CN218149194U - Keel structure of assembling fast - Google Patents

Keel structure of assembling fast Download PDF

Info

Publication number
CN218149194U
CN218149194U CN202222437968.3U CN202222437968U CN218149194U CN 218149194 U CN218149194 U CN 218149194U CN 202222437968 U CN202222437968 U CN 202222437968U CN 218149194 U CN218149194 U CN 218149194U
Authority
CN
China
Prior art keywords
main joist
jib
roof
nut
keel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222437968.3U
Other languages
Chinese (zh)
Inventor
周云宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Leader Innovative Materials Co ltd
Original Assignee
Jiangsu Leader Innovative Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Leader Innovative Materials Co ltd filed Critical Jiangsu Leader Innovative Materials Co ltd
Priority to CN202222437968.3U priority Critical patent/CN218149194U/en
Application granted granted Critical
Publication of CN218149194U publication Critical patent/CN218149194U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a keel structure of assembling fast, it includes: jib, main joist and hoist and mount piece, the jib interval sets up the top at the main joist, hoist and mount piece sets up and carries out hanging of main joist in the bottom of jib, hoist and mount piece includes nut, roof, curb plate, bottom plate and baffle respectively, be provided with the through-hole that corresponds with the jib on the roof, roof and downwardly extending are run through to the jib bottom, the curb plate sets up one side and the downwardly extending at the roof, the bottom plate is followed the bottom of curb plate and is extended to the below level of roof, main joist way bottom plate upper surface, the baffle upwards extends from bottom plate outside edge and carries out the spacing of main joist, the nut sets up the top surface at the bottom of jib and directional main joist downwards. Keel structure of assembling fast, main joist's installation easy and simple to handle, rethread nut has avoided moving upward and endwise slip of main joist, has promoted structural stability.

Description

Keel structure of assembling fast
Technical Field
The utility model relates to a building furred ceiling fossil fragments technical field especially relates to a keel structure of assembling fast.
Background
Before the building is hung on the ceiling, the keel frame needs to be installed, and then a decorative plate, such as a common gypsum board, needs to be installed at the bottom of the keel frame.
The keel frame usually comprises a main keel, the main keel is fixed at the indoor top through a hanging rod and a hanging piece, and bearing is carried out through the main keel or the auxiliary keel is conveniently installed. Among the prior art, hoist and mount piece and main joist fixed adopt the utility model discloses in the utility model of application number 201820044606.9 usually the furred ceiling fossil fragments mounting structure disclosed, as its attached drawing shows, hoist and mount piece is fixed in the jib bottom, main joist penetrates hoist and mount piece from one end, the hoist and mount piece is transversely run through to the rethread screw, carry out the spacing of main joist top, but hoist and mount piece side opening is little, main joist can only penetrate hoist and mount piece from one end, when the main joist longer and job site length direction limited, be unfavorable for the main joist to penetrate hoist and mount piece from one end, the installation is hard, and the screw transversely runs through hoist and mount piece can not restrict the displacement of main joist in length direction, poor stability, need improve.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a keel structure of assembling fast promotes and assembles efficiency and structural stability.
To achieve the purpose, the utility model adopts the following technical proposal:
a quick-connect keel structure, comprising: jib, main joist and hoist and mount piece, the jib interval sets up the top at the main joist, hoist and mount piece sets up and carries out hanging of main joist in the bottom of jib, hoist and mount piece includes nut, roof, curb plate, bottom plate and baffle respectively, be provided with the through-hole that corresponds with the jib on the roof, roof and downwardly extending are run through to the jib bottom, the curb plate sets up one side and the downwardly extending at the roof, the bottom plate is followed the bottom of curb plate and is extended to the below level of roof, main joist way bottom plate upper surface, the baffle upwards extends from bottom plate outside edge and carries out the spacing of main joist, the nut sets up the top surface at the bottom of jib and directional main joist downwards.
Wherein, be provided with the first nut that is located the roof bottom surface on the jib.
The lifting rod is provided with a second nut located on the top surface of the top plate, and the lower portion of the outer circle of the lifting rod is provided with a section of external thread corresponding to the second nut.
Wherein, the main joist cross-section adopts C shape structure.
Wherein the height of the baffle is 5 mm-10 mm.
The distance between the baffle and the side plate corresponds to the width of the main keel.
And the bottom of the nut is provided with a spherical convex block which is contacted with the top surface of the main keel in a downward protruding manner.
The utility model has the advantages that: the utility model provides a keel structure of assembling fast, hoist and mount piece side opening is great, make on the main joist can get into the bottom plate from the side of hoist and mount piece, and carry out spacing of main joist both sides through curb plate and baffle, easy and simple to handle, the rotation of rethread nut, carry out the pressure of main joist and consolidate, avoid moving up and the endwise slip of main joist, the structural stability has been promoted, and the bottom of nut is provided with the spherical convex block with the top surface contact of main joist, can carry out the pressure of main joist and consolidate, can easily form the spherical indentation at the main joist top surface again, the structural stability after assembling has been promoted.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
figure 2 is a schematic structural view of the center main runner of figure 1 prior to installation.
Detailed Description
The technical solution of the present invention is further explained by the specific embodiment with reference to fig. 1 to fig. 2.
A rapid-splice keel structure as shown in figures 1 and 2, comprising: jib 1, main joist 6 and hoist and mount piece 2, 1 intervals of jib set up the top at main joist 6, hoist and mount piece 2 sets up and carries out hanging of main joist 6 in the bottom of jib 1, and through a plurality of hoists 2 and the cooperation of jib 1, the level that realizes main joist 6 is hung.
In this embodiment, the hanging piece 2 includes a nut 3, a top plate 21, a side plate 22, a bottom plate 23 and a baffle 24, the top plate 21 is provided with a through hole corresponding to the hanging rod 1, so that the bottom of the hanging rod 1 penetrates through the top plate 21 and extends downwards, in this embodiment, the hanging rod 1 is provided with a first nut 4 located on the bottom surface of the top plate 21, and the position height of the top plate 21 at the lower part of the hanging rod 1 can be conveniently adjusted.
In addition, in order to improve the positional height stability of the top plate 21, a second nut 5 is provided on the suspension rod 1 so as to be positioned on the top surface of the top plate 21, and the top surface of the top plate 21 is regulated and adjusted by the second nut 5. The excircle lower part of jib 1 is provided with one section and the external screw thread that second nut 5 corresponds, conveniently carries out the rotation regulation of second nut 5.
The side plates 22 are arranged on one side of the top plate 21 and extend downwards, the bottom plate 23 extends horizontally from the bottom of the side plates 22 to the lower part of the top plate 21, the main keel 6 passes through the upper surface of the bottom plate 23, and the lifting of the main keel 6 is carried out through the bottom plate 23.
In this embodiment, the main joist 6 has a C-shaped cross section, and may be a channel steel, which is low in cost. In order to limit the two sides of the main keel 6, the baffle plate 24 extends upwards from the outer edge of the bottom plate to limit the main keel 6, and the distance between the baffle plate 24 and the side plate 22 corresponds to the width of the main keel 6 and is tightly matched with the width of the main keel 6, so that the main keel 6 is prevented from shaking left and right. The top plate 21, the side plates 22, the bottom plate 23 and the baffle plate 24 can adopt an integrated steel structure, and the strength is high.
In order to facilitate the installation of the main keel 6, the height of the baffle 24 is 5-10 mm, so that the main keel 6 can be limited, and the side surface of the hoisting part 2 can have a larger opening, as shown in fig. 2, the main keel 6 can enter the hoisting part 2 from the opening on the side surface of the hoisting part 2, the insertion from one end of the hoisting part 2 is not needed, and the keel frame can be conveniently assembled in a place with a limited length.
Will nut 3 sets up in the bottom of jib 1 and the top surface of directional main joist 6 downwards, and after main joist 6 got into hoist and mount piece 2, through nut 3's rotation, the top surface that can carry out main joist 6 was pressed admittedly, avoids shifting up and endwise slip of main joist 6, has promoted structural stability, and is easy and simple to handle. In addition, in this embodiment, the bottom of nut 3 is provided with the sphere lug 31 of the top surface contact with main joist 6 down-ward, sphere lug 31 can carry out the solid pressure of main joist 6, can form the sphere indentation at main joist 6 top surface light again, and sphere lug 31 is arranged in the sphere indentation, has further promoted the structural stability after assembling.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention, and it is to be understood that the present invention is not limited to the above embodiments, but may be modified within the scope of the present invention.

Claims (7)

1. The utility model provides a keel structure of assembling fast which characterized in that includes: jib, main joist and hoist and mount piece, the jib interval sets up the top at the main joist, hoist and mount piece sets up and carries out hanging of main joist in the bottom of jib, hoist and mount piece includes nut, roof, curb plate, bottom plate and baffle respectively, be provided with the through-hole that corresponds with the jib on the roof, roof and downwardly extending are run through to the jib bottom, the curb plate sets up one side and the downwardly extending at the roof, the bottom plate is followed the bottom of curb plate and is extended to the below level of roof, main joist way bottom plate upper surface, the baffle upwards extends from bottom plate outside edge and carries out the spacing of main joist, the nut sets up the top surface at the bottom of jib and directional main joist downwards.
2. The rapid erectable keel structure of claim 1, wherein said hanger bar is provided with a first nut located on the bottom surface of the top plate.
3. The rapidly assembled keel structure according to claim 1, wherein the hanger bar is provided with a second nut positioned on the top surface of the top plate, and the lower part of the outer circle of the hanger bar is provided with a section of external thread corresponding to the second nut.
4. The quick connect keel structure of claim 1, wherein said main keel cross-section is a C-shaped structure.
5. The quick connect keel structure of claim 1, wherein said baffles are 5mm to 10mm in height.
6. The rapid erection keel structure of claim 1, wherein the distance between the baffle and the side plate corresponds to the width of the main keel.
7. The rapid assembling keel structure according to claim 1, wherein the bottom of the nut is provided with a spherical projection which is in contact with the top surface of the main keel in a downward protruding manner.
CN202222437968.3U 2022-09-15 2022-09-15 Keel structure of assembling fast Active CN218149194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222437968.3U CN218149194U (en) 2022-09-15 2022-09-15 Keel structure of assembling fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222437968.3U CN218149194U (en) 2022-09-15 2022-09-15 Keel structure of assembling fast

Publications (1)

Publication Number Publication Date
CN218149194U true CN218149194U (en) 2022-12-27

Family

ID=84560643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222437968.3U Active CN218149194U (en) 2022-09-15 2022-09-15 Keel structure of assembling fast

Country Status (1)

Country Link
CN (1) CN218149194U (en)

Similar Documents

Publication Publication Date Title
CN201232354Y (en) Wooden formwork for shaping metal lining cylinder
CN200985580Y (en) Panel horizontal inserted type suspended ceiling
CN112064856A (en) Suspended ceiling pre-hanging piece and floor structure of building with same
CN218149194U (en) Keel structure of assembling fast
CN203605170U (en) Lamp installing suspension cable hooking clamp
CN215326633U (en) Hoisting device mounted on I-shaped steel beam
CN201411909Y (en) Wall-mounted type fabric rod
CN2844265Y (en) Directly-chucking light-steel keel
CN204609087U (en) A kind of furred ceiling mounts keel
CN201317991Y (en) Clamping joist
CN209874218U (en) Light keel decorative structure
CN201433526Y (en) Rain-sun cover
CN210636659U (en) Plane steel bar truss building carrier plate based on rapid Assembly formula
CN208604870U (en) A kind of aluminium alloy pendant for dry-hung plate
CN204001308U (en) A kind of metal decking unit curtain wall system
CN201771112U (en) Multipurpose reinforcement mat frame
CN202187456U (en) Counteracting bearing suspended-ceiling suspension device
CN211871242U (en) Steel construction purlin pluggable hoisting device
CN213330082U (en) Hoisting system for mounting assembled metal curtain wall ceiling board
CN212198148U (en) Prefabricated assembled stair hoisting structure of swift formula
CN215907164U (en) Dual-purpose keel mounting hook
CN219652488U (en) Tilting type tower column main rib hoisting device
CN216476314U (en) Assembly type formwork system of cast-in-place plate of steel structure building
CN210084734U (en) Detachable lifting appliance for square steel pipe column
CN218580508U (en) Auxiliary device convenient to bridge is dismantled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant