CN218175832U - A auxiliary device for drilling bored concrete pile head abolishes - Google Patents

A auxiliary device for drilling bored concrete pile head abolishes Download PDF

Info

Publication number
CN218175832U
CN218175832U CN202221400558.5U CN202221400558U CN218175832U CN 218175832 U CN218175832 U CN 218175832U CN 202221400558 U CN202221400558 U CN 202221400558U CN 218175832 U CN218175832 U CN 218175832U
Authority
CN
China
Prior art keywords
concrete
support frame
auxiliary device
pile head
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221400558.5U
Other languages
Chinese (zh)
Inventor
陈岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221400558.5U priority Critical patent/CN218175832U/en
Application granted granted Critical
Publication of CN218175832U publication Critical patent/CN218175832U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an auxiliary device for drilling bored concrete pile head abolishes relates to the construction field, aims at solving the pile foundation top and needs artifical breakage to demolish the extravagant problem of the big energy of work load, and its technical scheme main points are: the utility model provides an auxiliary device for drilling bored concrete pile head abolishes, includes the body, the body is including the support frame, install on the support frame and be arranged in sinking the vibrating device of body in the concrete, be provided with the sprinkler that is used for the water spray to get into the concrete on the body, the body is independent of the steel reinforcement cage and can with the up end contact of steel reinforcement cage and keep the body stable. The utility model discloses an auxiliary device for bored concrete pile head breaks can reduce the broken work load of concrete on the basis of guaranteeing pile foundation structural strength, reduces the building construction cost.

Description

A auxiliary device for drilling bored concrete pile head is broken
Technical Field
The utility model relates to a building field, more specifically say, it relates to an auxiliary device that is used for drilling bored concrete pile head to abolish.
Background
Pile foundation construction is essential basic work in building construction, and pile foundation construction usually is to drill at first, then clear the hole, and the steel reinforcement cage is placed to clear the qualified back in hole, and the stake foundation concrete is poured into best.
In the industry at present, in order to ensure the structural strength of a pile foundation, when concrete is poured in a reinforcement cage, more concrete can be poured, the height of a concrete foundation pile is higher than a set height by 80-100cm, so that the concrete in the reinforcement cage can be compacted under the action of self gravity, the contact between the concrete and a steel bar is more compact, after the pile foundation is fixedly formed, the formed concrete higher than the set height is knocked off through mechanical equipment, and only the needed concrete pile foundation is left for carrying out the next construction step.
At present, the concrete blocks with the length of 80-100cm are more than the concrete blocks in the industry, the common treatment mode is to crush the concrete blocks by crushing equipment, to re-screen the crushed concrete for recycling, and to crush the concrete blocks with the same size, so that great labor and energy are consumed, which is a construction expense which cannot be ignored in the construction industry, thus the construction cost is high, and the energy waste is caused.
Therefore, a new solution is needed to solve this problem.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide an auxiliary device for bored concrete pile head breaks away can reduce the convenient broken intensity of guaranteeing the pile foundation of concrete structure intensity.
The above technical object of the present invention can be achieved by the following technical solutions: the utility model provides an auxiliary device for drilling bored concrete pile head abolishes, includes the body, the body is including the support frame, install on the support frame and be arranged in sinking the vibrating device of body in the concrete, be provided with the sprinkler that is used for the water spray to get into the concrete on the body, the body is independent of the steel reinforcement cage and can with the up end contact of steel reinforcement cage and keep the body stable.
The utility model discloses further set up to: the vibration device comprises a concrete vibrator, and a body of the concrete vibrator is fixedly connected with the support frame.
The utility model discloses further set up to: the spraying device comprises a hollow guide pipe, a plurality of water outlet holes are formed in the guide pipe, the guide pipe is fixed on the support frame, and the guide pipe is connected with a water tank and overflows water from the water outlet holes through the water tank.
The utility model discloses further set up to: the water tank is provided with a high-pressure water pump for spraying water out of the water outlet hole of the guide pipe.
The utility model discloses further set up to: the guide pipe is arranged in a shape of a Chinese character 'hui' and used for enabling water in the guide pipe to circularly overflow.
The utility model discloses further set up to: the bottom integrated into one piece's of support frame spacing post, spacing post is used for stretching out the support frame and can contradict at the up end of steel reinforcement cage.
The utility model discloses further set up to: the support frame is further provided with an auxiliary lifting device used for enabling the body to be separated from the concrete and the reinforcement cage.
The utility model discloses further set up to: the auxiliary lifting device comprises at least one lifting column, one end of the lifting column is fixedly connected with the support frame, and the other end of the lifting column extends out of the body.
The utility model discloses further set up to: and scales are marked on the hoisting column.
To sum up, the utility model discloses following beneficial effect has: through setting up the body above the steel reinforcement cage, the body is including the support frame of installing vibrating device, like this under vibrating device's vibration effect, can carry out better compaction with the concrete in the steel reinforcement cage, guarantee the concrete in the steel reinforcement cage and the more closely knit contact of steel reinforcement cage, thereby guarantee the structural strength of pile foundation, still be provided with sprinkler on the support frame simultaneously, sprinkler is arranged in sinking into the concrete at the body in the time of spraying water and dilutes the concrete that is located the steel reinforcement cage upper end, thereby make the structural strength that the concrete piece that 80-100cm later stage above the steel reinforcement cage needs the broken concrete piece obtain great reduction, just so can both guarantee the structural strength of pile foundation, make the concrete piece that is located the steel reinforcement cage top can be very light broken, thereby the broken cost is reduced, the efficiency is improved, thereby the construction cost is reduced, better accord with energy saving and emission reduction's policy.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1. a body; 2. a support frame; 3. a vibrating device; 4. a conduit; 5. a water outlet hole; 6. a limiting column; 7. and (5) hoisting the column.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
An auxiliary device for breaking a concrete pile head of a bored pile is shown in figure 1 and comprises a body 1, wherein the body 1 can be set into any shape, in order to better work, the body 1 can be set into a hollow cylinder shape, a support frame 2 is integrally formed at the bottom of the body 1, the support frame 2 can be arranged in a cross shape, a vibration device 3 is fixedly arranged at the center of the support frame 2, the support frame 2 can be set into a thin structure so as to reduce the resistance of the support frame, and meanwhile, the structural strength of the support frame can be ensured to be enough to support the operation of the whole equipment; the vibration device 3 can be selected from a common concrete vibrator in the industry, namely a machine tool for tamping by utilizing the vibration action when concrete is poured, the machine tool is driven by electric power or compressed air to rotate eccentrically or impact reciprocally and vibrate quickly, and the vibration device can be arranged above the support frame 2 or below the support frame 2 under the condition of not influencing the operation.
Be provided with pipe 4 simultaneously on body 1, pipe 4 is hollow setting, and can be at pipe 4 inner loop for water, can set up pipe 4 to the type of returning, set up to two ring structures from top to bottom as shown in the figure, through a plurality of pipe connection between two rings, a plurality of delivery port 5 has been seted up on ring and pipeline, can connect external water tank through rubber hose on the ring, and can input water into pipe 4 through the booster pump, make the delivery port can be ceaselessly spray water to all directions.
The working principle of the scheme is as follows: when concrete pouring in the reinforcement cage exceeds a preset height, the body 1 is placed into concrete, the vibration device 2 is started, the vibration device 2 can gradually sink into the concrete in the process of deflection rotation of the vibration device 2, impact vibration can be continuously generated on the concrete in the sinking process, and therefore the concrete is compacted, the concrete is better contacted with the reinforcement cage, meanwhile, in order to ensure the position of the body 1 in the concrete, the tail end of the support frame 2 extends for a stroke to form a limiting column 6, the limiting column 6 can be abutted to the upper end face of the reinforcement cage, when the vibration device 2 drives the body 1 to sink, the limiting column 6 cannot sink any more when abutting to the end face of the reinforcement cage, so that the concrete in the reinforcement cage cannot be damaged, and the compaction effect can be achieved; certainly, it is more preferable that the tail end of the limiting column 6 can be fixedly provided with the elastic part such as a spring, one section of the spring is fixed on the limiting column 6, and the other end of the spring can abut against the side wall of the reinforcement cage, so that the vibration can be better buffered in the vibration process. In the sinking process of the vibrating device 2, the water outlet 5 of the conduit 4 continuously sprays water, so that the concrete above the reinforcement cage can be diluted, if water is only poured from the outside, the dilution effect cannot be realized, because the water cannot enter the concrete, the concrete above the reinforcement cage can be changed into a cement state only by sinking the conduit 4 into the concrete for water spraying dilution, and the structural strength of the concrete is relatively low, so that the concrete can be easily broken; the breaking cost can be greatly reduced; in order to conveniently take out the body 1 after construction is completed, the lifting columns 7 are fixedly mounted on the body 1, the lifting columns 7 can be provided with a plurality of lifting columns, the height of each lifting column 7 needs to be higher than that of the guide pipe 4, workers can conveniently take out the body 1 from concrete by contacting the lifting columns, scales can be marked on the lifting columns 7, and the workers can know the depth of the body immersed in the concrete at any time, so that the working progress is known; after the body reaches the position, can arrange the staff at any time and take out the body, avoid directly fixing in the concrete by the concrete when solidifying.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection not only limits in above-mentioned embodiment, and the fan belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that modifications and embellishments within the scope of the present disclosure may be made by those skilled in the art without departing from the principles of the present disclosure.

Claims (9)

1. The utility model provides an auxiliary device that is used for bored concrete pile head to abolish, includes body (1), its characterized in that: the concrete spraying device is characterized in that the body (1) comprises a support frame (2), a vibration device (3) used for sinking the body (1) into concrete is installed on the support frame (2), a spraying device used for spraying water into the concrete is arranged on the body (1), and the body (1) is independent of a steel reinforcement cage, can be in contact with the upper end face of the steel reinforcement cage and keeps the body stable.
2. The auxiliary device for breaking the concrete pile head of the bored pile according to claim 1, wherein: the vibrating device (3) comprises a concrete vibrator, and a body of the concrete vibrator is fixedly connected with the support frame (2).
3. The auxiliary device for breaking the concrete pile head of the bored pile according to claim 1, wherein: the spraying device comprises a hollow guide pipe (4), a plurality of water outlet holes (5) are formed in the guide pipe (4), the guide pipe (4) is fixed on the support frame (2), and the guide pipe (4) is connected with a water tank and overflows water from the water outlet holes (5) through the water tank.
4. The auxiliary device for breaking the concrete pile head of the bored pile according to claim 3, wherein: the water tank is provided with a high-pressure water pump for spraying water out of the water outlet hole (5) of the guide pipe (4).
5. The auxiliary device for breaking the concrete pile head of the bored pile according to claim 4, wherein: the guide pipe (4) is arranged in a shape of a Chinese character 'hui' and used for enabling water in the guide pipe (4) to overflow in a circulating mode.
6. The auxiliary device for breaking the concrete pile head of the bored pile according to claim 1, wherein: the bottom integrated into one piece's of support frame (2) spacing post (6), spacing post (6) are used for stretching out support frame (2) and can contradict at the up end of steel reinforcement cage.
7. An auxiliary device for bored pile concrete pile head demolition according to claim 1 or 6, wherein: and the support frame (2) is also provided with an auxiliary lifting device for separating the body from the concrete and the reinforcement cage.
8. The auxiliary device for bored pile concrete pile head demolition according to claim 7, wherein: the auxiliary lifting device comprises at least one lifting column (7), one end of the lifting column (7) is fixedly connected with the support frame (2), and the other end of the lifting column extends out of the body (1).
9. The auxiliary device for breaking the concrete pile head of the bored pile according to claim 8, wherein: and scales are marked on the hoisting column (7).
CN202221400558.5U 2022-06-07 2022-06-07 A auxiliary device for drilling bored concrete pile head abolishes Expired - Fee Related CN218175832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221400558.5U CN218175832U (en) 2022-06-07 2022-06-07 A auxiliary device for drilling bored concrete pile head abolishes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221400558.5U CN218175832U (en) 2022-06-07 2022-06-07 A auxiliary device for drilling bored concrete pile head abolishes

Publications (1)

Publication Number Publication Date
CN218175832U true CN218175832U (en) 2022-12-30

Family

ID=84609666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221400558.5U Expired - Fee Related CN218175832U (en) 2022-06-07 2022-06-07 A auxiliary device for drilling bored concrete pile head abolishes

Country Status (1)

Country Link
CN (1) CN218175832U (en)

Similar Documents

Publication Publication Date Title
CN203007952U (en) Concrete vibrating equipment for super-deep major-diameter cast-in-place pile
CN111021355B (en) Hoisting type cast-in-place pile head cutting device
CN201666157U (en) Inverted arch integral type moving die carrier
CN201738321U (en) Multifunctional pile machine
CN218175832U (en) A auxiliary device for drilling bored concrete pile head abolishes
CN210288391U (en) Supporting device for breaking reinforced concrete cast-in-place pile head by high-pressure water jet
CN113774822B (en) Dismantling method of old reinforced concrete bridge
CN103485340B (en) A kind of antinode plate fore shaft steel pile casting device and construction method thereof
CN112240022A (en) Construction method and construction equipment for static pressure immersed tube pile
CN112779912A (en) Pile foundation pile head integral breaking structure
CN107461145A (en) A kind of construction piling equipment
CN112343045A (en) Static pressure pipe pile sinking device with recyclable pile tip and construction method
CN109403326B (en) Method for taking out reinforcement cage based on serious hole collapse of drilled pile
CN104790374B (en) A kind of double end rammer compacter
CN201459734U (en) Dry bored pile tamper
CN213205625U (en) Drill bit for construction of concrete cast-in-situ bored pile
CN203475425U (en) Loop plate preliminary shaft steel casing device
CN212772367U (en) Drilling bored concrete pile mud processing apparatus
CN109877136A (en) A kind of hydraulic recycling plant of high quantity of reinforcement waste concrete and its disassembling method
CN211922229U (en) Highway quartering hammer
CN211597839U (en) Novel pound wall device
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
CN205892591U (en) Winch
CN102926383B (en) A kind of single shaft SMW engineering method stake machine
CN203741893U (en) Reinforcing system with reverse anchor rod static pressure piles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221230

CF01 Termination of patent right due to non-payment of annual fee