CN210530290U - Lifting frame for building decoration - Google Patents
Lifting frame for building decoration Download PDFInfo
- Publication number
- CN210530290U CN210530290U CN201921122327.0U CN201921122327U CN210530290U CN 210530290 U CN210530290 U CN 210530290U CN 201921122327 U CN201921122327 U CN 201921122327U CN 210530290 U CN210530290 U CN 210530290U
- Authority
- CN
- China
- Prior art keywords
- elevating gear
- base
- spiral
- support
- spiral elevating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005034 decoration Methods 0.000 title claims abstract description 23
- 230000003028 elevating effect Effects 0.000 claims abstract description 31
- 244000188472 Ilex paraguariensis Species 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 13
- 238000013461 design Methods 0.000 abstract description 9
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a crane for building decoration, the on-line screen storage device comprises a base, height adjusting device, lift platform, the last height adjusting device that is equipped with of lift platform, height adjusting device includes first threaded rod, first spiral elevating gear, the rotatory handle of second, second spiral elevating gear, first rotatory handle, first spiral elevating gear sets up on lift platform, second spiral elevating gear sets up on lift platform, first threaded rod is first spiral elevating gear vertical axle and is connected with the base, be equipped with the screw hole that matches with first threaded rod on the base, first spiral handle sets up and just is connected with second spiral elevating gear horizontal axle with first spiral elevating gear horizontal axle, the rotatory handle of second is connected with the vertical hub connection of second spiral elevating gear. The utility model has the advantages of reasonable design, easy operation is convenient, and the safety and stability is adjusted simply, saves time, the construction of being convenient for.
Description
Technical Field
The utility model belongs to the technical field of the construction and specifically relates to a crane for building decoration.
Background
Decoration is also called decoration or decoration, and refers to a whole set of construction scheme and design scheme which is implemented in a certain area and range and is formed according to a certain design concept and aesthetic rules, wherein the construction scheme and the design scheme are implemented by hydropower construction, walls, floors, ceilings, landscapes and the like. The decoration is embodied as small as the furniture placement and the door orientation and large as the customization of room accessories and lamps. Decoration is different from decoration, and the decoration is a method for performing art processing on living goods or living environment. Enhance the aesthetic effect, improve the function, economic value and social benefit, and take environmental protection as the design concept. Perfect decoration is closely combined with the functions of objects, is suitable for the manufacturing process, exerts the performance of material and has good artistic effect.
At decoration's in-process, the roof fitment is wasted time and energy very much, and roof fitment climbs the roof eminence with the ladder now usually, and work operation space is limited, and the fitment instrument is difficult to carry simultaneously, and it is inconvenient to take the instrument from top to bottom, draws the flower with ground very easily at the in-process of putting up moreover, and very carefully when using, just so greatly reduced the efficiency of workman's work. And the lifting device for decoration mainly depends on the bracket, and has the defects of insecurity, instability, poor flexibility and inconvenient height adjustment, so that a height-adjustable lifting device for decoration, which is safe, stable, good in flexibility and adjustable in height, is urgently needed to be designed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a crane for building decoration for solve current crane unsafe, unstable, the flexibility is poor, the inconvenient problem of altitude mixture control.
In order to solve the problems, the utility model provides a lifting frame for building decoration, which comprises a base, a height adjusting device and a lifting platform, the lifting platform is provided with the height adjusting device which comprises a first threaded rod, a first spiral lifting device, a second rotating handle, a second spiral lifting device and a first rotating handle, the first spiral lifting device is arranged on the lifting platform, the second spiral lifting device is arranged on the lifting platform, the first threaded rod is a vertical shaft of the first spiral lifting device and is connected with the base, a threaded hole matched with the first threaded rod is arranged on the base, the first spiral handle is arranged on the lifting platform, is connected with the horizontal shaft of the first spiral lifting device and is connected with the horizontal shaft of the second spiral lifting device, and the second rotary handle is connected with the vertical shaft of the second spiral lifting device.
The utility model provides a crane for building decoration still has following technical characteristic:
further, lift platform one side is equipped with the tool holder, the tool holder includes tool holder, couple, third spiral elevating gear, third rotation handle, first support, second support, the tool holder sets up first support with on the second support, first support top with second support top passes through connecting rod fixed connection, be equipped with the couple on the connecting rod.
Furthermore, the third spiral lifting device is arranged on the lifting platform, a threaded structure is arranged at the bottom of the first support, the first support is connected with a vertical shaft of the third spiral lifting device, the third rotary handle is connected with a horizontal shaft of the third spiral lifting device, and a through hole matched with the second support is formed in the lifting platform.
Further, lift platform is equipped with a plurality of vertical through-holes, the base bottom is equipped with a plurality of universal gyro wheels, be equipped with a plurality of supporting seats on the base, be equipped with a plurality of vertical screw holes on the base, the supporting seat with the screw hole phase-match, base one end is equipped with the trailer handle, be equipped with a plurality of guide bars on the base, guide bar one end is fixed on the base, the other end passes lift platform's vertical through-hole.
The utility model discloses following beneficial effect has: the utility model has the advantages of reasonable design, through the structural design who adopts hand promotion, can effective energy saving, and the instrument that adds places a set structural design, can avoid the construction worker to cause the extravagant condition of time because of the different oscilaltion platforms of instrument many times, stand and just can implement on lift platform and carry out height control to the platform, if the high position of more accurate adjustment needs, need not all to go down to subaerially at every turn and adjust, save operating time.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic structural view of a spiral lifting device according to an embodiment of the present invention;
fig. 3 is a front view of the spiral lifting device according to the embodiment of the present invention;
fig. 4 is a sectional view of the plane B-B of the front view of the spiral lifting device according to the embodiment of the present invention;
fig. 5 is a sectional view of a plane a-a of a front view of the spiral lifting device according to the embodiment of the present invention;
in the figure: 1-base, 11-universal roller, 12-support base, 13-trailer handle, 14-guide bar, 2-lifting platform, 3-height adjusting device, 31-first threaded bar, 32-first spiral lifting device, 321-spiral lifting device shell, 322-spiral lifting device turbine, 323-spiral lifting device vertical shaft, 324-spiral lifting device horizontal shaft, 33-second rotating handle, 34-second spiral lifting device, 35-first rotating handle, 4-tool holder, 41-tool box, 42-hook, 43-third spiral lifting device, 44-third rotating handle, 45-first support and 46-second support.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments. It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
Fig. 1 shows an embodiment of the lifting frame for building decoration, which comprises a base 1, a height adjusting device 3 and a lifting platform 2. The lifting platform 2 is provided with a height adjusting device 3, the height adjusting device 3 comprises a first threaded rod 31, a first spiral lifting device 32 and a second rotary handle 33, second spiral elevating gear 34, first rotatory handle 35, first spiral elevating gear 32 sets up on elevating platform 2, second spiral elevating gear 34 sets up on elevating platform 2, first threaded rod 31 is the vertical axle of first spiral elevating gear 32 and is connected with base 1, be equipped with the screw hole that matches with first threaded rod 31 on the base 1, first spiral handle 35 is connected with first spiral elevating gear 32 horizontal axis and is connected with second spiral elevating gear 34 horizontal axis, second rotatory handle 33 is connected with the vertical axle of second spiral elevating gear 34, the during operation accessible waves second rotatory handle 33 and drives first rotatory handle 35 horizontal migration, thereby it removes control elevating platform 2 vertical lift to drive first threaded rod 31.
Specifically, 4 universal rollers 14 are arranged at the bottom of the base 1 to achieve the position adjustment of the lifting frame; a plurality of supporting seats 12 are spirally connected to the base 1, and after the lifting frame reaches a designated position, the supporting seats 12 are rotated to fix the lifting frame at the designated position; the base 1 one end is equipped with trailer handle 13, conveniently removes the crane.
Specifically, lifting platform 2 top one side is equipped with tool holder 4, and tool holder 4 includes tool holder 41, couple 42, third spiral elevating gear 43, third rotation handle 44, first support 45, second support 46, and tool holder 41 sets up on first support 45 and second support 46, and connecting rod fixed connection is passed through with second support 46 top in first support 45 top, is equipped with couple 42 on the connecting rod. In work, the tool box 41 can hold tools such as construction brushing barrels or buckles, and the hook 42 can be hung on tools such as electric drills and wrenches to facilitate taking and placing of the tools.
Particularly, base 1 bottom is equipped with a plurality of universal gyro wheels 14, is equipped with a plurality of supporting seats 12 on the base 1, is equipped with a plurality of vertical screw holes on the base 1, supporting seat 12 and screw hole phase-match, and base one end is equipped with trailer handle 13.
Particularly, lift platform 2 is equipped with a plurality of vertical through-holes, and 1 bottom of base is equipped with a plurality of universal gyro wheels 11, is equipped with a plurality of supporting seats 12 on the base 1, is equipped with a plurality of vertical screw holes on the base 1, and supporting seat 12 and screw hole phase-match, base one end are equipped with trailer handle 13, are equipped with a plurality of guide bars 14 on the base 1, and 14 one end of guide bar are fixed on base 1, and the other end passes lift platform 2's vertical through-hole. When the lifting platform works, the handle of the trailer is pulled, the lifting frame is pulled to a designated position, the supporting seat 12 is rotated to enable the ground of the lifting frame to be in contact with the ground, the lifting frame 4 is fixed at the designated position, and the guide rod 14 guides the lifting platform to enable the lifting platform to only vertically move.
The working principle is as follows: firstly, a constructor pulls the lifting frame to a construction position, rotates the supporting seat 12 to enable the supporting seat to be in contact with the ground, places required construction tools into the tool box 41, shakes the first rotating handle 35 to enable the lifting platform 2 to be lifted to a proper height, then climbs onto the lifting platform 2, and shakes the first rotating handle 33; the first rotating handle 33 drives the horizontal shaft 324 of the spiral lifting device to move horizontally, so as to drive the turbine 322 of the spiral lifting device to rotate, so as to drive the vertical shaft 323 of the spiral lifting device to move vertically, so as to transfer the lifting platform 2 to the most appropriate height; the first rotary handle 33 is stopped to be shaken, then the third rotary handle 44 is shaken, and the tool rest 4 is adjusted to the optimum height for construction, and construction can be performed. This kind of promote structural design can let constructor carry out construction operation with the most suitable height, can effectively avoid elevating system height improper and cause the condition that influences construction or operation inconvenience.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.
Claims (4)
1. The utility model provides a crane for building decoration, its characterized in that, includes base (1), height adjusting device (3), lift platform (2), be equipped with on lift platform (2) height adjusting device (3), height adjusting device (3) include first threaded rod (31), first spiral elevating gear (32), the rotatory handle of second (33), second spiral elevating gear (34), first rotatory handle (35), first spiral elevating gear (32) set up on lift platform (2), second spiral elevating gear (34) set up on lift platform (2), first threaded rod (31) do first spiral elevating gear (32) vertical axle and with base (1) is connected, be equipped with on base (1) with the screw hole that first threaded rod (31) matees, first rotatory handle (35) with first spiral elevating gear (32) horizontal axle is connected and with institute's horizontal axle is connected and with The second spiral lifting device (34) is connected with a horizontal shaft, and the second rotating handle (33) is connected with a vertical shaft of the second spiral lifting device (34).
2. A crane for building decoration according to claim 1, wherein: lifting platform (2) one side is equipped with tool holder (4), tool holder (4) include tool holder (41), couple (42), third spiral elevating gear (43), third rotating handle (44), first support (45), second support (46), tool holder (41) set up first support (45) with on second support (46), first support (45) top with connecting rod fixed connection is passed through at second support (46) top, be equipped with couple (42) on the connecting rod.
3. A crane for building decoration according to claim 2, wherein: third spiral elevating gear (43) set up on lift platform (2), first support (45) bottom is equipped with the helicitic texture, first support (45) with third spiral elevating gear (43) vertical axis connects, third rotation handle (44) with third spiral elevating gear (43) horizontal axis connects, be equipped with on lift platform (2) with second support (46) assorted through-hole.
4. A crane for building decoration according to claim 3, wherein: lifting platform (2) are equipped with a plurality of vertical through-holes, base (1) bottom is equipped with a plurality of universal gyro wheels (11), be equipped with a plurality of supporting seats (12) on base (1), be equipped with a plurality of vertical screw holes on base (1), supporting seat (12) with the screw hole phase-match, base one end is equipped with trailer handle (13), be equipped with a plurality of guide bars (14) on base (1), guide bar (14) one end is fixed on base (1), the other end passes lifting platform (2)'s vertical through-hole.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921122327.0U CN210530290U (en) | 2019-07-17 | 2019-07-17 | Lifting frame for building decoration |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921122327.0U CN210530290U (en) | 2019-07-17 | 2019-07-17 | Lifting frame for building decoration |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210530290U true CN210530290U (en) | 2020-05-15 |
Family
ID=70598131
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921122327.0U Expired - Fee Related CN210530290U (en) | 2019-07-17 | 2019-07-17 | Lifting frame for building decoration |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210530290U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113089989A (en) * | 2021-03-31 | 2021-07-09 | 余旺 | Scaffold for building engineering liftable |
-
2019
- 2019-07-17 CN CN201921122327.0U patent/CN210530290U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113089989A (en) * | 2021-03-31 | 2021-07-09 | 余旺 | Scaffold for building engineering liftable |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108265974A (en) | A kind of independent supporting rack of building template | |
| CN210530290U (en) | Lifting frame for building decoration | |
| CN207973281U (en) | A kind of leather automatic rolling device | |
| CN108894721B (en) | Adjustable lifts for interior decoration | |
| CN218161496U (en) | Maintenance device for electric power construction | |
| CN215107087U (en) | A curtain wall installation device for prefabricated buildings | |
| CN212957776U (en) | Auxiliary supporting device convenient to use for construction | |
| CN214240888U (en) | Efficient stair climbing machine | |
| CN215317352U (en) | Leveling device is used in processing of portable lathe accessory | |
| CN211396488U (en) | Angle-adjustable wall plastering machine | |
| CN220684486U (en) | Intelligent folding arm crane for carrying omnibearing light articles | |
| CN220285271U (en) | Electric power construction frame | |
| CN106276496A (en) | A hand-operated multifunctional climbing ladder suitable for the elderly | |
| CN206693578U (en) | A kind of wall surface spraying work car | |
| CN207513127U (en) | A kind of finishing scaffold | |
| CN221316202U (en) | Waste material transport handcart for construction is built in room | |
| CN217323286U (en) | Electric power overhauls uses lift platform | |
| CN218403566U (en) | Lifting device for building electrical construction | |
| CN218264820U (en) | Equipment rack for construction engineering construction | |
| CN219469560U (en) | Hoisting device with protection mechanism for installing solar photovoltaic panel | |
| CN218284206U (en) | Manual welding operation platform | |
| CN219808686U (en) | Building construction platform convenient to remove | |
| CN219860443U (en) | Construction installation device for electrical engineering | |
| CN222184656U (en) | A climbing ladder for construction | |
| CN215429789U (en) | Part surface spraying turnover mechanism for industrial manufacturing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200515 |