CN218292564U - Additional prefabricated pipe lifting and transferring device of excavator bucket - Google Patents
Additional prefabricated pipe lifting and transferring device of excavator bucket Download PDFInfo
- Publication number
- CN218292564U CN218292564U CN202222415755.0U CN202222415755U CN218292564U CN 218292564 U CN218292564 U CN 218292564U CN 202222415755 U CN202222415755 U CN 202222415755U CN 218292564 U CN218292564 U CN 218292564U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- fixedly connected
- arc surface
- suspender
- center post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model belongs to the technical field of municipal engineering, in particular to an additional prefabricated pipe lifting and transferring device of an excavator bucket, which comprises a wallboard, wherein a supporting device is arranged on the surface of the wallboard, the supporting device comprises a central column, the central column is fixedly connected with the surface of the wallboard, two inclined struts are fixedly connected with the arc surface of the central column, and a hanging opening is formed in the surface of the wallboard; through setting up strutting arrangement, constructor safety is from top to bottom in having solved the work progress, the installation is loaded down with trivial details, dangerous big problem, the artifical suspender of wearing when avoiding the project to carry out prefabricated pipe erection in the past, it is inconvenient to demolish the suspender, especially the process of untiing the suspender causes wearing and tearing to the suspender easily, the suspender fracture appears causing the condition of potential safety hazard to supplementary hoist and mount workman after wearing and tearing for a long time, prefabricated pipe hoist and mount progress has been accelerated, the installation effectiveness has been improved, the installation quality has effectively been promoted, a large amount of supplementary cost of labor have been practiced thrift.
Description
Technical Field
The utility model relates to a municipal works technical field specifically is an additional prefabricated tubular product of digging machine scraper bowl plays to rise transfer device.
Background
Municipal works refer to municipal infrastructure construction works, and prefabricated pipelines are often required to be installed in municipal engineering projects.
When the prefabricated pipeline is installed in the past, the hanging strip is generally adopted to penetrate into the prefabricated pipeline and then the prefabricated pipe is lifted and installed, the way of manually penetrating and dismounting the hanging strip is inconvenient, particularly, the hanging strip is easily abraded in the process of unfastening the hanging strip, and after long-time abrasion, the hanging strip is broken, so that potential safety hazards are caused to auxiliary lifting workers; therefore, the additional prefabricated pipe lifting and transferring device for the excavator bucket is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
In order to compensate prior art's not enough, when having solved the project and carrying out prefabricated piping erection in the past, generally adopt the suspender to wear to lift by crane installation prefabricated pipe behind the prefabricated pipeline, the suspender is worn, demolish to the suspender inconvenient to this mode manual work, especially unties the process of suspender and causes wearing and tearing to the suspender easily, and the suspender fracture causes the problem of potential safety hazard to supplementary hoist and mount workman from coming after wearing and tearing for a long time, the utility model provides an additional prefabricated tubular product of digging machine scraper bowl plays to rise transfer device.
The utility model provides a technical scheme that its technical problem adopted is: a dig additional prefabricated tubular product of quick-witted scraper bowl and play to rise transfer device, including the wallboard, the surface of wallboard is equipped with strutting arrangement, strutting arrangement includes the center post, the fixed surface of center post and wallboard is connected, two bracings of the arc surface fixedly connected with of center post, the mouth of hanging has been seted up on the surface of wallboard, the internal surface sliding connection of hanging the mouth has the couple, through setting up strutting arrangement, has solved constructor safety about in the work progress, the loaded down with trivial details, dangerous big problem of installation, the artifical suspender of wearing when avoiding the project to carry out prefabricated pipe installation in the past, demolish the suspender inconvenient, especially untie the process of suspender and cause wearing and tearing to the suspender easily, long-time wearing and tearing back suspender fracture from coming to the condition that leads to the fact the potential safety hazard to supplementary hoist and mount workman appears for prefabricated pipe hoist and mount progress, improved the installation effectiveness, effectively promoted installation quality, practiced thrift a large amount of supplementary cost of labor.
Preferably, the auxiliary hole has been seted up on the surface of wallboard, the internal surface sliding connection in wallboard auxiliary hole has the chain, the one end fixedly connected with U type card of chain, the one end fixedly connected with stopper of U type card is kept away from to the chain, and after hanging the hook card in hang mouthful, through being connected U type card with digging machine relieving, the condition of getting in touch follow wallboard break away from appears when using the wallboard.
Preferably, the surface of the limiting block is provided with a limiting hole, the lower surface of the wallboard is fixedly connected with a supporting plate, a screw rod is inserted into the inner thread of the supporting plate, the screw rod is close to one end of the limiting block and fixedly connected with a limiting rod, the size of the limiting rod is matched with that of the limiting hole of the limiting block, the limiting block is pulled to enable the limiting block to drive a chain to slide in the auxiliary hole of the wallboard and enable the chain to be tightened, the screw rod is rotated in the supporting plate by rotating the screw rod, the screw rod drives the limiting rod to move to enable the limiting rod to be inserted into the limiting hole of the limiting block, and the device is in a stable installation state.
Preferably, the arc surface of center post is equipped with stop device, stop device includes the slipmat, the slipmat is with the arc surface sliding connection of center post, the arc surface fixedly connected with dead lever of center post, the arc surface sliding connection of dead lever has the slide, the slide is close to one side fixedly connected with inserted bar of slipmat, the jack has been seted up to the arc surface of slipmat, the slot has been seted up to the arc surface of center post, the arc surface cover of dead lever has the spring, the both ends of spring respectively with center post and slide fixed connection, through setting up stop device, avoided when transporting prefabricated pipeline to take place to slide with the center post and lead to the condition appearance that prefabricated pipeline breaks away from the center post, improved the stability of device.
Preferably, the dead lever is kept away from the one end fixedly connected with stop block of center post, the size of inserted bar and the size looks adaptation of slipmat jack and center post slot, pulling slide makes the slide on the dead lever, carries on spacingly through stop block to the slide, avoids the condition that the slide breaks away from the dead lever to appear.
Preferably, the arc surface fixedly connected with two locating racks of center post, the size of locating rack and the size looks adaptation of slipmat, when installing the slipmat, through supporting the slipmat in the locating rack, reached the effect that the inserted bar carries out the counterpoint with the jack of slipmat convenient to.
The utility model discloses an useful part lies in:
the utility model discloses a set up strutting arrangement, constructor safety is from top to bottom in having solved the work progress, the installation is loaded down with trivial details, dangerous big problem, the artifical suspender of wearing when avoiding the project to carry out prefabricated piping erection in the past, it is inconvenient to demolish the suspender, especially the process of untiing the suspender causes wearing and tearing to the suspender easily, the suspender fracture appears from the condition that comes to lead to the fact the potential safety hazard to supplementary hoist and mount workman after long-time wearing and tearing, prefabricated pipe hoist and mount progress has been accelerated, the installation effectiveness has been improved, the installation quality has effectively been promoted, a large amount of supplementary cost of labor have been practiced thrift.
The utility model discloses a set up stop device, avoided when transporting prefabricated pipeline to take place to slide with the center post and lead to the condition appearance that prefabricated pipeline breaks away from the center post, improved the stability of device.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a side view of the present invention;
fig. 3 is a schematic structural view of the supporting device of the present invention;
fig. 4 is a schematic view of a partial structure of the supporting device of the present invention;
fig. 5 is a schematic structural view of the middle stop device of the present invention.
In the figure: 1. wall plates; 2. a support device; 201. a central column; 202. bracing; 203. a hanging port; 204. hooking; 205. a chain; 206. a U-shaped card; 207. a limiting block; 208. a support plate; 209. a screw; 210. a limiting rod; 3. a limiting device; 31. a non-slip mat; 32. fixing the rod; 33. a slide plate; 34. inserting a rod; 35. a spring; 36. blocking; 37. a positioning frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-5, the additional prefabricated pipe lifting and transferring device for the excavator bucket comprises a wall plate 1, a supporting device 2 is arranged on the surface of the wall plate 1, the supporting device 2 comprises a central column 201, the central column 201 is fixedly connected with the surface of the wall plate 1, two inclined struts 202 are fixedly connected to the arc surface of the central column 201, a hanging opening 203 is formed in the surface of the wall plate 1, and a hook 204 is slidably connected to the inner surface of the hanging opening 203; the during operation, through setting up strutting arrangement 2, constructor safety is from top to bottom in having solved the work progress, the installation is loaded down with trivial details, dangerous big problem, the artifical suspender of wearing when avoiding the project to carry out prefabricated pipe erection in the past, it is inconvenient to demolish the suspender, especially the process of untiing the suspender causes wearing and tearing to the suspender easily, the suspender fracture appears causing the condition of potential safety hazard to supplementary hoist and mount workman after wearing and tearing for a long time, prefabricated pipe hoist and mount progress has been accelerated, the installation effectiveness has been improved, the installation quality has effectively been promoted, a large amount of supplementary cost of labor have been practiced thrift.
An auxiliary hole is formed in the surface of the wall plate 1, a chain 205 is connected to the inner surface of the auxiliary hole of the wall plate 1 in a sliding manner, a U-shaped clamp 206 is fixedly connected to one end of the chain 205, and a limiting block 207 is fixedly connected to one end, far away from the U-shaped clamp 206, of the chain 205; in operation, after the hook 204 is clamped in the hanging opening 203, the U-shaped clamp 206 is connected with the shovel teeth of the excavator, so that the situation that the hook 204 is separated from the wall plate 1 when the wall plate 1 is used is avoided.
A limiting hole is formed in the surface of the limiting block 207, a supporting plate 208 is fixedly connected to the lower surface of the wall plate 1, a screw 209 is inserted into the internal thread of the supporting plate 208, a limiting rod 210 is fixedly connected to one end, close to the limiting block 207, of the screw 209, and the size of the limiting rod 210 is matched with the size of the limiting hole of the limiting block 207; when the device works, the limiting block 207 is pulled to enable the limiting block 207 to drive the chain 205 to slide in the auxiliary hole of the wall plate 1 and enable the chain 205 to be tightened, the screw 209 is rotated to enable the screw 209 to rotate in the supporting plate 208, the screw 209 drives the limiting rod 210 to move to enable the limiting rod 210 to be inserted into the limiting hole of the limiting block 207, and the device is in a stable installation state.
The arc surface of the central column 201 is provided with a limiting device 3, the limiting device 3 comprises an anti-slip pad 31, the anti-slip pad 31 is connected with the arc surface of the central column 201 in a sliding manner, the arc surface of the central column 201 is fixedly connected with a fixing rod 32, the arc surface of the fixing rod 32 is connected with a sliding plate 33 in a sliding manner, one side, close to the anti-slip pad 31, of the sliding plate 33 is fixedly connected with an inserting rod 34, the arc surface of the anti-slip pad 31 is provided with an inserting hole, the arc surface of the central column 201 is provided with an inserting groove, the arc surface of the fixing rod 32 is sleeved with a spring 35, and two ends of the spring 35 are respectively fixedly connected with the central column 201 and the sliding plate 33; during operation, through setting up stop device 3, avoided when transporting prefabricated pipeline to take place to slide with center post 201 and lead to the condition appearance that prefabricated pipeline breaks away from center post 201, improved the stability of device.
One end of the fixing rod 32 far away from the central column 201 is fixedly connected with a stop block 36, and the size of the inserted rod 34 is matched with the size of the insertion hole of the non-slip mat 31 and the size of the insertion groove of the central column 201; when the sliding plate 33 is pulled to slide on the fixed rod 32, the sliding plate 33 is limited by the stop block 36, and the sliding plate 33 is prevented from being separated from the fixed rod 32.
The arc surface of the central column 201 is fixedly connected with two positioning frames 37, and the size of the positioning frames 37 is matched with that of the anti-skid pad 31; during operation, when the anti-slip mat 31 is installed, the anti-slip mat 31 is abutted to the positioning frame 37, so that the effect of conveniently aligning the insertion rod 34 with the insertion hole of the anti-slip mat 31 is achieved.
The working principle is that when the wallboard 1 needs to be installed, the hook 204 is fixed on the bucket, the hook 204 penetrates through the hanging opening 203 and is clamped by the dead weight of the wallboard 1, after the hook 204 is clamped in the hanging opening 203, the U-shaped clamp 206 is connected with the shovel teeth of the excavator, the limiting block 207 is pulled to drive the chain 205 to slide in the auxiliary hole of the wallboard 1 and tighten the chain 205, the screw 209 is rotated to rotate the screw 209 in the supporting plate 208, the screw 209 drives the limiting rod 210 to move to insert the limiting rod 210 into the limiting hole of the limiting block 207, so that the device is in a stable installation state, the effect of installing the wallboard 1 is achieved at the moment, when the prefabricated pipeline needs to be transported, inject center post 201 in the prefabricated pipeline, dig slowly rise after the machine inwards declines and rise wallboard 1, through center post 201 with prefabricated pipeline safety shift to waiting the construction region hoist and mount prefabricated pipeline, constructor safety is about having solved in the work progress, the installation is loaded down with trivial details, dangerous big problem, the artifical suspender of wearing when avoiding the project to carry out prefabricated pipe erection in the past, it is inconvenient to demolish the suspender, especially the process of untiing the suspender causes wearing and tearing to the suspender easily, the fracture of suspender appears from the condition that leads to the fact the potential safety hazard to supplementary hoist workman after wearing and tearing for a long time, prefabricated pipe hoist and mount progress has been accelerated, the installation effectiveness has been improved, the installation quality has been effectively promoted, a large amount of supplementary cost of labor have been practiced thrift.
When the anti-skid pad 31 needs to be disassembled, the sliding plate 33 is pulled to enable the sliding plate 33 to slide on the fixing rod 32 and stretch the spring 35, the sliding plate 33 is limited through the blocking block 36, the situation that the sliding plate 33 is separated from the fixing rod 32 is avoided, the sliding plate 33 drives the inserting rod 34 to move, the anti-skid pad 31 is slid out of the central column 201 until the inserting rod 34 is separated from the jack of the anti-skid pad 31 and the slot of the central column 201, the disassembling effect of the anti-skid pad 31 is achieved at the moment, the anti-skid pad 31 is convenient to replace, when the anti-skid pad 31 is installed, the anti-skid pad 31 is abutted to the positioning frame 37, the effect that the inserting rod 34 and the jack of the anti-skid pad 31 are convenient to align is achieved, the anti-skid pad 31 is in contact with a prefabricated pipeline, the situation that the prefabricated pipeline is separated from the central column 201 due to sliding of the central column 201 when the prefabricated pipeline is transported is avoided, and the stability of the device is improved.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed.
Claims (6)
1. The utility model provides an additional prefabricated tubular product of excavator scraper bowl plays to rise transfer device, includes wallboard (1), its characterized in that: the surface of wallboard (1) is equipped with strutting arrangement (2), strutting arrangement (2) include center post (201), the fixed surface of center post (201) and wallboard (1) is connected, the arc surface fixedly connected with two bracing (202) of center post (201), hang mouth (203) have been seted up on the surface of wallboard (1), the internal surface sliding connection of hanging mouth (203) has couple (204).
2. The additional prefabricated pipe lifting and transferring device for the excavator bucket as claimed in claim 1, wherein the device comprises: the auxiliary hole has been seted up on the surface of wallboard (1), the internal surface sliding connection in auxiliary hole of wallboard (1) has chain (205), the one end fixedly connected with U type card (206) of chain (205), the one end fixedly connected with stopper (207) of U type card (206) are kept away from in chain (205).
3. The additional prefabricated pipe lifting and transferring device of the excavator bucket as claimed in claim 2, wherein: spacing hole has been seted up on the surface of stopper (207), the lower fixed surface of wallboard (1) is connected with backup pad (208), backup pad (208) internal thread is inserted and is equipped with screw rod (209), one end fixedly connected with gag lever post (210) that screw rod (209) are close to stopper (207), the size of gag lever post (210) and the size looks adaptation in the spacing hole of stopper (207).
4. The additional prefabricated pipe lifting and transferring device of the excavator bucket as claimed in claim 1, wherein: the arc surface of center post (201) is equipped with stop device (3), stop device (3) include slipmat (31), slipmat (31) and the arc surface sliding connection of center post (201), the arc surface fixedly connected with dead lever (32) of center post (201), the arc surface sliding connection of dead lever (32) has slide (33), one side fixedly connected with inserted bar (34) that slide (33) are close to slipmat (31), the jack has been seted up to the arc surface of slipmat (31), the slot has been seted up to the arc surface of center post (201), the arc surface cover of dead lever (32) has spring (35), the both ends of spring (35) respectively with center post (201) and slide (33) fixed connection.
5. The additional prefabricated pipe lifting and transferring device of the excavator bucket as claimed in claim 4, wherein: one end of the fixing rod (32) far away from the central column (201) is fixedly connected with a stop block (36), and the size of the inserting rod (34) is matched with the size of the inserting hole of the anti-skid pad (31) and the size of the inserting groove of the central column (201).
6. The additional prefabricated pipe lifting and transferring device of the excavator bucket as claimed in claim 5, wherein: the arc surface of the central column (201) is fixedly connected with two positioning frames (37), and the size of the positioning frames (37) is matched with that of the anti-skid pad (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222415755.0U CN218292564U (en) | 2022-09-13 | 2022-09-13 | Additional prefabricated pipe lifting and transferring device of excavator bucket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222415755.0U CN218292564U (en) | 2022-09-13 | 2022-09-13 | Additional prefabricated pipe lifting and transferring device of excavator bucket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218292564U true CN218292564U (en) | 2023-01-13 |
Family
ID=84813362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222415755.0U Active CN218292564U (en) | 2022-09-13 | 2022-09-13 | Additional prefabricated pipe lifting and transferring device of excavator bucket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218292564U (en) |
-
2022
- 2022-09-13 CN CN202222415755.0U patent/CN218292564U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218292564U (en) | Additional prefabricated pipe lifting and transferring device of excavator bucket | |
CN209873584U (en) | Hang basket template and demolish device | |
KR200476754Y1 (en) | An excavator having removable forefinger | |
CN107161879B (en) | Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane | |
CN207599140U (en) | A kind of descending pipelines into ditch device | |
CN216889686U (en) | Prestressed concrete roof beam of convenient hoist and mount | |
CN108678392B (en) | Conveyer for high-rise building | |
CN206530032U (en) | Scaffold can be moved integrally | |
CN211769786U (en) | Culvert pipe lifting device for municipal construction | |
US2346338A (en) | Scaffolding and apparatus therefor | |
CN215801857U (en) | Temporary fixing device for acoustic pipe of cast-in-situ bored pile | |
CN207330126U (en) | Band volume reversal hanger | |
CN207404690U (en) | A kind of suspender of compression roller of granulator | |
CN211226017U (en) | Major diameter reinforced concrete pipe hoist | |
CN217051299U (en) | A mounting structure for glass septic tank | |
CN213387414U (en) | Loading structure for loader based on limiting assembly | |
CN219752346U (en) | Device for quickly replacing slag rake | |
CN212050164U (en) | Lifting lug for hoisting boiler secondary plate beam | |
CN218931438U (en) | Photovoltaic module hoist device | |
CN220618239U (en) | Hole pile lifting and soil discharging device | |
CN208267352U (en) | A kind of fixed device of free removal builder's jack I-steel | |
CN109132830B (en) | Detachable rectangular component hoisting structure and use method thereof | |
CN221084521U (en) | Basement fire control pipeline anti-sedimentation structure | |
CN221093431U (en) | Combined lifting appliance convenient to install and detach and used for lifting | |
CN212387550U (en) | Hoisting mechanism for mounting mine electromechanical equipment |