CN218117696U - Water mill bores pore-forming construction positioner - Google Patents

Water mill bores pore-forming construction positioner Download PDF

Info

Publication number
CN218117696U
CN218117696U CN202222259283.4U CN202222259283U CN218117696U CN 218117696 U CN218117696 U CN 218117696U CN 202222259283 U CN202222259283 U CN 202222259283U CN 218117696 U CN218117696 U CN 218117696U
Authority
CN
China
Prior art keywords
connecting rod
vertical shaft
rod piece
base
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222259283.4U
Other languages
Chinese (zh)
Inventor
张鸿远
张邵江
秦飞
潘青
敖凌宇
金元元
张玉
苏博
靳壮壮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN202222259283.4U priority Critical patent/CN218117696U/en
Application granted granted Critical
Publication of CN218117696U publication Critical patent/CN218117696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a terrazzo bores pore-forming construction positioner, include: the drilling unit comprises a progress base, a progress vertical shaft, a motor connecting device, a driving motor and a drill bit; the positioning unit comprises a positioning base, a positioning circular tube, a rotary vertical rod, a connecting rod piece and a first horizontal straightening instrument, wherein the positioning circular tube is fixedly arranged at the central position of the upper surface of the positioning base, the lower end of the rotary vertical rod is rotatably arranged in the positioning circular tube, the first horizontal straightening instrument is arranged on the positioning base, the rotary vertical rod is connected with one end of the connecting rod piece, and the process vertical shaft is movably and adjustably arranged at the other end of the connecting rod piece along the length direction. This device is effectual in the work progress construction straightness and the excavation size deviation of having guaranteed the terrazzo and bored, especially under the condition that has the reaming requirement, and this device can accurate positioning size, and construction safety can be high, and the efficiency of construction is high.

Description

Water mill bores pore-forming construction positioner
Technical Field
The utility model relates to a terrazzo bores pore-forming construction positioner belongs to hole stake construction technical field.
Background
The construction progress can be influenced greatly when the manual hole digging pile meets the rock stratum in the construction process, and some construction technologies need to be adopted to treat the rock stratum in order to accelerate the construction progress of the hole digging pile. The traditional hole pile rock processing technology adopts blasting excavation technology, has high technical requirements on blasting, has high safety risk, and is easy to cause hole collapse in blasting excavation. Compared with blasting excavation technology, the water mill rock drilling excavation technology has the advantages of higher hole forming quality and lower safety risk. At present, the water mill drill on the market is mostly of a single structure, all-round excavation of earth and stones can be realized only by manually moving the position of the water mill drill, the construction progress is slowed down while a large amount of manpower is consumed, the levelness of the water mill drill is low by virtue of the experience of workers, and the formed hole pile is poor in verticality. On the premise of ensuring safe construction, a device is urgently needed to be developed to meet the construction requirement of the hole pile.
SUMMERY OF THE UTILITY MODEL
Based on the foregoing, the utility model provides a terrazzo bores pore-forming construction positioner to overcome prior art's not enough.
The technical scheme of the utility model is that: a terrazzo bores pore-forming construction positioner includes:
the drilling unit comprises a process base, a process vertical shaft, a motor connecting device, a driving motor and a drill bit, wherein the process vertical shaft is fixedly arranged on the process base, the motor connecting device can be sleeved on the process vertical shaft in a vertically moving mode, the driving motor is arranged on the motor connecting device, and the driving motor can drive the drill bit to rotate;
the positioning unit comprises a positioning base, a positioning circular tube, a rotary vertical rod, a connecting rod piece and a first horizontal straightening instrument, wherein the positioning circular tube is fixedly arranged at the central position of the upper surface of the positioning base, the lower end of the rotary vertical rod is rotatably arranged in the positioning circular tube, the first horizontal straightening instrument is arranged on the positioning base, the rotary vertical rod is connected with one end of the connecting rod piece, and the process vertical shaft is movably and adjustably arranged at the other end of the connecting rod piece along the length direction.
As a terrazzo bores a preferred scheme of pore-forming construction positioner, wherein: the rotary vertical rod and the process vertical shaft are both provided with bolt holes, the connecting rod piece is provided with corresponding bolt holes at intervals along the length direction, and the connecting rod piece is hinged with the rotary vertical rod and the process vertical shaft through bolts.
As a terrazzo bores pore-forming construction positioner's an preferred scheme, wherein: rotatory pole setting with the bolt hole that the process vertical scroll was seted up is 1, and both are articulated through connecting rod spare, adaptable rock face slope condition.
As a terrazzo bores a preferred scheme of pore-forming construction positioner, wherein: and a limiting block is arranged at the upper line part of the process vertical shaft, and the height of the limiting block positioned below is higher than the upper intersection interface of the connecting rod piece and the process vertical shaft.
As a terrazzo bores pore-forming construction positioner's an preferred scheme, wherein: the upper end face of the limiting block positioned below is provided with a second horizontal straightening instrument.
As a terrazzo bores pore-forming construction positioner's an preferred scheme, wherein: bolt holes are respectively formed in four corners of the process base, and the process base is fixed to the ground through bolts.
As a terrazzo bores a preferred scheme of pore-forming construction positioner, wherein: the drilling unit can drill holes along the circumference of the wall of the hole pile along with the rotating vertical rod through the connecting rod piece.
As a terrazzo bores a preferred scheme of pore-forming construction positioner, wherein: the positioning base is a square steel plate, bolt holes are respectively formed in four corners of the positioning base, and the positioning base is fixed on the ground through bolts.
The utility model has the advantages that: this device is through the horizontal alignment appearance and the connecting rod piece of installation, and the effectual construction of having guaranteed the water mill and bored straightness and the hole stake excavation size deviation of digging in the work progress, the drilling unit can be through connecting the rod piece along with rotatory a week drilling of pole setting through the bolt of tearing the base open repeatedly ann, and construction safety can be high, and the efficiency of construction is high. The device can adjust the operation radius according to different pile diameters, has strong adaptability, is particularly suitable for hole pile construction with reaming requirements, does not damage in the using process and can be repeatedly used.
Drawings
FIG. 1 is a schematic view of a positioning device for a water mill drilling construction;
description of the reference numerals:
1 process base, 2 process vertical scroll, 3 motor connecting device, 4 driving motor, 5 drill bits, 6 location bases, 7 location pipes, 8 rotatory poles, 9 connection member, 10 first level alignment appearance, 11 stoppers, 12 second level alignment appearance.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
Referring to fig. 1, the positioning device for hole drilling construction by a water mill in the embodiment includes a drilling unit and a positioning unit.
The drilling unit comprises a process base 1, a process vertical shaft 2, a motor connecting device 3, a driving motor 4 and a drill bit 5, wherein the process vertical shaft 2 is welded on the process base 1, the motor connecting device 3 can be vertically moved and sleeved on the process vertical shaft 2, the motor connecting device 3 cannot horizontally rotate relative to the process vertical shaft 2, the driving motor 4 is installed on the motor connecting device 3, an output shaft of the driving motor 4 extends to the position below the motor connecting device 3, and the driving motor 4 can drive the drill bit 5 to rotate. Since the drilling unit is a commercially available product, which is a prior art in the field, it will not be described in detail.
The positioning unit comprises a positioning base 6, a positioning circular tube 7, a rotating upright rod 8, a connecting rod piece 9 and a first horizontal straightening instrument 10, wherein the first horizontal straightening instrument 10 is installed on the positioning base 6 to assist in leveling the positioning base 6, the positioning circular tube 7 is welded at the central position of the upper surface of the positioning base 6, the rotating upright rod 8 is matched with the positioning circular tube 7, the lower end of the rotating upright rod 8 is inserted into the positioning circular tube 7 and can rotate, 1 bolt hole is formed in the lower part of the rotating upright rod 8, 1 bolt hole is also formed in the lower end of the process vertical shaft 2, and the two are hinged through the connecting rod piece 9 and can adapt to the inclination condition of a rock layer; and the connecting rod 9 is provided with a plurality of corresponding bolt holes at intervals along the length direction, two ends of the connecting rod 9 are respectively connected with the rotating vertical rod 8 and the process vertical shaft 2 through bolts, and when the distance between the process vertical shaft 2 and the rotating vertical rod 8 needs to be adjusted, the process vertical shaft can be connected with the bolt holes in the connecting rod 9 through changing the connecting positions of the process vertical shaft 2.
Furthermore, in the device, a limit block 11 is installed at the upper line part of the process vertical shaft 2, and the upper limit and the lower limit of the motor connecting device 3 can be realized through the limit block 11, namely, the moving range of the motor connecting device 3 is the distance formed by the two limit blocks 11.
Furthermore, in the device, a second horizontal straightening instrument 12 is arranged on the upper end face of the limiting block 11 positioned below to assist in adjusting the verticality of the process vertical shaft 2, so that the verticality of the drill bit 5 during drilling is ensured.
In this embodiment, the process base 1 is made of a steel plate, and four corners of the process base are respectively provided with a bolt hole, and bolts are sleeved in the bolt holes. The distance between the limiting block 11 positioned at the upper part of the process vertical shaft 2 and the upper top surface of the process vertical shaft 2 is not less than 150mm, and the height of the limiting block 11 positioned at the lower part is higher than the upper intersection interface of the connecting rod piece 9 and the process vertical shaft 2. The process vertical shaft 2 adopts a square tube, the bottom of the square tube is welded in the middle of the process base 1, and the lower tube wall of the square tube is provided with 1 bolt hole. The positioning base 6 is a square steel plate, bolt holes are respectively formed in four corners of the square steel plate, and the square steel plate is fixed on an excavated ground rock stratum through bolts. The connecting rod piece 9 can be I-shaped steel, bolt holes are formed in the connecting rod piece at intervals of 100mm, and the connecting rod piece 9 is hinged to the process vertical shaft 2 and the rotating vertical rod 8 through bolts according to actual needs.
The construction method comprises the following steps: the positioning base 6 is placed on an excavated ground rock stratum and fastened through bolts, the positioning base 6 is assisted to be leveled according to a first horizontal straightening instrument 10 during fastening, one end of a connecting rod piece 9 is connected with a rotating vertical rod 8 through bolts, the process base 1 is placed at the edge of a position to be drilled, the process base is fastened through the bolts, the process base is assisted to adjust the verticality of a process upright column according to a second horizontal straightening instrument 12 during fastening, and meanwhile the connecting rod piece 9 is connected with a process vertical shaft 2 through the bolts. And starting the driving motor 4 to drive the drill bit 5 to rotate, so that rock excavation can be realized. Compared with the prior art, this device is through the horizontal alignment appearance and the connecting rod piece 9 of installation, and the effectual construction straightness that has guaranteed the water mill and bored and excavation size deviation in the work progress, especially under the condition that has the reaming requirement, this device can accurate positioning size, and construction safety can be high, and the efficiency of construction is high, has avoided hole stake secondary excavation. The device can adjust the operation radius according to different pile diameters, has strong adaptability, does not damage in the using process and can be repeatedly used.
The above-mentioned embodiments only represent some embodiments of the present invention, and the description thereof is specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.

Claims (8)

1. The utility model provides a terrazzo bores pore-forming construction positioner which characterized in that includes:
the drilling unit comprises a process base (1), a process vertical shaft (2), a motor connecting device (3), a driving motor (4) and a drill bit (5), wherein the process vertical shaft (2) is fixedly arranged on the process base (1), the motor connecting device (3) can be sleeved on the process vertical shaft (2) in a vertically moving and sleeving manner, the driving motor (4) is arranged on the motor connecting device (3), and the driving motor (4) can drive the drill bit (5) to rotate;
location unit, including location base (6), location pipe (7), rotatory pole setting (8), connecting rod piece (9) and first horizontal straightening appearance (10), location pipe (7) set firmly in location base (6) upper surface central point puts, the lower extreme rotatable install in of rotatory pole setting (8) in location pipe (7), first horizontal straightening appearance (10) install in on location base (6), rotatory pole setting (8) with the one end of connecting rod piece (9) is connected, process vertical scroll (2) with can follow length direction and remove the regulation install in the other end of connecting rod piece (9).
2. The wet grinding drilling hole-forming construction positioning device as claimed in claim 1, wherein bolt holes are formed in the rotating vertical rod (8) and the process vertical shaft (2), corresponding bolt holes are formed in the connecting rod piece (9) along the length direction of the connecting rod piece at intervals, and the connecting rod piece (9) is connected with the rotating vertical rod (8) and the process vertical shaft (2) through bolts.
3. The positioning device for the water mill drilling and hole forming construction as claimed in claim 2, wherein the number of the bolt holes formed in the rotating vertical rod (8) and the process vertical shaft (2) is 1, and the rotating vertical rod and the process vertical shaft are hinged through a connecting rod piece (9) so as to adapt to the inclination condition of a rock layer surface.
4. The wet grinding drill hole-forming construction positioning device is characterized in that a limiting block (11) is arranged at the upper line part of the process vertical shaft (2), and the height of the limiting block (11) positioned below is higher than the upper intersection interface of the connecting rod piece (9) and the process vertical shaft (2).
5. The positioning device for the water mill drilling construction is characterized in that a second horizontal straightening instrument (12) is arranged on the upper end face of the lower limiting block (11).
6. The watermill drilling hole construction positioning device as claimed in claim 1, wherein bolt holes are respectively formed in four corners of the process base (1) and are fixed on the ground through bolts.
7. The watermill drilling and hole-forming construction positioning device as claimed in claim 1, wherein the positioning base (6) is a square steel plate, and bolt holes are respectively formed in four corners of the square steel plate and are fixed on the ground through bolts.
8. The positioning device for hole-forming construction by water mill drilling is characterized in that the drilling unit can drill a hole along the wall of the bored pile for a circle by the connecting rod (9) along with the rotating vertical rod (8).
CN202222259283.4U 2022-08-26 2022-08-26 Water mill bores pore-forming construction positioner Active CN218117696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222259283.4U CN218117696U (en) 2022-08-26 2022-08-26 Water mill bores pore-forming construction positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222259283.4U CN218117696U (en) 2022-08-26 2022-08-26 Water mill bores pore-forming construction positioner

Publications (1)

Publication Number Publication Date
CN218117696U true CN218117696U (en) 2022-12-23

Family

ID=84528816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222259283.4U Active CN218117696U (en) 2022-08-26 2022-08-26 Water mill bores pore-forming construction positioner

Country Status (1)

Country Link
CN (1) CN218117696U (en)

Similar Documents

Publication Publication Date Title
CN213233477U (en) Foundation pit supporting structure and foundation pit slope supporting system
CN103132908B (en) Device for drilling rock and embedding rock-socketed prestressed pipe pile by down-hole hammer and construction method of device
CN109024719B (en) Pile side disturbance resistance-reducing building inclination correcting method
CN112796307A (en) Square pile construction method of rotary drilling rig
CN218117696U (en) Water mill bores pore-forming construction positioner
CN217174760U (en) Mounting device for steel pipe pile
CN210105743U (en) Excavation device for drainage well in municipal engineering road maintenance ponding area
CN116905962A (en) Construction device and construction method for high-pressure jet grouting impervious wall
CN115419054B (en) Karst strong development stratum substantial pile foundation construction device and method
CN115387328B (en) Beach cast-in-place pile construction method based on ultra-long spiral drilling machine
CN114508629B (en) Pipe jacking construction method for penetrating through mixed gravel layer and sandstone layer
CN214091729U (en) Constructional engineering pile device
CN214993840U (en) Well-digging vibration pile sinking system for prefabricated inclined piles
CN110629765B (en) Safety protection device and protection method for H-shaped steel foundation pit
CN213926276U (en) Deep foundation pit grouting device
CN107143335A (en) The guide hole construction method of ultra-deep shaft
JP2002030658A (en) Support for hammer drill
CN113107356B (en) Construction method for forming holes of square anti-slide piles
CN215169722U (en) Bored concrete pile construction rig that facilitates use
CN214007113U (en) Dig bored concrete pile soon and use supporting fixture convenient to butt joint pipeline
CN215761503U (en) Reamer bit for cement concrete mixing pile roadbed pilot hole
CN117514001A (en) Pile foundation rotary digging device with guiding function
CN116220028B (en) Integrated square pile hoisting construction device and construction method thereof
CN113006678B (en) Integrated pore-forming machine tool and method for drilling pore-forming in pebble layer by using same
CN219100038U (en) Simple piling and drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant