CN218091897U - Support is used in civil engineering construction - Google Patents

Support is used in civil engineering construction Download PDF

Info

Publication number
CN218091897U
CN218091897U CN202221693697.1U CN202221693697U CN218091897U CN 218091897 U CN218091897 U CN 218091897U CN 202221693697 U CN202221693697 U CN 202221693697U CN 218091897 U CN218091897 U CN 218091897U
Authority
CN
China
Prior art keywords
supporting seat
wall
installation piece
block
mounting panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221693697.1U
Other languages
Chinese (zh)
Inventor
黄祥云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221693697.1U priority Critical patent/CN218091897U/en
Application granted granted Critical
Publication of CN218091897U publication Critical patent/CN218091897U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the technical field of civil engineering construction, a support is used in civil engineering construction is disclosed, including first supporting seat and activity set up in first installation piece and the second installation piece of first supporting seat inner wall, first supporting seat one side activity is provided with the second supporting seat, second supporting seat both sides are run through and are seted up first standing groove and second standing groove, first installation piece activity sets up in the inner wall of first standing groove, second installation piece activity sets up in the inner wall of second standing groove, two the activity is provided with first mounting panel and second mounting panel between the first installation piece, the equal fixed mounting in first mounting panel both ends has first fixed block, the equal fixed mounting in second mounting panel both ends has the second fixed block, the second cell body of evenly distributed is seted up through first installation piece top and bottom. The support structure can be rapidly assembled and used, the bearing area of the support can be adjusted according to needs when the support structure is used, and the support structure has better stability.

