CN211572480U - Functional frame for building construction - Google Patents
Functional frame for building construction Download PDFInfo
- Publication number
- CN211572480U CN211572480U CN201921863357.7U CN201921863357U CN211572480U CN 211572480 U CN211572480 U CN 211572480U CN 201921863357 U CN201921863357 U CN 201921863357U CN 211572480 U CN211572480 U CN 211572480U
- Authority
- CN
- China
- Prior art keywords
- construction
- feeding
- bottom plate
- frame
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 9
- 238000010276 construction Methods 0.000 claims abstract description 64
- 230000001681 protective effect Effects 0.000 description 6
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a construction technical field is built in the room, and discloses a function frame is used in room construction. The functional frame for building construction comprises a base, a feeding frame and a construction frame, wherein universal wheels and a first hydraulic telescopic rod are mounted at the bottom of the base, the feeding frame comprises a feeding bottom plate and a feeding top plate, a second hydraulic telescopic rod is mounted at the top of the feeding bottom plate, and a charging bucket seat and a tool storage box are mounted at the top of the feeding top plate; the scaffold includes the construction bottom plate, third hydraulic telescoping rod is installed at the construction bottom plate top, the backup pad is installed to third hydraulic telescoping rod one end, the construction roof is installed at the backup pad top, construction roof top fixed mounting has the rail guard, this function frame is used in the construction in room, pay-off frame and scaffold have, conveniently convey the material to the constructor, the time has been practiced thrift, the work efficiency is improved, install the instrument receiver at the top of pay-off frame, can be used for accomodating construction tool, the rail guard is installed at the construction frame top, the factor of safety is increased.
Description
Technical Field
The utility model relates to a construction technical field is built in the room specifically is a function frame is used in construction is built in room.
Background
In the building construction project, the verticality of the wall surface needs to be guaranteed when the wall surface is built completely, the building completion of the wall surface is guaranteed by the arrangement of a scaffold when a building is built, and in the building industry, the scaffold refers to various supports which are erected for workers to operate and solve vertical and horizontal transportation on a construction site and mainly aims at up-and-down operation of constructors.
In the prior art, the scaffold has a complex structure and a certain potential safety hazard, is slow in erection speed, needs to be repeatedly disassembled and assembled, is too long in time consumption, and affects the whole project period, and for constructors, the disassembling and assembling workload is large, the labor intensity is high, and in construction, the scaffold with the structure is inconvenient for conveying materials or tools, the constructors adopt simple mechanisms of pulleys and ropes for lifting, no safety measures are provided, and the potential safety hazard is serious; on some private construction sites, construction personnel may even use "throw" to transport materials or tools, which is common in today's society. And need use multiple instrument at the building in-process, the instrument is abandoned at will not only is lost easily, causes the injury to constructor easily moreover.
SUMMERY OF THE UTILITY MODEL
The not enough to prior art, the utility model provides a function frame is used in construction is built in room possesses convenient feed, improves advantages such as efficiency of construction and construction protection receive and release, has solved the problem that the feed is inconvenient, the efficiency of construction is low and construction potential safety hazard.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides a function frame is used in construction in room, includes base, pay-off frame and scaffold, the top at the base is installed to the pay-off frame, the top at the base is installed to the scaffold.
The base bottom fixed mounting has the universal wheel, base bottom fixed mounting has first hydraulic telescoping rod, the one end fixed mounting that base bottom was kept away from to first hydraulic telescoping rod has the supporting seat.
The pay-off frame includes pay-off bottom plate and pay-off roof, pay-off bottom plate top center fixed mounting has the second hydraulic stretching pole, the one end fixed mounting that the pay-off bottom plate was kept away from to the second hydraulic stretching pole has the fixed block, the inside fixed mounting of fixed block has the connecting rod, the equal fixed mounting lifter in connecting rod both ends, the slider is all installed at the lifter both ends, the spout has all been seted up to the top of pay-off bottom plate and the bottom of pay-off roof, pay-off roof top fixed mounting has the storage bucket seat, pay-off roof top fixed mounting has the instrument receiver.
The construction comprises a construction bottom plate, a third hydraulic telescopic rod is fixedly mounted at the top of the construction bottom plate, a supporting plate is fixedly mounted at one end, away from the construction bottom plate, of the third hydraulic telescopic rod, a construction top plate is fixedly mounted at the top of the supporting plate, a protective guard is fixedly mounted at the top of the construction top plate, a protective door is arranged on one side of the protective guard, and a safety lock is fixedly mounted on the front surface of the protective door.
Furthermore, the universal wheel has four, four the universal wheel is the bottom four corners of rectangle symmetric distribution at the base, first hydraulic telescoping rod has four, four first hydraulic telescoping rod is the bottom four corners of rectangle symmetric distribution at the base.
Further, the lifter has four, four the lifter is equallyd divide into two sets ofly, and two sets of lifters fixed mounting respectively at the both ends of connecting rod, the specification and dimension looks adaptation of slider and spout, and slider movable mounting is inside the spout.
Furthermore, the number of the third hydraulic telescopic rods is four, and the four third hydraulic telescopic rods are distributed on the top of the construction bottom plate in a rectangular mode.
Furthermore, the feeding bottom plate and the construction bottom plate are both fixedly installed at the top of the base, and the construction bottom plate is located at the back of the feeding bottom plate.
The utility model has the advantages that:
1. this functional frame is used in construction is built in room has pay-off frame and scaffold, and the storage bucket seat is installed at the pay-off frame top, can put into the storage bucket seat with the storage bucket inside, and the pay-off frame can be sent the material to the position parallel to each other with workman's construction position, conveniently conveys the material to the constructor, owing to have the pay-off frame in addition, the constructor needn't go the transport material to go up and down the scaffold repeatedly, has practiced thrift the time, has improved work efficiency.
2. This function frame is used in construction is built in room installs the instrument receiver at the top of pay-off frame, can be used for accomodating construction tool, prevents that the instrument was thrown randomly and is leaded to lose and drop to cause the potential safety hazard that arouses, the rail guard is installed at the scaffold top, and the rail guard can prevent that constructor from falling, and constructor can increase the safety index with the safety belt card on the rail guard in addition.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below.
FIG. 1 is a left side view of the structure of the present invention;
FIG. 2 is a schematic view of the structure of the present invention;
fig. 3 is a schematic view of the top view structure of the feeding bottom plate of the present invention.
Description of reference numerals: 1-base, 2-feeding frame, 201-feeding bottom plate, 202-feeding top plate, 203-second hydraulic telescopic rod, 204-fixed block, 205-connecting rod, 206-lifting rod, 207-sliding block, 208-sliding groove, 209-charging bucket seat, 210-tool storage box, 3-construction frame, 301-construction bottom plate, 302-third hydraulic telescopic rod, 303-supporting plate, 304-construction top plate, 305-protective fence, 306-protective door, 307-safety lock, 4-universal wheel, 5-first hydraulic telescopic rod and 6-supporting seat.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-3, a functional frame for building construction includes a base 1, a feeding frame 2 and a scaffold 3, wherein the feeding frame 2 is installed on the top of the base 1, and the scaffold 3 is installed on the top of the base 1.
Base 1 bottom fixed mounting has universal wheel 4, universal wheel 4 has four, four universal wheels 4 are rectangle symmetric distribution in base 1's bottom four corners, the effect of universal wheel 4 is the convenient whole equipment that removes, base 1 bottom fixed mounting has first hydraulic telescoping rod 5, first hydraulic telescoping rod 5 has four, four first hydraulic telescoping rod 5 are rectangle symmetric distribution in base 1's bottom four corners, the one end fixed mounting that base 1 bottom was kept away from to first hydraulic telescoping rod 5 has supporting seat 6, 5 extensions of first hydraulic telescoping rod drive supporting seat 6 downstream, first hydraulic telescoping rod 5 finally supports whole equipment, supporting seat 6 plays support and fixed action.
The feeding frame 2 comprises a feeding bottom plate 201 and a feeding top plate 202, the feeding bottom plate 201 is fixedly arranged at the top of the base 1, a second hydraulic telescopic rod 203 is fixedly arranged at the center of the top of the feeding bottom plate 201, the second hydraulic telescopic rod 203 can stretch and retract to drive the feeding top plate 202 to lift, a fixed block 204 is fixedly arranged at one end, far away from the feeding bottom plate 201, of the second hydraulic telescopic rod 203, a connecting rod 205 is fixedly arranged inside the fixed block 204, lifting rods 206 are fixedly arranged at two ends of the connecting rod 205, four lifting rods 206 are provided, the four lifting rods 206 are divided into two groups, the two groups of lifting rods 206 are respectively and fixedly arranged at two ends of the connecting rod 205, sliding blocks 207 are arranged at two ends of the lifting rods 206, sliding grooves 208 are respectively arranged at the top of the feeding bottom plate 201 and the bottom of the feeding top plate 202, the sliding blocks 207 are matched with the specification and size of the, the top of the feeding top plate 202 is fixedly provided with a material barrel seat 209, a material barrel can be placed in the material barrel seat 209, the top of the feeding top plate 202 is fixedly provided with a tool storage box 210, and the tool storage box 210 can be used for placing construction tools.
Scaffold 3 includes construction bottom plate 301, the equal fixed mounting of construction bottom plate 301 is at base 1 top, and construction bottom plate 301 is located pay-off bottom plate 201, back construction bottom plate 301 top fixed mounting have third hydraulic telescoping rod 302, the flexible lift that drives construction roof 304 of third hydraulic telescoping rod 302, third hydraulic telescoping rod 302 has four, four third hydraulic telescoping rod 302 are the rectangular distribution at construction bottom plate 301's top, the one end fixed mounting that construction bottom plate 301 was kept away from to third hydraulic telescoping rod 302 has backup pad 303, backup pad 303 top fixed mounting has construction roof 304, construction roof 304 top fixed mounting has rail guard 305, rail guard 305 one side is provided with guard gate 306, guard gate 306 is positive fixed surface installs safety lock 307.
When in use, the equipment is moved to a construction position through the universal wheels 4, then the first hydraulic telescopic rod 5 is opened and extended downwards to drive the supporting seat 6 to move downwards to support the whole equipment, the equipment is fixedly supported, then a constructor opens a protective door 306 to enter the protective fence 305, after the constructor stands on a construction top plate 304 of the construction frame 3, the constructor starts a third hydraulic telescopic rod 302 to lift the construction top plate 304 to a construction position, then the charging basket containing the materials is placed in a charging basket seat 209 at the top of a feeding top plate 202 of the feeding frame 2, a second hydraulic telescopic rod 203 is opened to extend upwards to drive a fixed block 204 to rise upwards, a connecting rod 205 is driven to rise upwards to drive two groups of lifting rods 206 at two ends to approach to the middle, so that the feeder top plate 202 is fed to a position level with the constructor and the constructor can take out the tool from the inside of the tool storage box 210 for construction.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (5)
1. The utility model provides a function frame is used in construction in room, includes base (1), pay-off frame (2) and scaffold (3), its characterized in that: the feeding frame (2) is arranged at the top of the base (1), and the construction frame (3) is arranged at the top of the base (1);
the universal wheel (4) is fixedly installed at the bottom of the base (1), the first hydraulic telescopic rod (5) is fixedly installed at the bottom of the base (1), and the supporting seat (6) is fixedly installed at one end, far away from the bottom of the base (1), of the first hydraulic telescopic rod (5);
the feeding frame (2) comprises a feeding bottom plate (201) and a feeding top plate (202), a second hydraulic telescopic rod (203) is fixedly installed in the center of the top of the feeding bottom plate (201), a fixed block (204) is fixedly installed at one end, far away from the feeding bottom plate (201), of the second hydraulic telescopic rod (203), a connecting rod (205) is fixedly installed inside the fixed block (204), lifting rods (206) are fixedly installed at two ends of the connecting rod (205), sliding blocks (207) are installed at two ends of the lifting rod (206), sliding grooves (208) are formed in the top of the feeding bottom plate (201) and the bottom of the feeding top plate (202), a material barrel seat (209) is fixedly installed at the top of the feeding top plate (202), and a tool storage box (210) is fixedly installed at the top of the feeding top plate (202);
scaffold (3) are including construction bottom plate (301), construction bottom plate (301) top fixed mounting has third hydraulic telescoping rod (302), the one end fixed mounting that construction bottom plate (301) was kept away from in third hydraulic telescoping rod (302) has backup pad (303), backup pad (303) top fixed mounting has construction roof (304), construction roof (304) top fixed mounting has rail guard (305), rail guard (305) one side is provided with guard gate (306), the positive fixed surface of guard gate (306) installs safety lock (307).
2. The functional frame for building construction according to claim 1, wherein: universal wheel (4) have four, four universal wheel (4) are the bottom four corners of rectangle symmetric distribution at base (1), first hydraulic telescoping rod (5) have four, four first hydraulic telescoping rod (5) are the bottom four corners of rectangle symmetric distribution at base (1).
3. The functional frame for building construction according to claim 1, wherein: the lifting rods (206) are four, the lifting rods (206) are equally divided into two groups, the two groups of lifting rods (206) are fixedly installed at two ends of the connecting rod (205) respectively, the sliding blocks (207) are matched with the sliding grooves (208) in specification and size, and the sliding blocks (207) are movably installed inside the sliding grooves (208).
4. The functional frame for building construction according to claim 1, wherein: the number of the third hydraulic telescopic rods (302) is four, and the four third hydraulic telescopic rods (302) are distributed on the top of the construction bottom plate (301) in a rectangular mode.
5. The functional frame for building construction according to claim 1, wherein: the feeding bottom plate (201) and the construction bottom plate (301) are fixedly mounted at the top of the base (1), and the construction bottom plate (301) is located at the back of the feeding bottom plate (201).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921863357.7U CN211572480U (en) | 2019-10-31 | 2019-10-31 | Functional frame for building construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921863357.7U CN211572480U (en) | 2019-10-31 | 2019-10-31 | Functional frame for building construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211572480U true CN211572480U (en) | 2020-09-25 |
Family
ID=72530150
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921863357.7U Active CN211572480U (en) | 2019-10-31 | 2019-10-31 | Functional frame for building construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211572480U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112360131A (en) * | 2020-11-04 | 2021-02-12 | 江苏晟德机械设备有限公司 | Detachable integral lifting steel platform system for super high-rise variable-plane construction and construction method |
-
2019
- 2019-10-31 CN CN201921863357.7U patent/CN211572480U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112360131A (en) * | 2020-11-04 | 2021-02-12 | 江苏晟德机械设备有限公司 | Detachable integral lifting steel platform system for super high-rise variable-plane construction and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211572480U (en) | Functional frame for building construction | |
| CN110565938A (en) | Construction is with safe type hanging flower basket | |
| CN212715834U (en) | Scaffold for building construction | |
| CN211850741U (en) | A safe hanging flower basket for high-rise outer wall fitment construction | |
| CN212295575U (en) | Safe type scaffold frame for construction | |
| CN211448690U (en) | A working platform for shield tunnel segment removal | |
| CN210768117U (en) | Rail guard for building safety | |
| CN210710627U (en) | Elevator of adjustable wallboard | |
| CN209703967U (en) | A kind of Multifunctional decoration construction bracket | |
| CN219175792U (en) | A protective construction platform for high-rise buildings | |
| CN206815220U (en) | A kind of electronic fence of the telescopic lifting with current limiting bar for large-scale activity | |
| CN212773403U (en) | Electric lifting device for attached lifting scaffold | |
| CN205201453U (en) | Multifunctional workbench | |
| CN115959605A (en) | Lifter for construction site | |
| CN213595729U (en) | Safety protection device for hoisting machinery | |
| CN213204906U (en) | Safety scaffold for building engineering construction | |
| CN208633587U (en) | A kind of housing construction temporary traffic jump frame | |
| CN211253786U (en) | Cement tank with warning device | |
| CN210064115U (en) | Goods placing device convenient for taking and placing goods | |
| CN211472183U (en) | Safe hanging flower basket is used in bridge construction | |
| CN210457386U (en) | Electric power engineering construction protector | |
| CN220319258U (en) | Building engineering security fence | |
| CN218509059U (en) | Can have enough to meet need construction of use with platform of unloading | |
| CN214693197U (en) | Lifting frame for laying blast furnace electrical cables | |
| CN213626587U (en) | Hanging flower basket for construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |