CN218091901U - Workbench with protection function for electric power construction - Google Patents

Workbench with protection function for electric power construction Download PDF

Info

Publication number
CN218091901U
CN218091901U CN202221980737.0U CN202221980737U CN218091901U CN 218091901 U CN218091901 U CN 218091901U CN 202221980737 U CN202221980737 U CN 202221980737U CN 218091901 U CN218091901 U CN 218091901U
Authority
CN
China
Prior art keywords
electric power
power construction
personnel
building material
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221980737.0U
Other languages
Chinese (zh)
Inventor
邹少兵
邹少志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Rongsheng Electrical Engineering Co ltd
Original Assignee
Shenzhen Rongsheng Electrical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Rongsheng Electrical Engineering Co ltd filed Critical Shenzhen Rongsheng Electrical Engineering Co ltd
Priority to CN202221980737.0U priority Critical patent/CN218091901U/en
Application granted granted Critical
Publication of CN218091901U publication Critical patent/CN218091901U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to an electric power construction workstation technical field especially relates to a workstation is used in electric power construction with safeguard function, the condition that electric power construction on the market takes place the high altitude for the workstation and drops in order to prevent building material among the prior art has been solved, can use modes such as bandage to fix building material usually, personnel need remove the bandage on the building material on the way in the use and just can use the material, this has increased the time that personnel's aerial work used undoubtedly, personnel remove the bandage through the manpower and have also increased personnel's aerial work's potential safety hazard, can't provide quick convenient help and the problem of protection for personnel. The utility model provides a workstation is used in electric power construction with safeguard function, includes elevating system and base, and elevating system installs in the top of base, and elevating system's top fixedly connected with is dull and stereotyped. The utility model discloses avoided building material from the risk that drops aloft, increased the security performance of device to building material fixed and personnel operative installations.

Description

Workbench with protection function for electric power construction
Technical Field
The utility model relates to an electric power construction workstation technical field especially relates to a workstation is used in electric power construction with safeguard function.
Background
After the construction of building main part was accomplished, the work task of next stage generally was decorated the building outer wall, the outer wall is the embodiment of a building outward appearance, the outer wall decoration is the important step in the building finishing engineering, it mainly includes works such as paint, wall tile, stone plate material of pasting, and generally need artifical the completion, and in order conveniently to decorate the higher department of outer wall, most of staff adopt over-and-under type workstation to be convenient for the staff to be under construction higher department on the workstation.
However, the electric power construction workbench is used by people, not only can the people be driven, but also the building materials to be used can be lifted and lowered together with the people, and in order to prevent the building materials from falling off from the high altitude, the electric power construction workbench in the market can be used for fixing the building materials by using a binding band and other modes, the people need to remove the binding band on the building materials in the using process to use the materials, so that the using time of the people in the air operation is increased undoubtedly, the potential safety hazard of the people in the air operation is increased by removing the binding band through the manpower, the quick and convenient help and protection cannot be provided for the people, and therefore, the electric power construction workbench with the protection function is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a workstation is used in electric power construction with safeguard function, the condition of the workstation is used in order to prevent building material emergence high altitude to drop for electric power construction in the market among the prior art has been solved, can use modes such as bandage to fix building material usually, personnel need remove the bandage on the building material on the way of using and just can use the material, this has increased the time that personnel's aerial work used undoubtedly, personnel also increased the potential safety hazard of personnel's aerial work through removing the bandage of manpower, can't provide quick convenient help and the problem of protection for personnel.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a workstation is used in electric power construction with safeguard function, includes elevating system and base, and elevating system installs in the top of base, elevating system's top fixedly connected with is dull and stereotyped, dull and stereotyped top one side fixedly connected with storage box, one side fixedly connected with mounting box of storage box, and storage box is close to one side of mounting box and has seted up logical groove, the motor is installed to one side of mounting box, the one end transmission of motor is connected with the lead screw that runs through the mounting box lateral wall, the other end of lead screw is connected with one side inner wall rotation of mounting box, the outer lane cover of lead screw is equipped with the nut cover, outer lane one side fixedly connected with of nut cover runs through the connecting block that leads to the groove, the vertical grip block that is provided with of inner chamber of storage box, one side and the adjacent connecting block one end fixed connection of grip block, and the opposite side of grip block and the inside wall sliding connection of adjacent storage box.
Preferably, the other side of the top of the flat plate is fixedly connected with a guardrail.
Preferably, universal wheels are mounted at four corners of the bottom of the base.
Preferably, one side of the top of the clamping plate is rotatably connected with another clamping plate through a hinge.
Preferably, one end of the screw rod penetrates through the side wall of the mounting box through the shaft sleeve and is in transmission connection with an output shaft of the motor, and the other end of the screw rod is rotatably connected with the inner side wall of the adjacent storage frame through a rotating shaft.
Preferably, one side of one of the clamping plates, which is far away from the connecting block, is fixedly connected with a sliding block, and the inner wall of one side of the storage frame is provided with a sliding groove matched with the sliding block.
The utility model discloses possess following beneficial effect at least:
when personnel use, personnel place building material at first and get into and deposit the frame inboard, it is rotatory to drive the lead screw through the motor, make the nut cover drive the grip block adjacent with the nut cover through the connecting block and carry out the displacement, offset the inboard building material of frame of depositing, help building material stabilizes, personnel stand in the inboard of guardrail, go up and down the operation through elevating system to the flat board, to this end, the work flow of device has been accomplished, through structural design, the mode of using the fixed building material of bandage in the traditional mode has been changed, adopt more convenient effectual fixed to building material's fixing, the risk that building material dropped from the air has been avoided, the security performance of device to building material fixed and personnel operative installations has been increased.
The utility model discloses still possess following beneficial effect:
through the setting of guardrail, the risk that has prevented carelessly to fall under the aerial operation of personnel, through the setting of universal wheel, make things convenient for personnel mobile device to each work area for a large amount of building materials that pile up can be put into to the device, increased the loading performance of device, through the setting of pivot, make the lead screw rotatory more smooth and easy, through the setting of spout and slider, make the grip block remove more rapidly, guaranteed the balance of grip block.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without any creative effort.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a sectional view of the mounting box of the present invention;
FIG. 3 is a schematic view of the structure of the clamping plate of the present invention;
fig. 4 is a schematic view of the chute structure of the present invention.
In the figure: 1. a lifting mechanism; 2. a base; 3. a universal wheel; 4. a flat plate; 5. a storage frame; 6. a guardrail; 7. mounting a box; 8. a screw rod; 9. a motor; 10. a nut sleeve; 11. a through groove; 12. a clamping plate; 13. a hinge; 14. a chute; 15. a slide block.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-4, a workbench with a protection function for electric power construction comprises an elevating mechanism 1 and a base 2, the elevating mechanism 1 is installed on the top of the base 2, a flat plate 4 is fixedly connected on the top of the elevating mechanism 1, a storage frame 5 is fixedly connected on one side of the top of the flat plate 4, a mounting box 7 is fixedly connected on one side of the storage frame 5, a through groove 11 is formed in one side of the storage frame 5 close to the mounting box 7, a motor 9 is installed on one side of the mounting box 7, one end of the motor 9 is in transmission connection with a lead screw 8 penetrating through the side wall of the mounting box 7, the other end of the lead screw 8 is in rotation connection with the inner wall of one side of the mounting box 7, a nut sleeve 10 is sleeved on the outer ring of the lead screw 8, a connecting block penetrating through the through groove 11 is fixedly connected on one side of the outer ring of the nut sleeve 10, a clamping plate 12 is vertically arranged in the inner cavity of the storage frame 5, one side of the clamping plate 12 is fixedly connected with one end of the adjacent connecting block, and the other side of the clamping plate 12 is connected with the inner side wall of the adjacent storage frame 5 in a sliding manner, specifically, when the device is used by a person, the person firstly puts the building material into the inner side of the storage frame 5, the motor 9 drives the screw rod 8 to rotate, so that the nut sleeve 10 is horizontally displaced under the limit of the connecting block and the through groove 11, and also drives the clamping plate 12 adjacent to the nut sleeve 10 to be displaced, so as to abut against the building material on the inner side of the storage frame 5, help the building material to be stabilized, the person stands on the inner side of the guardrail 6, and carries out lifting operation on the flat plate 4 through the lifting mechanism 1, thus completing the working process of the device, and through the structural design, the mode of fixing the building material by using a binding band in the traditional mode is changed, more convenient and effective fixation is adopted for the fixing of the building material, and the risk of falling of the building material from the air is avoided, the safety performance of the device for fixing the building material and using the device by personnel is improved.
