CN206530032U - Scaffold can be moved integrally - Google Patents
Scaffold can be moved integrally Download PDFInfo
- Publication number
- CN206530032U CN206530032U CN201720181569.1U CN201720181569U CN206530032U CN 206530032 U CN206530032 U CN 206530032U CN 201720181569 U CN201720181569 U CN 201720181569U CN 206530032 U CN206530032 U CN 206530032U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- munnion
- move integrally
- board
- supporting leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Invalid Beds And Related Equipment (AREA)
Abstract
Scaffold, including pulley can be moved integrally the utility model discloses one kind(7), scaffold main body is provided with pulley, the scaffold main body includes skirting board(2), munnion(3), bridging(4), scaffold board(5)With retractable oblique supporting leg(6), bridging(4)It is arranged on munnion(3)Inside, skirting board(2)It is fixedly installed on munnion(3)Top, scaffold board(5)It is fixed on munnion(3)Bottom, retractable oblique supporting leg(6)It is arranged on munnion(3)Bottom outside.The utility model can move integrally scaffold and retractable oblique supporting leg is connected with munnion, increase skewed horizontal load, shortcoming is taken in high improving scaffold stability and eliminate conventional tearing open for scaffold diagonal brace repeatability, and high improves efficiency of construction, reduces construction cost;Bundling belt/chain from one layer to operation layer integral loop around binding formed stable job platform effectively avoid multi-layer scaffold set up and operation process in fall apart, topple over danger.
Description
Technical field
The utility model is related to a kind of scaffold, can especially move integrally scaffold.
Background technology
In larger occasion, public domain high-rise working, general job content is single, and the cycle is short, workload is few, needs frequent
Adjust job position.Especially the public building such as more venue is constructed in recent years, and in work progress, high-rise working is especially more, but
Job content is simple and greatly belongs to fragmentary operation, is taken in order to avoid repeatability and tears the artificial wave that scaffold is caused open
Take, the increase of construction delay, cost so that need consider assembly and disassembly, load-carrying properties, using relevant issues such as safety, costs.
Utility model content
The purpose of this utility model is can to move integrally scaffold there is provided one kind for above-mentioned the deficiencies in the prior art, should
Scaffold assembling and dissembling speed is fast, can integrally flexibly quick movement, safety and stability.
To reach above-mentioned technique effect, the technical scheme that the utility model is used is as follows:
The utility model can move integrally scaffold, including pulley, and scaffold main body, the pin hand are provided with pulley
Frame body includes skirting board, munnion, bridging, scaffold board and retractable oblique supporting leg, and bridging is arranged on inside munnion, skirting board
The top of munnion is fixedly installed on, scaffold board is fixed on munnion bottom, and retractable oblique supporting leg is arranged on the outside of mullion boots.
As preferred scheme of the present utility model, hoisting mechanism, the hoisting mechanism bag are provided with scaffold main body
Lifting tackle group and hoist ropes are included, lifting tackle group is fixed at the top of munnion, and the rope body of hoist ropes is around in lifting tackle group.
As preferred scheme of the present utility model, the retractable oblique supporting leg include trivet, trivet by pipe clamp with
Munnion is connected, and strengthening support is internally provided with trivet, and reinforcing bar is provided with the outside of trivet, is set in reinforcing bar bottom
There is chock.
As preferred scheme of the present utility model, bundling belt/chain is provided between multilayer scaffold board.
As preferred scheme of the present utility model, guardrail is provided with the top of munnion.
As preferred scheme of the present utility model, the munnion, bridging use the coating steel pipes of external diameter Φ 25 ± 0.5.
As preferred scheme of the present utility model, guardrail uses the coating steel pipes of external diameter Φ 42.7 ± 0.5.
As preferred scheme of the present utility model, the trivet and strengthening support use DN40 coating steel pipes.
As preferred scheme of the present utility model, the bundling belt/chain uses the wide bundling belt/chains of 38mm.
The advantage that the utility model can move integrally scaffold is:Retractable oblique supporting leg is connected with munnion, increased oblique
Shortcoming is taken in support, high improving scaffold stability and eliminate conventional tearing open for scaffold diagonal brace repeatability, and high carries
Efficiency of construction has been risen, construction cost is reduced;Bundling belt/chain forms stable operation from one layer to operation layer integral loop around binding
Platform effectively avoid multi-layer scaffold set up and operation process in fall apart, topple over danger;Lifting tackle is effectively avoided
The falling from high altitude that workmen's adjacent side operation is caused is dangerous.
Brief description of the drawings
Fig. 1 is that the utility model can move integrally the front view of scaffold.
Fig. 2 is that the utility model can move integrally the side view of scaffold.
Fig. 3 is that the utility model can move integrally the retractable oblique leg structure schematic diagram of scaffold.
Embodiment
As shown in drawings, the utility model can move integrally scaffold, including pulley 7, and scaffold is provided with pulley 7
Main body.By setting pulley to be moved easily scaffold main body, to meet the transfer tasks needs of different job locations.
Scaffold main body is reusable, and dismounting is easy, convenient transport.The scaffold main body includes skirting board 2, munnion
3rd, bridging 4, scaffold board 5 and retractable oblique supporting leg 6, bridging 4 are arranged on inside munnion 3, and skirting board 2 is fixedly installed on munnion
3 top, scaffold board 5 is fixed on the bottom of munnion 3, and retractable oblique supporting leg 6 is arranged on the bottom outside of munnion 3.
By the way that scaffold main body is arranged to include skirting board 2, munnion 3, bridging 4, scaffold board 5 and retractable oblique supporting leg
6 structure type, the munnion 3, bridging 4 are preferred to use the coating steel pipes of external diameter Φ 25 ± 0.5.Munnion 3 is used as scaffold master
The main frame of body, bridging improves the shear resistance of munnion, prevents munnion from deforming.
Skirting board is to prevent from being placed on the object imprudence of scaffold board to be kicked, and pounds following people or thing.Skirting board 2 is excellent
Choosing is made using plank 200mm × 10mm.Can manned or loading, the job platform of formation workman on scaffold board 5.
Retractable oblique supporting leg 6 is supported from the outside of munnion 3 to munnion, to improve the stability of munnion.
It was independent to be hung using lifting rope in the past because workman is on scaffold during operation, it usually needs some objects or instrument
Take, hang take during the part that takes hung because lifting rope is unstable swing excessive, can cause to hang the feelings for taking part by impact failure
Condition occurs, therefore is provided with scaffold main body hoisting mechanism, and the hoisting mechanism includes lifting tackle group 9 and hoist ropes
10, lifting tackle group 9 is fixed on the top of munnion 3, and the rope body of hoist ropes 10 is around in lifting tackle group 9.During handling, object is hung
On hoist ropes, hoist ropes, band animal body lifting are then pulled.
Scaffold board can be one layer, also can multilayer, when installation settings has multilayer scaffold board, preferably set between multilayer scaffold board
Put bundling belt/chain(8), by setting bundling belt to play what firm multi-layer scaffold was acted on.Bundling belt/the chain 8 is preferred to use
Wide bundling belt/the chains of 38mm.
In use, people on ground is by pulling the steering of the boosted assembly pulley 9 again of hoist ropes 10 so as to driving scaffold board 5
Move up or move down, by scaffold board come safe transport material requested.
To improve the stability that scaffold is overall, prevent scaffold from being rocked when workman carries out operation or mobile, therefore set
Retractable oblique supporting leg is put to be reinforced.The retractable oblique supporting leg 6 includes trivet 6-1, and trivet 6-1 is by pipe clamp with erecting
Frame 3 is connected, and strengthening support 6-2 is internally provided with trivet 6-1, and reinforcing bar 6-3 is provided with the outside of trivet 6-1, is adding
Gu bar 6-3 bottoms are provided with chock 6-4.The trivet and strengthening support use DN40 coating steel pipes.
To improve the security that workman station carries out operation on scaffold, the top of munnion 3 is provided with guardrail, guardrail 11 is adopted
With the coating steel pipes of external diameter Φ 42.7 ± 0.5.
In use, after the completion of scaffold main body is assembled, oblique supporting leg can be merged and opened, below supporting leg cushioning chock with
Increase supporting leg stable fastness, then set up top operational level scaffold board, reuse bundling belt/chain by the multilayer pin hand set up
Plate binding reinforcing becomes one.Lifting object assembly pulley is installed according to on-site actual situations, can be with when aloft operation
Job platform is arrived in being lifted construction material, work equipment by assembly pulley of safe ready, if desired can during change job position
Merge oblique supporting leg to close, then the convenient and swift position for being pushed into need construction operation.
Claims (9)
1. one kind can move integrally scaffold, including pulley(7), scaffold main body is provided with pulley, it is characterised in that:Institute
Stating scaffold main body includes skirting board(2), munnion(3), bridging(4), scaffold board(5)With retractable oblique supporting leg(6), bridging
(4)It is arranged on munnion(3)Inside, skirting board(2)It is fixedly installed on munnion(3)Top, scaffold board(5)It is fixed on munnion(3)
Bottom, retractable oblique supporting leg(6)It is arranged on munnion(3)Bottom outside.
2. according to claim 1 move integrally scaffold, it is characterised in that:Handling is provided with scaffold main body
Mechanism, the hoisting mechanism includes lifting tackle group(9)And hoist ropes(10), lifting tackle group(9)It is fixed on munnion(3)Top
Portion, hoist ropes(10)Rope body be around in lifting tackle group(9)On.
3. according to claim 1 move integrally scaffold, it is characterised in that:The retractable oblique supporting leg(6)Including
Trivet(6-1), trivet(6-1)Pass through pipe clamp and munnion(3)It is connected, in trivet(6-1)It is internally provided with strengthening support
(6-2), in trivet(6-1)Outside is provided with reinforcing bar(6-3), in reinforcing bar(6-3)Bottom is provided with chock(6-4).
4. according to claim 1 move integrally scaffold, it is characterised in that:Bundle is provided between multilayer scaffold board
Bandage/chain(8).
5. according to claim 1 move integrally scaffold, it is characterised in that:In munnion(3)Top is provided with guardrail
(11).
6. according to claim 1 move integrally scaffold, it is characterised in that:The munnion(3), bridging(4)Adopt
With the coating steel pipes of external diameter Φ 25 ± 0.5.
7. according to claim 5 move integrally scaffold, it is characterised in that:Guardrail(11)Using external diameter Φ 42.7 ±
0.5 coating steel pipe.
8. according to claim 3 move integrally scaffold, it is characterised in that:The trivet and strengthening support are used
DN40 coating steel pipes.
9. according to claim 4 move integrally scaffold, it is characterised in that:Bundling belt/the chain(8)Using 38mm
Wide bundling belt/chain.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720181569.1U CN206530032U (en) | 2017-02-28 | 2017-02-28 | Scaffold can be moved integrally |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720181569.1U CN206530032U (en) | 2017-02-28 | 2017-02-28 | Scaffold can be moved integrally |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206530032U true CN206530032U (en) | 2017-09-29 |
Family
ID=59916889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720181569.1U Expired - Fee Related CN206530032U (en) | 2017-02-28 | 2017-02-28 | Scaffold can be moved integrally |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206530032U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396951A (en) * | 2018-03-20 | 2018-08-14 | 芜湖成安建设工程有限公司 | A kind of tooling for construction |
CN108999389A (en) * | 2018-07-26 | 2018-12-14 | 广州供电局有限公司 | The replacing options of Portable vertical hoistable platform and STATCOM valve group |
-
2017
- 2017-02-28 CN CN201720181569.1U patent/CN206530032U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396951A (en) * | 2018-03-20 | 2018-08-14 | 芜湖成安建设工程有限公司 | A kind of tooling for construction |
CN108999389A (en) * | 2018-07-26 | 2018-12-14 | 广州供电局有限公司 | The replacing options of Portable vertical hoistable platform and STATCOM valve group |
CN108999389B (en) * | 2018-07-26 | 2021-06-22 | 广东电网有限责任公司广州供电局 | Portable vertical lifting platform and replacement method of STATCOM valve bank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105401714B (en) | Attached lifting scaffold and lifting method | |
CN201458596U (en) | Crane with self-dismounting device | |
CN201116453Y (en) | Drilling tool sleeve transmission device | |
CN101177959A (en) | Curtain wall unit hanging equipment and construction method thereof | |
CN206530032U (en) | Scaffold can be moved integrally | |
CN108862081A (en) | A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN205114772U (en) | Perpendicular conveyer of ready -package elevartor shaft material | |
CN210976552U (en) | Foldable operation platform device in elevator shaft | |
CN105110205B (en) | A kind of reverse method for dismounting of derrick crane | |
CN208105827U (en) | A kind of construction scaffolding structure | |
CN206722431U (en) | Discharging platform for high-rise building construction | |
CN206646836U (en) | A kind of exterior wall, inner partition plate movement lifting frame | |
CN214269987U (en) | Hoisting device applied to high-rise building roof elevator shaft | |
CN202467145U (en) | Discharging platform of whole lifting-lowering outer frame | |
CN202000647U (en) | Base device for lifting scaffold in elevator shaft | |
CN105863280B (en) | A kind of discharging platform that can be voluntarily lifted | |
CN213738121U (en) | Full-intelligent self-climbing conveying operation table | |
CN209163407U (en) | A kind of detachable simple construction lifting platform | |
CN209567730U (en) | A kind of small-sized lattice dead man steel construction | |
CN105883645A (en) | Disassembling method for tower crane attaching devices | |
CN207245131U (en) | A kind of packaged type automatic lifting operating platform | |
CN209024100U (en) | A kind of movable simple hanging apparatus | |
CN206203763U (en) | Self-driving floor hanging apparatus | |
CN213771139U (en) | Take jacking function's portable handling frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170929 Termination date: 20210228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |