CN218202068U - Lifting device for building installation engineering - Google Patents

Lifting device for building installation engineering Download PDF

Info

Publication number
CN218202068U
CN218202068U CN202222103164.XU CN202222103164U CN218202068U CN 218202068 U CN218202068 U CN 218202068U CN 202222103164 U CN202222103164 U CN 202222103164U CN 218202068 U CN218202068 U CN 218202068U
Authority
CN
China
Prior art keywords
fixedly connected
electric
lifting
sliding block
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222103164.XU
Other languages
Chinese (zh)
Inventor
王凯
翟喜慧
白洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222103164.XU priority Critical patent/CN218202068U/en
Application granted granted Critical
Publication of CN218202068U publication Critical patent/CN218202068U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a building installation engineering technical field just discloses a elevating gear for building installation engineering, including elevating system, elevating system's outside is provided with the charging mechanism, elevating system includes the base, the top of base has seted up the spout, the inside of spout is provided with the sliding block, the inside of sliding block is provided with reciprocating lever, reciprocating lever's right side fixedly connected with reciprocating motor, the top fixedly connected with electric lift platform of sliding block, the top fixedly connected with rail guard of electric lift platform; this elevating gear for architectural erection engineering passes through in the staff gets into electric lift platform, and restart electric lift platform drives the staff and rises to the department that needs the construction, when needing to remove to the next door construction, starts reciprocating motor and drives the reciprocating lever for the reciprocating lever drives the sliding block and slides in the spout, and then drives electric lift platform and remove to another department construction, thereby accomplishes the operation of removing electric lift platform.

Description

Lifting device for building installation engineering
Technical Field
The utility model relates to a building installation engineering technical field specifically is a elevating gear for building installation engineering.
Background
The building installation engineering refers to various equipment used for living, production and maintenance of functions in a building or a structure, and the like, pipeline installation, line laying and the like, and the building installation engineering often needs to be raised to a height for operation, and at the moment, a lifting device is needed to lift workers to a specified height for work.
At present current elevating gear is when using, place elevating gear in the below that needs the construction department mostly, rise the staff to the construction department again, but need to descend by elevating gear again when the next door construction, move elevating gear to the place that the next door needs the construction again, operate repeatedly, lead to reduced the efficiency of construction, it is thus clear that we need a lifting gear for the building installation engineering to be used for solving the current elevating gear who mentions in the above-mentioned background art when using, place elevating gear in the below that needs the construction department mostly, rise the staff to the construction department again, but need to descend by elevating gear again when the next door construction, move elevating gear to the place that the next door needs the construction again, operate repeatedly, lead to reduced the problem of efficiency of construction.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a lifting device for architectural installation engineering possesses the advantage of removing, solved the current lifting device who mentions in the above-mentioned background art when using, mostly place lifting device in the below of needs construction department, rise the staff to construction department again, but need take advantage of lifting device again to the staff when needing the next door construction, remove lifting device to the place that the next door needs the construction again, operate repeatedly, lead to reducing the problem of efficiency of construction.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a lifting device for building installation engineering comprises a lifting mechanism, wherein a charging mechanism is arranged outside the lifting mechanism;
when construction is needed, the worker is lifted movably through the lifting mechanism, and the needed materials are loaded and conveyed through the loading mechanism, so that the operation of lifting the worker movably and loading the materials is completed.
The lifting mechanism comprises a base, a sliding chute is formed in the top of the base, a sliding block is arranged inside the sliding chute, a reciprocating rod is arranged inside the sliding block, a reciprocating motor is fixedly connected to the right side of the reciprocating rod, an electric lifting table is fixedly connected to the top of the sliding block, and a protective guard is fixedly connected to the top of the electric lifting table;
when needs are under construction, fix on ground through the base this moment, the staff gets into in the electric lift platform, and then drive the staff through starting the electric lift platform again and rise to the department that needs the construction, the rethread rail guard is protected the staff, when needing to remove to the next door and be under construction, start reciprocating motor and drive the reciprocating lever, and then make the reciprocating lever drive the sliding block and slide in the spout at base top, and then drive the electric lift platform and remove to another department construction, thereby accomplish the operation that removes the electric lift platform, reach the effect that improves the efficiency of construction.
The feeding mechanism comprises an electric feeding table, a baffle is fixedly connected to the top of the electric feeding table, an expansion plate is fixedly connected to one end of the baffle, a clamping block is fixedly connected to the left side of the expansion plate, and a clamping groove is formed in one end of the baffle;
when needs carried the material, when not rising this moment, place the material on electronic charging deck, the rethread baffle blocks, and the material drops when avoiding rising, rises to construction department, and when needing to use, the rethread handle drives the expansion plate and makes the fixture block leave the draw-in groove, and then opens electronic charging deck for the material can be taken to the staff, has avoided material and staff together, influences the operation of staff's construction.
Preferably, the reciprocating rod penetrates through the sliding groove and extends to the right side of the sliding groove, and the reciprocating motor is fixedly connected to the right side of the base.
Through above-mentioned technical scheme, support reciprocating motor through the base, run through the spout and extend to the right side of spout through the reciprocating lever and make reciprocating motor can drive the reciprocating lever and operate.
Preferably, the bottom of the base is provided with a moving groove, the inside of the moving groove is fixedly connected with an electric lifting column, and the bottom of the electric lifting column is provided with a universal wheel.
Through above-mentioned technical scheme, drive the universal wheel through starting electronic lift post and leave the shifting chute, and then can reach the operation that removes elevating gear.
Preferably, the electric loading platform is arranged on the front surface of the electric lifting platform, and the number of the baffle plates and the number of the guard rails are three.
Preferably, the electric lifting columns are arranged in a plurality and are distributed in a rectangular array.
Preferably, the height of the telescopic plate is matched with that of the baffle, and the back of the telescopic plate is fixedly connected with a handle.
Preferably, the length and the width of the sliding block are matched with the bottoms of the electric lifting table and the electric loading table, and the top of the electric lifting table is fixedly connected with an anti-slip pad.
Compared with the prior art, the utility model provides a lifting device for building installation engineering possesses following beneficial effect:
1. this elevating gear for architectural erection engineering, through being provided with the base, devices such as sliding block and electric lift platform mutually support, specifically fix on ground for through the base, the staff gets into in the electric lift platform, and then drive the staff and rise to the department that needs the construction through starting electric lift platform again, the staff is protected to the rethread rail guard, when needing to remove to the next door and carry out the construction, start reciprocating motor and drive the reciprocating lever, and then make the reciprocating lever drive the sliding block and slide in the spout at base top, and then drive the electric lift platform and remove to another department construction, thereby accomplish the operation of removing electric lift platform, reach the effect that improves the efficiency of construction, the current elevating gear who mentions among the above-mentioned background art when using has been solved, mostly place elevating gear in the below that needs the department of construction, rise the staff to the department of construction again, but need take advantage of elevating gear again to descend when needing to the next door construction, again move elevating gear to the place that needs the construction next door, repeat the operation, lead to the problem that construction efficiency has been reduced.
2. This elevating gear for architectural erection engineering, mutually support through being provided with devices such as electronic charging deck and baffle, specifically for when not ascending, place the material on electronic charging deck, the rethread baffle blocks, the material drops when avoiding ascending, rise to construction department, when needing to use, the rethread handle drives the expansion plate and makes the fixture block leave the draw-in groove, and then open electronic charging deck, make the staff can take the material, avoided material and staff together, influence the operation of staff's construction.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the electric loading table of the present invention;
fig. 3 is a schematic sectional view of the present invention;
fig. 4 is a schematic side sectional view of the present invention.
Wherein: 1. a lifting mechanism; 2. a charging mechanism; 11. a base; 12. a chute; 13. a slider; 14. a reciprocating lever; 15. a reciprocating motor; 16. an electric lifting table; 17. protecting a fence; 21. an electric loading table; 22. a baffle plate; 23. a retractable plate; 24. a clamping block; 101. an electric lifting column; 102. a universal wheel; 103. a non-slip mat; 201. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a lifting device for building installation engineering comprises a lifting mechanism 1, a charging mechanism 2 is arranged outside the lifting mechanism 1;
when construction is needed, the lifting mechanism 1 is used for movably lifting the working personnel, and the loading mechanism 2 is used for loading the needed materials, so that the movable lifting and loading operation of the working personnel are completed.
The lifting mechanism 1 comprises a base 11, a sliding chute 12 is formed in the top of the base 11, a sliding block 13 is arranged inside the sliding chute 12, a reciprocating rod 14 is arranged inside the sliding block 13, a reciprocating motor 15 is fixedly connected to the right side of the reciprocating rod 14, an electric lifting table 16 is fixedly connected to the top of the sliding block 13, and a protective guard 17 is fixedly connected to the top of the electric lifting table 16;
when needs are under construction, fix on ground through base 11 this moment, the staff gets into in the electric lift platform 16, and then drive the staff through starting electric lift platform 16 again and rise to the department that needs the construction, rethread rail guard 17 protects the staff, when needing to remove to the next door and construct, start reciprocating motor 15 and drive reciprocating lever 14, and then make reciprocating lever 14 drive sliding block 13 and slide in the spout 12 at base 11 top, and then drive electric lift platform 16 and remove to another department construction, thereby accomplish the operation of removing electric lift platform 16, reach the effect that improves the efficiency of construction.
The charging mechanism 2 comprises an electric charging platform 21, the top of the electric charging platform 21 is fixedly connected with a baffle plate 22, one end of the baffle plate 22 is fixedly connected with an expansion plate 23, the left side of the expansion plate 23 is fixedly connected with a clamping block 24, and one end of the baffle plate 22 is provided with a clamping groove;
when needs carry the material, when not rising this moment, place the material on electronic charging stand 21, rethread baffle 22 blocks, and the material drops when avoiding rising, rises to construction department, when needing to use, rethread handle 201 drives expansion plate 23 and makes fixture block 24 leave the draw-in groove, and then opens electronic charging stand 21 for the staff can take the material, has avoided material and staff together, influences the operation of staff's construction.
Specifically, the reciprocating rod 14 penetrates through the sliding chute 12 and extends to the right side of the sliding chute 12, and the reciprocating motor 15 is fixedly connected to the right side of the base 11.
Through above-mentioned technical scheme, support reciprocating motor 15 through base 11, run through spout 12 and extend to the right side of spout 12 through reciprocating lever 14 and make reciprocating motor 15 can drive reciprocating lever 14 and operate.
Specifically, a moving groove is formed in the bottom of the base 11, an electric lifting column 101 is fixedly connected to the inside of the moving groove, and a universal wheel 102 is arranged at the bottom of the electric lifting column 101.
Through the technical scheme, the universal wheel 102 is driven to leave the moving groove by starting the electric lifting column 101, and then the operation of moving the lifting device can be achieved.
Specifically, the electric loading table 21 is arranged on the front surface of the electric lifting table 16, and three baffles 22 and guard rails 17 are arranged.
Through above-mentioned technical scheme, all set up to three through baffle 22 and rail guard 17 for baffle 22 and rail guard 17 are the rectangle, make the material of taking of the electronic charging deck 21 of entering that the staff can be convenient.
Specifically, the electric lifting columns 101 are provided in plurality, and the plurality of electric lifting columns 101 are distributed in a rectangular array.
Through above-mentioned technical scheme, be the distribution of rectangular array and then support that can be better and remove elevating gear through setting up a plurality of electronic lift posts 101.
Specifically, the height of the expansion plate 23 is matched with that of the baffle 22, and a handle 201 is fixedly connected to the back of the expansion plate 23.
Through above-mentioned technical scheme, through 23 high and baffle 22 looks adaptations of expansion plate and then can be better block the material, separate material and staff, the rethread has handle 201 to make things convenient for the staff to close and open electronic charging stand 21.
Specifically, the length and the width of the sliding block 13 are matched with the bottoms of the electric lifting platform 16 and the electric loading platform 21, and the top of the electric lifting platform 16 is fixedly connected with an anti-slip pad 103.
Through the technical scheme, the length and the width of the sliding block 13 are matched with the bottoms of the electric lifting platform 16 and the electric loading platform 21, so that the sliding block 13 can better support the electric lifting platform 16 and the electric loading platform 21, and the sliding of a worker is avoided by arranging the anti-slip pad 103.
When using, fix on ground through base 11, the staff gets into in the electric lift platform 16, and then drive the staff through starting electric lift platform 16 again and rise to the department that needs the construction, rethread rail guard 17 protects the staff, when needing to remove to the next door and construct, start reciprocating motor 15 and drive reciprocating lever 14, and then make reciprocating lever 14 drive sliding block 13 and slide in the spout 12 at base 11 top, and then drive electric lift platform 16 and remove to another department of construction, thereby accomplish the operation that removes electric lift platform 16, reach the effect that improves the efficiency of construction.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a lifting device for building installation engineering, includes elevating system (1), its characterized in that: a charging mechanism (2) is arranged outside the lifting mechanism (1);
the lifting mechanism (1) comprises a base (11), a sliding groove (12) is formed in the top of the base (11), a sliding block (13) is arranged inside the sliding groove (12), a reciprocating rod (14) is arranged inside the sliding block (13), a reciprocating motor (15) is fixedly connected to the right side of the reciprocating rod (14), an electric lifting platform (16) is fixedly connected to the top of the sliding block (13), and a protective guard (17) is fixedly connected to the top of the electric lifting platform (16);
the loading mechanism (2) comprises an electric loading platform (21), a baffle (22) is fixedly connected to the top of the electric loading platform (21), an expansion plate (23) is fixedly connected to one end of the baffle (22), a clamping block (24) is fixedly connected to the left side of the expansion plate (23), and a clamping groove is formed in one end of the baffle (22).
2. The lifting device for building installation engineering of claim 1, characterized in that: the reciprocating rod (14) penetrates through the sliding groove (12) and extends to the right side of the sliding groove (12), and the reciprocating motor (15) is fixedly connected to the right side of the base (11).
3. The lifting device for building installation engineering of claim 1, characterized in that: the bottom of the base (11) is provided with a moving groove, an electric lifting column (101) is fixedly connected to the inside of the moving groove, and universal wheels (102) are arranged at the bottom of the electric lifting column (101).
4. The lifting device for building installation engineering of claim 1, wherein: the electric loading platform (21) is arranged on the front surface of the electric lifting platform (16), and the number of the baffles (22) and the number of the guard rails (17) are three.
5. A lifting device for building erection engineering according to claim 3, characterized in that: the electric lifting columns (101) are arranged in a plurality, and the electric lifting columns (101) are distributed in a rectangular array.
6. The lifting device for building installation engineering of claim 1, characterized in that: the height of the telescopic plate (23) is matched with that of the baffle (22), and the back of the telescopic plate (23) is fixedly connected with a handle (201).
7. The lifting device for building installation engineering of claim 1, characterized in that: the length and the width of the sliding block (13) are matched with the bottoms of the electric lifting platform (16) and the electric charging platform (21), and the top of the electric lifting platform (16) is fixedly connected with an anti-skid pad (103).
CN202222103164.XU 2022-08-10 2022-08-10 Lifting device for building installation engineering Active CN218202068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222103164.XU CN218202068U (en) 2022-08-10 2022-08-10 Lifting device for building installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222103164.XU CN218202068U (en) 2022-08-10 2022-08-10 Lifting device for building installation engineering

Publications (1)

Publication Number Publication Date
CN218202068U true CN218202068U (en) 2023-01-03

Family

ID=84655014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222103164.XU Active CN218202068U (en) 2022-08-10 2022-08-10 Lifting device for building installation engineering

Country Status (1)

Country Link
CN (1) CN218202068U (en)

Similar Documents

Publication Publication Date Title
CN218202068U (en) Lifting device for building installation engineering
CN213985355U (en) Automatic weight calibrating installation
CN207856096U (en) A kind of fire-fighting equipment lifting deliverance apparatus
CN211166527U (en) Auxiliary platform and contact net overhaul operation vehicle
CN211618932U (en) Platform is stacked to three-dimensional circulation coil of strip clout
CN111114394A (en) Auxiliary platform and contact net overhaul operation vehicle
CN110980079A (en) Platform is stacked to three-dimensional circulation coil of strip clout
CN211572480U (en) Functional frame for building construction
CN210483091U (en) Building platform of unloading
CN213953047U (en) A auxiliary positioning device for building a wall
CN109986514B (en) Automatic maintenance platform device
CN210064115U (en) Goods placing device convenient for taking and placing goods
CN114704106B (en) Overhanging type unloading platform and unloading method
CN210457386U (en) Electric power engineering construction protector
CN108584769B (en) Heavy machinery lifting device
CN213817158U (en) Mounting structure between bus duct floors
CN219618986U (en) Adjustable waterproof cloth covering device
CN214696949U (en) Intelligent self-climbing discharging platform
CN215101732U (en) Stable form electromechanical device installation device
CN220889354U (en) House building construction platform
CN212957691U (en) Construction is with platform of unloading
CN219791183U (en) Building material stores frame
CN220926204U (en) Manual stacking auxiliary device
CN213865283U (en) Movable lifting platform for directional delivery of line pipes
CN210263904U (en) Creeping formwork construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant