CN218092327U - Electric power iron tower that can install fast - Google Patents

Electric power iron tower that can install fast Download PDF

Info

Publication number
CN218092327U
CN218092327U CN202221371398.6U CN202221371398U CN218092327U CN 218092327 U CN218092327 U CN 218092327U CN 202221371398 U CN202221371398 U CN 202221371398U CN 218092327 U CN218092327 U CN 218092327U
Authority
CN
China
Prior art keywords
tower body
downside
tower
cup
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221371398.6U
Other languages
Chinese (zh)
Inventor
孙玉倩
张守春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Dezhen Heavy Industry Group Co ltd
Original Assignee
Qingdao Dezhen Heavy Industry Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Dezhen Heavy Industry Group Co ltd filed Critical Qingdao Dezhen Heavy Industry Group Co ltd
Priority to CN202221371398.6U priority Critical patent/CN218092327U/en
Application granted granted Critical
Publication of CN218092327U publication Critical patent/CN218092327U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an electric power iron tower that can install fast, including downside tower body and installation base, downside tower body installation is fixed on the upper end intermediate position of installation base, cup joint the tower body structure through being provided with the centre, it is fixed to make the centre cup joint the tower body and be convenient for the installation, the centre cup joints the screw that the middle tower body socle of tower body passes through the installation base ring, thereby be convenient for fixed connection is on the downside tower body, make middle tower body socle be convenient for erect the installation fast, middle tower body shell is convenient for stabilize the support and use like this, middle tower body shell is because of the inboard tower body grooving in upper end, thereby the tower body is cup jointed on the top and be convenient for spacing erection use, it is convenient more fast when cup jointing the tower body on the equipment top, and cup joint the tower body structure through being provided with the top, thereby be convenient for fix in the centre and cup joint the tower body, the inside of cup jointing tower body and tower body downside in the centre all is the hollow state because of top, it is lighter when the handling installation to wholly to erect like this, thereby be convenient for install fast.

Description

Electric power iron tower that can install fast
Technical Field
The utility model relates to an electric power iron tower technical field, concretely relates to electric power iron tower that can install fast.
Background
The transmission line iron tower is a tower-shaped building for power transmission. Transmission line towers are tower structures used to support and suspend conductors, overhead lines and other accessories, such as high-rise structures that maintain a specified safe distance from conductor to conductor, conductor to tower, conductor to overhead line, conductor to ground or crossover span.
At present, when an existing electric power iron tower is installed and fixed, due to the fact that the rod piece and the rod piece are integrally fixed, the whole iron tower is not very convenient to splice, and the problem that the iron tower is not efficient in installation is solved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power iron tower that can install fast to propose current electric power iron tower in solving above-mentioned background art when the installation is fixed, because of wholly adopting the fixed of member and member, wholly not very convenient when the concatenation like this, make not very efficient problem in the installation.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an electric power iron tower that can install fast, includes downside tower body and installation base, downside tower body installation is fixed on the upper end intermediate position of installation base, be provided with the bottom side protector in the week side of downside tower body, the tower body is cup jointed in the middle of the upper end of downside tower body is provided with, the middle upper end of cup jointing the tower body is provided with the top and cup joints the tower body, the upper end inboard that the tower body was cup jointed on the top is provided with down the side arm pole, the both ends top of downside arm pole is provided with down the insulator, the top of downside arm pole is located the top and cup joints and be provided with the side arm pole on the tower body, the both ends top of going up the side arm pole is provided with the insulator.
The bottom side protector comprises an inclined barbed rod, a metal lantern ring and an assembly screw, the assembly screw is arranged in the middle of the inner side of the metal lantern ring, the inclined barbed rod is arranged on the outer side of the circumference of the metal lantern ring, and the metal lantern ring is fixedly connected to the tower body on the lower side through the assembly screw.
Wherein, the middle tower body that cup joints includes middle tower body shell, installation foundation ring, middle tower body socle and tower body grooving, the upper end inboard of middle tower body shell is provided with tower body grooving, be provided with the installation foundation ring on the lower extreme outside of middle tower body shell, be provided with middle tower body socle in the middle of the lower extreme of middle tower body shell, middle tower body socle passes through installation foundation ring fixed connection on the downside tower body.
Wherein, the top cup joints the tower body and includes tower body shell, last tower body cover post, equipment ring, upside through-hole and downside through-hole, be provided with the equipment ring on going up the lower extreme outside of tower body shell, be provided with tower body cover post in the middle of going up the lower extreme of tower body shell, the upper end inboard of going up tower body shell is provided with the downside through-hole, the top of downside through-hole is located tower body shell and is provided with the upside through-hole, it cup joints on the tower body through equipment ring fixed connection in the middle of to go up tower body cover post.
The top cup joints the tower body and cup joints in the middle of fixing in the middle of cup jointing the upper end of tower body, just the top cup joints the tower body and cup joints the tower body in the middle and passes through screw fixed connection.
Wherein, the middle tower body that cup joints is cup jointed and is fixed in the middle of the upper end of downside tower body, just the middle junction of cup jointing tower body and downside tower body is provided with sealed cushion.
Wherein, the inside that the tower body was cup jointed to the top, the tower body and downside tower body were cup jointed in the middle of, all is hollow state.
To sum up, owing to adopted above-mentioned technique, the beneficial effects of the utility model are that:
1. the utility model discloses in, cup joint tower body structure in the middle of being provided with, it is fixed to cup joint the tower body in the middle of making, the middle tower body socle that cup joints the tower body passes through the screw of erection foundation ring, thereby be convenient for fixed connection on the downside tower body, make middle tower body socle be convenient for erect the installation fast, the tower body shell is convenient for stably support the use in the middle of like this, middle tower body shell is because of the inboard tower body grooving in upper end, thereby the tower body spacing erection use of being convenient for is cup jointed on the top, make and cup joint the tower body on the equipment top more convenient fast.
2. The utility model discloses in, cup joint tower body structure through being provided with the top to be convenient for fix in the centre and cup joint on the tower body, the top cup joints the last tower body socle of tower body and passes through the screw of equipment ring, makes be convenient for fixed connection cup joint the tower body in the centre, is convenient for install and use fast like this, and it is convenient for stably place to go up the tower body shell, goes up the tower body shell because of inboard downside through-hole in upper end and upside through-hole, makes downside armed lever and upside armed lever be convenient for install and fix and use.
3. The utility model discloses in, cup joint the inside that tower body, centre cup jointed tower body and downside tower body because of the top and all be the cavity state, it is lighter when wholly erectting the handling installation like this for be convenient for the installation and erect the use, thereby be convenient for install fast, effectively improve holistic installation effectiveness.
Drawings
Fig. 1 is a schematic view of a three-dimensional structure of an electric iron tower capable of being quickly installed according to the present invention;
fig. 2 is a schematic structural view of a bottom side protector, a lower tower body and a mounting bottom ring of a fast-installable electric power tower according to the present invention;
fig. 3 is a schematic view of a structure of a middle sleeved tower body of an electric iron tower capable of being quickly installed according to the present invention;
fig. 4 is the utility model relates to a tower body structure sketch is cup jointed on top of electric power iron tower that can install fast.
In the figure: 1. an upper insulator; 2. the top end is sleeved with the tower body; 21. an upper tower shell; 22. an upper tower body sleeve column; 23. assembling the circular ring; 24. an upper side through hole; 25. a lower through hole; 3. an upper side arm lever; 4. a lower side arm lever; 5. a lower insulator; 6. the middle is sleeved with a tower body; 61. an intermediate tower shell; 62. mounting a bottom ring; 63. sleeving a column on the middle tower body; 64. a tower body sleeve groove; 7. a lower tower body; 8. a bottom side protector; 81. inclining the barbed rod; 82. a metal collar; 83. assembling screws; 9. and (7) installing a base.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1 and 2, an electric power iron tower that can install fast, including downside tower body 7 and installation base 9, downside tower body 7 is installed and is fixed on the upper end intermediate position of installation base 9, be provided with bottom side protector 8 on the week side of downside tower body 7, downside tower body 7's upper end is provided with the centre and cup joints tower body 6, the centre is cup jointed tower body 6's upper end and is provided with the top and cup joints tower body 2, the upper end inboard that tower body 2 was cup jointed to the top is provided with downside armed lever 4, downside armed lever 4's both ends top is provided with lower insulator 5, downside armed lever 4's top is located the top and is cup jointed and be provided with upside armed lever 3 on tower body 2, the both ends top of upside armed lever 3 is provided with insulator 1, when using, downside tower body 7 is because of the installation base 9 of lower extreme, thereby be convenient for fixing on the assigned position, because of tower body top cup joints 2, the centre is cup jointed tower body 6 and downside tower body 7 is convenient for stable support, downside tower body 7 is because of the bottom side protector 8 on week side, thereby play fine protection effect, the top is cup jointed tower body 2 through inboard upside armed lever 3 and downside armed lever 4, make it convenient for insulator 1 and lower insulator 5 to erect and place, thereby be convenient for the electric wire and erect and use.
The utility model discloses in, bottom side protector 8 includes slope thorn pole 81, metal lantern ring 82 and equipment screw 83, be provided with equipment screw 83 in the middle of the inboard of metal lantern ring 82, be provided with slope thorn pole 81 on the circumference outside of metal lantern ring 82, metal lantern ring 82 is through equipment screw 83 fixed connection on downside tower body 7, bottom side protector 8's metal lantern ring 82 is through equipment screw 83 fixed connection on downside tower body 7, make metal lantern ring 82 be convenient for the installation fix, metal lantern ring 82 is because of the slope thorn pole 81 in the circumference outside, play fine guard action like this, thereby avoid personnel to scramble the use.
The utility model discloses in, the inside that tower body 2, middle tower body 6 and downside tower body 7 were cup jointed on the top all is the cavity state, cup joints tower body 2, middle inside that cup joints tower body 6 and downside tower body 7 because of the top and all is the cavity state, wholly erects like this when the handling installation more light for be convenient for install and erect the use, thereby be convenient for install fast, effectively improve holistic installation effectiveness.
The working principle is as follows: when using, downside tower body 7 is because of installation base 9 of lower extreme to be convenient for fix on the assigned position, cup joint tower body 2 because of the top, the centre cup joints tower body 6 and downside tower body 7 and is convenient for stably support, downside tower body 7 is because of the bottom side protector 8 of week side, thereby play fine guard action, the top cup joints tower body 2 through inboard last side armed lever 3 in upper end and downside armed lever 4, make upper insulator 1 and lower insulator 5 be convenient for the installation and place, thereby be convenient for erect the electric wire and use.
Example two
Referring to fig. 1 and fig. 3, an electric power iron tower that can install fast, this embodiment compares in embodiment one, the centre cup joints tower body 6 and cup joints and fixes in the middle of the upper end of downside tower body 7, and the centre cup joints the junction of tower body 6 and downside tower body 7 and is provided with sealed cushion, the centre cup joints tower body 6 and includes middle tower body shell 61, installation bottom ring 62, middle tower body socle 63 and tower body grooving 64, the upper end inboard of middle tower body shell 61 is provided with tower body grooving 64, be provided with installation bottom ring 62 on the lower extreme outside of middle tower body shell 61, be provided with middle tower body socle 63 in the middle of the lower extreme of middle tower body shell 61, middle tower body socle 63 is through installation bottom ring 62 fixed connection on downside tower body 7.
The working principle is as follows: cup joint tower body 6 in the middle of cup jointing in the upper end of downside tower body 7, it is fixed to make the middle tower body 6 that cup joints be convenient for the installation, and the middle junction of cup jointing tower body 6 and downside tower body 7 is provided with sealed cushion, thereby it is inseparabler firm when tower body 6 and downside tower body 7 are fixed to cup joint in the middle of, the middle tower body socle 63 that cup joints tower body 6 passes through the screw of installation foundation ring 62, thereby be convenient for fixed connection on downside tower body 7, make middle tower body socle 63 be convenient for erect the installation fast, tower body shell 61 is convenient for stably support and uses in the middle of like this, middle tower body shell 61 is because of the inboard tower body grooving 64 in upper end, thereby the top cup joints tower body 2 and is convenient for spacing installation and use, make it convenient more fast when cup jointing tower body 2 on the equipment top.
EXAMPLE III
Referring to fig. 1 and fig. 4, an electric power iron tower that can install fast, this embodiment compares in embodiment two, the top cup joints tower body 2 and cup joints and fixes in the middle of cup jointing the upper end of tower body 6, and the top cup joints tower body 2 and middle cup joint tower body 6 and passes through screw fixed connection, the top cup joints tower body 2 and includes tower body shell 21, go up tower body sleeve post 22, equipment ring 23, upside through-hole 24 and downside through-hole 25, be provided with equipment ring 23 on the lower extreme outside of going up tower body shell 21, be provided with tower body sleeve post 22 in the middle of going up the lower extreme of tower body shell 21, the upper end inboard of going up tower body shell 21 is provided with downside through-hole 25, the top of downside through-hole 25 is located and is provided with upside through-hole 24 on last tower body shell 21, it cup joints on tower body 6 through equipment ring 23 fixed connection to go up tower body sleeve post 22.
The working principle is as follows: cup joint tower body 2 because of the top and cup joint in the middle of fixing the upper end of cup jointing tower body 6, make the top cup joint tower body 2 and be convenient for the installation erect, and the fix with screw, make the top cup joint tower body 2 and the equipment of middle cover tower body 6 more firm stable, the top cup joints the last tower body sleeve post 22 of tower body 2 and passes through the screw of equipment ring 23, make be convenient for fixed connection cup joint tower body 6 in the middle of, be convenient for install and use fast like this, and it is convenient for stably place to go up tower body shell 21, it is because of inboard downside through-hole 25 and the upside through-hole 24 of upper end to go up tower body shell 21, make downside armed lever 4 and upside armed lever 3 be convenient for install fixed use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.

Claims (7)

1. The utility model provides a but electric power iron tower of quick installation, includes downside tower body (7) and installation base (9), its characterized in that: downside tower body (7) installation is fixed on the upper end intermediate position of installation base (9), be provided with bottom side protector (8) on the week side of downside tower body (7), the upper end of downside tower body (7) is provided with the centre and cup joints tower body (6), the centre upper end of cup jointing tower body (6) is provided with the top and cup joints tower body (2), the upper end inboard that tower body (2) were cup jointed on the top is provided with downside armed lever (4), the both ends top of downside armed lever (4) is provided with down insulator (5), the top of downside armed lever (4) is located the top and cup joints and be provided with upside armed lever (3) on tower body (2), the both ends top of upside armed lever (3) is provided with insulator (1).
2. The quickly mountable electric power tower of claim 1, wherein: the bottom side protector (8) comprises an inclined stab rod (81), a metal sleeve ring (82) and an assembly screw (83), the assembly screw (83) is arranged in the middle of the inner side of the metal sleeve ring (82), the inclined stab rod (81) is arranged on the outer side of the circumference of the metal sleeve ring (82), and the metal sleeve ring (82) is fixedly connected to the tower body (7) on the lower side through the assembly screw (83).
3. The quickly installable power tower of claim 1, wherein: middle tower body (6) of cup jointing is including middle tower body shell (61), installation foundation ring (62), middle tower body socle (63) and tower body grooving (64), the upper end inboard of middle tower body shell (61) is provided with tower body grooving (64), be provided with installation foundation ring (62) on the lower extreme outside of middle tower body shell (61), tower body socle (63) in the middle of being provided with of the lower extreme of middle tower body shell (61), middle tower body socle (63) are through installation foundation ring (62) fixed connection on downside tower body (7).
4. The quickly mountable electric power tower of claim 1, wherein: the tower body (2) is cup jointed on the top includes tower body shell (21), goes up tower body socle (22), equipment ring (23), upside through-hole (24) and downside through-hole (25), it is provided with equipment ring (23) on the lower extreme outside of tower body shell (21) to go up, be provided with in the middle of the lower extreme of going up tower body shell (21) tower body socle (22), the upper end inboard of going up tower body shell (21) is provided with downside through-hole (25), the top of downside through-hole (25) is located and is provided with upside through-hole (24) on tower body shell (21), it cup joints on tower body (6) through equipment ring (23) fixed connection in the middle to go up tower body socle (22).
5. The quickly installable power tower of claim 1, wherein: the top cup joints in the middle of tower body (6) is cup jointed in tower body (2) cup joint in the middle of the upper end, just tower body (2) and middle cup joint tower body (6) are cup jointed through screw fixed connection in the top.
6. The quickly installable power tower of claim 1, wherein: the middle sleeve joint tower body (6) is sleeved and fixed in the middle of the upper end of the lower side tower body (7), and a sealing rubber pad is arranged at the joint of the middle sleeve joint tower body (6) and the lower side tower body (7).
7. The quickly mountable electric power tower of claim 1, wherein: the inside that tower body (2) were cup jointed, tower body (6) and downside tower body (7) are cup jointed in the middle of the top all is hollow state.
CN202221371398.6U 2022-06-02 2022-06-02 Electric power iron tower that can install fast Active CN218092327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221371398.6U CN218092327U (en) 2022-06-02 2022-06-02 Electric power iron tower that can install fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221371398.6U CN218092327U (en) 2022-06-02 2022-06-02 Electric power iron tower that can install fast

Publications (1)

Publication Number Publication Date
CN218092327U true CN218092327U (en) 2022-12-20

Family

ID=84461135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221371398.6U Active CN218092327U (en) 2022-06-02 2022-06-02 Electric power iron tower that can install fast

Country Status (1)

Country Link
CN (1) CN218092327U (en)

Similar Documents

Publication Publication Date Title
EP1062399B1 (en) Utility pole mounting structure
KR100322053B1 (en) Insulator for supporting the jumper wire of electric wire cable
CN218092327U (en) Electric power iron tower that can install fast
EP0157641B1 (en) Tile having nozzle
KR100890642B1 (en) The streetlight pole having a device of guiding an electric cable and method making the pole with it
KR101102402B1 (en) Waterproof streetlamp pole
KR101183198B1 (en) Auxilary telephone pole
CN107359573B (en) Pipe nut connecting fitting
CN211579549U (en) Tubular bus connecting fitting for lightning arrester
CN215485055U (en) Distribution wire pole with fixed baseplate
CN218668786U (en) A transmission of electricity power pole for electric power engineering
CN219756208U (en) Lamp mounting bracket suitable for bridge suspension cable
JP2004080923A (en) Branch connection structure and its construction method for power transmission branched steel tower
CN211830095U (en) Circular street sign indicating number
CN220325245U (en) Wire hanging fitting, composite cross arm and transmission pole
CN216794031U (en) Christmas tree lamp pole
CN210622427U (en) Firm type wire pole
CN204782190U (en) On --spot interim power consumption assembled of construction supports switching device
CN212027356U (en) Overhead line commutation steel pipe pole
CN210598355U (en) Subassembly is erect in communication guyed tower high altitude
CN210373309U (en) LED street lamp sealing and fixing assembly
CN216345110U (en) Camera stand column
CN215001280U (en) Lamp mounting rod
EP3199726B1 (en) Utility pole
CN218781217U (en) Mounting structure of lamp pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant