CN212957691U - Construction is with platform of unloading - Google Patents

Construction is with platform of unloading Download PDF

Info

Publication number
CN212957691U
CN212957691U CN202021416358.XU CN202021416358U CN212957691U CN 212957691 U CN212957691 U CN 212957691U CN 202021416358 U CN202021416358 U CN 202021416358U CN 212957691 U CN212957691 U CN 212957691U
Authority
CN
China
Prior art keywords
fixed
bracing piece
box
platform
pull ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021416358.XU
Other languages
Chinese (zh)
Inventor
李福军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021416358.XU priority Critical patent/CN212957691U/en
Application granted granted Critical
Publication of CN212957691U publication Critical patent/CN212957691U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction is with platform of unloading, including fixed knot, the fixed inside fixed bracing piece that is provided with of knot, the inside spout of having seted up of bracing piece, the inside fixed pulley that is provided with of spout, the fixed plate that is provided with in pulley top, the fixed case that is provided with in fixed plate outside left side top, the fixed block that is provided with in the fixed case right side outside, the screw has been seted up on the inside right side of fixed block. The utility model discloses earlier in the use with the bracing piece setting on the floor surface and use fixed the knot fixed with the bracing piece, settle the pulley between the spout is inside, use wire rope with the fixed pull ring and the bracing piece left side pull ring fixed connection that set up in last floor top, can increase the bearing capacity of bracing piece like this, fixed wire rope that sets up between the pull ring of charging box top four corners, can make things convenient for the loop wheel machine to load and unload the charging box like this, the inside fixed wire rope that is provided with of fixed box left side pull ring, can stimulate fixed box like this at will.

Description

Construction is with platform of unloading
Technical Field
The utility model relates to a construction technical field specifically is a platform of unloading for construction.
Background
The unloading platform is a temporary operation platform and an operation frame which are usually erected on a construction site and are generally used for material turnover. The discharging platform is divided into a movable discharging platform, a floor type discharging platform and an overhanging type discharging platform. And it should be noted that the manufacturing of the unloading platform should be carried out by professional electric welders, the required welding line should not have the desoldering, the welding line should be full, the wood board on the platform should be fully paved and firmly bound by 8 lead wires, the height of the guard rail should not be less than 1.5 meters, and the inner side should be hung with a dense mesh safety net, the anchor button of the steel wire rope should meet the specification requirement;
the traditional unloading platform for building construction has the following defects;
at present, traditional construction platform lifting device places building tool or material behind the platform of unloading, needs constructor to unload the platform on with cargo handling to the building in, relatively expends time and physical power to relevant regulation only allows two people to operate on the platform of unloading simultaneously usually, and the detention time overlength on the platform of unloading also does not benefit to constructor's safety.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction is with platform of unloading to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction is with platform of unloading, includes fixed the knot, the fixed inside fixed bracing piece that is provided with of knot, the inside spout of having seted up of bracing piece, the inside fixed pulley that is provided with of spout, the fixed plate that is provided with in pulley top, the fixed case that is provided with in fixed plate outside left side top, the fixed block that is provided with in the fixed case right side outside, the screw has been seted up on the inside right side of fixed block, the fixed hydraulic ram that is provided with in fixed plate top right side, the fixed bolt that is provided with between hydraulic ram and the fixed block, the bolt is located inside the screw, the inside.
Preferably, pull rings are fixedly arranged on the outer sides of the two sides of the right end of the support rod.
Preferably, the top end of the charging box is fixedly provided with a pull ring.
Preferably, a pull ring is fixedly arranged at the top end of the upper floor where the support rod is located.
Preferably, the charging box is movably arranged inside the fixed box.
Preferably, pull rings are fixedly arranged on the left side of the outer portion of the fixed box.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model is characterized in that the support bar is arranged on the surface of the floor and fixed by the fixing buckle during the use process, the pulley is arranged between the inner parts of the sliding groove, the pull ring fixedly arranged at the top end of the previous floor is fixedly connected with the pull ring at the left side of the support bar by the steel wire rope, thus the bearing capacity of the support bar is increased, the steel wire rope is fixedly arranged between the pull rings at the four corners of the top end of the charging box, thus the charging box can be conveniently assembled and disassembled by the crane, the steel wire rope is fixedly arranged in the pull ring at the left side of the fixing box, thus the fixing box can be pulled randomly, after the charging box reloads construction materials on the ground, the tower crane lifts the charging box by the steel wire rope fixed between the pull rings until the charging box is placed between the inner parts of the fixing box, then a worker pulls the fixing box by, the fixed box can be easily pulled into a floor, so that the probability of safety accidents is reduced, after the fixed box reaches the inside of the floor, the right side of the hydraulic top fixed box is started to be jacked up, the charging box slides out of the inside of the fixed box, and workers can take out construction materials from the inside of the charging box at will;
2. the utility model discloses can with unload the platform after the platform of unloading hoist and mount material or construction tool inside to the construction floor, greatly reduced constructor's safety problem, the charging box is unloaded and also not has the number restriction, has improved the work efficiency of unloading, this structure has simple structure, convenient to use, excellent in use effect's advantage.
Drawings
FIG. 1 is a schematic view of the overall structure of a discharging platform for building construction according to the present invention;
FIG. 2 is an outside view of the overall structure of the discharging platform for building construction;
fig. 3 is the utility model relates to a construction is with A structure enlargements of platform of unloading.
In the figure: 1. a charging box; 2. a fixed box; 3. a hydraulic jack; 4. a pulley; 5. a chute; 6. a fixing buckle; 7. a support bar; 8. a pull ring; 9. a screw hole; 10. a bolt; 11. a fixing plate; 12. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a construction is with platform of unloading, is detained 6, its characterized in that including fixed: the fixed bracing piece 7 that is provided with of 6 inside fixes of knot, the inside spout 5 of having seted up of bracing piece 7, the inside fixed pulley 4 that is provided with of spout 5, the fixed plate 11 that is provided with in 4 tops of pulley, the fixed case 2 that is provided with in 11 outside left sides tops of fixed plate, the fixed block 12 that is provided with in 2 right sides of fixed case, screw 9 has been seted up on the inside right side of fixed block 12, the fixed hydraulic ram 3 that is provided with in 11 top right sides of fixed plate, the fixed bolt 10 that is provided with between hydraulic ram 3 and the fixed block 12, bolt 10 is located inside screw 9, the inside activity of fixed case 2 is provided.
Pull rings 8 are fixedly arranged on the outer sides of the two sides of the right end of the support rod 7, so that a steel wire rope can be fixed between the pull ring 8 at the end of the support rod 7 and the pull ring 8 fixed at the top end of the upper layer, the support rod 7 bears larger weight, and the safety of the discharging platform is improved; the top ends of the charging boxes 1 are fixedly provided with pull rings 8, so that the charging boxes 1 can be more easily hoisted by a tower crane; a pull ring 8 is fixedly arranged at the top end of the upper floor where the support rod 7 is positioned, so that a steel wire rope can be fixed between the pull ring 8 at the end of the support rod 7 and the pull ring 8 fixed at the top end of the upper floor, and the maximum bearing capacity of the support rod 7 is increased; the charging box 1 is movably arranged in the fixed box 2, so that the charging box 1 is more convenient and quicker to place or take out from the fixed box 2 by a tower crane; the left side of the outer portion of the fixed box 2 is fixedly provided with pull rings 8, so that after the charging box 1 is charged, a worker can pull the fixed box 2 to be placed in the fixed box 2 by a tower crane to reduce potential safety hazards.
The working principle is as follows: the utility model is characterized in that the support bar 7 is arranged on the surface of the floor and the support bar 7 is fixed by the fixing buckle 6, the pulley 4 is arranged between the inner parts of the sliding groove 5, the pull ring 8 fixedly arranged at the top end of the previous floor is fixedly connected with the pull ring 8 at the left side of the support bar 7 by the steel wire rope, thus the bearing capacity of the support bar 7 can be increased, the steel wire rope is fixedly arranged between the pull rings 8 at the four corners of the top end of the charging box 1, thus the charging box 1 can be conveniently loaded and unloaded by a crane, the steel wire rope is fixedly arranged in the pull ring 8 at the left side of the fixing box 2, thus the fixing box 2 can be pulled at will, after the charging box 1 reloads construction materials on the ground, the charging box 1 is lifted by the steel wire rope fixed between the pull rings 8 until the charging box 1 is placed in the fixing box 2, then a worker, through the fixed pulley 4 that sets up of fixed plate 11 downside slides in spout 5 insidely, can be easily with fixed case 2 inside the floor, reduce the probability that the incident takes place like this, fixed case 2 reaches the inside back-start hydraulic ram 3 fixed case 2 right side of floor and is pushed up the charging box 1 and slide out fixed case 2 insidely, and the workman can take out construction material from charging box 1 inside at will.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction is with platform of unloading, includes fixed knot (6), its characterized in that: fixed knot (6) inside fixed bracing piece (7) that is provided with, spout (5) have been seted up to bracing piece (7) inside, spout (5) inside fixed pulley (4) that is provided with, fixed plate (11) that is provided with in pulley (4) top, fixed plate (11) outside left side top is fixed and is provided with fixed case (2), fixed case (2) right side outside is fixed and is provided with fixed block (12), screw (9) have been seted up on fixed block (12) inside right side, fixed plate (11) top right side is fixed and is provided with hydraulic ram (3), it is provided with bolt (10) to fix between hydraulic ram (3) and fixed block (12), bolt (10) are located inside screw (9), fixed case (2) inside activity is provided with charging box (1).
2. The discharging platform for building construction according to claim 1, wherein: and pull rings (8) are fixedly arranged on the outer sides of the two sides of the right end of the support rod (7).
3. The discharging platform for building construction according to claim 1, wherein: the top end of the charging box (1) is fixedly provided with pull rings (8).
4. The discharging platform for building construction according to claim 1, wherein: and a pull ring (8) is fixedly arranged at the top end of the upper floor where the support rod (7) is located.
5. The discharging platform for building construction according to claim 1, wherein: the charging box (1) is movably arranged in the fixed box (2).
6. The discharging platform for building construction according to claim 1, wherein: and pull rings (8) are fixedly arranged on the left side of the outer part of the fixed box (2).
CN202021416358.XU 2020-07-17 2020-07-17 Construction is with platform of unloading Active CN212957691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021416358.XU CN212957691U (en) 2020-07-17 2020-07-17 Construction is with platform of unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021416358.XU CN212957691U (en) 2020-07-17 2020-07-17 Construction is with platform of unloading

Publications (1)

Publication Number Publication Date
CN212957691U true CN212957691U (en) 2021-04-13

Family

ID=75393543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021416358.XU Active CN212957691U (en) 2020-07-17 2020-07-17 Construction is with platform of unloading

Country Status (1)

Country Link
CN (1) CN212957691U (en)

Similar Documents

Publication Publication Date Title
WO2012056435A1 (en) Telescopic tower crane and scaffold
CN210313286U (en) Lifting device in light partition wall slat field
CN212957691U (en) Construction is with platform of unloading
CN214734024U (en) Indoor material conveying device in high-rise building construction process
CN108483190B (en) Intelligent aluminum alloy template material conveying device and operation method thereof
CN214780406U (en) Portable middle and high-rise hoisting device
CN212105183U (en) Safe formula is used for high-rise building's platform of unloading
CN207130627U (en) The overhead job platform of bridge construction
CN214653269U (en) Simple ALC wallboard hoisting equipment
CN213059778U (en) Crane for civil engineering
CN214269948U (en) Lifting device for dismantling wet joint formwork of bridge
CN213923658U (en) Conveying device for lifting materials in super high-rise building floor
CN211499833U (en) Novel hydraulic climbing type unloading platform matched with attached scaffold for use
CN210738106U (en) Material transfer platform applied to construction
CN212503705U (en) Assembled building element hoist device
CN218754748U (en) Transport device for demolishing materials of ancient buildings
CN215101614U (en) Earthwork overhead hoist for construction
CN210528304U (en) Material transportation frame of conveniently unloading for building
CN216918417U (en) High-rise building rubbish clearing device
CN213976583U (en) Lifting machine for civil construction engineering
CN211523220U (en) Underground continuous wall construction device
CN205531262U (en) Steel construction construction platform can rise automatically
CN220539250U (en) Steel pipe removes scaffold
CN214828254U (en) High-efficiency and high-safety lifting device for building engineering
CN214058848U (en) Chain plate bucket elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant