CN201738321U - Multifunctional pile machine - Google Patents

Multifunctional pile machine Download PDF

Info

Publication number
CN201738321U
CN201738321U CN 201020282554 CN201020282554U CN201738321U CN 201738321 U CN201738321 U CN 201738321U CN 201020282554 CN201020282554 CN 201020282554 CN 201020282554 U CN201020282554 U CN 201020282554U CN 201738321 U CN201738321 U CN 201738321U
Authority
CN
China
Prior art keywords
pile
functional
chassis
construction
stake machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201020282554
Other languages
Chinese (zh)
Inventor
朱建舟
张后禅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongji Pile Industry Co Ltd
Original Assignee
Shanghai Zhongji Pile Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongji Pile Industry Co Ltd filed Critical Shanghai Zhongji Pile Industry Co Ltd
Priority to CN 201020282554 priority Critical patent/CN201738321U/en
Application granted granted Critical
Publication of CN201738321U publication Critical patent/CN201738321U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a multifunctional pile machine, which comprises a chassis, a running mechanism arranged below the chassis, and a control room arranged above the chassis, wherein at least one crane and a traveling crane with a winch are arranged above the chassis, and the traveling crane is used for supporting a power head for executing multiple pile machine operation by the winch. The utility model provides the multifunctional pile machine for operation of pile pressing, pile driving, vibration pile pressing or deep mixing of cement composite soil, and the pile machine is combined by a pile frame of a walking pile driver and a crane; the pile machine solves the problem that various construction processes need to be realized by matching multiple pile machines so as to complete the pile forming construction, and simultaneously, the pile driver can also be used to form piles in the separate construction process such as hammering construction, vibratory hammer construction and boring construction, meets the requirements of the development of pile foundation and the continuous improvement of the pile forming process for the pile driver well, and reduces construction cost and personnel and construction equipment use cost.

Description

A kind of multi-functional stake machine
Technical field
The utility model relates to a kind of construction implement, especially a kind of multi-functional stake machine that possesses multiple function.
Background technology
Existing pile foundation type mainly contains on-the-spot boring or tube-sinking cast-in-situ pile and preformed pile, pile machinery mainly is divided into pile-driving machine, hammering stake machine and Static pressure pile driver, except that Static pressure pile driver, the primary structure form of other machines is mainly the form of structure that pile frame adds power hammer, and pile frame mainly contains walking and two kinds of forms of crawler type.Above-mentioned existing stake machine form all is single dynamic structure form.
Now the construction requirement for pile foundation is more and more higher in the city, and the form of pile foundation is also more and more simultaneously, and these two kinds of pile-formation process that technology is separated of existing independent boring and prefabricated pile also have the technology of planting of both combinations.The urban architecture middle-high building is more and more now simultaneously; effective utilization of the underground space is also also more and more higher for the requirement of bracing of foundation pit; the form of structure of bracing of foundation pit material and kind are also more and more, for the environmental protection requirement of bracing of foundation pit and also more and more higher to the settlement request of surrounding buildings.
Form of structure commonly used has several ways such as bored pile, anchor pole stake, SMW worker's method and prefabricated units insertion cement mixing pile water-stop curtain in the bracing of foundation pit engineering at present, and common way is boring and plants the construction technology that a technology combines.Present existing stake machine all just has single pile function, separate unit stake machine can only be implemented a kind of piling work, can only carry out the piling operation as pile press, hammer stake machine can only be hammered an operation into shape, bore the stake machine and can only bore a notes stake operation, relate to that kinds of processes must many stake machines supporting could smooth construction, this all is disadvantageous for improving efficiency of construction, reducing operating expenses, shorten construction period.
Traditional multi-functional stake machine mostly is development on the basis of original fluid pressure type static pile press, only considered generally to bear the requirement of bore forming technology of the engineering piles of vertical load, and can't satisfy for the requirement of special dimensions such as bank protection retaining soil and shore protection type pile foundation form, as being development on fluid pressure type static pile press basis in the Chinese patent application 02240699.9,200420057622, only considered the requirement of construction works stake.Though 200420057622 machines of the patent No. can satisfy the requirement of construction on land, but because silent piling mechanism is positioned at a machine middle part, stride walking step increases when cooperating outside pile frame to carry out integrated construction, efficiency of construction is affected, and can't accomplish rapidly and efficiently moving when drilling pile technological forming campshed wall is constructed.Can't accomplish effect that machine drill hole and hydraulic static piling simultaneously construct when constructing simultaneously aboard ship.
The utility model content
The technical problems to be solved in the utility model provides a kind of multi-functional stake machine, to reduce or to avoid problem noted earlier.
For solving the problems of the technologies described above, the utility model proposes a kind of multi-functional stake machine, comprise the chassis, be arranged at the walking mechanism of below, described chassis and the control room that is arranged at top, described chassis, wherein, top, described chassis also is provided with the overhead traveling crane of at least one crane and a band hoist engine, and described overhead traveling crane supports the unit head of carrying out multiple stake machine operation by described hoist engine.
Preferably, described unit head can be respectively applied for and carry out the mix cement operation of composite earth of piling, piling, vibration piling or deep layer.
Preferably, described unit head can connect respectively and be used to carry out the mix cement instrument of operation of composite earth of piling, piling, vibration piling or deep layer.
Preferably, also be provided with a multi-functional clamp on the described chassis, described multi-functional clamp setting is positioned at the below of described crane.
Preferably, also be provided with a multi-functional clamp on the described chassis, described multi-functional clamp setting is positioned at the below of described overhead traveling crane.
Preferably, the position is provided with a multi-functional clamp adjustablely on the described chassis.
Preferably, described overhead traveling crane comprises a king-tower frame and a diagonal brace.
Preferably, described walking mechanism comprises horizontal stride and the vertical stride that is positioned at below, described chassis.
Preferably, described walking mechanism is removably disposed in the below on described chassis.
Preferably, the described walking mechanism of below, described chassis can be dismantled from this chassis, and described multi-functional stake machine can be installed on boats and ships or the floating platform by the described chassis that disassembles described walking mechanism.
The utility model is to provide a kind of piling, piling, the mix cement multi-functional stake machine of operation of composite earth of vibration piling or deep layer, these facility have crane of a walking stake machine pile frame assembling to combine, this machine has solved multiple construction technology and must use many stake machines to cooperate the shortcoming of ability bore forming, this machine can be constructed as independent construction technology such as hammering again simultaneously, vibrating hammer construction and drilling construction pile use, well satisfied the requirement updated of the development of pile foundation and pile-formation process, reduced operating expenses and personnel for the stake machine, the cost of use of construction equipment.This organizational security has stayed on the basis of advantage of conventional piles machine simultaneously, has increased a multi-functional clamp, can be good at guaranteeing pile body verticality and pile quality in the bore forming.Adopt the pile frame structure of walking also can better be applicable to various construction plants condition, the security performance of pile frame also can be guaranteed.This machine is simple in structure, multiple functional, cost is lower, easy to maintenance, can be suitable for various pile foundation construction requirements.
Description of drawings
The following drawings only is intended to the utility model done and schematically illustrates and explain, does not limit scope of the present utility model.Wherein,
Fig. 1 shows is lateral plan according to the multi-functional stake machine of a specific embodiment of the present utility model;
What Fig. 2 showed is the front view of multi-functional stake machine shown in Figure 1;
What Fig. 3 showed is the user mode reference diagram of multi-functional stake machine shown in Figure 1.
The specific embodiment
Understand for technical characterictic of the present utility model, purpose and effect being had more clearly, now contrast the description of drawings specific embodiment of the present utility model.Wherein, identical parts adopt identical label.
Fig. 1-2 shows the multi-functional stake machine according to a specific embodiment of the present utility model, and wherein, what Fig. 1 showed is the lateral plan of this multi-functional stake machine; The front view of the shown in Figure 1 multi-functional stake machine that Fig. 2 shows.
Shown in Fig. 1-2, comprise chassis 7, be removable installed in the walking mechanism 9,10 of 7 belows, chassis and the control room 11 that is arranged at 7 tops, chassis according to a kind of multi-functional stake machine of the present utility model, 7 tops, chassis also are provided with the overhead traveling crane 1 of at least one crane 6 and a band hoist engine 12, and overhead traveling crane 1 is used for supporting the unit head 2 of carrying out multiple stake machine operation by hoist engine 12.As shown in the figure, overhead traveling crane 1 comprises a king-tower frame 5 and a diagonal brace 4; In addition, the walking mechanism in the utility model 9,10 further comprises horizontal stride 10 and the vertical stride 9 that is positioned at 7 belows, chassis.
In according to a specific embodiment of the present utility model, unit head 2 can be respectively applied for carries out the operations such as composite earth that mix cement of piling, piling, vibration piling or deep layer, further, in another specific embodiment, unit head 2 can connect respectively and be used to carry out the mix cement instrument 3 of operations such as composite earth of piling, piling, vibration piling or deep layer.
In addition, in according to another specific embodiment of the present utility model, also be provided with a multi-functional clamp 8 on the chassis 7, this multi-functional clamp 8 position on chassis 7 can be adjusted at any time, it can be provided with the below that is positioned at crane 6, also can be positioned at the below of overhead traveling crane 1, perhaps be positioned at other any suitable position.
The major function feature of the above multi-functional stake machine is to pass through the various constructing operation instruments 3 of unit head 2 arbitrary combination, multiple borer, static pile press, shocks pile driver, vibration pile press, the deep layer instrument 3 of multiple plant equipment such as compound earth pile machine, cementitious composite Tu Fangshenweimuqiang, diaphragm wall, holing with slurry wall protection pile forming machine that mixes cement for example, thus can on a machinery equipment, carry out simultaneously and finish multiple different construction technology, the construction ability of construction technology method according to engineering design different process standard.
In addition, the utility model also is provided with multi-functional clamp 8, and this multi-functional clamp 8 is actually a kind of many specifications anchor clamps that can adapt to various difform engineering piles, can carry out various special-shaped Construction of Engineering Pile.
And this multi-functional stake machine can also be arranged to very easily by chassis 7 and carry out various Foundation Design operations waterborne, emergency repair engineering construction on boats and ships or the floating platform after removing bottom stride 9,10.Finish this machine of use under the equal engineering construction condition, have engineering and use mechanical quantity few, energy consumption is few, finish the efficient height, construction quality is good, the duration is short, little to the surrounding enviroment influence, save the incomparable original advantage of other construction machineries such as construction costs.
King-tower frame 5 is unit head 2 or the suspension of other pile-formation process pile dynamic power machine and the guiding pylon of multi-functional stake machine of the present utility model, crane 6 is mainly lifting pile body or the use of other matching operation machinery when fitting in pile driving construction, and the multi-functional clamp 8 of this moment can optionally be installed on king-tower frame 5 positions of overhead traveling crane 1 to be controlled to pile verticality.When carrying out the construction of two-in-one pile-formation process, king-tower frame 5 is mainly the hanger of the instrument 3 of unit head 2, hole or the construction of cement mixing pile, the function of crane 6 then is the lifting machinery of implanting prefabricated class framework and the suspension bracket of hanging pile unit head 2 (as vibrating hammer, hydraulic vibration driver), multi-functional clamp is positioned under the loop wheel machine of crane 6 for 8 this moments, is mainly the verticality of control prefabricated units pile body and the positioning requirements of pile body position.
Taking and expense of engineering time and plant equipment saved in construction when the utility model carries out kinds of processes under can the situation of non-interference.The interior adjustment of certain limit of longitudinal separation and verticality is carried out in king-tower frame 5 in this machine and multi-functional clamp 8 visual requirements, to adapt to the requirement of different construction occasions and construction technologies.
This machine only need be removed stake motor spindle stride when carrying out over-water construction, and chassis 7 is installed on boats and ships or the floating platform, also can be mounted to rail mounted or swivel base formula, carries out ram machine construction waterborne and all kinds of emergency repair operation waterborne easily.
In a word, when the utility model has well solved on moulding bank protection soil blocking pile or river course slope protection stake and the ship construction slope protection pile to the requirement of stake machine, and when adopting the highrise pile cap construction to the requirement (pile body height above ground level greater than stake machine hydraulic pressure centre bore overhead can't move a machine during construction) of stake machine.The utility model development on reference to the basis of the advantage of traditional hammering stake machine, pile-driving machine and fluid pressure type static pile press, multi-functional stake function of the present utility model is applied to the requirement of various applications to pile foundation construction, can rapid construction, it can not be the fast moving auxiliary construction that can satisfy stake machine when moulding keeps off the drilling pile technology of native bank protection class stake (bracing of foundation pit, the retaining soil slope protection pile of high-grade highway, high-speed railway) and slope protection pile and engineering piles.
Though it will be appreciated by those skilled in the art that the utility model is that mode according to a plurality of embodiment is described, and is not that each embodiment only comprises an independently technical scheme.Narration like this only is for the sake of clarity in the manual; those skilled in the art should make manual as a wholely to be understood, and regard technical scheme related among each embodiment as the mode that can be combined into different embodiment mutually understand protection domain of the present utility model.
The above only is the schematic specific embodiment of the utility model, is not in order to limit scope of the present utility model.Any those skilled in the art, equivalent variations, the modification of being done under the prerequisite that does not break away from design of the present utility model and principle and combining all should belong to the scope of the utility model protection.

Claims (10)

1. multi-functional stake machine, comprise chassis (7), be arranged at the walking mechanism (9,10) of below, described chassis (7) and the control room (11) that is arranged at top, described chassis (7), it is characterized in that, top, described chassis (7) also is provided with the overhead traveling crane (1) of at least one crane (6) and a band hoist engine (12), described overhead traveling crane (1 unit head (2) by the multiple stake of described hoist engine (12) support execution machine operation.
2. multi-functional stake machine according to claim 1 is characterized in that, described unit head (2) can be respectively applied for carries out the mix cement operation of composite earth of piling, piling, vibration piling or deep layer.
3. multi-functional stake machine according to claim 1 is characterized in that, described unit head (2) can connect respectively and be used to carry out the mix cement instrument (3) of operation of composite earth of piling, piling, vibration piling or deep layer.
4. multi-functional stake machine according to claim 1 is characterized in that also be provided with a multi-functional clamp (8) on described chassis (7), described multi-functional clamp (8) setting is positioned at the below of described crane (6).
5. multi-functional stake machine according to claim 1 is characterized in that also be provided with a multi-functional clamp (8) on described chassis (7), described multi-functional clamp (8) setting is positioned at the below of described overhead traveling crane (1).
6. multi-functional stake machine according to claim 1 is characterized in that described chassis (7) are gone up the position and are provided with a multi-functional clamp (8) adjustablely.
7. multi-functional stake machine according to claim 1 is characterized in that described overhead traveling crane (1) comprises a king-tower frame (5) and a diagonal brace (4).
8. multi-functional stake machine according to claim 1 is characterized in that, described walking mechanism (9,10) comprises horizontal stride (10) and the vertical stride (9) that is positioned at below, described chassis (7).
9. multi-functional stake machine according to claim 1 is characterized in that described walking mechanism (9,10) is removably disposed in the below of described chassis (7).
10. multi-functional stake machine according to claim 1, it is characterized in that, the described walking mechanism (9,10) of below, described chassis (7) can be dismantled from this chassis (7), and described multi-functional stake machine can be installed on boats and ships or the floating platform by the described chassis (7) that disassembles described walking mechanism (9,10).
CN 201020282554 2010-08-05 2010-08-05 Multifunctional pile machine Expired - Fee Related CN201738321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020282554 CN201738321U (en) 2010-08-05 2010-08-05 Multifunctional pile machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020282554 CN201738321U (en) 2010-08-05 2010-08-05 Multifunctional pile machine

Publications (1)

Publication Number Publication Date
CN201738321U true CN201738321U (en) 2011-02-09

Family

ID=43553599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020282554 Expired - Fee Related CN201738321U (en) 2010-08-05 2010-08-05 Multifunctional pile machine

Country Status (1)

Country Link
CN (1) CN201738321U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561350A (en) * 2012-02-09 2012-07-11 安徽力达实业股份有限公司 Combined static pile press
CN103628479A (en) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 Shaft-bottom power-head counterboring precast-pile pressing construction method and device
CN104947669A (en) * 2015-05-27 2015-09-30 成都绿迪科技有限公司 Vehicle-amounted portable structure of spiral pile driver
CN105735277A (en) * 2016-04-19 2016-07-06 黑龙江龙华岩土工程有限公司 Hammering type pile machine mixing and jet grouting device and pile forming method thereof
CN106245647A (en) * 2016-08-25 2016-12-21 张赛 The miniature piling equipment in a kind of construction site
CN106677180A (en) * 2017-02-17 2017-05-17 北京中岩大地科技股份有限公司 Multi-function perpendicularity adjusting equipment
CN107340786A (en) * 2017-06-26 2017-11-10 中交航局安装工程有限公司 A kind of control system of DCM ships slurrying amount
CN110344414A (en) * 2019-07-12 2019-10-18 刘建军 A kind of pilot hole plant stake piling all-in-one machine

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561350A (en) * 2012-02-09 2012-07-11 安徽力达实业股份有限公司 Combined static pile press
CN103628479A (en) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 Shaft-bottom power-head counterboring precast-pile pressing construction method and device
CN103628479B (en) * 2012-08-27 2017-05-10 上海中技桩业股份有限公司 Shaft-bottom power-head counterboring precast-pile pressing construction method and device
CN104947669A (en) * 2015-05-27 2015-09-30 成都绿迪科技有限公司 Vehicle-amounted portable structure of spiral pile driver
CN105735277A (en) * 2016-04-19 2016-07-06 黑龙江龙华岩土工程有限公司 Hammering type pile machine mixing and jet grouting device and pile forming method thereof
CN106245647A (en) * 2016-08-25 2016-12-21 张赛 The miniature piling equipment in a kind of construction site
CN106245647B (en) * 2016-08-25 2018-12-18 江山锐意科技服务有限公司 A kind of miniature piling equipment in construction site
CN106677180A (en) * 2017-02-17 2017-05-17 北京中岩大地科技股份有限公司 Multi-function perpendicularity adjusting equipment
CN107340786A (en) * 2017-06-26 2017-11-10 中交航局安装工程有限公司 A kind of control system of DCM ships slurrying amount
CN110344414A (en) * 2019-07-12 2019-10-18 刘建军 A kind of pilot hole plant stake piling all-in-one machine

Similar Documents

Publication Publication Date Title
CN201738321U (en) Multifunctional pile machine
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN201924360U (en) Multifunctional hydraulic static pile press
CN105887876B (en) A kind of construction method and its pile-forming apparatus of cast-in-place major diameter combination thin-walled screw thread pile tube
CN201137057Y (en) Bridge subaqueous base floating type borehole platform
CN101614019A (en) The multilayer underground structure next to existing building self-supporting construction method
CN103437348A (en) Construction device and method of pile peripheral cemented soil cast-in-place stiffness core pile
CN2926319Y (en) Rooted foundation and anchored topped-push construction set apparatus
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN201891123U (en) Single-wall steel hanging box with concrete bottom plate
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN1488818A (en) Jacketed disc pile and piling method, extruding-expanding device, pile sinking machine and use
CN203654309U (en) Pile-caisson hydraulic structure
CN203654196U (en) Guide apparatus for large and multifunctional over-water construction platform
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN202144598U (en) Sunk type underground structure
CN102926382B (en) A kind of construction method of SMW engineering method
CN209779640U (en) foundation pit supporting pile top crown beam construction structure
CN105604061B (en) A kind of surface unit and its construction method entering rock installation for steel-pipe pile in water
CN102345287A (en) Construction method of large-diameter cast-in-situ thin-wall concrete composite pile and special hole forming device
CN201202114Y (en) Bearing pile
CN202865842U (en) Multifunctional pile establishing machine
CN201459708U (en) Rotatable multi-shaft drill hole irrigation concrete occlusion guard post wall
CN106400814A (en) Foundation pit supporting method
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20180805

CF01 Termination of patent right due to non-payment of annual fee