The scheme has the following working processes:
when personnel use, the personnel at first place the building material and get into and deposit 5 inboards, it is rotatory to drive lead screw 8 through motor 9, make nut cover 10 carry out the displacement of horizontality under the spacing of connecting block and logical groove 11, the grip block 12 that has also driven and is adjacent with nut cover 10 carries out the displacement, offset the building material of depositing 5 inboards, help building material stabilizes, the personnel stand in the inboard of guardrail 6, the operation of going up and down to dull and stereotyped 4 through elevating system 1, to this end, the work flow of device has been accomplished.
According to the working process, the following steps are known:
through structural design, the mode of using the bandage to fix building material in the traditional mode has been changed, has adopted more convenient effectual fixed to building material's fixed, has avoided building material from the risk that drops in the air, has increased the security performance that the device is fixed and personnel use device to building material.
Further, the other side of the top of the flat plate 4 is fixedly connected with a guardrail 6, and particularly, the guardrail 6 is arranged, so that the risk that personnel fall carelessly during aerial operation is avoided.
Further, universal wheel 3 is all installed to four corners in the bottom of base 2, and is concrete, through the setting of universal wheel 3, makes things convenient for personnel mobile device to each work area.
Further, one side of the top of the clamping plate 12 is rotatably connected with another clamping plate 12 through a hinge 13, and particularly, through the arrangement of the two clamping plates 12, the device can be placed into a large number of stacked building materials, so that the loading performance of the device is improved.
Further, the one end of lead screw 8 is passed through the lateral wall that the mounting box 7 was run through to the axle sleeve and is connected with the output shaft transmission of motor 9, and the other end of lead screw 8 is connected through the pivot rotation with the adjacent inside wall of depositing frame 5, and is concrete, through the setting of pivot for lead screw 8 is rotatory more smoothly.
Further, one side fixedly connected with slider 15 that one of them grip block 12 kept away from the connecting block, deposit one side inner wall of frame 5 and offer the spout 14 with slider 15 looks adaptation, it is concrete, through the setting of spout 14 and slider 15 for grip block 12 moves more rapidly, has guaranteed grip block 12's balance.
In summary, the following steps: when personnel use, personnel place building material at first and get into storage frame 5 inboardly, it is rotatory to drive lead screw 8 through motor 9, make nut cover 10 carry out the displacement of horizontality under the spacing of connecting block and logical groove 11, the grip block 12 adjacent with nut cover 10 has also been driven and has carried out the displacement, building material to storage frame 5 inboards offsets, help building material to stabilize, personnel stand in the inboard of guardrail 6, carry out the lift operation through elevating system 1 to dull and stereotyped 4, so far, the work flow of device has been accomplished, through the setting of guardrail 6, the risk that personnel fall carelessly under the aerial work has been prevented, through the setting of universal wheel 3, make things convenient for personnel's mobile device to each work area, make things convenient for the device to put into a large amount of building material that piles up, the loading performance of device has been increased, through the setting of pivot, make 8 rotatory more smooth and easy, through the setting of spout 14 and slider 15, make grip block 12 remove more rapidly, the balance of grip block 12 has been guaranteed, through structural design, the mode of using bandage for fixing building material has been changed in traditional mode, the effectual building material of fixing has been adopted, the device has more convenient for building material to use, and has increased the safety risk of building material.
The foregoing shows and describes the basic principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the principles of the present invention may be applied to any other embodiment without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a workstation for electric power construction with safeguard function, includes elevating system (1) and base (2), and elevating system (1) is installed in the top of base (2), its characterized in that, the dull and stereotyped (4) of top fixedly connected with of elevating system (1), top one side fixedly connected with storage box (5) of dull and stereotyped (4), one side fixedly connected with mounting box (7) of storage box (5), and storage box (5) are close to one side of mounting box (7) and have seted up logical groove (11), motor (9) are installed to one side of mounting box (7), the one end transmission of motor (9) is connected with lead screw (8) that run through mounting box (7) lateral wall, the other end of lead screw (8) is connected with one side inner wall rotation of mounting box (7), the outer lane cover of lead screw (8) is equipped with nut cover (10), outer lane one side fixedly connected with of nut cover (10) runs through the connecting block that leads to logical groove (11), the vertical grip block (12) that is provided with in inner chamber of storage box (5), one side and the one end fixed connection of grip block (12) and the adjacent connecting block (12) and the opposite side of adjacent grip block (5) connection.
2. The workbench with the protection function for the electric power construction as recited in claim 1, wherein a guardrail (6) is fixedly connected to the other side of the top of the flat plate (4).
3. The workbench with the protection function for the electric power construction as recited in claim 1, wherein universal wheels (3) are mounted at four corners of the bottom of the base (2).
4. The electric power construction workbench with protection function according to claim 1, characterized in that one side of the top of the clamping plate (12) is rotatably connected with another clamping plate (12) through a hinge (13).
5. The workbench with the protection function for the electric power construction as recited in claim 1, wherein one end of the lead screw (8) is connected with the output shaft of the motor (9) through the side wall of the mounting box (7) by a shaft sleeve in a transmission manner, and the other end of the lead screw (8) is rotatably connected with the inner side wall of the adjacent storage frame (5) by a rotating shaft.
6. The workbench with the protection function for electric power construction as recited in claim 1, wherein a sliding block (15) is fixedly connected to one side of one of the clamping plates (12) far away from the connecting block, and a sliding groove (14) matched with the sliding block (15) is formed in the inner wall of one side of the storage frame (5).
CN202221980737.0U 2022-07-29 2022-07-29 Workbench with protection function for electric power construction Active CN218091901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221980737.0U CN218091901U (en) 2022-07-29 2022-07-29 Workbench with protection function for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221980737.0U CN218091901U (en) 2022-07-29 2022-07-29 Workbench with protection function for electric power construction

Publications (1)

Publication Number Publication Date
CN218091901U true CN218091901U (en) 2022-12-20

Family

ID=84484834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221980737.0U Active CN218091901U (en) 2022-07-29 2022-07-29 Workbench with protection function for electric power construction

Country Status (1)

Country Link
CN (1) CN218091901U (en)

Similar Documents

Publication Publication Date Title
CN212027021U (en) Lifting platform is assisted in stone material installation
CN113200461A (en) Hydraulic and hydroelectric engineering construction lifting equipment
CN202087343U (en) Feeding device of hydraulic three-roller machine
CN218091901U (en) Workbench with protection function for electric power construction
CN214114757U (en) Liftable support for construction engineering construction
CN213512947U (en) Solar monitoring all-in-one machine
CN211765612U (en) Handcart for building engineering who facilitates use
CN210563293U (en) Lifting type construction platform for building engineering outer wall
CN210530290U (en) Lifting frame for building decoration
CN220867037U (en) Multifunctional lifting platform for building construction
CN220815077U (en) Construction frame for house decoration
CN220976392U (en) Material lifting device for building decoration
CN212711268U (en) Feeding equipment for chemical industry that security performance is high
CN221253688U (en) Aluminum plate curtain wall mounting, supporting and lifting device
CN210480009U (en) House building material lifting device
CN217573531U (en) Trimming equipment for glass production
CN220645102U (en) Device for building outer elevation construction
CN217201891U (en) Support is used in highway engineering construction
CN219732690U (en) Construction engineering scaffold
CN219905390U (en) Transfer frame with overturning function
CN220954505U (en) Engineering building construction frame
CN220809472U (en) Dyeing raw material transfer device
CN215439468U (en) Liftable support for construction engineering construction
CN219689216U (en) Building material lifting device
CN218665111U (en) Lifting device for construction operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant