CN202865842U - Multifunctional pile establishing machine - Google Patents

Multifunctional pile establishing machine Download PDF

Info

Publication number
CN202865842U
CN202865842U CN 201220580308 CN201220580308U CN202865842U CN 202865842 U CN202865842 U CN 202865842U CN 201220580308 CN201220580308 CN 201220580308 CN 201220580308 U CN201220580308 U CN 201220580308U CN 202865842 U CN202865842 U CN 202865842U
Authority
CN
China
Prior art keywords
chassis
pile
machine
disc
pile driver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220580308
Other languages
Chinese (zh)
Inventor
严平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Nanlian Base Foundation Engineering Co Ltd
Original Assignee
Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Nanlian Base Foundation Engineering Co Ltd filed Critical Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority to CN 201220580308 priority Critical patent/CN202865842U/en
Application granted granted Critical
Publication of CN202865842U publication Critical patent/CN202865842U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a multifunctional pile establishing machine which comprises a walking mechanism, chassis arranged above the walking mechanism, an operating room, a stand column, a rear support matched with the stand column and a crown block with a winding engine, wherein the operating room and the stand column are arranged on the chassis,. The crown block is connected with operating equipment which carries out multiple pipe machine operations through the winding engine, the chassis comprise an upper chassis and a lower chassis, and the upper chassis is connected with the lower chassis through a rotary mechanism and can rotate in 360 degrees around a center. The stand column is hinged with upper chassis, the rear support comprises an adjusting oil cylinder, the operating room adjusts the length of the rear support through the adjusting oil cylinder, and the stand column is enabled to have the function of overlarge inclined angles of 5 degrees forward and 20 degrees backwards. The multifunctional pile establishing machine has the advantages that double chassis are arranged in a walking type pile machine, the upper chassis can rotate in 360 degrees around the center of the pile machine, and the multifunctional pile establishing machine can be suitable for carrying out stirring pile establishing, punching and grabbing pile establishing, hoisting and other auxiliary construction work in different directions under various conditions of narrow space.

Description

Multi-functional pile driver
Technical field
The utility model relates to a kind of pile foundation construction equipment, relates in particular to a kind of multi-functional pile driver with several functions.
Background technology
The urban architecture middle-high building is more and more now; effective utilization of the underground space is also more and more higher for the requirement of bracing of foundation pit; the form of structure of bracing of foundation pit material and kind are also more and more, for the environmental protection requirement of bracing of foundation pit and also more and more higher to the settlement request of surrounding buildings.
Form of structure commonly used has bored pile, anchor pile, SMW engineering method and prefabricated units to insert several ways such as cement mixing pile water stopping curtain in Foundation Pit Support Engineering at present, cost is high, construction bothers, speed waits problem slowly but existing fender post exists, what form goes along with sb. to guard him the piling wall strength and stiffness and usually can not satisfy requirement of engineering, and we have developed a kind of brand-new fender post for this reason---and prefabricated reinforced concrete is the lateral force resistance stake on an empty stomach.Therefore and a kind of multi-functional pile driver of exploitation this kind fender post has that cost is low, reliable in quality, the advantage such as lightweight, brings into play the benefit of this fender post for maximum, combines with planting a technique simultaneously.
Present existing pile driver only has single pile function mostly, the separate unit pile driver can only be implemented a kind of piling work, can only carry out the piling operation such as pile press, hammer stake machine can only be hammered an operation into shape, and relating to kinds of processes must many supporting ability of stake machine smooth construction.More existing Multifunctional piling machines are not again specially for prefabricated reinforced concrete this novel fender post of lateral force resistance stake on an empty stomach, therefore usually can't match with described fender post construction technology, self have the shortcomings such as narrow site constructional difficulties simultaneously yet.
Although therefore Multifunctional cement stirring soil pile planting machine can lift, plant the operations such as stake, but it is dumb also to exist the narrow and small place operation, discontinuous, the inefficiency of constructing, applicable plant the shortcomings such as pile constructing process is simple, single, therefore existing multi-functional pile driver for prefabricated reinforced concrete on an empty stomach the pile constructing process of planting of stake have many discomforts.
Summary of the invention
The utility model provides that a kind of construction plant is scalable, construction technology cooperates numerous multi-functional pile drivers, solved prefabricated reinforced concrete on an empty stomach the lateral force resistance stake plant the problem of a process matching, also solved the shortcoming that above-mentioned traditional Multifunctional piling machine exists.
A kind of multi-functional pile driver, comprise walking mechanism, be positioned at the chassis of walking mechanism top, operating room and the column above the chassis, also comprise the back brace that cooperates with column and with the overhead traveling crane of hoist engine, overhead traveling crane is connected with the work tool of carrying out multiple stake machine operation by hoist engine, described chassis comprises top bottom-disc and low bottom-disc, and top bottom-disc links to each other with low bottom-disc by rotating mechanism and can do around the center 360 degree rotations; Described column and top bottom-disc are hinged, and described back brace comprises the adjusting oil cylinder, and operating room is regulated back brace length and made column have backward 5 degree to the super large inclination angle functions of 20 degree forward by regulating oil cylinder.
Described work tool can be respectively applied to carry out the operation that piling, piling, vibration piling or multiaxis deep-cement stir the composite earth stake.
Described walking mechanism is stride travel mechanism, Double bottom dish structure is set on the walking stride belongs to pioneering in present similar stake machine.
Described work tool below is connected with a multi-functional chuck that can clamp pile body.
Described work tool is the multiaxis unit head, is convenient to a machine the loosening soil of prefabricated reinforced concrete empty stomach lateral force resistance stake enforcement stake end is directly planted pile constructing process, the quickening efficiency of construction.
Described top bottom-disc is hinged with two columns that are arranged side by side.
Described two columns, different according to operation technical ability, hang respectively the work tool with difference in functionality, carry out simultaneously the construction operation of difference in functionality.
Described on loosens spoils body, suspension and the column and the work tool that is connected with overhead traveling crane, hoist engine grab cone or revolve for punching and scrape out drill, be applicable on an empty stomach lateral force resistance stake preexisting hole pile method construction technology of prefabricated reinforced concrete, also be applicable to the pile constructing process of planting of different pile bodies.
The beneficial effects of the utility model are:
1, in walking stake machine the Double bottom dish is set, top bottom-disc can be done around stake machine center 360 degree rotations, carries out in different directions stirring pile-grafting under the applicable various narrow space conditions, rushes to grab and plant stake, lifting and other back works construction;
2, the column of stake on the machine has backward 5 degree to the super large inclination angle functions of 20 degree forward, improved greatly operating efficiency;
3, this machine adopts two column combination structures that can carry out simultaneously different work, carries out flexible combination according to different process, has reduced the safety technics support risk of simultaneously operation of different process phase mutual interference;
4, the multiaxis unit head and the chuck that arrange on this machine, well satisfied prefabricated reinforced concrete on an empty stomach the lateral force resistance stake plant fast a requirement, also solved multiple construction technology and must use the characteristics that the cooperation of many stake machines could bore forming.
Description of drawings
Fig. 1 is the front view of the multi-functional pile driver of the utility model;
Fig. 2 is the right view of the multi-functional pile driver of the utility model;
Fig. 3 is that the utility model embodiment 1 king-pile machine hangs a schematic diagram;
Fig. 4 is that the utility model embodiment 1 king-pile machine is planted a schematic diagram;
Fig. 5 is along the sectional view shown in the A-A among Fig. 4;
Fig. 6 is along the sectional view shown in the B-B among Fig. 4;
Fig. 7 is that the utility model embodiment 1 king-pile machine is planted a schematic diagram;
Fig. 8-the 10th, vibration is pressed into and plants a flow chart among the utility model embodiment 2;
Figure 11-the 13rd, punching is grabbed to revolve to dig and is planted a flow chart among the utility model embodiment 2.
The specific embodiment
Embodiment 1
Shown in Fig. 1-2, a kind of multi-functional pile driver, comprise walking mechanism 1, be positioned at the chassis of walking mechanism top, operating room 2 and the column 3 above the chassis, also comprise the back brace 4 that cooperates with column 3 and with the overhead traveling crane 6 of hoist engine 5, overhead traveling crane 6 is connected with the work tool 7 of carrying out multiple stake machine operation by hoist engine, work tool 7 belows are connecting the chuck 10 that can clamp pile body.
Wherein walking mechanism 1 is stride travel mechanism, and stride travel mechanism comprises having the function of vertically moving and be parallel to each other front stride 11, the rear stride 13 of arranging and the middle stride 12 with assistance turning function.
Walking mechanism 1 is connecting the chassis by hoist cylinder mechanism 14, and hoist cylinder mechanism 14 is in order to guarantee that the chassis is at the same level line; The chassis comprises top bottom-disc 8 and low bottom-disc 9, and low bottom-disc 9 can only be along the walking mechanism action with hoist cylinder mechanism 14 integrated connections, and top bottom-disc 8 links to each other with low bottom-disc 9 by rotating mechanism and can do around stake machine center 360 degree rotations; Column 3 is hinged with top bottom-disc 8, and back brace 4 comprises the adjusting oil cylinder, and operating room 2 is regulated back brace 4 length and made column 3 have backward 5 degree to the super large inclination angle functions of 20 degree forward by regulating oil cylinder.
Shown in Fig. 3-7, prefabricated reinforced concrete adopts the loosening soil of stake end directly to plant a method when on an empty stomach the lateral force resistance stake is planted.Work tool 7 on the Multifunctional piling machine is the multiaxis unit head; The empty stomach district that the multiaxis drilling rod passes in the on an empty stomach lateral force resistance stake links to each other with the multiaxis unit head, and an end that is used for cutting soil is cyclone nozzle 17, and when planting, the limit cutting soil of spraying water is rotated in churning in front; Can also be the drift that shakes, the limit loosening soil body of trimming water spray that shakes.Chuck 10 is multi-functional chuck simultaneously, can adapt to various difform engineering piles.
The functional character of the above multi-functional pile driver is by the rotation of top bottom-disc, the high inclination-angle tilt function of column, to make a machine carry out stirring pile-grafting at the different directions of narrow construction plant, to hang the operations such as stake; Work tool can be the unit head of multiple pile machine equipment use simultaneously, such as multiple borer, static pile press, shocks pile driver, vibration pile press, deep-layer stirring cementitious composite stake machine etc., thereby can carry out and finish different construction technologies, construction technical method a machinery equipment according to engineering design different process standard.
Embodiment 2
On the basis of embodiment 1 described multi-functional pile driver Double bottom dish, top bottom-disc is hinged with two columns that are arranged side by side.
Two columns require according to the difference of construction technology, construction depth, construction equipment and different.According to the difference of construction technology, two columns 3 can hang respectively the work tool 7 with difference in functionality, carry out simultaneously the construction operation of difference in functionality.
The construction operation of realizing:
Shown in Fig. 8-10, vibration is pressed into and plants a method operation, and the work tool 7 on one of them column is multifunctional motive power head, can clamping multiaxis drilling rod 15, and an end of drilling rod 15 is stirring vane.During construction, start unit head, unit head moves downward along slide rail 16, loosening soil body limit is stirred to the motion of soil body depths in the stirring vane limit, constructs to desired depth, withdraws from drilling rod 15, operating room 2 is controlled top bottom-disc 8 and is rotated to the pile body place, control the chuck 10 of another column 3 and clamp pile body, top bottom-disc 8 rotation is to place, stake hole, under the common effect of stake machine static-pressure system or vibrational system or both systems pile body implanted in the hole.
Shown in Figure 11-13, punching is grabbed to revolve to dig and is planted a method operation, and the work tool 7 that the overhead traveling crane 6 on one of them column 3 connects by hoist engine 5 scrapes out drill or cone is grabbed in punching for revolving.During construction, revolve scrape out drill or punching grab cone at the predetermined construction place excavation soil body to desired depth, rotate hoist engine, lifting is revolved and is scraped out drill; Behind another column 3 lifting pile bodies pile body is implanted in the hole of excavation.
Except above-mentioned two kinds of operations, can also carry out deep-cement and stir operation, silent piling operation, holing with slurry wall protection operation, vibration piling operation etc.Multi-functional pile driver top bottom-disc can also hinged a plurality of columns except can hinged two columns.
The construction operation of above-mentioned multi-functional pile driver more goes a step further on embodiment 1, the two column combined mechanisms that need by different work is set, carry out flexible combination according to different technique, routine needed to be integrated on the equipment by the construction technology operation that several plant equipment disperse to finish finish separately, improve operating efficiency and reduced the safety technics support risk that simultaneously operation of different process interferes with each other, saved taking and expense of engineering time and plant equipment.
The utility model well solved prefabricated reinforced concrete on an empty stomach the lateral force resistance stake plant a problem, when adopting the loosening soil of stake end directly to plant method, can plant fast stake and improve an efficiency of construction; Simultaneously also be applicable to various pile foundation constructions field, can rapid construction.
Those skilled in the art are to be understood that; the above-mentioned specific embodiment; be not to limit scope of the present utility model; any those skilled in the art; under the prerequisite that does not break away from design of the present utility model and principle, adopt the technical scheme that is equal to replacement or equivalent transformation formation, all drop on the claimed scope of the utility model.

Claims (8)

1. multi-functional pile driver, comprise walking mechanism (1), be positioned at the chassis of walking mechanism top, operating room (2) and the column (3) of top, chassis, also comprise the back brace (4) that cooperates with column (3) and the overhead traveling crane (6) of being with hoist engine (5), overhead traveling crane (6) is connected with the work tool (7) of carrying out multiple stake machine operation by hoist engine, it is characterized in that: described chassis comprises top bottom-disc (8) and low bottom-disc (9), and top bottom-disc (8) links to each other with low bottom-disc (9) by rotating mechanism and can do around the center 360 degree rotations; Described column (3) is hinged with top bottom-disc (8), described back brace (4) comprises the adjusting oil cylinder, and operating room (2) is regulated back brace (4) length and made column (3) have backward 5 degree to the super large inclination angle functions of 20 degree forward by regulating oil cylinder.
2. multi-functional pile driver according to claim 1 is characterized in that: described work tool (7) can be respectively applied to carry out the operation that piling, piling, vibration piling or multiaxis deep-cement stir the composite earth stake.
3. multi-functional pile driver according to claim 1 is characterized in that: described walking mechanism (1) is stride travel mechanism.
4. multi-functional pile driver according to claim 1 is characterized in that: be connected with a multi-functional chuck (10) that can clamp pile body below the described work tool (7).
5. multi-functional pile driver according to claim 4, it is characterized in that: described work tool (7) is the multiaxis unit head.
6. multi-functional pile driver according to claim 4, it is characterized in that: described top bottom-disc (8) is hinged with two columns that are arranged side by side (3).
7. multi-functional pile driver according to claim 6 is characterized in that: described two columns (3), and different according to operation technical ability, hang respectively the work tool (7) with difference in functionality, carry out simultaneously the construction operation of difference in functionality.
8. multi-functional pile driver according to claim 7, it is characterized in that: described work tool (7) upper with column (3) for loosens spoils body, suspension and that is connected with overhead traveling crane (6), hoist engine (5) is grabbed cone for rushing, and also can scrape out drill for revolving.
CN 201220580308 2012-11-05 2012-11-05 Multifunctional pile establishing machine Expired - Lifetime CN202865842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220580308 CN202865842U (en) 2012-11-05 2012-11-05 Multifunctional pile establishing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220580308 CN202865842U (en) 2012-11-05 2012-11-05 Multifunctional pile establishing machine

Publications (1)

Publication Number Publication Date
CN202865842U true CN202865842U (en) 2013-04-10

Family

ID=48032573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220580308 Expired - Lifetime CN202865842U (en) 2012-11-05 2012-11-05 Multifunctional pile establishing machine

Country Status (1)

Country Link
CN (1) CN202865842U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278950A (en) * 2014-03-21 2015-01-14 陶德明 Dual-station hydraulic shock rotary drilling and rotary spraying power head
CN106499338A (en) * 2016-12-22 2017-03-15 徐工集团工程机械有限公司 Rig
CN110344414A (en) * 2019-07-12 2019-10-18 刘建军 A kind of pilot hole plant stake piling all-in-one machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278950A (en) * 2014-03-21 2015-01-14 陶德明 Dual-station hydraulic shock rotary drilling and rotary spraying power head
CN106499338A (en) * 2016-12-22 2017-03-15 徐工集团工程机械有限公司 Rig
CN110344414A (en) * 2019-07-12 2019-10-18 刘建军 A kind of pilot hole plant stake piling all-in-one machine

Similar Documents

Publication Publication Date Title
CN102803616B (en) For the method and apparatus manufacturing the underwater foundation of building
CN105442560A (en) Arc buckling equipment with T-shaped piles and rectangular piles
CN102425372B (en) Vibrato-drilling type punching drilling rig
CN201738321U (en) Multifunctional pile machine
CN1312376C (en) Multifunctional drill machine and its construction method
CN202865842U (en) Multifunctional pile establishing machine
CN202417302U (en) Vibrating drilling type impact digging drilling machine
CN205475253U (en) Supporting structure of foundation pit
RU61732U1 (en) SCREW DRIVING DEVICE
CN105507283A (en) Arc inserting and buckling equipment for T-shaped piles and rectangular piles
CN105569008A (en) Rectangular splicing equipment for T-shaped piles and rectangular piles
CN204436260U (en) Combination type rotating digs drill bit
CN201785755U (en) Dedicated slope protection device for soil nailing walls
CN210659915U (en) Double-column drilling machine
CN202249756U (en) Multi-drillbit rotary impacting and smashing engineering grooving machine
CN105525610A (en) Arc locking equipment for T piles and rectangular piles
CN105442556A (en) Circular-arc lock catch equipment for T-shaped piles and rectangular piles
CN105507307A (en) Stirring and drilling machine of H-shaped connection pile
CN105442557A (en) Circular-arc lock catch equipment for T-shaped piles and rectangular piles
CN105421416A (en) Trapezoidal insertion-connection equipment for T-shaped piles and rectangular piles
CN105625356A (en) Trapezoidal splicing equipment for T-shaped piles and rectangular piles
CN105568984A (en) V-shaped inserting and buckling device for T-shaped piles and rectangular piles
CN105603990A (en) T-pile and rectangular-pile arc insertion equipment
CN105442559A (en) Circular-arc splicing equipment for T-shaped piles and rectangular piles
JPH08114082A (en) Cantilever bucket type vertical shaft excavation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130410

CX01 Expiry of patent term