Description

Support is used in civil engineering construction
Technical Field
The application relates to the technical field of civil engineering construction, more specifically relates to a support is used in civil engineering construction.
Background
A support for civil engineering construction is a device for performing auxiliary support to prevent collapse in construction engineering, and is widely used in various engineering constructions in which constructors often build supports for installing or carrying objects.
However, the conventional scaffold for civil engineering construction is generally difficult to be assembled and used quickly, difficult to adjust the bearing area of the scaffold quickly, and insufficient in stability, and needs to be further improved.
SUMMERY OF THE UTILITY MODEL
In order to solve the above problem, the present application provides a support for civil engineering construction.
The application provides a support for civil engineering construction adopts following technical scheme:
the utility model provides a support is used in civil engineering construction, including first supporting seat and activity set up in first installation piece and the second installation piece of first supporting seat inner wall, first supporting seat one side activity is provided with the second supporting seat, second supporting seat both sides are run through and are seted up first standing groove and second standing groove, first installation piece activity sets up in the inner wall of first standing groove, second installation piece activity sets up in the inner wall of second standing groove, two the activity is provided with first mounting panel and second mounting panel between the first installation piece, the equal fixed mounting in first mounting panel both ends has first fixed block, the equal fixed mounting in second mounting panel both ends has the second fixed block, first installation piece top and bottom are run through the second fixed block of seting up evenly distributed, second cell body inner wall activity is provided with first stopper.
Through the technical scheme, place first installation piece in the inner wall department of first standing groove, place the second installation piece in the inner wall department of second standing groove, remove the distance that first supporting seat and second supporting seat are relative as required, remove another set of first supporting seat and second supporting seat to same distance department, splice first mounting panel and second mounting panel together, make the second stopper get into the inner wall department of sixth cell body, select a plurality of first mounting panels and second mounting panel to splice as required, place the both ends inner wall department at two first installation pieces with the second mounting panel after the concatenation, first fixed block gets into in the first cell body this moment, the second fixed block gets into in the first cell body, thereby can realize the fast assembly of this support, pass the second cell body with first stopper, first fixed block and second installation piece are placed in the eighth cell body, can realize the stable of first fixed block and place that the second fixed block is stepped on with the same reason, thereby realize the stable placement of first mounting panel and second mounting panel, place first mounting panel and second installation piece on the top of second cell body or constructor on the installation foot.
Further, first supporting seat and second supporting seat are the same kind of structure, the equal fixed mounting in first supporting seat both ends has the connecting block, the bottom of connecting block and the bottom of first supporting seat are in with the plane, the top fixed mounting of first supporting seat has the handle.
Through above-mentioned technical scheme, through setting up the handle to conveniently mention first supporting seat and second supporting seat, make things convenient for the removal of supporting seat.
Furthermore, a third groove body which is uniformly distributed is fixedly arranged at the top end of the second mounting block, and a fourth groove body is arranged at the bottom end of the third groove body in a penetrating manner.
Through the technical scheme, the limiting effect on the first limiting block can be realized by the fourth groove body, and the stable placement of the first limiting block is facilitated.
Further, first cell body of seting up evenly distributed is run through at first installation piece both ends, the inner wall of first cell body is laminated with the outer wall of first fixed block mutually, first fixed block and second fixed block are the homogeneous structure.
Through the technical scheme, the first fixing block and the second fixing block are placed on the inner wall of the first groove body, and therefore the first mounting plate and the second mounting plate can be mounted quickly.
Furthermore, a sixth groove body is formed in the two sides of the first mounting plate in a penetrating mode, a second limiting block is fixedly mounted on the two sides of the second mounting plate, and the second limiting block is matched with the sixth groove body.
Through the technical scheme, the second limiting block is placed on the inner wall of the sixth groove body, and the first mounting plate and the second mounting plate can be quickly spliced.
Furthermore, a fifth groove body is formed in the top end and the bottom end of the first fixing block in a penetrating mode, the inner wall of the fifth groove body is attached to the outer wall of the first limiting block, a seventh groove body is formed in the top end and the bottom end of the second fixing block in a penetrating mode, and the inner wall of the seventh groove body is attached to the outer wall of the first limiting block.
Through above-mentioned technical scheme, place first stopper and can realize stable the placing of first fixed block in fifth cell body to can realize stable the placing of first mounting panel.
Further, the activity of second installation piece bottom is provided with evenly distributed's cushion, the eighth cell body has been seted up in cushion top and bottom run through, the bottom outer wall laminating of eighth cell body inner wall and first stopper.
Through the technical scheme, the first limiting block penetrates through the first mounting block, the first fixing block, the second mounting block and the first limiting block, and the first limiting block can be stably placed.
To sum up, the present application includes at least one of the following advantageous technical effects:
(1) The bracket structure can realize the rapid assembly of the bracket by arranging the first supporting seat and the second supporting seat as well as the first placing groove and the second placing groove, placing the first mounting block at the inner wall of the first placing groove and placing the second mounting block at the inner wall of the second placing groove;
(2) The first mounting plate and the second mounting plate of the support structure can be quickly spliced, a plurality of first mounting plates and second mounting plates can be selected according to required areas to be spliced and assembled, the spliced structure of the first mounting plates and the second mounting plates is placed between the two first mounting blocks, the first fixing blocks and the second fixing blocks enter the first groove bodies on the first mounting blocks, and then the first mounting plates and the second mounting plates can be stably placed;
(3) This supporting structure passes first installation piece, first fixed block, second installation piece and first stopper with first stopper through setting up first stopper, can realize fixing first fixed block on first installation piece to can realize the stable of first mounting panel and second mounting panel and place, thereby can improve the stability of this support.
Drawings
FIG. 1 is a schematic structural view of a scaffold for civil engineering construction;
fig. 2 is a schematic perspective split structure of a first mounting plate and a second mounting plate in the present application;
FIG. 3 is a schematic view of a second mounting block according to the present application;
FIG. 4 is a schematic perspective view of a spacer according to the present application;
FIG. 5 is a schematic perspective view of a first mounting block of the present application;
fig. 6 is a schematic perspective view of a first supporting seat according to the present application.
The reference numbers in the figures illustrate: 1. a first support base; 2. a second support seat; 3. a first placing groove; 4. a first mounting block; 5. a second placing groove; 6. a second mounting block; 7. connecting blocks; 8. a first mounting plate; 9. a second mounting plate; 10. a first tank body; 11. a second tank body; 12. a first fixed block; 13. a second fixed block; 14. a cushion block; 15. a third tank body; 16. a fourth tank body; 17. a first stopper; 18. a handle; 19. a fifth tank body; 20. a sixth tank body; 21. a seventh trough body; 22. a second limiting block; 23. an eighth trough body.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without making creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings, and are only for convenience of description of the present invention and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses support for civil engineering construction, set up in first installation piece 4 and the second installation piece 6 of first supporting seat 1 inner wall including first supporting seat 1 and activity, the activity of 1 one side of first supporting seat is provided with second supporting seat 2, second supporting seat 2 both sides are run through and have been seted up first standing groove 3 and second standing groove 5, the activity of first installation piece 4 sets up in the inner wall of first standing groove 3, the activity of second installation piece 6 sets up in the inner wall of second standing groove 5, the activity is provided with first mounting panel 8 and second mounting panel 9 between two first installation pieces 4, the equal fixed mounting in 8 both ends of first mounting panel has first fixed block 12, the equal fixed mounting in second mounting panel 9 both ends has second fixed block 13, the second cell body 11 that sets up evenly distributed is run through to 4 tops of first installation piece and bottom, the activity of second cell body 11 inner wall is provided with first stopper 17, the fixed third cell body 15 that sets up evenly distributed in 6 tops of second installation piece, third cell body 15 bottom runs through and has been seted up fourth cell body 16.
Referring to fig. 1, in order to facilitate the movement of the first supporting seat 1 and the second supporting seat 2, the first supporting seat 1 and the second supporting seat 2 have the same structure, the connecting blocks 7 are fixedly mounted at both ends of the first supporting seat 1, the bottom ends of the connecting blocks 7 and the bottom end of the first supporting seat 1 are located on the same plane, and the handle 18 is fixedly mounted at the top end of the first supporting seat 1. The first supporting seat 1 and the second supporting seat 2 can be conveniently moved by the handle 18.
Referring to fig. 2, in order to realize the rapid assembly of the first mounting plate 8 and the second mounting plate 9, the first mounting block 4 has first grooves 10 extending through both ends thereof, the inner wall of the first groove 10 is attached to the outer wall of the first fixing block 12, the first fixing block 12 and the second fixing block 13 are of the same structure, the first mounting plate 8 has sixth grooves 20 extending through both sides thereof, the second mounting plate 9 has second stoppers 22 fixedly mounted on both sides thereof, and the second stoppers 22 are adapted to the sixth grooves 20. Place second stopper 22 in the inner wall department of sixth cell body 20, can realize the quick concatenation equipment of first mounting panel 8 and second mounting panel 9, all place first fixed block 12 and second fixed block 13 in first cell body 10, can realize that first mounting panel 8 and second mounting panel 9 place the inside at first mounting block 4 fast.
Referring to fig. 1-4, in order to fix the first fixing block 12, a fifth groove 19 is formed through the top end and the bottom end of the first fixing block 12, the inner wall of the fifth groove 19 is attached to the outer wall of the first limiting block 17, a seventh groove 21 is formed through the top end and the bottom end of the second fixing block 13, the inner wall of the seventh groove 21 is attached to the outer wall of the first limiting block 17, evenly distributed cushion blocks 14 are movably arranged at the bottom end of the second mounting block 6, eighth grooves 23 are formed through the top end and the bottom end of the cushion blocks 14, and the inner wall of the eighth groove 23 is attached to the outer wall of the bottom end of the first limiting block 17. The first limiting block 17 penetrates through the second groove body 11, the fifth groove body 19 and the fourth groove body 16 to be placed in the purple eighth groove body 23, so that the first fixing block 12 can be fixed on the inner wall of the first groove body 10, and the second fixing block 13 can be fixed in the same way.
The embodiment of the application provides a support for civil engineering construction's implementation principle does: according to the position of required reasonable removal first supporting seat 1 and second supporting seat 2, place first installation piece 4 in the inner wall department of two first standing grooves 3, place second installation piece 5 in the inner wall department of two second standing grooves 6, according to the relative distance of required removal first supporting seat 1 and second supporting seat 2, move another set of first supporting seat 1 and second supporting seat 2 to same distance department, splice first mounting panel 8 and second mounting panel 9 together, make second stopper 22 get into the inner wall department of sixth cell body 20, select a plurality of first mounting panels 8 and second mounting panel 9 to splice as required, first mounting panel 8 and second mounting panel 9 after the concatenation are placed in the both ends inner wall department of two first installation pieces 4, first fixed block 12 gets into first cell body 10 this moment, second fixed block 13 gets into adjacent first cell body 10, thereby can realize the fast assembly of this support, pass first stopper 17 second cell body 11, first fixed block 12 and second installation piece 6 are placed in eighth processing first cell body 10, thereby can realize placing first mounting panel 8 and second mounting panel 9 and stabilize the top of the second mounting panel 9 and place the stable work of second mounting panel 8 and second mounting panel 9 and can be placed on the construction personnel, thereby can realize stable operation of this support.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. The utility model provides a support is used in civil engineering construction, include first supporting seat (1) and the activity set up in first installation piece (4) and second installation piece (6) of first supporting seat (1) inner wall, its characterized in that: first supporting seat (1) one side activity is provided with second supporting seat (2), second supporting seat (2) both sides are run through and have been seted up first standing groove (3) and second standing groove (5), first installation piece (4) activity sets up in the inner wall of first standing groove (3), second installation piece (6) activity sets up in the inner wall of second standing groove (5), two the activity is provided with first mounting panel (8) and second mounting panel (9) between first installation piece (4), the equal fixed mounting in first mounting panel (8) both ends has first fixed block (12), the equal fixed mounting in second mounting panel (9) both ends has second fixed block (13), evenly distributed's second cell body (11) have been seted up to first installation piece (4) top and bottom, second cell body (11) inner wall activity is provided with first stopper (17).
2. The scaffold for civil engineering construction according to claim 1, characterized in that: first supporting seat (1) and second supporting seat (2) are the same kind of structure, the equal fixed mounting in first supporting seat (1) both ends has connecting block (7), the bottom of connecting block (7) and the bottom of first supporting seat (1) are in with the plane, the top fixed mounting of first supporting seat (1) has handle (18).
3. The scaffold for civil engineering construction according to claim 1, characterized in that: the top end of the second mounting block (6) is fixedly provided with third groove bodies (15) which are uniformly distributed, and the bottom end of each third groove body (15) is provided with a fourth groove body (16) in a penetrating manner.
4. The scaffold for civil engineering construction according to claim 1, wherein: the utility model discloses a fixing device for the automobile seat, including first installation piece (4), first cell body (10) of seting up evenly distributed are run through at first installation piece (4) both ends, the inner wall of first cell body (10) is laminated with the outer wall of first fixed block (12) mutually, first fixed block (12) and second fixed block (13) are the same kind of structure.
5. The scaffold for civil engineering construction according to claim 1, wherein: the utility model discloses a cell body, including first mounting panel (8), first mounting panel (9), first mounting panel (8) both sides are run through and have been seted up sixth cell body (20), the equal fixed mounting in second mounting panel (9) both sides has second stopper (22), second stopper (22) and sixth cell body (20) looks adaptation.
6. The scaffold for civil engineering construction according to claim 1, characterized in that: the novel groove is characterized in that a fifth groove body (19) is formed in the top end and the bottom end of the first fixing block (12) in a penetrating mode, the inner wall of the fifth groove body (19) is attached to the outer wall of the first limiting block (17), a seventh groove body (21) is formed in the top end and the bottom end of the second fixing block (13) in a penetrating mode, and the inner wall of the seventh groove body (21) is attached to the outer wall of the first limiting block (17) in a penetrating mode.
7. The scaffold for civil engineering construction according to claim 1, wherein: the bottom end of the second mounting block (6) is movably provided with a cushion block (14) which is uniformly distributed, the top end and the bottom end of the cushion block (14) are penetrated through to form an eighth groove body (23), and the inner wall of the eighth groove body (23) is attached to the outer wall of the bottom end of the first limiting block (17).
CN202221693697.1U 2022-07-04 2022-07-04 Support is used in civil engineering construction Active CN218091897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221693697.1U CN218091897U (en) 2022-07-04 2022-07-04 Support is used in civil engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221693697.1U CN218091897U (en) 2022-07-04 2022-07-04 Support is used in civil engineering construction

Publications (1)

Publication Number Publication Date
CN218091897U true CN218091897U (en) 2022-12-20

Family

ID=84477557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221693697.1U Active CN218091897U (en) 2022-07-04 2022-07-04 Support is used in civil engineering construction

Country Status (1)

Country Link
CN (1) CN218091897U (en)

Similar Documents

Publication Publication Date Title
CN218091897U (en) Support is used in civil engineering construction
CN213969668U (en) Welding platform tool for modular building unit frame
CN212453113U (en) Assembly type connecting structure capable of improving assembly rate
CN212478519U (en) Splicing type building template for constructional engineering
CN210396374U (en) Road and bridge construction safety protection isolating device
CN210032088U (en) Easily install steel construction assembled node
CN210413084U (en) Gantry laser cutting machine tool body ground rail unit
CN111910793A (en) Anti-cracking anti-seepage building wallboard convenient to install quickly and installation method
CN216011073U (en) Outer machine construction of air conditioner is with reserving fixed bolster
CN220335917U (en) Install elevator foundation ditch reinforcing apparatus additional
CN214005981U (en) High-light steel structure
CN211286658U (en) Aluminum alloy template assembling and connecting structure
CN217105807U (en) Building structure assembled precast beam
CN215859026U (en) Lightweight aluminum formwork for building
CN219952836U (en) Optical shed is assembled to modularization
CN215977766U (en) Support seat of connecting piece
CN216766012U (en) Anti-crack and anti-permeability structure of overlong large-area concrete basement structure
CN213059958U (en) Combined supporting platform of high-rise building construction tower crane
CN214135893U (en) Assembling table for attaching frame fixed special-shaped aluminum plate
CN217998581U (en) Modularization keel structure convenient to high-speed joint
CN219382813U (en) Aircraft nose assembly fixture
CN210622011U (en) Assembled shear force wall convenient to installation
CN213448841U (en) Concatenation formula activity board house
CN214364907U (en) Template for building engineering construction
CN218204960U (en) Structure convenient to installation of precast beam component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant