CN218174475U - Construction building suspension - Google Patents

Construction building suspension Download PDF

Info

Publication number
CN218174475U
CN218174475U CN202222443847.XU CN202222443847U CN218174475U CN 218174475 U CN218174475 U CN 218174475U CN 202222443847 U CN202222443847 U CN 202222443847U CN 218174475 U CN218174475 U CN 218174475U
Authority
CN
China
Prior art keywords
support
connecting block
motor
plate
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222443847.XU
Other languages
Chinese (zh)
Inventor
马昆钊
吴森阳
姚启杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Municipal Engineering Construction Group Co Ltd
Original Assignee
Ningbo Municipal Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Municipal Engineering Construction Group Co Ltd filed Critical Ningbo Municipal Engineering Construction Group Co Ltd
Priority to CN202222443847.XU priority Critical patent/CN218174475U/en
Application granted granted Critical
Publication of CN218174475U publication Critical patent/CN218174475U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a construction building suspension, comprising a base plate, both sides are connected with the support column on the bottom plate, bottom plate one side is provided with the balancing weight, it is equipped with first connecting plate to all insert in the through-hole, be equipped with the through-hole on the first connecting plate of one side and be provided with first motor, the through-hole interpolation is equipped with the screw rod, the one end of screw rod is connected with the rotor shaft of first motor, both sides spiro union has the connecting block in the middle of the screw rod, the connecting block below all is provided with first support, it has first cluster round pin to alternate in the pinhole, all the cover is equipped with first pulley on the first cluster round pin of first support inboard, one side connecting block is connected with the mounting panel, mounting panel one side is provided with the second motor, the upper end of connecting block all is provided with the second support, it has the pivot to alternate between the second support, the inboard all the cover of second support is equipped with the capstan winch. The controller connected through the first motor enables the first motor to rotate positively and negatively, the connecting block is enabled to move left and right on the screw rod, the limiting plate limits the connecting block to rotate on the screw rod, and the hanging basket connected below the connecting block moves along with the connecting block.

Description

Construction building suspension
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to construction building suspension.
Background
Along with the rapid development of social economy, high-rise buildings are more and more, the construction requirements cannot be met by using a traditional scaffold in the construction process of the high-rise buildings, so that a hanging basket is needed to suspend constructors on the outer wall of a building, a suspension is needed in the lifting process of the hanging basket, in the prior art, the suspension is arranged at the top of the building, a long arm on the suspension extends out of the building, a pulley is arranged on the long arm extending out of one end of the building, a traction rope on the hanging basket penetrates through a groove in the pulley to be connected with a winch, and the hanging basket is lifted by a through pipe winch, so that the defects that: in the prior art, the hanging basket is inconvenient to move left and right after being lifted, the hanging basket can be moved left and right only by newly installing the suspension, and the hanging basket is inconvenient to use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction building suspension to lift the inconvenient problem that removes about the hanging flower basket after the hanging flower basket among the solution prior art.
In order to achieve the above purpose, the utility model provides a following technical scheme: construction building suspension, comprising a base plate, both sides are connected with the support column on the bottom plate, bottom plate one side is provided with the balancing weight, all be equipped with the through-hole on the support column, it is equipped with first connecting plate, one side all to insert in the through-hole be equipped with the through-hole on the first connecting plate and be provided with first motor, the through-hole interpolation is equipped with the screw rod, the one end of screw rod is connected with the rotor shaft of first motor, both sides spiro union has the connecting block in the middle of the screw rod, be connected with the syntopic board between the connecting block, the connecting block below all is provided with first support, all be equipped with the pinhole on the first support, the pinhole alternates there is first cluster round pin, and first support inboard all the cover is equipped with first pulley on the first cluster pin, one side the connecting block is connected with the mounting panel, mounting panel one side is provided with the second motor, the upper end of connecting block all is provided with the second support, the pivot has been alternated between the second support, the rotor shaft of second motor is connected with the one end of pivot, the inboard of second support all is equipped with the capstan winch.
Preferably, a bearing groove is formed in the connecting plate on the other side, a bearing is arranged in the bearing groove, the other end of the screw rod is connected with a connecting rod, the connecting rod is inserted into an inner ring of the bearing, and the bearing enables the screw rod to rotate more smoothly to reduce friction.
Preferably, limiting plates are connected to two sides below the first connecting plate, the limiting plates are located on two sides of the connecting block, and the limiting plates limit the rotation of the connecting block.
Preferably, connecting block one side all is provided with the third support, all be equipped with the pinhole on the third support, it has the second cluster round pin all to alternate in the pinhole, and the third support is inboard the second cluster round pin all is equipped with the second pulley, and the second pulley on the third support props up the haulage rope, prevents haulage rope and connecting block friction damage.
Compared with the prior art, the beneficial effects of the utility model are that: when the position was controlled to the hanging flower basket of below to needs, the controller of connecting through first motor made first motor just reverse, made the connecting block remove about on the screw rod, limiting plate restriction connecting block is rotatory on the screw rod, made the hanging flower basket of connecting block below connection remove along with the connecting block, and the third support can prop up the haulage rope and prevent with the connecting block friction, increase the life of haulage rope.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a front view of the cutting schematic diagram of the present invention;
fig. 3 is a left side view of the present invention;
FIG. 4 is an enlarged schematic view of a in FIG. 2;
fig. 5 is an enlarged schematic view of b in fig. 3.
In the figure: 1. a base plate; 2. a support pillar; 3. a balancing weight; 4. a first connecting plate; 5. a screw; 6. a first motor; 7. connecting blocks; 8. a co-location plate; 9. a first bracket; 10. a first series of pins; 11. a first pulley; 12. a bearing groove; 13. a bearing; 14. a limiting plate; 15. mounting a plate; 16. a second motor; 17. a second bracket; 18. a rotating shaft; 19. a winch; 20. a third support; 21. a second series of pins; 22. a second pulley.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in figures 1, 2, 3, 4 and 5, the embodiment of the utility model provides a construction building suspension, which comprises a bottom plate 1, wherein the bottom plate 1 is made of stainless iron, support columns 2 are welded on the left side and the right side of the bottom plate 1, balancing weights 3 are arranged on the left side and the right side of the rear part of the bottom plate 1, through holes are arranged above the support columns 2, a first connecting plate 4 is inserted in the through holes in an interference manner, a through hole is arranged on the right first connecting plate 4, a first motor 6 is fixed on the first connecting plate 4 at the right end of the through hole by a bolt, the model of the first motor 6 is PL22-400W, the power input end of the first motor 6 is connected with the power output end of a cable positive and negative rotation controller, the power input end of the positive and negative rotation controller is connected with an external power supply by a cable, a screw rod 5 is inserted in the through hole in a sliding manner, the right end of the screw rod 5 is connected with a rotor shaft of the first motor 6 in the through hole by a key, left and right sides spiro union has connecting block 7 in the middle of the screw rod 5, the welding has the identical plate 8 between 7 tops of connecting block, identical plate 8 makes connecting block 7 remove simultaneously, 7 below of connecting block all welds first support 9, the pinhole has all been seted up on first support 9, it has first cluster round pin 10 to slide to alternate in the pinhole, equal sliding sleeve is equipped with first pulley 11 on the first cluster round pin 10 of first support 9 inboard, the both ends of first cluster round pin 10 are riveted with the riveter, the haulage rope on the hanging flower basket all passes the recess on the first pulley 11, bearing groove 12 has been seted up on the right side of the first connecting plate 4 in left side, bearing 13 has been inserted to the interference in bearing groove 12, the left end welding of screw rod 5 has the connecting rod, the inner circle of bearing 13 is inserted to the connecting rod interference, reduce friction when bearing 13 makes screw rod 5 rotate, it is better smooth to rotate.
Fig. 1, fig. 2, fig. 3, fig. 4, fig. 5 shows, limiting plate 14 has all been welded to both sides around first connecting plate 4 below, limiting plate 14 is located the front and back both sides of connecting block 7, limiting plate 14 limits connecting block 7 and rotates around when removing, the welding has mounting panel 15 on the connecting block 7 of left side, mounting panel 15 left side bolt fastening has second motor 16, second motor 16's model is PL22-400W, the power output end of positive and negative rotation controller is connected with the cable to second motor 16's power input end, the power input end of positive and negative rotation controller connects the peripheral hardware power with the cable, second support 17 has all been welded to the upper end of connecting block 7, slip cross-under has pivot 18 between second support 17, the rotor shaft of second motor 16 and the left end flange joint of pivot 18, the inboard cover of second support 17 is equipped with capstan winch 19, connecting block 7 front side has all welded third support 20, all seted up the pinhole has been seted up on the third support 20, second cluster pin 21 has all been inserted intentionally in the pinhole, the inboard second cluster pin 21 of third support 20 all slips under the cover and is equipped with second cluster pin 22, the both ends of interference, the second cluster pin for the friction pulley 21 and rivet the connecting block for the traction rope, prevent that the traction rope from crossing through-off the friction pulley 21 on the second pulley and rivet the connecting block 20, the traction rope support rope, the traction rope on the second pulley 20, the traction rope passes through-plane and rivet the traction rope, the traction rope support block 20, the friction pulley is equipped with the friction pulley, the friction of the second pulley, the traction rope.
The working principle of the embodiment is as follows: after the installation is accomplished, when the position is adjusted about the hanging flower basket, the rotor shaft that positive and negative rotation controller control first motor 6 connected through first motor 6 is rotatory, the rotor shaft of first motor 6 drives screw rod 5 rotatory, remove about the connecting block 7 on the screw rod 5, the hanging flower basket that drives the below through the haulage rope removes to suitable position, when the height that needs to the hanging flower basket is adjusted, the rotor shaft that positive and negative rotation controller control second motor 16 that connects through second motor 16 is rotatory, the electronic pivot 18 of rotor shaft is rotatory, the capstan winch 19 in the pivot 18 withdraws the haulage rope or puts down, the hanging flower basket of below reciprocates along with the haulage rope, and the third support 20 props up the haulage rope and keeps away from connecting block 7, prevent to rub with connecting block 7.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.

Claims (4)

1. Construction building suspension, its characterized in that: comprises a bottom plate (1), wherein supporting columns (2) are connected to two sides of the bottom plate (1), a balancing weight (3) is arranged on one side of the bottom plate (1), through holes are formed in the supporting columns (2), a first connecting plate (4) is inserted into the through holes, one side of the bottom plate is provided with through holes on the first connecting plate (4) and a first motor (6), a screw (5) is inserted into the through holes, one end of the screw (5) is connected with a rotor shaft of the first motor (6), two sides of the middle of the screw (5) are connected with connecting blocks (7) in a threaded manner, a homonymy plate (8) is connected between the connecting blocks (7), a first support (9) is arranged below the connecting blocks (7), pin holes are formed in the first support (9), a first string pin (10) is inserted into the pin holes, a first string pin (11) is sleeved on the first string pin (10) on the inner side of the first support (9), one side of the connecting blocks (7) is connected with a mounting plate (15), a second motor (16) is arranged on one side of the mounting plate (15), a second support (17) is arranged at the upper end of the connecting block (7), and one end of the second motor (17) is connected with a rotating shaft (17), the inner sides of the second supports (17) are all sleeved with winches (19).
2. The construction building suspension according to claim 1, wherein: and a bearing groove (12) is formed in the connecting plate (4) on the other side, a bearing (13) is arranged in the bearing groove (12), the other end of the screw rod (5) is connected with a connecting rod, and the connecting rod is inserted into an inner ring of the bearing (13).
3. The construction building suspension according to claim 1, wherein: limiting plates (14) are connected to two sides below the first connecting plate (4), and the limiting plates (14) are located on two sides of the connecting block (7).
4. The construction building suspension according to claim 1, wherein: connecting block (7) one side all is provided with third support (20), all be equipped with the pinhole on third support (20), all cross the interpolation in the pinhole has second cluster round pin (21), and third support (20) are inboard second cluster round pin (21) all are equipped with second pulley (22).
CN202222443847.XU 2022-09-15 2022-09-15 Construction building suspension Active CN218174475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222443847.XU CN218174475U (en) 2022-09-15 2022-09-15 Construction building suspension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222443847.XU CN218174475U (en) 2022-09-15 2022-09-15 Construction building suspension

Publications (1)

Publication Number Publication Date
CN218174475U true CN218174475U (en) 2022-12-30

Family

ID=84622627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222443847.XU Active CN218174475U (en) 2022-09-15 2022-09-15 Construction building suspension

Country Status (1)

Country Link
CN (1) CN218174475U (en)

Similar Documents

Publication Publication Date Title
CN208869129U (en) Telescopic building hoist day beam is set in elevator traction
CN109110616A (en) Telescopic building hoist day beam and its installation and application are set in elevator traction
CN205114894U (en) Manual formula wall type swing crane; derrick
CN218174475U (en) Construction building suspension
CN205312925U (en) Hydraulic luffing formula swing arm tower machine
CN207175294U (en) A kind of crane telescopic boom structure
WO2022233156A1 (en) Method for disposing lifting power apparatus in attached lifting/lowering scaffold
CN206014281U (en) A kind of tower crane standard knot introducing device
CN213085198U (en) Balance hanging beam group lifting appliance
CN202011709U (en) Installation work platform for wind turbine generator set
CN214692991U (en) Movable guide vane hoisting tool
CN202657829U (en) Hoisting in place device for fixing branch hinge of arc gate
CN220787815U (en) Pull arm loading lifting hook convenient to replace
CN201694777U (en) Self hoisting device of hydraulic turbine volute
CN208022598U (en) A kind of suspension apparatus escapement
CN214692837U (en) Electromagnetic rotary hanging beam
CN207078933U (en) A kind of small-sized machine hoisting machine for building
CN218596009U (en) Pulley block for hook bridge crane
CN218860209U (en) Flange crane adaptable to different hoisting spaces
CN216038301U (en) A hoisting accessory for hydraulic engineering pipeline
CN214989646U (en) Shield constructs section of jurisdiction loading and uses lifting clamp
CN212475913U (en) Hoisting mechanism for import and export trade packing box
CN220449530U (en) Wire rod hoist and mount frock
CN211769924U (en) Efficient material loading and unloading device for building
CN216819015U (en) Outdoor installation-free suspension type power distribution cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant