CN220954505U - Engineering building construction frame - Google Patents

Engineering building construction frame Download PDF

Info

Publication number
CN220954505U
CN220954505U CN202322758517.4U CN202322758517U CN220954505U CN 220954505 U CN220954505 U CN 220954505U CN 202322758517 U CN202322758517 U CN 202322758517U CN 220954505 U CN220954505 U CN 220954505U
Authority
CN
China
Prior art keywords
base
supporting
standing
screw
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322758517.4U
Other languages
Chinese (zh)
Inventor
杨杰
王龙龙
冯振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Sizheng Construction Engineering Co ltd
Original Assignee
Anhui Sizheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Sizheng Construction Engineering Co ltd filed Critical Anhui Sizheng Construction Engineering Co ltd
Priority to CN202322758517.4U priority Critical patent/CN220954505U/en
Application granted granted Critical
Publication of CN220954505U publication Critical patent/CN220954505U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an engineering building construction frame. The engineering building construction frame comprises a base, the top of base is provided with the standing board, the top of standing board is provided with the rail guard, a plurality of supporting screw rods are installed in the top rotation of base, the cover is equipped with two installation pieces on the supporting screw rod, the base with be provided with two crane between the standing board, two get the thing mouth on the standing board, be provided with the thing board of putting in getting the thing mouth, the both ends of crane are provided with elevating system, be provided with feeding mechanism on the supporting screw rod. The engineering construction frame provided by the utility model has the advantages of simple operation, higher safety, more convenience in moving and transporting materials and higher bearing performance and stability.

Description

Engineering building construction frame
Technical Field
The utility model relates to the technical field of construction frames, in particular to an engineering building construction frame.
Background
The engineering building construction frame is a supporting structure used in the construction process of building engineering and is used for providing a temporary working platform and a support, has a certain height and stability, can bear workers, tools, materials and the like, can provide safe and reliable construction conditions, improves the construction efficiency and ensures the construction quality.
But in the indoor construction process of the engineering building, the multipurpose scaffold serves as a construction frame, however, the heights of a plurality of scaffolds cannot be adjusted, a plurality of scaffolds of different types are required to be used for superposition, the safety is low, the scaffold is heavy and inconvenient to carry, and in addition, when materials related to construction are carried on the construction frame, the scaffold is required to be pulled by using ropes manually, so that the scaffold is complicated and the labor is quite consumed.
Therefore, it is necessary to provide a new engineering construction frame to solve the above technical problems.
Disclosure of utility model
The technical problem solved by the utility model is to provide the engineering building construction frame which has the advantages of simple operation, higher safety, more convenient movement and material conveying, and higher bearing performance and stability.
In order to achieve the above purpose, the technical scheme of the utility model is specifically realized as follows:
The utility model provides an engineering building construction frame, which comprises: the base, the top of base is provided with the board of standing, the top of standing the board is provided with the rail guard, a plurality of supporting screw is installed in the top rotation of base, just the top slip of supporting screw passes the board of standing, the cover is equipped with two installation pieces on the supporting screw, and two one side that the installation piece kept away from each other respectively with the top of base with the bottom fixed connection of board of standing, the base with be provided with two lifting frames between the board of standing, and two the lifting frames are located a plurality of between the supporting screw, two get the thing mouth on the board of standing, be provided with in getting the thing mouth and put the thing board, just it establishes two to put thing board thread bush on the supporting screw, the both ends of lifting frame are provided with elevating system, be provided with feeding mechanism on the supporting screw.
As a further scheme of the utility model, the lifting mechanism comprises a bidirectional screw rod arranged between the base and the lifting frame, two ends of the bidirectional screw rod are respectively connected with the mounting block in a rotating way, a first rotating mechanism is arranged on the bidirectional screw rod and is connected with the top of the base, two sliding blocks are sleeved on the bidirectional screw rod in a threaded way and are respectively positioned on two sides of the first rotating mechanism, a sliding rod is arranged between the standing plate and the lifting frame, two ends of the sliding rod are respectively fixedly connected with the mounting block, two sliding blocks are sleeved on the sliding rod in a sliding way, and the top and the bottom of the lifting frame are respectively connected with the four sliding blocks.
As a further scheme of the utility model, the feeding mechanism comprises a second rotating mechanism arranged on the supporting screw, a plurality of caulking grooves are formed in the top of the standing plate, the supporting screw is slidably arranged in the caulking grooves, a limiting plate is fixedly arranged at the top end of the supporting screw, and the limiting plate is matched with the caulking grooves.
As a further scheme of the utility model, the bottom of the base is provided with a plurality of heavy universal wheels.
As a further scheme of the utility model, the first rotating mechanism and the second rotating mechanism are composed of a motor and two gears, wherein the two gears of the first rotating mechanism are meshed in parallel, and the two gears of the second rotating mechanism are meshed vertically.
As a further scheme of the utility model, the plurality of supporting screws are specifically arranged into four groups, two groups are sleeved with the object placing plates, the four supporting screws are arranged on the base in a rectangular shape, and the two second rotating mechanisms are respectively arranged on the two supporting screws in diagonal positions.
As a further scheme of the utility model, the object placing plate is Z-shaped, the two Z-shaped are oppositely arranged, wherein two included angles of the Z-shaped are right angles, the plate at the bottom of the Z-shaped is sleeved on a group of two supporting screws, and the plate at the top is matched with the object taking opening.
The utility model provides an engineering building construction frame, which has the beneficial effects that: through set up independence on the scaffold elevating system with feeding mechanism and through independent control system control, have and utilize the workman to use and control the scaffold according to the construction needs, through elevating system can with the elevating system goes up and down, and then will the board of standing carries out the lift, is favorable to the workman to construct, through feeding mechanism can, utilizes mechanical power to send the required material during the workman construction to on the board of standing, avoid the manpower pulling to produce uneven and tired, through will a plurality of universal wheels of base bottom set up into heavy universal wheel can increase the stability and the bearing capacity of scaffold, ensure that the high altitude construction safety of workman realizes through setting up two kinds of rotating mechanism and feeding mechanism's lift is controlled, is favorable to promoting scaffold installation and the simplicity and swiftly of operation, through with a plurality of the quantity of supporting screw sets up and will two second rotating mechanism carries out the diagonal line and places, is favorable to keeping on the scaffold and take the material and place when setting up the board and can also be favorable to carrying out the thing and dodge the board is put to the opposite the top when setting up the material and can be good for the top is put to the opposite the top and can be kept to the material and is put the board.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the description of the embodiments will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic view of a construction of a preferred embodiment of an engineering construction frame according to the present utility model;
FIG. 2 is a schematic diagram of the front view of the structure shown in FIG. 1;
FIG. 3 is a schematic top view of the structure of FIG. 2;
fig. 4 is a schematic view of the partial cross-sectional structure shown in fig. 3.
Reference numerals in the drawings: 1. a base; 2. a standing board; 3. a guard rail; 4. a support screw; 5. a mounting block; 6. a lifting frame; 7. a material taking port; 8. a storage plate; 9. a bidirectional screw; 10. a first rotation mechanism; 11. a slide block; 12. a slide bar; 13. a second rotation mechanism; 14. a caulking groove; 15. and a limiting plate.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
Referring to fig. 1 to 4, an engineering building construction frame provided by an embodiment of the present utility model includes: the base 1, the top of base 1 is provided with standing board 2, standing board 2's top is provided with rail guard 3, a plurality of supporting screw 4 are installed in the top rotation of base 1, and the top slip of supporting screw 4 passes standing board 2, the cover is equipped with two installation pieces 5 on the supporting screw 4, and one side that two installation pieces 5 keep away from each other is respectively with the top of base 1 and standing board 2's bottom fixed connection, be provided with two crane 6 between base 1 and the standing board 2, and two crane 6 are located between a plurality of supporting screw 4, two get thing mouth 7 have been seted up on the standing board 2, be provided with in getting thing mouth 7 and put thing board 8 thread bush and establish on two supporting screw 4, the both ends of crane 6 are provided with elevating system, be provided with feeding mechanism on the supporting screw 4, through setting up independent elevating system and feeding mechanism on the construction frame and control through independent control system, it uses and controls the construction frame to have the utilization workman according to the construction needs.
The elevating system is including setting up the bi-directional screw 9 between base 1 and crane 6, and the both ends of bi-directional screw 9 rotate with installation piece 5 respectively and be connected, be provided with first rotary mechanism 10 on the bi-directional screw 9, and first rotary mechanism 10 is connected with the top of base 1, the screw thread cover is equipped with two sliders 11 on the bi-directional screw 9, and two sliders 11 are located the both sides of first rotary mechanism 10 respectively, be provided with slide bar 12 between standing plate 2 and crane 6, the both ends of slide bar 12 respectively with installation piece 5 fixed connection, and the slip cap is equipped with two sliders 11 on the slide bar 12, the top and the bottom of crane 6 are connected with four sliders 11 respectively, can go up and down crane 6 through elevating system, and then go up and down standing plate 2, be favorable to the workman to carrying out the construction.
The feeding mechanism is including setting up the second slewing mechanism 13 on supporting screw 4, a plurality of caulking grooves 14 have been seted up at the top of standing board 2, and supporting screw 4 slidable mounting is in caulking groove 14, supporting screw 4's top fixed mounting has limiting plate 15, and limiting plate 15 and caulking groove 14 looks adaptation, can, through feeding mechanism, send ground to standing board 2 with the required material when the workman was under construction to utilize mechanical power, avoid the manpower pulling to produce uneven and tired hard.
The bottom of base 1 is provided with a plurality of heavy universal wheels, through setting up a plurality of universal wheels of base 1 bottom into heavy universal wheel can increase the stability and the bearing capacity of scaffold, ensures workman's high altitude construction safety.
The first rotating mechanism 10 and the second rotating mechanism 13 are composed of a motor and two gears of a large gear and a small gear, the two gears of the first rotating mechanism 10 are meshed in parallel, the two gears of the second rotating mechanism 13 are meshed vertically, lifting of the lifting mechanism and the feeding mechanism are controlled by arranging two rotating mechanisms of similar structures, and convenience and rapidness in installation and operation of the construction frame are improved.
The support screws 4 are specifically arranged into four, two of the support screws are arranged into one group, each group is sleeved with a storage plate 8, the four support screws 4 are arranged on the base 1 in a rectangular shape, the two second rotating mechanisms 13 are respectively arranged on the two support screws 4 in diagonal positions, and the two second rotating mechanisms 13 are arranged in groups according to the number of the support screws 4 and are placed in diagonal directions, so that the balance of workers in construction and material taking on a construction frame is maintained.
The object placing plate 8 is Z-shaped, two Z-shaped are oppositely arranged, wherein two included angles of the Z-shaped are right angles, the plate sleeve at the bottom of the Z-shaped is arranged on a group of two supporting screws 4, and the plate at the top is matched with the object taking opening 7, so that the object placing plate 8 is arranged in a Z-shaped manner and is oppositely installed, and the object placing plate is beneficial to avoiding the installation block 5 and can be sent to the standing plate 2 to the top of the object placing plate 8 to the maximum extent.
The working principle of the engineering building construction frame provided by the utility model is as follows:
When the movable type vertical lifting frame is used, firstly, the sectional protective guard 3 is arranged at the top of the standing plate 2, then the construction frame is moved to a construction area through a plurality of heavy universal wheels, locking is carried out after stopping, then according to a specific construction height, the first rotating mechanism 10 is started, a motor in the mechanism drives two gears to rotate to drive the bidirectional screw 9 to rotate, two sliding blocks 11 sleeved on the bidirectional screw 9 slide in opposite directions along with the bidirectional screw, and then the lifting frame 6 is driven to lift, the lifting frame 6 lifts and lowers simultaneously to drive the standing plate 2 to lift and lower above the base 1 so as to reach a height suitable for construction or shrink for moving and carrying, and after the standing plate 2 rises to a certain height, the standing plate is limited by the limiting plate 15, and at the moment, the limiting plate 15 is positioned in the caulking groove 14;
When the construction materials are conveyed, a worker performs construction on the standing plate 2 with the adjusted height, when the materials are required to be conveyed in the middle, the second rotating mechanism 13 can be started, two gears are driven to rotate through the rotation of a motor in the mechanism, then the supporting screw 4 connected with the second rotating mechanism 13 is driven to rotate, at the moment, the object placing plate 8 is driven to stably slide up and down on the supporting screw 4 under the support of the other supporting screw 4, the materials placed on the object placing plate 8 are conveyed into the object taking opening 7, the worker can take away the materials, when the length or width of the placed materials is larger than the object taking opening 7, the sectional protective rail 3 near the object taking opening 7 can be partially taken down, the materials are taken away from the edge of the standing plate 2, the detached protective rail 3 is recovered after the materials are taken away, in addition, if the materials placed on one side of the object placing plate 8 are overweight, proper counterweight objects can be placed on the object placing plate 8 on the other end of the object placing plate 8 so as to keep balance and safety of the whole construction frame;
The control system involved in each part of the whole construction frame is controlled by an independent controller which can be fixed on the standing board 2 or can be independently arranged and held by workers.
Compared with the related art, the engineering building construction frame provided by the utility model has the following beneficial effects:
The utility model provides an engineering building construction frame, which is controlled by arranging an independent lifting mechanism and a feeding mechanism on the construction frame and by an independent control system, wherein the lifting mechanism and the feeding mechanism are used by workers according to construction needs, the lifting mechanism can lift the lifting frame 6, and then the standing plate 2 is lifted, so that the engineering building construction frame is beneficial to the workers, materials required by the workers during construction can be conveyed to the standing plate 2 by using mechanical power through the feeding mechanism, uneven force and fatigue caused by manual pulling are avoided, the stability and bearing capacity of the construction frame can be improved by arranging a plurality of universal wheels at the bottom of the base 1 into heavy universal wheels, the high-altitude construction safety of the workers is ensured, the lifting of the lifting mechanism and the feeding mechanism is controlled by arranging two rotating mechanisms with similar structures, the simplicity and the rapidness of the installation and the operation of the construction frame are facilitated to be improved, the balance of the workers during construction and the taking of the materials on the construction frame is facilitated to be maintained by arranging a plurality of supporting screws 4 in groups, and arranging two second rotating mechanisms 13 in a diagonal line, and the standing plate 8 can be arranged on the top of the construction frame to be beneficial to be installed to the standing plate 8 relatively and can be installed on the top of the standing plate 8.
The foregoing is merely exemplary of the present application and is not intended to limit the present application. Various modifications and variations of the present application will be apparent to those skilled in the art. Any modification, equivalent replacement, improvement, etc. which come within the spirit and principles of the application are to be included in the scope of the claims of the present application.

Claims (7)

1. An engineering building scaffold, comprising:
Base (1), the top of base (1) is provided with standing board (2), the top of standing board (2) is provided with rail guard (3), a plurality of supporting screw (4) are installed in the top rotation of base (1), just the top slip of supporting screw (4) passes standing board (2), the cover is equipped with two installation pieces (5) on supporting screw (4), and two one side that installation piece (5) kept away from each other respectively with the top of base (1) with the bottom fixed connection of standing board (2), base (1) with be provided with two crane (6) between standing board (2), and two crane (6) are located a plurality of between supporting screw (4), set up two on standing board (2) and get thing mouth (7), be provided with in getting thing mouth (7) and put thing board (8) screw thread cover and establish two on supporting screw (4), crane (6) are provided with feed mechanism on two ends, screw (4) are provided with.
2. The engineering building construction frame according to claim 1, wherein the lifting mechanism comprises a bidirectional screw rod (9) arranged between the base (1) and the lifting frame (6), two ends of the bidirectional screw rod (9) are respectively and rotatably connected with the mounting block (5), a first rotating mechanism (10) is arranged on the bidirectional screw rod (9), the first rotating mechanism (10) is connected with the top of the base (1), two sliding blocks (11) are sleeved on the bidirectional screw rod (9) in a threaded manner, the two sliding blocks (11) are respectively positioned on two sides of the first rotating mechanism (10), a sliding rod (12) is arranged between the standing plate (2) and the lifting frame (6), two ends of the sliding rod (12) are respectively and fixedly connected with the mounting block (5), two sliding blocks (11) are sleeved on the sliding rod (12), and the top and the bottom of the lifting frame (6) are respectively connected with four sliding blocks (11).
3. The engineering building construction frame according to claim 2, wherein the feeding mechanism comprises a second rotating mechanism (13) arranged on the supporting screw (4), a plurality of caulking grooves (14) are formed in the top of the standing plate (2), the supporting screw (4) is slidably mounted in the caulking grooves (14), a limiting plate (15) is fixedly mounted at the top end of the supporting screw (4), and the limiting plate (15) is matched with the caulking grooves (14).
4. Engineering construction work frame according to claim 1, characterized in that the bottom of the foundation (1) is provided with a plurality of heavy universal wheels.
5. A construction work frame according to claim 3, characterized in that the first rotation mechanism (10) and the second rotation mechanism (13) are composed of one motor and two large and small gears, the two gears of the first rotation mechanism (10) are engaged in parallel, and the two gears of the second rotation mechanism (13) are engaged vertically.
6. An engineering building construction frame according to claim 3, wherein a plurality of the supporting screws (4) are specifically arranged into four, two of the supporting screws are arranged into a group, each group is sleeved with the object placing plate (8), the four supporting screws (4) are arranged on the base (1) in a rectangular shape, and the two second rotating mechanisms (13) are respectively arranged on the two supporting screws (4) in diagonal positions.
7. The engineering building construction frame according to claim 6, wherein the object placing plate (8) is in a Z shape, two Z shapes are oppositely arranged, two included angles of the Z shapes are right angles, a plate at the bottom of the Z shape is sleeved on a group of two supporting screws (4), and a plate at the top of the Z shape is matched with the object taking opening (7).
CN202322758517.4U 2023-10-16 2023-10-16 Engineering building construction frame Active CN220954505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322758517.4U CN220954505U (en) 2023-10-16 2023-10-16 Engineering building construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322758517.4U CN220954505U (en) 2023-10-16 2023-10-16 Engineering building construction frame

Publications (1)

Publication Number Publication Date
CN220954505U true CN220954505U (en) 2024-05-14

Family

ID=91024770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322758517.4U Active CN220954505U (en) 2023-10-16 2023-10-16 Engineering building construction frame

Country Status (1)

Country Link
CN (1) CN220954505U (en)

Similar Documents

Publication Publication Date Title
CN212101853U (en) Elevating gear for construction
CN212359051U (en) Electric power high altitude construction auxiliary device
CN106276695A (en) Movably lowering or hoisting gear
CN211254967U (en) Adjustable automatic general hoist of microsatellite hoisting point
CN220954505U (en) Engineering building construction frame
CN217264706U (en) Electric power installation and maintenance platform
CN214989874U (en) Giant tire dismounting pneumatic hammer supporting auxiliary device
CN213623007U (en) Mechanical arm for carrying constructional engineering
CN210857938U (en) Scaffold convenient to carry material
CN210232335U (en) Novel elevator door plant processing is fixed device
CN220012061U (en) House building lifting device
CN211813309U (en) Multi-functional lifting device of architectural equipment
CN220618266U (en) Hoisting machine with remote control function
CN215798175U (en) Reinforced block masonry wall assembly construction hoisting binding device
CN217205197U (en) Adjustable scaffold is used in building engineering construction
CN217535378U (en) Novel construction elevator
CN216072879U (en) Material feeding unit for construction
CN218758592U (en) Scaffold for construction of large storage tank bearing platform
CN108117005A (en) A kind of Portable elevator for construction material transport
CN213036802U (en) Adjustable lifting device for structural engineering
CN218779902U (en) Scaffold for multi-use architecture
CN219732690U (en) Construction engineering scaffold
CN212954033U (en) Tower crane with adjustable counter weight
CN212453545U (en) Lifting device for electric power construction
CN218205579U (en) Scaffold for constructional engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant