Municipal administration road construction road surface drainage device
Technical Field
The utility model relates to a town road construction technical field, concretely relates to town road construction road surface drainage device.
Background
In municipal engineering, the design of a pavement drainage structure is an important step. The road surface is usually provided with a water outlet communicated with a sewer, and a water outlet cover is arranged at the water outlet; the drainage cover can drain water on the road surface, and can also ensure the safety of personnel and vehicles, the existing road drainage mainly adopts the mode that drainage pits are arranged on two sides of the road surface, the grid cover is arranged on the drainage pit, and accumulated water entering the drainage pit is finally conveyed by a drainage pipeline connected with the drainage pit. The following problems exist in the prior art:
1. the existing municipal road construction pavement drainage device is easy to block a drainage hole by impurities, so that the drainage effect of the device is reduced, and accumulated water on a road cannot be well drained by the device;
2. the existing municipal road construction pavement drainage device is easy to drain water on roads in the use process in extremely rainy seasons such as flood.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
a drainage device for a municipal road construction pavement comprises a main body, wherein a drainage cover is arranged on the front surface of the main body, a filtering device is fixedly arranged on one side of the main body, an adjusting device is arranged on one side of the filtering device, and a flood control device is fixedly arranged on one side of the main body; the adjusting device comprises a base, the bottom of the base is fixedly connected with the bottom of the main body, a damping spring is arranged above the base, and a damper is fixedly arranged on one side of the damping spring; the filter device comprises an impurity box, one side of the impurity box is fixedly connected with one side of the main body, an outlet is fixedly arranged on one side of the impurity box, and a slag collecting groove is formed in one side of the outlet.
The utility model discloses technical scheme's further improvement lies in: the damping spring's top fixed mounting has the pneumatic cylinder, the top of pneumatic cylinder is provided with the hydraulic stem, one side fixed mounting of hydraulic stem has fixation nut, the top of pneumatic cylinder is provided with the shell, the top fixed mounting of shell has the bolt.
The utility model discloses technical scheme's further improvement lies in: the bottom of the fixing nut is fixedly connected with the upper part of the hydraulic cylinder, and one side of the damping spring is fixedly connected with one side of the damper.
The utility model discloses technical scheme's further improvement lies in: the slag collecting groove is characterized in that a drain hole is formed above the slag collecting groove, a first filter screen is fixedly mounted at the bottom of the slag collecting groove, a second filter screen is arranged at the bottom of the first filter screen, and a mounting block is arranged on one side of the first filter screen.
The utility model discloses technical scheme's further improvement lies in: one side of the installation block is provided with a first filter screen, and one side of the slag collecting groove is fixedly provided with an outlet.
The utility model discloses technical scheme's further improvement lies in: the flood control device is including the apron, one side of apron and one side fixed connection of main part, one side of apron is provided with the flood discharge mouth, one side of apron is provided with the drainage fence, the top of drainage fence is provided with the screen cloth, one side fixed mounting of screen cloth has the switch, the bottom of screen cloth is provided with the baffle-box.
The utility model discloses technical scheme's further improvement lies in: one side of the drainage fence is movably connected with one side of the cover plate, and one side of the buffer tank is fixedly connected with one side of the cover plate.
Due to the adoption of the technical scheme, the device has the advantages that, compared with the prior art, the utility model, the technological progress who gains is:
1. the utility model provides a town road construction road surface drainage device, through the bolt, the hydraulic stem, the attenuator, a pedestal, damping spring, the pneumatic cylinder, fixation nut, under the combined action of shell, can adjust the processing with the device when moving, adjust and control the size of device inside according to actual conditions, the device will make the inner space grow through adjusting when debris in the inflow device are more, utilize the bolt to fix the device to it, fix one side of the contact surface with the device and one side on ground, avoid drainage device to be washed away when meetting flood or rainy season and lead to municipal drainage to break down, will carry out altitude mixture control to the device through the cooperation between pneumatic cylinder and the hydraulic stem simultaneously and let the device inner space strengthen, improve the accessible space of device.
2. The utility model provides a town road construction road surface drainage device, through the wash port, the export, the impurity case, first filter screen, the second filter screen, the installation piece, under the combined action in collection cinder notch, can make the device carry out filtration treatment when the function, debris to the aquatic filter, the difficult condition that the sewer is blockked up that appears, improve drainage efficiency, utilize the leaf in collection cinder notch with the channel when making in the municipal sewage inflow device through the wash port, plastic bag and municipal rubbish can be collected to the impurity incasement through the export, thereby make things convenient for the cleanup crew to concentrate the clearance, reduce the clean and tidy nature that the clearance degree of difficulty improved the sewer greatly, carry out secondary filtration with it through first filter screen and second filter screen and avoid causing the pipeline blockage after getting into the underground, change the installation after extracting the filter screen from the device through the installation piece after the filter screen uses for a long time, improve device installation efficiency, thereby avoid appearing difficult installation phenomenon extension installation time and drag road drainage progress.
3. The utility model provides a town road construction road surface drainage device, through the switch, a cover plate, the flood discharge mouth, the buffer box, the screen cloth, under the combined action of drainage fence, make the device prevent flood treatment work when the function, reduce city waterlogging possibility, when city waterlogging ponding is serious, when ponding pressure reaches the certain degree, drainage fence and flood discharge mouth can utilize the switch to open it, thereby discharge flood ponding to the main drainage ditch way fast in, with fastest speed entering sewer, reduce city ponding volume as early as possible, impurity blocks up it when utilizing the screen cloth to filter to prevent the flood discharge simultaneously, improve device prevents stifled nature and practicality.
Drawings
FIG. 1 is a schematic structural view of the municipal road construction pavement drainage device of the utility model;
fig. 2 is a schematic structural diagram of the adjusting device of the present invention;
FIG. 3 is a schematic view of the structure of the filtering device of the present invention;
fig. 4 is a schematic structural view of the flood control device of the present invention.
In the figure: 1. a main body; 2. a drainage cover; 3. an adjustment device; 4. a filtration device; 5. a flood control device; 31. a bolt; 32. a hydraulic lever; 33. a damper; 34. a base; 35. a damping spring; 36. a hydraulic cylinder; 37. fixing a nut; 38. a housing; 41. a drain hole; 42. an outlet; 43. an impurity box; 44. a first filter screen; 45. a second filter screen; 46. mounting blocks; 47. a slag collecting groove; 51. a switch; 52. a cover plate; 53. a flood discharge opening; 54. a buffer tank; 55. screening a screen; 56. and (4) draining a fence.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the utility model provides a drainage device for municipal road construction pavement, which comprises a main body 1, wherein a drainage cover 2 is arranged on the front surface of the main body 1, a filtering device 4 is fixedly arranged on one side of the main body 1, an adjusting device 3 is arranged on one side of the filtering device 4, and a flood control device 5 is fixedly arranged on one side of the main body 1; the adjusting device 3 comprises a base 34, the bottom of the base 34 is fixedly connected with the bottom of the main body 1, a damping spring 35 is arranged above the base 34, and a damper 33 is fixedly arranged on one side of the damping spring 35; the filtering device 4 comprises an impurity box 43, one side of the impurity box 43 is fixedly connected with one side of the main body 1, an outlet 42 is fixedly arranged on one side of the impurity box 43, and a slag collecting groove 47 is arranged on one side of the outlet 42.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, a hydraulic cylinder 36 is fixedly mounted above the damping spring 35, a hydraulic rod 32 is disposed above the hydraulic cylinder 36, a fixing nut 37 is fixedly mounted on one side of the hydraulic rod 32, a housing 38 is disposed above the hydraulic cylinder 36, a bolt 31 is fixedly mounted above the housing 38, the bottom of the fixing nut 37 is fixedly connected with the upper side of the hydraulic cylinder 36, and one side of the damping spring 35 is fixedly connected with one side of the damper 33.
In this embodiment, can adjust the processing with the device when the operation, regulate and control the inside size of device according to actual conditions, the device will make the inner space grow through adjusting when the debris that flow in the device are more, utilize bolt 31 to fix the device to it, fix one side of device and one side of the contact surface on ground, avoid drainage device to be washed away when running into flood or rainy season and lead to municipal drainage to break down, will carry out altitude mixture control to the device through the cooperation between pneumatic cylinder 36 and the hydraulic stem 32 simultaneously and let the device inner space increase, improve the usable space of device.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, a drain hole 41 is arranged above the slag collecting groove 47, a first filter screen 44 is fixedly installed at the bottom of the slag collecting groove 47, a second filter screen 45 is arranged at the bottom of the first filter screen 44, an installation block 46 is arranged on one side of the first filter screen 44, the first filter screen 44 is arranged on one side of the installation block 46, and an outlet 42 is fixedly installed on one side of the slag collecting groove 47.
In this embodiment, can make the device carry out filtration treatment when the function, debris to the aquatic filters, the difficult condition that the sewer is blockked up that appears, improve drainage efficiency, utilize the leaf in sediment groove 47 with the channel when making municipal sewage flow into the device through wash port 41, plastic bag and municipal rubbish can be collected to impurity box 43 in through export 42, thereby make things convenient for the cleanup crew to concentrate the clearance, the clearance degree of difficulty that significantly reduces improves the clean and tidy nature of sewer, filter impurity in with sewage once more through first filter screen 44 and second filter screen 45 and carry out the secondary filtration with it and avoid causing the pipe blockage after getting into the underground, change the installation after extracting the filter screen from the device through installation piece 46 after the filter screen is used for a long time, improve device installation efficiency, thereby avoid appearing difficult installation phenomenon delay installation time and delay the road drainage progress.
Example 4
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the flood control device 5 comprises a cover plate 52, one side of the cover plate 52 is fixedly connected with one side of the main body 1, one side of the cover plate 52 is provided with a flood discharge opening 53, one side of the cover plate 52 is provided with a drainage fence 56, a screen 55 is arranged above the drainage fence 56, one side of the screen 55 is fixedly provided with a switch 51, the bottom of the screen 55 is provided with a buffer tank 54, one side of the drainage fence 56 is movably connected with one side of the cover plate 52, and one side of the buffer tank 54 is fixedly connected with one side of the cover plate 52.
In this embodiment, make the device prevent flood treatment work when the function, reduce urban waterlogging possibility, when urban waterlogging ponding is serious, when ponding pressure reaches the certain degree, drainage fence 56 and flood discharge mouth 53 can utilize switch 51 to open it, thereby discharge flood ponding to main drainage channel in fast, with the fastest speed gets into the sewer, reduce urban ponding volume as early as possible, utilize screen cloth 55 will filter impurity when preventing the flood discharge simultaneously and block up it, improve the anti-blocking nature and the practicality of device.
The working principle of the municipal road construction pavement drainage device is described in detail below.
As shown in fig. 1-4, the device can be adjusted during operation, the size of the inside of the device can be adjusted according to actual conditions, when more sundries flow into the device, the inner space of the device can be enlarged through adjustment, the device can be fixed by using the bolt 31, one side of the device and one side of the contact surface of the ground can be fixed, the municipal drainage failure caused by flushing away the drainage device when the drainage device encounters flood or rainy season can be avoided, meanwhile, the height of the device can be adjusted by matching between the hydraulic cylinder 36 and the hydraulic rod 32 to enlarge the inner space of the device, the usable space of the device can be increased, the device can be filtered during operation, the sundries in the water can be filtered, the sewer is not easy to be blocked, and the drainage efficiency can be improved, the municipal sewage flows into the device through the drain hole 41, and simultaneously leaves, plastic bags and municipal garbage in the channel are collected into the impurity box 43 through the outlet 42 by using the slag collecting groove 47, thereby facilitating the centralized cleaning of cleaning personnel, greatly reducing the cleaning difficulty and improving the tidiness of the sewer, the impurities in the sewage are filtered again through the first filter screen 44 and the second filter screen 45 to avoid the pipeline blockage after entering the ground, the filter screen is pulled out from the device through the mounting block 46 after being used for a long time to be replaced and mounted, the mounting efficiency of the device is improved, the delay of the mounting time due to the difficult mounting phenomenon is avoided, the road drainage progress is delayed, the flood prevention treatment work is carried out when the device is operated, the urban waterlogging possibility is reduced, when the urban flood accumulation pressure reaches a certain degree, the drainage fence 56 and the flood discharge port 53 can be opened by using the switch 51, thereby discharge flood ponding fast to main drainage channel in to get into the sewer at fastest speed, reduce the urban ponding volume as early as possible, utilize screen cloth 55 will filter impurity when preventing the flood discharge simultaneously and block up it, improve the stifled nature and the practicality of preventing of device.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.