecting and anchoring the bayonet lock; 3. a square gasket; 4. an adjustable nut; 5. a horn-shaped PVC sleeve; 6. oppositely pulling the screw rod; 7. a fixing hole of the opposite-pulling screw rod; 8. concrete structure solid; 9. square wood; 10. covering and gluing the wood template; 11. shaping a clamp; 12. an aluminum alloy template; 13. a rectangular tube; 14. a first connecting member; 15. a second connecting member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Unless defined otherwise, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this disclosure belongs. The terms "upper", "lower", "left", "right", "front", "rear", "inner", "outer" and the like used in the specification and claims of the present disclosure are used only to indicate relative positional relationships, and when the absolute position of a described object is changed, the relative positional relationships are changed accordingly. The parts of the present invention not described in detail are the known techniques of those skilled in the art.
Example 1:
as shown in fig. 1-4, the device for reinforcing the connection between an aluminum alloy formwork and a wooden formwork at a formwork hanging position of the present invention comprises a reinforcing member 1, wherein the reinforcing member 1 is integrally H-shaped and comprises two rectangular tubes 13 arranged in parallel at intervals, and the rectangular tubes 13 can be aluminum alloy rectangular tubes, so that the device is light in weight and convenient to carry and use; the welding is provided with a plurality of first connecting pieces 14 between two rectangular pipe 13 inboards, and both are provided with a plurality of second connecting pieces 15 with the welding between the side, first connecting piece 14 and second connecting piece 15 can adopt C type channel steel to make and form, and the center department of first connecting piece 14 has been seted up and has been provided with split screw rod fixed orifices 7 and be provided with split screw rod 6, and the pole body cover of split screw rod 6 is equipped with tubaeform PVC sleeve pipe 5, and tubaeform PVC sleeve pipe 5's both ends are the horn type, and its length can be when formwork, the width size customization of concreting effectively improves the shutoff quality to the split bolt hole, and tubaeform PVC sleeve pipe 5's both sides are provided with adjustable nut 4 and square gasket 3 respectively, and the center department of second connecting piece 15 has seted up the bolt hole and is provided with and connects anchor bayonet lock 2.
Example 2:
embodiment 1 a structure is established in propping up of aluminum alloy template and wooden template connection hanging mould department reinforcing apparatus, including concrete structure entity 8, the concrete structure entity 8 lower part outside is provided with aluminum alloy template 12, its characterized in that: the concrete structure solid body 8 is characterized in that cladding plywood templates 10 are respectively arranged on two sides of the upper part of the concrete structure solid body 8, the reinforcing member 1 is arranged on the outer side of the concrete structure solid body 8, square timber 9 is arranged between the reinforcing member and the cladding plywood templates 10, counter-pull screws 6 on the reinforcing member respectively penetrate through counter-pull screw fixing holes 7 on first connecting pieces 14, the cladding plywood templates 10 and the concrete structure solid body 8, the outer sides of the first connecting pieces 14 and the cladding plywood templates 10 on the inner side of the concrete structure solid body 8 are respectively screwed and fixed through square gaskets 3 and adjustable nuts 4, and the horn-shaped PVC sleeve 5 is arranged inside the concrete structure solid body 8; the top of the aluminum alloy template 12 is L-shaped and is fixedly connected with the connecting anchor bayonet lock 2 on the second connecting piece 15; the outer side of a cladding glued wood template 10 on the inner side of the concrete structure entity 8 is provided with square timber 9, and a sizing clamp 11 is arranged between the square timber 9 and the outer side of a rectangular pipe 13 of the reinforcing member 1.
When the aluminum alloy template and the wooden template are connected, the template hanging reinforcing device and the erecting structure are constructed, the installation and use method comprises the following steps:
the method comprises the following steps: preparation for assembly
A1, fixing a reinforcing piece 1 (the inner sides of two rectangular pipes 13 made of aluminum alloy are fixed by utilizing the side edges of two sections of C-shaped channel steels in the middle (namely a first connecting piece 14) in a welding mode, wherein the first connecting piece 14 is provided with a counter-pulling screw fixing hole 7, the side surfaces of the two rectangular pipes 13 made of aluminum alloy are welded with the C-shaped channel steels on the same side (namely a second connecting piece 15), the second connecting piece 15 is provided with a connecting anchoring bayonet lock 2, the reinforcing piece 1 is integrally H-shaped, a horn-shaped PVC sleeve 5, a square gasket 3, a counter-pulling screw 6 with adjustable length, anchoring bayonet locks 2 connected at different media and the like, and the anchoring bayonet locks are carried by workers to a formwork erecting site at the position where an aluminum alloy formwork and a wood formwork are connected with a hanging formwork, and the number and the arrangement interval of reinforcing device groups are selected according to the erecting height and the width of the hanging formwork;
a2, aligning the fixed bolt hole on the second connecting piece with the pin reinforcing hole position on the aluminum alloy template 12, connecting the anchoring bayonet lock 2 at different medium positions to penetrate through the upper hole and the lower hole, and fixing the connecting anchoring bayonet lock 2 by using a small hammer to ensure that the connecting anchoring bayonet lock is not deviated;
step two: use in formwork erecting process
B1, before the formwork is erected, selecting horn-shaped PVC sleeves 5 with different lengths which are matched with the erected hanging formwork according to the width of the cross section of the hanging formwork, and fixing the sleeves in a cladding glued wood formwork 10 used by the hanging formwork by using counter-pulling screws 6 with adjustable lengths so as to ensure the width of the cross section in the erecting process of the hanging formwork;
b2, when the hanging formwork is erected, 1 worker pushes the opposite-pulling screw 6 to penetrate through an opposite-pulling screw fixing hole 7 of the reinforcing piece 1 welded with C-shaped channel steel (a first connecting piece 14) in the middle, meanwhile, the opposite-pulling screw is firmly fixed and clamped at two sides by using a square gasket 3 and an adjustable nut 4 so as not to displace, then, the square timber 9, a sizing clamp 11 and the like are used for further fixing, and then, concrete is poured;
step three: finishing and collecting of template demolition after concrete pouring
C1, after the concrete is formed and the strength of a detachable mold is achieved, the sizing clamp 11 is removed, the adjustable nuts 4 and the square gaskets 3 on the split screws 6 on the side edges of the reinforcing piece 1 are loosened, so that the split screws 6 with adjustable lengths are in a free state and are pulled out from the other side;
c2, connecting different media between each reinforcing member 1 and the aluminum alloy template 12 with the anchoring bayonet lock 2, withdrawing, dismounting the reinforcing members 1, and taking away by a mould dismounting worker after all finishing.

Claims (4)

1. The utility model provides an aluminum alloy template and plank sheathing are connected and are hung mould department reinforcing apparatus which characterized in that: it includes reinforcement (1), reinforcement (1) wholly is the H type, it includes rectangular pipe (13) that two parallel intervals set up, fixed a plurality of first connecting piece (14) of being provided with between two rectangular pipe (13) inboards, both are fixed between the same side and are provided with a plurality of second connecting piece (15), the center department of first connecting piece (14) has been seted up and has been counterpully drawn screw rod fixed orifices (7) and be provided with counterpully drawn screw rod (6), the pole body cover of counterpully drawn screw rod (6) is equipped with tubaeform PVC sleeve pipe (5), the both sides of tubaeform PVC sleeve pipe (5) are provided with adjustable nut (4) and square gasket (3) respectively, the center department of second connecting piece (15) is provided with and connects anchor bayonet lock (2).
2. The aluminum alloy formwork and wood formwork connecting formwork hanging reinforcing device of claim 1, characterized in that: the rectangular pipe (13) is made of aluminum alloy.
3. The aluminum alloy formwork and wood formwork connecting formwork hanging reinforcing device of claim 1, characterized in that: the first connecting piece (14) and the second connecting piece (15) are both made of C-shaped channel steel.
4. A supporting structure of a reinforcing device at the position of a hanging mould for connecting an aluminum alloy template and a wooden template according to any one of claims 1 to 3, including concrete structure entity (8), concrete structure entity (8) lower part outside is provided with aluminum alloy template (12), its characterized in that: two sides of the upper part of the concrete structure solid (8) are respectively provided with a surface-covering glued wooden template (10), the reinforcing member (1) is arranged on the outer side of the concrete structure solid (8), a square timber (9) is arranged between the reinforcing member and the surface-covering glued wooden template (10), a counter-pull screw (6) on the reinforcing member passes through a counter-pull screw fixing hole (7) on a first connecting piece (14), the surface-covering glued wooden template (10) and the concrete structure solid (8) respectively, the outer side of the first connecting piece (14) and the outer side of the surface-covering glued wooden template (10) on the inner side of the concrete structure solid (8) are screwed and fixed through a square gasket (3) and an adjustable nut (4) respectively, and the horn-shaped PVC sleeve (5) is arranged inside the concrete structure solid (8); the top of the aluminum alloy template (12) is L-shaped and is fixedly connected with a connecting anchoring bayonet lock (2) on a second connecting piece (15); the concrete structure solid body (8) is characterized in that square timber (9) is arranged on the outer side of the cladding glued wooden template (10) on the inner side of the concrete structure solid body (8), and a sizing clamp (11) is arranged between the square timber (9) and the outer side of the rectangular pipe (13) of the reinforcing member (1).
CN202222665313.1U 2022-10-10 2022-10-10 Aluminum alloy template and plank sheathing are connected and hang mould department reinforcing apparatus and prop up and establish structure Active CN218292785U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222665313.1U CN218292785U (en) 2022-10-10 2022-10-10 Aluminum alloy template and plank sheathing are connected and hang mould department reinforcing apparatus and prop up and establish structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222665313.1U CN218292785U (en) 2022-10-10 2022-10-10 Aluminum alloy template and plank sheathing are connected and hang mould department reinforcing apparatus and prop up and establish structure

Publications (1)

Publication Number Publication Date
CN218292785U true CN218292785U (en) 2023-01-13

Family

ID=84807979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222665313.1U Active CN218292785U (en) 2022-10-10 2022-10-10 Aluminum alloy template and plank sheathing are connected and hang mould department reinforcing apparatus and prop up and establish structure

Country Status (1)

Country Link
CN (1) CN218292785U (en)

Similar Documents

Publication Publication Date Title
CN101368444B (en) Novel profiled bar and wood combination type door, window shaping template and its installation method
CN103161309A (en) Narrow deformation joint inner side template installation and construction method
CN110630011A (en) Template reinforcing system for double shear walls at deformation joint and construction method thereof
CN110778105A (en) Clear water formwork and construction process thereof
CN210976588U (en) Template reinforcing system for double shear walls at deformation joint
CN104153573B (en) V-type cylinder concrete pour mould and construction method
CN108086674A (en) A kind of roof boarding hangs the construction method of mould and roof boarding
CN207813019U (en) A kind of UHPC non-dismantling formworks of casting concrete column
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN113152893A (en) Template for building construction and using method
CN218292785U (en) Aluminum alloy template and plank sheathing are connected and hang mould department reinforcing apparatus and prop up and establish structure
CN211286638U (en) Aluminum alloy template outer wall K board reinforcing apparatus for building
CN211369523U (en) Template system of expansion joint shear force wall
CN213597494U (en) Ultra-large type reinforced structure for steel concrete beam side mould
CN204081482U (en) V-type cylinder transposition section concreting mould
CN208396295U (en) A kind of open-cut station construction stair formwork erecting structure
CN113668849A (en) Post-cast strip pouring equipment and construction method thereof
CN217420503U (en) Tool type cast-in-place beam formwork system
CN113090025A (en) Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure
CN218758706U (en) A template system of consolidating for superimposed sheet post-cast strip construction
CN217734809U (en) Quick-mounting disassembly-free wall connecting piece and scaffold device
CN111424972A (en) Method and structure for reinforcing ultra-large type steel concrete beam side mold
CN210622327U (en) Concrete pouring and tamping construction device for reinforced dense beam column joints
CN210508406U (en) External hoop integral drawknot type cylindrical frame beam supporting device
CN111002432A (en) Prefabricated constructional column template and using method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant