CN217174760U - Mounting device for steel pipe pile - Google Patents

Mounting device for steel pipe pile Download PDF

Info

Publication number
CN217174760U
CN217174760U CN202123383280.3U CN202123383280U CN217174760U CN 217174760 U CN217174760 U CN 217174760U CN 202123383280 U CN202123383280 U CN 202123383280U CN 217174760 U CN217174760 U CN 217174760U
Authority
CN
China
Prior art keywords
pipe pile
steel
drill bit
steel pipe
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123383280.3U
Other languages
Chinese (zh)
Inventor
王彦东
甄铁
郭淑霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN202123383280.3U priority Critical patent/CN217174760U/en
Application granted granted Critical
Publication of CN217174760U publication Critical patent/CN217174760U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model belongs to engineering construction field especially relates to an installation device of steel-pipe pile. Including the steel-pipe pile, the rig, drill bit and connecting piece, the both ends of steel-pipe pile set up connecting piece and drill bit respectively, the drill bit fastens in the one end of steel-pipe pile through solid fixed ring, the rig is provided with the one end of connecting piece at the steel-pipe pile, the connecting piece passes through fastener with drill bit and steel-pipe pile fastening, the rotatory rotation that drives the steel-pipe pile through the work of drill bit, drive the steel-pipe pile into the soil through the drilling of drill bit to ground. The utility model has the advantages that the steel pipe pile is drilled, the damage to the steel pipe pile caused by the smashing is avoided, the length required by the design can be reached, the engineering quality is ensured, the fitting arranged on the steel pipe pile can be installed and disassembled at any time, the manufacture is simple, the materials are easy to obtain, and the fitting can be repeatedly used; the installation process of the steel pipe pile is convenient and simple.

Description

Mounting device for steel pipe pile
Technical Field
The utility model belongs to engineering construction field especially relates to an installation device of steel-pipe pile.
Background
The steel pipe pile is a foundation device suitable for construction of wharf ports.
In the prior art, a rotary rod drives a drill bit to drill holes in soil, after the holes are formed, a steel pipe pile is hammered into the holes, and then a grouting process is carried out; the traditional steel pipe pile installation method easily causes the phenomena of non-vertical pore-forming, collapse of pore wall soil and the like. Therefore, a novel steel pipe pile installation device is urgently needed to be designed.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides an engineering construction field especially relates to a steel-pipe pile's installation device.
The utility model adopts the technical proposal that: the utility model provides an installation device of steel-pipe pile, includes steel-pipe pile, rig, drill bit and connecting piece, the connecting piece with the drill bit set up respectively in the both ends of steel-pipe pile, the rig passes through the connecting piece sets up on the steel-pipe pile, the rotatory accessible of rig the connecting piece drives the steel-pipe pile is rotatory, makes to be provided with the drill bit the steel-pipe pile is bored in the soil.
Furthermore, a fastening device is arranged on the connecting piece, the connecting piece is connected with the drilling machine through the fastening device, and the fastening device drives the steel pipe pile to move through the movement of the drilling machine.
Further, the connecting piece is arranged on a fixing ring, the size of the fixing ring can be adjusted, and the connecting piece is fixed on the steel pipe pile.
Further, the drill bit is provided with a buckle, and the buckle can fix the drill bit on one end of the steel pipe pile.
Furthermore, a serrated knife is arranged in one end of the steel pipe pile connected with the drill bit, and the serrated knife is matched with the drill bit to break soil blocks generated during rotation.
Further, the steel pipe pile is provided with a level gauge, and the level gauge can measure the installation position of the steel pipe pile.
The utility model has the advantages and positive effects that: by adopting the technical scheme, the steel pipe pile is more convenient to install; the steel pipe pile is drilled, so that the damage to the steel pipe pile caused by the smashing is avoided, the length required by the design can be reached, and the engineering quality is ensured; the device has the advantages of simple structure, low processing cost, high production efficiency and the like.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
in the figure:
1. steel pipe pile 2, drill bit 3 and drilling machine
4. Connecting piece 5, buckle 6 and fastening device
7. Level meter
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings in conjunction with the following embodiments. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. In addition, in the following description, descriptions of technologies of well-known structures are omitted so as to avoid unnecessarily obscuring the concepts of the present invention.
Embodiments of the present invention will be described below with reference to the accompanying drawings.
As shown in fig. 1, the utility model belongs to engineering construction field, a steel-pipe pile's installation device, including steel-pipe pile 1, drill bit 2, rig 3, connecting piece 4, buckle 5, fastener 6 and spirit level 7, wherein connecting piece 4 installs the one end at steel-pipe pile 1, drill bit 2 installs the looks remote site that installs connecting piece 4 one end at steel-pipe pile 1, connecting piece 4 connects rig 3 on steel-pipe pile 1, it is rotatory to drive steel-pipe pile 1 through the work of rig 3, drill bit 2 of installation is rotatory to make steel-pipe pile 1 bore into ground on steel-pipe pile 1, accomplish steel-pipe pile 1's installation.
Preferably, the drill bit 2 is provided with a buckle 5, wherein the drill bit 2 is the drill bit 2 with the same radius according to the radius of the steel pipe pile 1, the drill bit 2 can be replaced according to different terrains where the steel pipe pile 1 is installed, and the drill bit 2 is in a serrated knife shape in the embodiment; the drill bit 2 is matched with the installation of the steel pipe pile 1 and is arranged into the disposable drill bit 2, in order to save cost, the drill bit 2 is processed into a circular sawtooth knife-shaped iron sheet, through the design, the installation of the steel pipe pile 1 is facilitated, and meanwhile, the cost is saved; be provided with buckle 5 in the junction of drill bit 2 and steel-pipe pile 1, buckle 5 is the adjustable rectangular buckle of a kind of surrounding drill bit 2, can be with the stable one end that is fixed in steel-pipe pile 1 of drill bit 2 through buckle 5, through using buckle 5 to be fixed in the mode on steel-pipe pile 1 with drill bit 2, has both made things convenient for the installation of steel-pipe pile 1 to bury, has still simplified the installation under the condition of practicing thrift the cost simultaneously.
Preferably, the connecting piece 4 is mounted on the steel pipe pile 1 through a fixing ring, the fixing ring is an adjustable steel ring, the fixing ring can adjust the radius of the fixing ring according to the radius of different steel pipe piles 1, and the fixing ring can be suitable for different types of steel pipe piles 1; the fixing ring is also provided with a fastening device 6, the fastening device 6 can connect the connecting piece 4 with the drilling machine 3, and the fastening device 6 is fastened with the drill bit 2 through an adjustable steel ring which is suitable for different types of drill bits.
Preferably, in the steel pipe pile 1 at one end connected with the drill bit 2, a serrated knife is arranged in the steel pipe pile 1, the serrated knife is arranged in one circle in the steel pipe pile 1, a large amount of soil blocks generated when the drill bit 2 rotates can be smashed by the serrated knife arranged in the steel pipe pile 1, and the steel pipe pile 1 is convenient to install; the steel pipe pile 1 is also provided with a level gauge 7, and the perpendicularity of the steel pipe pile 1 can be adjusted before and after the steel pipe pile 1 is installed through the level gauge 7.
Example 1:
a steel pipe pile installation device is characterized in that firstly, a steel pipe pile needing to be installed in the ground is simply machined, a drill bit is installed at one end of the steel pipe pile, the drill bit is fixed to one end of the steel pipe pile through a buckle, and a serrated knife is welded in the steel pipe pile through welding in one end of the steel pipe pile with the drill bit;
installing a connecting piece on the steel pipe pile at the other end of the steel pipe pile, adjusting the size of a fixing ring arranged on the connecting piece to ensure that the fixing ring is installed on the steel pipe pile to play a role of fastening and not falling off, enabling a drilling machine to be close to one end of the steel pipe pile, where the connecting piece is arranged, and connecting and fastening the connecting piece and the drilling machine by using a fastening device to ensure that the steel pipe pile and the drilling machine are installed; and finally, arranging the gradienter on the steel pipe pile.
After the installation is finished, erecting the steel pipe pile on the ground through a drilling machine, measuring and marking a proper position according to the measurement of a level gauge, and taking a foundation for the subsequent vertical installation of the steel pipe pile in the soil; starting a drilling machine after the position is measured, driving the steel pipe pile to rotate by the rotation of the drilling machine, enabling a drill bit to easily drill into the ground through high-speed rotation, measuring the position of the steel pipe pile after the drill bit is driven to a proper position, finely adjusting the final installation, and completing the installation of the steel pipe pile; after the installation is completed, the connecting piece can be detached from the drilling machine and the steel pipe pile, the level meter is detached, and tools are recycled for subsequent steel pipe pile installation.
By adopting the technical scheme, the steel pipe pile is more convenient to install; the steel pipe pile is drilled, so that the damage to the steel pipe pile caused by the smashing is avoided, the length required by the design can be reached, and the engineering quality is ensured; the embodiment of the utility model provides a have simple structure, advantages such as the processing cost is low, production efficiency height.
The embodiments of the present invention have been described in detail, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (6)

1. The utility model provides an installation device of steel-pipe pile, includes steel-pipe pile, rig, drill bit and connecting piece, the connecting piece with the drill bit set up respectively in the both ends of steel-pipe pile, the rig passes through the connecting piece sets up on the steel-pipe pile, the rotatory accessible of rig the connecting piece drives the steel-pipe pile is rotatory, makes to be provided with the drill bit the steel-pipe pile is bored in the soil.
2. The steel pipe pile installation apparatus according to claim 1, wherein: and a fastening device is arranged on the connecting piece, the connecting piece is connected with the drilling machine through the fastening device, and the fastening device drives the steel pipe pile to move through the movement of the drilling machine.
3. The steel pipe pile installation apparatus according to claim 1, wherein: the connecting piece is arranged on the fixing ring, the size of the fixing ring can be adjusted, and the connecting piece is fixed on the steel pipe pile.
4. The steel pipe pile installation apparatus according to claim 1, wherein: the drill bit is provided with a buckle, and the buckle can fix the drill bit on one end of the steel pipe pile.
5. The steel pipe pile installation apparatus according to claim 1, wherein: and a serrated knife is arranged in one end of the steel pipe pile connected with the drill bit, and the serrated knife is matched with the drill bit to break soil blocks generated during rotation.
6. The steel pipe pile installation apparatus according to claim 1, wherein: the steel-pipe pile is provided with the spirit level, the spirit level measurable quantity the mounted position of steel-pipe pile.
CN202123383280.3U 2021-12-29 2021-12-29 Mounting device for steel pipe pile Active CN217174760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123383280.3U CN217174760U (en) 2021-12-29 2021-12-29 Mounting device for steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123383280.3U CN217174760U (en) 2021-12-29 2021-12-29 Mounting device for steel pipe pile

Publications (1)

Publication Number Publication Date
CN217174760U true CN217174760U (en) 2022-08-12

Family

ID=82731041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123383280.3U Active CN217174760U (en) 2021-12-29 2021-12-29 Mounting device for steel pipe pile

Country Status (1)

Country Link
CN (1) CN217174760U (en)

Similar Documents

Publication Publication Date Title
US8631627B2 (en) Helical pole support bracket and method for supporting a pole
CN203603586U (en) Equipment support regulating device
CN201109914Y (en) Apparatus for monitoring sedimentation of soft soil foundation
CN211230435U (en) Fixing device of inclinometer
CN110378616A (en) Jet grouting pile construction real-time monitoring method for quality
CN210090077U (en) Portable ground detects sampling device
CN203498836U (en) Device for pulling casing by utilizing rotary drilling rig
CN217174760U (en) Mounting device for steel pipe pile
CN114232627A (en) Mounting device and using method of steel pipe pile
CN208024341U (en) A kind of rotary digging stake locator
CN210341918U (en) Novel vibration pile sinking device
CN216717360U (en) Dig stake hole straightness measuring device that hangs down soon
CN214309619U (en) Geological engineering sampler
CN111893999B (en) Pile pulling guide frame and pile pulling method for waste inclined piles
CN113529706A (en) Anchor cable construction method for intelligently detecting hole expanding aperture
CN210164421U (en) Visual accurate positioning device for construction of three-axis stirring pile
CN218117696U (en) Water mill bores pore-forming construction positioner
CN204940280U (en) A kind of transmission line of electricity screw pile erection equipment
CN210564379U (en) Rock wall beam excavation sample frame
CN111058441A (en) Construction device and method for placing large-diameter steel casing under deepwater and rapid stream conditions
CN216766019U (en) Triaxial cement mixing pile non-normal position test deviational survey oral area fixed knot constructs
CN219240540U (en) Auxiliary device for determining verticality of excavation of cast-in-situ pile foundation of iron tower
CN110206032A (en) A kind of novel vibrating pile sinking process
CN220772089U (en) Simple detection tool for hole bottom diameter of bottom-expanded bored pile
CN214783860U (en) Drill bit device of mixing pile machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant