CN218292008U - Install elevator concrete foundation additional and pour mould protection point - Google Patents

Install elevator concrete foundation additional and pour mould protection point Download PDF

Info

Publication number
CN218292008U
CN218292008U CN202222206122.9U CN202222206122U CN218292008U CN 218292008 U CN218292008 U CN 218292008U CN 202222206122 U CN202222206122 U CN 202222206122U CN 218292008 U CN218292008 U CN 218292008U
Authority
CN
China
Prior art keywords
side wall
foundation
foundation pit
outer side
liang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222206122.9U
Other languages
Chinese (zh)
Inventor
宣善竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Minsheng Derrick Manufacturing Co ltd
Original Assignee
Anhui Minsheng Derrick Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Minsheng Derrick Manufacturing Co ltd filed Critical Anhui Minsheng Derrick Manufacturing Co ltd
Priority to CN202222206122.9U priority Critical patent/CN218292008U/en
Application granted granted Critical
Publication of CN218292008U publication Critical patent/CN218292008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to a concrete placement field especially relates to an install elevator concrete foundation additional and pour mould protection point, including the mouth style of calligraphy foundation pit raft board of horizontal setting, the vertical fixed mounting in foundation pit raft board inside wall upper portion has foundation pit outer side wall, polylith two liang of end to end in proper order of foundation pit outer side wall enclose into a mouthful style of calligraphy, polylith two liang of end to end in proper order of foundation pit outer side wall passes through mounting fixed connection, foundation pit raft board lower part fixed mounting has support piece, the vertical foundation pit inner side wall that is provided with of support piece up end, the utility model discloses can improve device intensity, prevent the mould stripping, the practicality is stronger.

Description

Install elevator concrete foundation additional and pour mould protection point
Technical Field
The utility model relates to a concrete placement field especially relates to an install elevator concrete foundation additional and pour mould protection point.
Background
Concrete pouring refers to the process of pouring concrete into a mold until plasticized.
The existing concrete pouring mold is simple in structure and not high enough in supporting strength, the mold is opened due to overlarge pressure during concrete pouring, and the problems of mold explosion and the like occur in the concrete condensation process, so that the production of products is not facilitated, the waste of materials is caused, unnecessary economic loss is caused, and the improvement is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the background art, and the concrete foundation of a kind of proposition installs elevator additional and pours the mould guard point.
In order to achieve the above purpose, the utility model adopts the technical scheme that: the utility model provides an install elevator concrete foundation additional and pour mould protection point, includes the mouth style of calligraphy foundation pit raft board of horizontal setting, the vertical fixed mounting in foundation pit raft inboard wall upper portion has foundation pit outer side wall, polylith two liang of head-to-tail in proper order of foundation pit outer side wall enclose into a mouthful style of calligraphy, polylith two liang of head-to-tail in proper order of foundation pit outer side wall passes through mounting fixed connection, foundation pit raft board lower part fixed mounting has support piece, the vertical interior side wall of foundation pit that is provided with of support piece up end, the interior side wall cross-section of foundation pit is concave style of calligraphy, polylith two liang of head-to-tail in proper order of side wall enclose into a mouthful style of calligraphy, polylith in two liang of head-to-tail in proper order of foundation pit inner side wall passes through mounting fixed connection.
Preferably, L-shaped angle steels are fixedly mounted at the corner of the upper end surface of the foundation pit raft and at two ends of the foundation pit outer side wall respectively.
Preferably, the opposite surfaces of the foundation pit outer side wall and the foundation pit inner side wall are respectively and fixedly provided with a connecting piece, the upper end surface of each connecting piece is provided with a U-shaped notch, circular pipes are matched in the notches of the connecting pieces in a transverse sliding mode, and the circular pipes which are perpendicular to each other are respectively and fixedly connected through circular pipe joints.
Preferably, a gap is reserved between the foundation pit outer side wall and the foundation pit inner side wall.
Compared with the prior art, the utility model discloses following beneficial effect has:
through setting up foundation ditch outer wall and foundation ditch inner wall, on using basic fixed means, it connects to carry out supplementary fixed to foundation ditch outer wall and foundation ditch inner wall to recycle pipe cooperation pipe, improve the intensity of device, and install the equal welded connection spare in outside at each position steel mould, prevent to explode the mould, the reverse mould, and set up the angle steel, firm steel form, trompil on the steel form simultaneously, the vibrting spear vibrates, and play the effect in exhaust hole, prevent that the inside hollowing that forms of concrete, simple and practical.
Drawings
Fig. 1 is a schematic structural view of the concrete foundation pouring mold protection point additionally provided with the elevator of the utility model;
fig. 2 is a schematic view of a raft structure of a foundation pit with an additional protection point of the pouring mold for the concrete foundation of the elevator;
fig. 3 is the utility model relates to an install enlargedly of A department in fig. 2 of elevator concrete foundation pouring mould guard point additional.
1. A raft plate of the foundation pit; 2. an outer side wall of the foundation pit; 3. a support member; 4. the inner side wall of the foundation pit; 5. angle steel; 6. a connecting member; 7. a circular tube; 8. and (4) connecting the round pipes.
Detailed Description
The following description is presented to disclose the invention so as to enable any person skilled in the art to practice the invention. The preferred embodiments in the following description are given by way of example only, and other obvious variations will occur to those skilled in the art.
As shown in figures 1-3, the added elevator concrete foundation pouring mold protection point comprises a transversely arranged square foundation pit raft plate 1, wherein a foundation pit outer side wall 2 is vertically and fixedly installed on the upper portion of the inner side wall of the foundation pit raft plate 1, the foundation pit outer side wall 2 and the inner side wall 4 of the foundation pit are spliced and assembled by components such as round pipe 7-grade screw bolts and the like, the movable extension and contraction can be carried out, so that the pouring size is controlled, a plurality of foundation pit outer side walls 2 are sequentially connected end to form a square, a steel film short column is vertically and fixedly installed on the upper end surface of the foundation pit raft plate 1, the upper end surface of the foundation pit outer side wall 2 is flush with the upper end surface of the steel film short column, a plurality of foundation pit outer side walls 2 are sequentially and fixedly connected end to end through fixing parts, a support part 3 is fixedly installed on the lower portion of the foundation pit raft plate 1, the inner side wall 4 of the foundation pit is detachably connected through a special-shaped steel plate, the later-stage mold removal is convenient, and the product appearance sensitivity is kept, the upper end face of the support piece 3 is vertically provided with a foundation pit inner side wall 4, the section of the foundation pit inner side wall 4 is in a concave shape, a plurality of foundation pit inner side walls 4 are sequentially connected end to form a square shape, a plurality of foundation pit inner side walls 4 are sequentially fixedly connected end to end through fixing pieces, a steel mould at the overlapped part of the foundation pit outer side wall 2 or the foundation pit inner side wall 4 is provided with a hole, the hole center interval is 50mm, the foundation pit outer side wall 2 is a cold rolled steel mould, the upper part of a foundation pit raft plate 1 is covered by the steel mould, when concrete is prevented from being poured, the concrete overflows, meanwhile, holes are formed on the steel mould, firstly, a vibrating rod is convenient to vibrate, secondly, the air exhaust hole is prevented from being formed inside the concrete, L-shaped angle steel 5 is respectively and fixedly arranged at the corner of the upper end face of the foundation pit plate 1 and the two ends of the foundation pit outer side wall 2, the steel mould is used for stabilizing the steel mould, the strength of the device is improved, and a gap is reserved between the foundation pit outer side wall 2 and the foundation pit inner side wall 4, the connecting pieces are welded outside the steel mould at each position of the device, the steel mould is stabilized by a steel pipe, and mould explosion and mould reversing are prevented.
The opposite face of side wall 4 is fixed mounting respectively has connecting piece 6 in foundation ditch outer side wall 2 and the foundation ditch, and the notch of U style of calligraphy is seted up to connecting piece 6 up end, and horizontal sliding fit has pipe 7 in connecting piece 6's the notch, and two liang of pipe 7 of many mutually perpendicular connect 8 fixed connection through the pipe respectively, utilize pipe 7 to strengthen the intensity of foundation ditch outer side wall 2 and foundation ditch inner side wall for the device is firm more stable.
The user sets up foundation ditch outer side wall 2 and foundation ditch inner wall 4 earlier, places pipe 7 on connecting piece 6 again to two root circle pipes 7 that will intersect utilize pipe joint 8 to connect fixedly, will cover the steel form again, pour the concrete between foundation ditch outer side wall 2 and foundation ditch inner wall 4 and pour, demolish whole device frame after the concrete drying sets again.
The foregoing shows and describes the basic principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the principles of the present invention may be applied to any other embodiment without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (4)

1. The utility model provides an install elevator concrete foundation additional and pour mould protection point, includes the mouth style of calligraphy foundation ditch raft board (1) of horizontal setting, its characterized in that: foundation ditch raft board (1) the vertical fixed mounting in inside wall upper portion has foundation ditch outer side wall (2), polylith foundation ditch outer side wall (2) two liang of end to end in proper order encloses into a mouthful style of calligraphy, polylith two liang of end to end in proper order of foundation ditch outer side wall (2) passes through mounting fixed connection, foundation ditch raft board (1) lower part fixed mounting has support piece (3), support piece (3) up end is vertical to be provided with in the foundation ditch side wall (4), side wall (4) cross-section is concave type in the foundation ditch, polylith two liang of end to end in proper order encloses into a mouthful style of calligraphy in foundation ditch raft board (4), polylith two liang of end to end in proper order of foundation ditch side wall (4) are two liang of head to end in proper order and pass through mounting fixed connection in the foundation ditch.
2. The concrete foundation pouring mold protection point with the elevator as claimed in claim 1, wherein: and L-shaped angle steel (5) are respectively and fixedly mounted at the corner of the upper end surface of the foundation pit raft plate (1) and the two ends of the foundation pit outer side wall (2).
3. The concrete foundation casting mold protection point additionally provided with the elevator according to claim 1, characterized in that: the foundation pit outer side wall (2) and the opposite face of foundation pit inner side wall (4) are fixed mounting respectively has connecting piece (6), the notch of U style of calligraphy is seted up to connecting piece (6) up end, horizontal sliding fit has pipe (7) in the notch of connecting piece (6), many mutually perpendicular's pipe (7) are two liang respectively through pipe joint (8) fixed connection.
4. The concrete foundation pouring mold protection point with the elevator as claimed in claim 1, wherein: and a gap is reserved between the foundation pit outer side wall (2) and the foundation pit inner side wall (4).
CN202222206122.9U 2022-08-22 2022-08-22 Install elevator concrete foundation additional and pour mould protection point Active CN218292008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222206122.9U CN218292008U (en) 2022-08-22 2022-08-22 Install elevator concrete foundation additional and pour mould protection point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222206122.9U CN218292008U (en) 2022-08-22 2022-08-22 Install elevator concrete foundation additional and pour mould protection point

Publications (1)

Publication Number Publication Date
CN218292008U true CN218292008U (en) 2023-01-13

Family

ID=84796004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222206122.9U Active CN218292008U (en) 2022-08-22 2022-08-22 Install elevator concrete foundation additional and pour mould protection point

Country Status (1)

Country Link
CN (1) CN218292008U (en)

Similar Documents

Publication Publication Date Title
CN208072950U (en) A kind of combination set shaped steel formwork
CN101497209A (en) Technique for producing concrete nuclear waste barrel and mold thereof
CN108301618A (en) Steel-wood combined constructional column template and construction method thereof
CN206220489U (en) Concrete post formwork for placing tightening device
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN218292008U (en) Install elevator concrete foundation additional and pour mould protection point
CN212153153U (en) Arc template system of cast-in-place culvert vault
US3693930A (en) Pre-cast concrete panels
CN207647181U (en) A kind of wall hangs mould template reinforcing device
CN209990152U (en) Opening-closing type pouring opening structure
CN207812999U (en) Digital alloy steel framework plastic formwork
US6279867B1 (en) Multi-part form of a mold for forming a containment member for molten metal
CN209040549U (en) A kind of formwork erecting structure that oblique arch face structural concrete pours
CN209907926U (en) Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column
CN216130570U (en) Ship-berthing component forming device
CN212926521U (en) Novel assembled EPS wall body module
CN219862945U (en) Suspension type roof side form support frame
CN217998930U (en) Constructional column template support system structure
CN217106140U (en) Bolt rod mold hanging device for post-pouring of assembled laminated slab joint
CN214163407U (en) Shaping device for inverted T-shaped precast beam
CN215759142U (en) Steel form for cup mouth foundation
CN214303107U (en) Die for integral gas distribution and water distribution filter beam plate construction
CN212146897U (en) Inner formwork supporting and anti-floating structure of large box girder
CN108590165A (en) A kind of construction method of deep basal pit concrete of basement exterior wall
CN211340799U (en) Be used for deep basal pit reverse construction method connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant